Tsolum River Coal Project Exploration Drilling Program February, 1994 Coal License No’s: Land District: Latitude and Longitl N.T.S.: Owner: Operator: Date Completed: Prepared by: 8353 through 8400 and 8519 through 8535 Comox Land District Jde: 49O48’ north 12.W 2’ west 92 k/3 and 93 f/14 Canadian Occidental Petroleum Ltd. Canadian Occidental Petroleum Ltd. May, 1994 R.A. Swaren, P. Geol.

Upload: buidiep

Post on 22-Mar-2018

218 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Tsolum River Coal ProjectExploration Drilling Program

February, 1994

Coal License No’s:

Land District:Latitude and Longitl

N.T.S.:Owner:

Operator:

Date Completed:Prepared by:

8353 through 8400 and8519 through 8535Comox Land District

Jde: 49O48’ north12.W 2’ west92 k/3 and 93 f/14Canadian OccidentalPetroleum Ltd.Canadian OccidentalPetroleum Ltd.May, 1994R.A. Swaren, P. Geol.

Page 2: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

1.0 Introduction1 .I Purpose and Scope1.2 Location Extent and Access1.3 Physiography1.4 Exploration to Date1.5 Existing Infrastructure

2.0

3.0

Land Disposition 5

Geology 63.1 Geologic Setting 63.2 Stratigraphy 63.3 Drill Hole Stratigraphy 133.4 Coal Seams 153.5 Structure 16

4.0 Quality4.1 Outcrop Sample Quality4.2 Drill Core Sample Quality

5.0 Reserves

6.0 Program Costs

Table of Contents

Summary and Recommendations ii

171717

19

20

List of Appendices

Appendix A Core Photos Back of ReportAppendix B Lithologs Back of ReportAppendix C Core Logs Back of ReportAppendix D Quality Analysis Back of ReportAppendix E E-Logs Back of ReportAppendix F Maps 2 and 3 and Cross Sections Back of Report

mw/rs/misc/reportOl

Page 3: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

i i

Summarv and Recommendations

In February of 1994 Canadian Occidental drilled 6 holes for 1945 meters at a total costof about $150,000.00

The program identified two main seams, the 2 and 3 seam that may be of mineablethickness on the property.

The seams outcrop west of the property and dip northeast to depths of 600 meters onthe eastern edge of the property.

The 2 seam quality is quite good with recoveries of 85% at 1.45 S.G. with less than10% ash, less than 1% sulfur and 7300 cal/gm heating value.

Further drilling is required to determine the reserve potential and should beconcentrated to the north of the Oyster River and only 2 miles south of it.

Other exploration areas occur in the south and south-central portions of the propertywhich have not been explored to date.

mw/rslmisclreport01

Page 4: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 1

1.0 INTRODUCTION

A 6 hole drilling program totaling 6380 feet (1,945m) was carried out byCanadian Occidental Petroleum Ltd. in February/March of 1994. This programconcentrated on the section across structure following the Iron River road on thenorth side of the Oyster River near Campbell River, BC

The Iron River road was also the line used for an high resolution seismicprogram also carried out by Canadian Occidental in early 1993.

Upon completion of the program, seam numbers and formation tops wereidentified by C.G. Cathyl-Bickford of Westwater Mining Ltd. using the lithologsand Electra logs provided by Canadian Occidental.

The following report is a summary of the data obtained from the program.

1.1 PURPOSEANDSCOPE

The drilling program was carried out to determine the number, thickness,quality, depth and extent of coal seams present in the area targeted bythe high resolution seismic program of 1993.

Not enough holes were drilled to determine reserve potential nor toevaluate the potential of the whole property.

This report therefore concentrates mainly on the section drilled along theOyster River.

1.2 LOCATION EXTENT AND ACCESS

The Tsolum River Property is located in the east-central portion ofVancouver Island, British Columbia ( Figure 1). It is situated in the ComoxLand District extending from 2 kilometers north of the town of Courtenay,NWfor 50 kilometers to the Campbell River airport.

The property is approximately 7 kilometers in width and has an aerialextent of 14,345 hectares (Map No. 2).

mwlrs/misc/reportOl

Page 5: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

0 D m D 40 m t4 ? .p so lm OCCIDENTAL PETROLEUM LTD.W.TdX%

TSOLUM RIVER

Page 6: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 3

The drilling program was concentrated in the northern portion of theproperty near the town of Campbell River.

The property is accessed by the paved highway 19 running North/Southalong the eastern edge as well as a major logging road andpowerline/pipeline corridor running North/South along the western edge.Many logging roads and paved rural roads run east west connecting theabove major routes.

1.3 PHYSIOGRAPHY

the Tsolum River property is located in the low lying coastal flats ofVancouver Island. Elevations range from sea level in the east to 160meters in the west. Generally however, the relief is low and the area quiteflat except for where water courses have cut valleys down into thetopography.

The Oyster River and its tributary the Little Oyster River flow west to eastin the northern portion of the property and Slack Creek and the TsolumRiver flow southeast draining the southern two thirds of the property.

The entire area has been logged of its original forest cover and at presentsecond and third growth timber has reached a mature enough age to belogged again.

The predominant vegetation in the area is cedar, fir, hemlock, alder,maple and cottonwood.

1.4 EXPLORATION TO DATE

In 1980 Canadian Occidental carried out a preliminary geologic mappingprogram.

In late 1991 several coal outcrops were sampled along the western edgeof the property and detailed quality analysis was carried out. (locations onMap 3 and cross-sections in Appendix F)

In February 1993 a high resolution seismic program was completed alongthe Iron River road north of the Oyster River in order to target the mostprospective drill sites.

In February 1994 Canadian Occidental carried out a 6 hole explorationprogram summarized in this report.

Page 7: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 4

1.5 EXISTING INFRASTRUCTURE

The major industries in the Campbell River area are: tourism, sport andcommercial fishing, lumbering, pulp production and mining.

The major mining activities in the area at the present time are theWestmin Mine near Buttle Lake which produces copper, lead and zincand the Quinsam Mine, located 32 kilometers west of Campbell Riverwhich produces coal.

The Quinsam Mine which obtained government approval in 1984 isproducing approximately 500,000 tonnes of thermal grade coal per yearfrom surface and underground operations although the surface mineablereserves are nearing the end of their life.

The underground mine utilizes room and pillar mining methods. The coalis then trucked to the plant where it is cleaned, trucked to the governmentbarge loadout at Middle Point, barged to the limestone quarry owned byHolnam West Materials Ltd. on Texada Island, and finally loaded ontoships up to Panamax for export (Figure 3).

If any new coal mines were to start production in the area it would be wellworthwhile to consider loading onto ships directly at Middle Point north ofCampbell River.

Page 8: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 5

2.0 LAND DISPOSITION

Canadian Occidental Petroleum Ltd. holds BC coal licenses on 14,345 hectaresof crown land which comprises the Tsolum River property (Map No. 2).

An area of 10,944 hectares is held under British Columbia Coal Licenses 8353through 8400. The anniversary date is May 1, 1989.

A further area of 3,401 hectares is held under BC coal licenses 8519 through8535. The anniversary date of these licenses is January 15,1992.

Canadian Occidental does not hold rights to surface or timber.

mw/rs/misc/repoftOl

Page 9: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 6

3 . 0 GEOLOGY

3 . 1 GEOLOGIC SETT ING

The major coal deposits of Vancouver Island, including the Comox andNanaimo coal fields were deposited in the Late Cretaceous. The coalmeasures are part of the Nanaimo Group, which outcrops along thesoutheastern and northeastern edges of the Cretaceous to TertiaryGeorgia Basin. As shown on Figure 3, the Georgia Basin is elongate tothe northwest, and largely underlies the Strait of Georgia between theBritish Columbia mainland and Vancouver Island. A substantial portion ofEastern Vancouver Island and a smaller portion of the Puget Lowland ofWashington State are underlain by up to 4,000 meters of Nanaimo Groupsedimentary rocks.

The Tsolum River property is located entirely within the Comox coal fieldof the Georgia Basin. For that reason, only the Lithostratigraphy of thatBasin will be described in this report.

The stratigraphic nomenclature of the Cretaceous rocks of the Comoxcoal field as reviewed by Cathyl-Bickford and Hoffman in 1991 issummarized in Figure 2.

3 . 2 S T R A T I G R A P H Y

The Nanaimo Group consists of siliciclastic and minor carbonatesidimentary rocks of Late Cretaceous age, which were deposited in theGeorgia Basin. The contact of the Nanaimo Group with underlying pre-Cretaceous basement rocks is unconformable and in places is marked bysubstantial relief.

Four formations and numerous members may be recognized within theNanaimo Group at Tsolum River. References given with each formationand member name refer to the original publication of that stratigraphicname.

A. Comox Formation (Clapp, 1912):

The Comox Formation consists of three members within theTsolum River study area: the basal Benson, medial Cumberlandand uppermost Dunsmuir Member. Coals of economic interest areconcentrated in the Cumberland Member.

mw/rslmisc/reportOl

Page 10: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

EOCENE TO OLIGOCENE

Catface Intrusions: sills and dykes of dacite andfine-grained quartz diorite

LATE CRETACEOUS (Nanaimo Group)

Lambert FM.: shale; siltstone

Denman FM.: sandstone, minor conglomerate

Cedar District FM.: shales; siltstone

Protection Fm.: sandstone, minor conglomerate

Trent River Formation (Units 4-7)

Royston Mb.: shale and siltstone

Tsable Mb.: conglomerate and sandstone

Browns Mb.: sandstone and siltstone, locally glauconitic

Puntledge Mb.: siltstone; minor sandstone

Comox Formation (Units l-3)

Dunsmuir Mb.: sandstone; minor siltstone, shale, conglomerate and coal

Cumberland Mb.: sandstone, siltstone, shale and coal; locally

thick coal beds

Benson Mb.: conglomerate and sandstone; red siltstone and shale

JURASSIC AND OLDER

Basement Complex: chiefly basaltic volcanic rocks

Taken from Canadian Occidental report entitled “Tsolum River Preliminary

Evaluation Update January 1992”

CANADIAN OCCIDENTAL PETROLEUM LT[

TSOLUM RIVER

STRATI GRAPHIC SECTION

Page 11: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

FIGURE3 : COALFIELD LOCATION MAP

Legend

-::.;‘.,Gg:: - Coalfields

- Outline of Georgia Basin

Barge or Ship loadout

l �- Major town

British ColumbiaMainland

Page 12: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 9

A.1 Benson Member (Clapp, 1914):

The Benson Member consists mainly of pebble-, cobble- andboulder-conglomerate, principally composed of basaltic clasts withrare clasts of limestone, skarn and granodiorite. Occasionalinterbeds of green pebbly sandstone, red siltstone, and mottled,red and green shale occur in the Benson Member.

Within the Tsolum River study area, the Benson Member is up to220m thick, but it is frequently absent due to irregular basementpoleotopography. The Benson sediments were probably depositedin southwest-flowing, deeply-channelized braided streams andalluvial fans.

The Benson Member is of Turonian to early Santonian age. Itscontact with pre-Cretaceious basement is unconformable.

A.2 Cumberland Member @i&ford and Kenyon, 1988):

The Cumberland Member consists mainly of variably-carbonaceous mudstone and siltstone with thick coal beds andoccasional channel-sands. Coals in the Cumberland Memberrange in thickness from 30 cm to 180 cm.

Within the Tsolum River study area, the Cumberland Member is 50to 95 m thick; it thickens to the southwest and thins to thenortheast. Thickness of the Cumberland Member is controlledmainly by paleotopography on its basal contact, and to a lesserextent by postdepositional erosion at its upper contact. TheCumberland sediments were probably deposited in a complex ofmeandering streams, alluvial plains and coastal marshes, within alow-gradient deltaic system.

The Cumberland Member is probably of early Santonian age. Itscontact with the underlying Benson Member is gradational byinterbedding. Where the Benson Member is absent, theCumberland Member directly overlies basement.

A.3 Dunsmuir Member (Bickford and Kenyon, 1988):

The Dunsmuir Member consists mainly of fine to medium-grainedsandstone with minor thin interbeds of mudstone, siltstone andcoal. Coals within the Dunsmuir Member range in thickness from20 cm to 120 cm. The Dunsmuir coals are characteristically high insulphur.

mw/rslmischeportOl

Page 13: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 10

Within the Tsolum River study area, the Dunsmuir Member is 200to 280 metres thick; it thickens to the north towards CampbellRiver. Thickness of the Dunsmuir Member is controlled partly bythe depth of erosion at its basal contact. The Dunsuir sedimentswere deposited within a complex of at least five stacked, northwest-striking barrier-island shorelines; environments of depositioninclude tidal inlets, submerged lobate tidal deltas above wave-base, sheltered back-barrier lagoons and barrier bars or barrierislands.

The Dunsmuir Member is of late Santonian age. Its contact withthe underlying Cumberland Member is abrupt and locally erosional,with relief of up to 20 metres.

6. Trent River Formation (Clapp, 1912):

The Trent River Formation consists of five members within theTsolum River study area. From base to top they are thePuntledge, Browns, Royston, Oyster River and Willow PointMembers.

B.l Puntledge Member (Bickford and Kenyon, 1988):

The Puntledge Member consists of dark grey to black siltstone,fine-grained sandstone and minor dark grey silty mudstone,containing an abundant fauna of ammonites, pelagic bivalves,saurians and amphibians.

Within the Tsolum River study area, the Puntledge Member is 19 to30 metres thick. It thins to the north towards Campbell River, andthickens markedly to the south towards Courtenay. Thickness ofthe Puntledge Member is controlled by onlap upon thenorthwestward-thickening Dunsmuir Member. The Puntledgesediments were deposited in sheltered lagoons and bays, openingsouthwestwards into prodeltaic shelves.

The Puntledge Member is of late Santonian to early Campanianage. Its contact with the underlying Dunsmuir Member is abrupt.

B.2 Browns Member (Bickford and Kenyon, 1988):

The Browns Member consists of very fine to medium-grained, lightgrey to greenish-grey sandstone with occasional interbeds of

mw/rs/misc/reportOl

Page 14: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 11

sandy siltstone and minor thin coal beds. It contains a locally-abundant fauna of ammonites, bivalves and gastropods.

Within the Tsolum River study area, the Browns Member is 125 to165 metres thick. It thins southeastward towards Courtenay, andthickens northwards towards Campbell River. Coals are rare atOyster River, and become more frequent near Campbell River.The Browns sediments were deposited in delta-front of shelfalenvironments near Oyster River and Black Creek, passingnorthwards into a delta-top environment near Campbell River. TheBrowns paleodelta probably prograded to the south and southwest.

The Browns Member is of early Campanian age. Its contact withthe underlying Puntledge Member is gradational by inter-tonguing.

B.3 Royston Member (Bickford and Kenyon, 1988):

The Royston Member consists of dark grey to greenish-greymudstone, siltstone and minor fine-grained sandstone. It containsabundant ammonites, bivalves, echinoderms and fish.

Within the Tsolum River study area, the Royston Member is 25 to148 metres thick. It thins to the north and northeast, and thickensto the southeast. The Royston sediments were deposited on theslopes of a southward to southwestward-prograding delta, insubmarine-fan, fan-channel and interfan environments.

The Royston Member is of early Campanian age. Its basal contactwith the Browns Member is gradational by inter-tonguing.

B.4 Oyster River Member (Cathyl-Bickford, 1992):

The Oyster River Member consists of grey to greenish-grey, fine-grained sandstone and siltstone with occasional pebbly stringers.It contains abundant pelagic bivalves and ammonites in its typearea at Oyster River.

Within the Tsolum River study area, the Oyster River Member is 90to 131 metres thick. It thins to the north and southeast; it cannotbe recognized south of Black Creek, and it may be absent in thisarea. The Oyster River sediments were probably deposited in arelatively small, southwestward to southward-prograding delta. Tothe north near Campbell River, the Oyster River Member containsseveral thin coal beds, suggesting that deposition in a delta-topenvironment occurred in this area.

Page 15: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 12

The Oyster River Member is of middle to late Campanian age. Itscontact with the underlying Royston Member is gradational byinter-tonguing.

B.5 Willow Point Member (Cathyl-Bickford, 1992):

The Willow Point Member consists of dark grey mudstone andsiltstone, with occasional thin, graded beds of sandstone andmuddy limestone. It contains a sparse fauna of pelagic bivalvesand ammonites.

Within the Tsolum River study area, the Willow Point Member is 32to 45 metres thick, thickening southeastward to perhaps as muchas 165 metres near Miracle Beach. The Willow Point sedimentswere deposited as part of a submarine-fan comples, probablyincluding fanlevee and interfan environments.

The Willow Point Member is probably of Late Campanian age. Itscontact with underlying units is abrupt, and may locally beerosional.

C. Denman Formation (Williams, 1924):

The Denman Formation consists of three members in its typelocality on Denman Island. Only the basal Madigan Member hasbeen recognized in the Tsolum River study area. The overlyingGraham and Norman Point Members of the Denman Formationappear to be absent in the study area.

C.1 Madigan Member (Cathyl-Bickford, 1992):

The Madigan Member consists of medium to coarse-grainedsandstone with occasional lenticular interbeds of siltstone andpebble-conglomerate. It is apparently unifossiliferous, apart fromoccasional trace-fossils at bed tops.

Within the Tsolum River study area, the Madigan Member is 47 to50 metres thick. Lack of data precludes commentary on thicknesstrends. The Madigan sediments were probably deposited onoffshore marine shelves below wave-base, possibly incorporatingsand-wave complexes similar to those found in the modern NorthSea shelf.

mw/rs/misc/reportOl

Page 16: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 13

The Madigan Member is probably of Late Campanian age. itscontact with the underlying Willow Point Member is gradational byinter-tonguing.

D. Lambert Formation (Williams, 1924):

The Lambert Formation consists of dark grey to black mudstoneand siltstone with occasional thin interbeds of fine-grainedsandstone and orange-weathering muddy limestone. It containsoccasibnal pelagic bivalves and ammonites.

Within the Tsolum River study area, the Lambert Formation is atleast 42 metres thick. Its top contact has not yet been determinedby drilling, and indeed only subcrop to the east of the shoreline ofGeorgia Strait. The Lambert sediments were probably deposited ina distal submarine-fan or deep-basinal interfan environment.

The Lambert Formation is of Late Campanian to earlyMaastrichtian age. Its contact with the underlying DenmanFormation is abrupt.

3.3 Drill Hole Stratigraphy

The formation tops and coal seam roofs as identified by Cathyl-Bickfordare summarized in Figure 4.

As can be seen the easternmost hole No. 94-01 started in the uppermostLambert Formation and as the drilling moved west the lower formationswere encountered along with the coal measures and basement rocks ofthe Karmutsen Formation.

The number 1 seam which has been identified as Y and is near the top ofthe Dunsmuir member of the Comox formation was numbered Y due tothe fact that it is mainly carbonaceous shale and cannot be called anactual seam. The 2,3 and 4 seams are all located in the Cumberlandmember of the Comox formation.

As can be seen on Map No. 3, most of the surface outcrop of theDunsmuir and Cumberland members is located just west of the TsolumRiver property boundary.

Page 17: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Stratigraphic TopsCanadian Occidental PetroleumTsokm River CO-series boreholes, 1994

FiboR* 4.

II1 0

98

75

4

3

2

1

DriftLambert Fm.Denman Fm:

Madigan Mb.Trent River Fm:

Willow Point Mb.Oyster River Mb..

Royston Mb.Browns Mb.

Puntledge Mb.Comox Fm.:

Dunsmuir Mb.:M-markerY roof

N-markerS-marker

Cumberland Mb.:2 roof2A roof3 roof3A roof4 roof

Benson Mb.Karmutsen Fm.

CO-I .CO-2 CO-3 CO-4 CO-5 CO-6.5.0 27.0 18.8 5.5 17.4 22.5

starts . .

.47.7 : :

8 5 . 8 .112.0 starts .

fault @ 91.5243.1 - 91.5 .268.7 135.6 .

3 9 3 . 2 i79.5

DNR 300 .5 1373.8 .386.4 .

fault a387.2faulted out

. . .startsfault a75.5

starts 95.7

starts 21.6 ; 17.371.5 101.5 203.6NP NP 212.5

78.3 i19.4 i14.5388.6 starts 158.3 178.3 271.6DNR 33.5 216.3 219.4 324.0

42.5 230.8 225.0 330.749.2 N P 236.5 340.560.0 NP 249.0 345.364.6 NP NP 352.082.8 NP NP NP98.0 266.7 311.8 379.2

DNR 274.2 DNR DNR

Preliminary: subject to revision following log/seismic correlation

C.G.Cathyl-Bickford1994 May 9

Page 18: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 15

3.4 Coal Seams

The following are approximate thicknesses of the coal seam intervals ineach of the drill holes. These intervals are total coal, shale rock andpartings as obtained using lithologs, electrologs and core logs.

Hole 94-01no coal

Y seamHole 94-02

386.4 - 387.2 = 0.8 m carbonaceous shale

2 seam2A seam3 seam3A seam4 seam

Hole 94-0342.5 - 45.8 = 3.3 m49.2 -31.0 = 1.8 m60.0 - 63.3 = 3.3 m64.6 - 65.4 = 0.8 m82.8 - 84.2 = 1.4 m

Y seam2 seam

Hole 94-0424.2 - 124.7 = 0.5 m coal and shale230.8 - 231.6 = 0.8 m carbonaceous shale

Y seam2 seam2A seam3 seam3A seam4 seam

Hole 94-05149.3 - 150.0 = 0.7 m225.0 - 226.3 = 1.3 m236.5 - 237.0 = 0.6 m249.0 - 250.5 = 1.5 mnot presentnot present

Y seamHole 94-06

212.5 - 213.0 = 0.5 m carbonaceous shale2 seam 330.7 - 331.7 = 1.0 m2A seam 340.5 - 340.9 = 0.4 m3 seam 345.3 - 348.6 = 3.3 m coal and shale3A seam 352.0 - - 353.4 = 1.4 m4 seam not present

From the drill hole data it can be seen that the Y or 1 seam is mainlycarbonaceous shale in this area. On the section along the Iron River road

mw/rs/misclreport0l

Page 19: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 16

the No. 2 and No. 3 seams reach mineable thicknesses although thereare thick shale and rock partings in the thicker seam intervals.

The No. 4 seam is in most cases nonexistant or at the most very thin.

Hole No. 4 shich was the only hole drilled away from the Iron River roadwas located 4 miles south and in that particular area the seams thin andshale out.

The most prospective coal area found in this program is in the vicinity ofthe Oyster River and most likely to the north. There is of course the entirelower two thirds of the property open to exploration. As can be seen fromthe cross-sections B and C using old drill hole data there is excellentpotential for finding the full suite of seams although which may or may notbe of mineable thickness is unknown.

3.5 STRUCTURE

The 1993 the high resolution seismic program did identify many highangle east dipping faults which could also have been the result of thinningof reflecting horizons due to changes in depositional environment.

The only drill hole encountering faulting was 94-02 and this hole wasdrilled in an area defined as a fault area from the seismic information.

A major wrench fault with lateral and downward movement runs the lengthof the property along the westward edge (cross-sections and Map No. 3).

In general however the beds dip to the north east from the 1 O-l 5 dipsencountered on the western edge to 0 - 3 over most of the remainder ofthe property.

A shallow synclinal feature has been identified by surface mapping in the N.E. portionof the property.

Page 20: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 17

4 . 0 QIJALIN

The Comox coals are generally blocky and hard, and have well developed cleatsystems. The rank ranges from high volatile A bituminous to anthracite, with thehigher ranks being confined to narrow belts, 1 - 3 kilometers wide, adjacent toTertiary loccoliths. Mean random vitrinite reflectances of the Comox coals rangefrom 0.59 to 0.99% throughout most of the coal field, and are as high as 3.21%near the laccoliths.

All of the coals have high vitinite contents which is consistent with their generallybright appearance in hand specimens.

4.1 OUTCROP SAMPLE QUALITY

During November of 1991 samples were obtained from outcrops just westof the Tsolum River property.

These sample locations are shown on the geologic map No. 3 and on thecross-sections, except sample T-001 which obtained from Quinsam’sunderground mine in the No. 4 seam (Quinsam’s No. 1 seam).

From the float/sink tests done on the samples, a specific gravity of 1.4was found to be optimal in producing a coal of less than 10% ash and lessthan 1% sulfur with heating values over 7,000 callgm and yields of about70%. These were obtained from samples No. T-002 and T-003 of the No.2 seam on the Oyster River. Positive seam identification was not possibleand one sample may be from the No. 3 seam, or 2A seam.

The remaining samples T-004 to T-007 were obtained further south, tothe west of the central and southern portions of the Tsolum River propertywhere loccolithic intrusions of the Tertiary have altered and upgraded thecoal seams.

The results of the quality analysis is found in Appendix D.

4.2 DRILL CORE SAMPLE QUALITY

During the 1994 drilling program an attempt was made to obtain core ofthe coal seams for quality analysis. The coring was undertaken blindlywithout the benefit of a pilot hole and without knowing the seam numberor depth. Therefore, coring was attempted when coal was encountered inthe cuttings and thus after much of the seam had been drilled through.

Attempts were made at coring three drill holes; 94-03, 94-04 and 94.05.Of these three holes only hole 94-03 had a modicum of success and two

mw/rs/misc/reportOl

Page 21: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 18

samples numbered 940301 and 940302 were obtained. Sample 940301was from the No. 2 seam and 940302 was from the 2A seam. (Core logsAppendix C and quality in Appendix D.)

Sample 940301 is the most representative of a possible mineable seam,the No. 2 seam. From the float/sink tests done on this sample a specificgravity of 1.45 was chosen to be optimal in producing a coal of less than10% ash and 1% sulfur with a heating value over 7300 cal/gm and yieldsof 85%. The coal has an F.S.I. of 2 l/2.

Sample 940302 is poorer in quality and is more like the outcrop samplesobtained in 1993. As a matter of interest this sample has an F.S.I. of 4.

mw/rs/misc/reportOl

Page 22: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 19

5.0 RESERVES

Reserves were not calculated due to the lack of data over the eastern portions ofthe property. What is known is that there are possibly two mineable seams inthe Oyster River area. These two seams, the 2 seam and 3 seam outcrop to thewest of the property, are at approximately 200 meters depth along the westernedge of the Tsolum River property and dip to a depth up to 600 meters on theeastern edge of the property as evidenced by the formations encountered in hole94-01.

The southern portions of Tsolum River also had reserve potential as evidencedby old drill hole data incorporated into cross-sections B and C.

mw/rslmisc/report0l

Page 23: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 20

6.0 PROGRAM COSTS

The six hole drilling program completed a total of 1,945 meters of drilling for atotal cost of $151,622.39. The following is a summarized breakdown of costswhich also include G.S.T.

Drilling

mobilization/demobilization319 feet cased hole @ 22.OO/ft2475 feet open hole at 9.OO/ft1497 feet open hole at 11 .OO/ft1260 feet open hole at 13.001ft760 feet open hole at 14.OO/ftfuel72.0 rig hours at 200.00/hr6.0 standby hrs at 120.00/hrroom and boardconsumablessupervision

TaxTotal

Electroloaoinq

mobilization/demobilization $950.00standby rate @ 350.001day $4,200.00logging rate @ 675001day $4,050.00room and board at $1 OO.OO/day $1,800.00file conversion $280.00

Tax $1,393.35Total $12,673.35

Core Supplies

bags, ties, etc.core boxes

Total

$8,000.00$7,177.50

$22,275.00$16,467.00$16,380.00$10,640.00

$7,975.00$14,400.00

$720.00$5250.00$5180.00$4,333.25$8,315.84

$127,113.59

$195.07$500.00

$695.07

mw/rs/misc/report0l

Page 24: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Road Rental

Total

Qualitv Analysis

Total

Surveying

Total

Cementing

Total

Site Preparation/Reclamation

Total

All Costs Total

Page 21

$1,300.00

$2.55357

$2,803.40

$1,749.46

$2.733.95

$151.622.39

mw/rs/misc/reportOl

Page 25: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Page 22

References

Cathyl-Bickford, C.G.

1992: Geology and energy resource potential of the Tsable River and Denman island(92 F/aO, aa); in Geological Fieldwork 1991, British Columbia Minisfry of Energy,Mines and Petroleum Resources, Paper 1992-1, pages 419 to 426.

Bickford, C.G.C. and Kenyon, C.E.

1988: Coalfield geology of eastern Vancouver Island (92F); in Geological Fieldwork1987, Brifish Columbia Ministry of Energy, Mines and Petroleum Resources,Paper 1988-l) pages 441 to 450.

Clapp, C.H.

1912: Notes on the geology of the Comox and Suquash coalfields, Vancouver Island;in Summary Report for the year 1911; Geological Survey of Canada, pages 105107

1914: Geology of the Nanaimo map-area; Geological Survey of Canada, Memoir 51.

Williams, T.B.

1924: The Comox coal basin; Universify of Wisconsin, unpublished Ph.D. thesis;copies held by Cordilleran Division of Geological Survey of Canada and byWestwater Mining Ltd.

mw/rs/misc/reportOl

Page 26: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 27: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 28: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 29: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 30: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

LithologHole No. 94-01

I DnscrintionHorn IO Footage0 - 2.0 2.0 Road fill2.0 - 6.0 4.0 Gravel and sand

I

827.0 - 835.0 8.0 Sandstone, medium grained835.0 - 871.0 36.0 Sandstone, fine grained871 .O - 915.0 44.0 Shale, silty915.0 - 1400.0 485.0 Sandstone. fine arained with a siltstone strinaer

T.D. 1400 feet

Page 31: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

LithologHole No. 94-02

--I Description’ ‘-stage

I ” I - , a.” I 5.” Gravel

u0.u I- 1 l31.U ) I1.U 1 aanasront157.0 1- 1443.0 1286.0

117n

?, medium grained650.0 - 760.0 210.0 Sandstone760.0 - 907.0 147.0 Sandstonccm7 n _ elfin n ;2 n s:anrlstnnr

:, fine grainedw-v.” --.., , VI, I --.-, .‘, medium grained

?, salt and pepper_-_ __, with calcitestrace. ‘y with pyrite

IL, ~,..a 8L”V.V I I.”1285.0 - 1350.0 65.01350.0 - 1400.0 50.0

vuI IuI.yI ,2, coarse and salt and pepperSandstone, white and coarseConglomerate, greenish grey

T.D. 1400 feet

Page 32: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

LithologHole No. 94-03

Shale, carbonaceousCOAL

( Z6U.U 17.0 ShaleCOAL

1261.0 A_,. ̂ 1 1- 1270.0 19.0 Shale^_^ ^ ^ ^

Sandstone, fine grained1z/7.0 11.0 Shale

,n A 1

LIU.U I- ) LIY.U 1 l.U

279.0 ) - 1 281.0 12.01shale1 Sandstone, fine grained

Page 33: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

I I

lEirsE& 9.0nterval (feet) Description

FootageShale

292.0 2.0 Siltstone310.0 18.0 Shale325.0 15.0 White volcanic ash, soft crumbly339.0 14.0 Volcanic, green360.0 21.0 Volcanic, grey

T.D. 360 feet

Page 34: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

LithologHole No. 94-04

Sandstone, grey and coarse grained) Siltstone, grey

- Inglomerate, white and greenAe with COAt traces

625.0 - 640.0 15.0640.0 - 650.0 10.0650.0 - 661.0 11.0 1co661.0 - 663.0 2.0 ( Sh;663.0 - 691.0 28.0 ’ @;I+691.0 - 747- - - -747.0 - 756.0 19.07+F: n 7K;EL r-l I 9 n

Page 35: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

783.0 - 808.0 25.0 Siltstone, fine grained808.0 - 813.0 5.0 Shale with GQ& stringers813.0 - 885.0 72.0 Sandstone, fine grained885.0 - 895.0 10.0 Conglomerate895.0 - 920.0 25.0 Volcanics, gr-n

T.D. 920 feet

Page 36: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

LithologHole No. 94-05

I Interval Ifeet\

Page 37: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

581.0 - 710.0 29.0 1 Conglomerate71nn -. .-.- 730.0 7rIl-l 1 Shale

730.0 - 742.0 12.c742.0 - 745.0 3.0 IGL-.- ^ -^*^ -^^ I ..?I,

--.- _..-.-.-

-I 1 Siltstone’ 3&

) /Y.U srrrstone with fine grained sandstone bandsII.0 Shale

- _COALSiltstoneSandstone, fine grained

1 SiltstoneConglomerate

rained:onglomerate

and darkConglomerateSandstone, medium darkConglomerateSiltstone, shalyCOAL. shalySiltstone

, Sandstonemics, green

T.D. 1040 feet

Page 38: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

LithologHole No. 94-06

Interval (feet) DescriptionFrom 1 1 To ) Footage0 I- 135.0 135.0 Gravel and boulders

’ ’ ’740.0 - 803.0 63.0 Conglomerate803.0 - 920.0 117.0 Sandstone, fine grained with siltstone layers920.0 - 957.0 37.0 Conglomerate957.0 - 990.0 33.0 Sandstone, medium grained to conglomerate990.0 - 1005.0 15.0 Volcanics? (conglomerate ?)1005.0 - 1070.0 65.0 Conglomerate

Page 39: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

I”,“,” , - , I”OO.” ( 19.” 1 Siltstone_,.-- n 1 I”“,7 n I a ,. ’ -7AL and shale-

1 ssrstone

I I I I I IT.D. 1260 feet

Page 40: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Property Name Tsolum River Hole Number 94-03Core Logged by: Ron Swaren

Date: Feb 24, 1994

Dip at IO” Recovery 95%Core IntervalNo. (From)

MetersRun 1 Box 1 42.67Run 1 Box I 43.01

Interval0-o)

Meters43.0143.08

Sample CompositeNo. No.

Run 1 Box 1 43.08 43.43

Run 1 Box 1 43.43 43.44Run I 43.44 44.28Box1 &2

IRun I Box 2 44.28 44.36

Run 1 Box 2 44.36 44.61I I I I

Run .I Box 2 44.61 45.26 940301I I I

Run I Box 2 45.26 45.75

Run 230x3&4

45.75 48.83

Description IntervalThickness

MetersMissing coaly shale as belowCoaly shale. Small 2mm bright coal bands inhard shale. Calcite along cleating. Mediumblack to black.

0.340.07

Dark Grey to black siitstone with manycarbonaceous plant inclusions throughout.Coaly band black shiny and Calcite on jointsHard dark grey siltstone with Carbonaceousinclusions up to .Ol cm near base andCarbonaceous plant material throughout.Coal: bright hard blocky, black with Pyrite onjoints & cleats.Siltstone: dark brown at top going to dark greyblack at base.

0.35

0.010.84

0.08

0.25

Coal: somewhat shaly, blocky black - minorpyrite on cleats. 2A seam or 2 rider.Siltstone: hard medium grey, very minorCarbonaceous material

0.65

0.49

Shale - silty throughout although more at top.Thin Carbonaceous bands occur every 0.10meters and one or two are 0.01 m thick.

3.08

I I I I82% Recovery Drilled - no coreRun 3 Box 5 50.60 51.15 Missing. Coal as below 0.55Run 3 Box5 51.15 51.63 940302 Coal: Bright quite friable at top. Pyrite on cleats. 0.48

One 0.04 m parting of shale near top.

mw/rs/misc/tsolum3 Page I

Page 41: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Property Name Tsolum River

CoreNo.

Run 3 Box 5

Run 3Box5&6Run 3 Box 6Run 3 Box 6Run 3 Box 6Run 3 Box 6

Run 3 Box 6 52.73Run 3 Box 6 53.38

Interval(From)Meters51.63

51.78

52.2252.4952.5152.54

Hole Number 94-03Core Logged by: Ron Swaren

Date: Feb 24, 1994

CompositeNo.

Description

Light brown grey Bentonite with Carbonaceousshale parting at top & 0.03 m coal at base.Carbonaceous shale, black hard lots of CoalymaterialSiltstone med. grey hardcoal stringermudstone - brown to greyCoal - bright hard breaks crumbly. Has Calciticveining.Siltstone. Med. grained grey in color 0.65Fine grained med. grey sandstone 0.30

IntervalThickness

Meters0.15

0.44

0.270.020.030.19

mw/rslmisc/tsolum3 Page 2

Page 42: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Property Name Tsolum River

Beds flat lying 0 - 5” Box 1 recovery 985Core Interval IntervalNo. (From) (ToI

Meters MetersRun 1 Box 1 51.5 51.87

Run 1 Box 1 51.87 52.27

Run 1 Box 1 52.27 52.78Run 1 52.78 53.34Box1 &2Run I Box 2 53.34 53.42Run 1 Box 2 53.42 53.50

Run 1 Box 2 53.5 54.38

Hole Number 94-04Core Logged by: Ron Swaren

Date: Feb 21, 1994

Core recovery 100% Drilled - no core takenCoree ) Interval ( Interval 1 Sample Composite Descrintion

No. No.No. (From)Meters

(To)Meters

Sample CompositeNo. No.

Description IntervalThickness

Meters0.32Carbonaceous shale and minor coaly shale.

Much of sample is missingDark brownish grey fine grained sandstone withCarbonacous inclusions

0.40

Salt and pepper fine grained sandstoneMedium brown medium hard siltstone withcoaly and carbonaceous stringers.Shaly coal. Blocky fairly hard.Carbonaceous shaley moderately siltymudstone. Dark brown to blackMedium grey silty medium hard mudstone

0.510.76

0.080.08

0.88

Run 2 Box 3Run 2 Box 3

Run 2 Box 3

Run 2Box3&4

88.39 88.4688.46 88.62

88.62 89.59

89.59 90.09

Shaly coal. Brown streak, very hard - black.Carbonaceous -siltstone black, medium hard.Minor 1 mm carbonate bandsMedium to brown silty mudstone withgreycarbonaceous coaly bands of 1 mm. Core splitson bandsSiltstone, light grey very very minorcarbonaceous bands.

IYIWPI Y0.070.16

0.97

0.50

mw/rs/misc/tsolum4 Page 1

Page 43: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Property Name Tsolum River Hole Number 94-04Core Logged by: Ron Swaren

Date: Feb 21, 1994

Core Interval Interval Sample CompositeNo. (From)

Description IntervalU-0) No. No. Thickness

Meters Meters MetersRun 2 Box 4 90.09 91.45 Medium grey to brown silty mudstone. 1.36

Carbonaceous and coaly inclusions throughout.Medium hard.

Recovery 100% Drilled - no core takenRun 3 Box 5 98.15 98.17 Coaly shale. Poor coal. black hard. 0.02Run 3 98.15 101.19Box5&6

Med. grey fine grained Sst with Carbonaceous 3.04inclusions hard.

mw/rs/misc/tsolum4 Page 2

Page 44: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Property Name Tsolum River

Dip about 0” - 5O Recovery 100%Core Interval IntervalNo. (From) (To)

Meters MetersRun 1 150.27 150.31Run 1 150.31 153.35

I I

Hole Number 94-05Core Logged by: Ron Swaren

Date: Feb 24, 1994

Description IntervalThickness

-Carbonaceous shale

MetersI III-IA-.-

Dark grey to light grey silstone to fine grainedsandstone. Coal lense .02 m near base.Carbonaceous inclusions throughout

mw/rs/misc/tsolum5 Page 1

Page 45: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

ANALYTICAL RESULTS -VANCOUVER ISLAND OUTCROP SAMPLES

A/.

Page 46: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

ANALYTICAL RESULTS-VANCOUVER ISLAND OUTCROP SAMPLESDECEMBER 1992

Nl7“.

dlNE-

8.X

3.5

222L

-15.6+

23.81

5.3:

5

Ti

Page 47: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

CLIENT: CANADIAN OCCIDENTAL PETROLELM LTB.PROJECT: SEVEN SAHPLES, T-001 TO T-007, RECEIVED OECEtiBER 11, 1991LAB NO: 11946HR - J195ZHROATE: GECEHBER 13, 1991

ANALYSIS OF COAi, air dried asis

LAB NO: SAHPLE ID: AOH% HBISTX

4.40

4.90

5.80

5.30

3.30

3.30

5.10

11946HR T-001

11947HR T-002

1194EHR T-003

11949HR T-004

11950HR T-005

11951HR T-006

11952HR T-007

1.605.93

.705.57

1.106.84

.205.49

.203.49

-203.49

-305.38

ASH% VOLl F.C.%

16.60 35.40 46.4015.87 33.84 44.3616.87 35.98 47.15

15.70 34.80 48.8014.93 33.09 46.4115.81 35.05 49.14

14.30 33.60 51.0013.47 31.65 48.0414.46 33.97 51.57

18.10 9.10 72.6017.14 8.62 68.7518.14 9.12 72.75

18.60 24.20 57.0017.99 23.40 55.1218.64 24.25 57.11

14.30 25.20 60.3013.83 24.37 58.3114.33 25.25 60.42

9.50 25.40 64.80 2.91 7626 ,077 --9.02 24.10 61.50 2.76 7237 .0739.53 25.48 64.99 2.92 7649 ,077

SXcv

CALlGll Cl% H.6.1.

.56 6318

.54 6040

.57 6421

_- 48

-36 6370 ,085 --.34 6058 .OBl.36 6415 .086

.75 6700 .113 ---71 6311 .106.76 6775 .114

4.09 6776 .047 --3.87 6417 .0454.M 6790 .b47

2.90 6696 .061 --2.80 6475 ,0592.91 6709 ,061

2.96 7162 ,063 --2.86 6926 .0612.97 7176 .063

F.S.I.

l-112

2

l-112

0

5-112

9

6

BASIS

adbarbdb

adbarbdb

adbarbdb

adbarbdb

adbarbdb

adbarbdb

adbarbdb

ElIIlL iT4Ezl~~:ngINDUSTRIES Division

Page 48: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

CLIENT: CANADIAN OCCIDENTAL PETRULEUil LTD.PROJECT: SEVEN SAHPLES, T-001 TO T-007, RECEIVED DECEHBER 11, 1991LAB NO: 11947-11952DATE: DECEHBER 13, 1991

LAB NO: 11947SAUPLE ID: T-002

FLOAT-SINK ANALYSIS

S.G. FRACTIONS WTXCUMILATIVE

ASH% UT% ASH%

-1.40 72.50 5.80 72.50 5.801.40 - 1.50 7.90 15.30 80.40 6.731.50 - 1.60 2.30 22.10 82.70 7.16

+I.60 17.30 53.00 100.00 15.09

LAB NO: 11949SARPLE ID: T-004

S.G. FRACTIUN UT%

-1.40 11.801.40 - 1.50 46.501.50 - 1.60 25.80

t1.60 15.90

LAB NO: 11951SAUPLE ID: T-006

S.G. FRACTION UT%

-1.40 69.601.40 - 1.50 13.501.50 - 1.60 4.60

t1.60 12.30

CUHULATIVEASH% UT% ASH%

5.60 11.80 5.6013.60 58.30 11.9821.40 84.10 14.8734.20 109.00 17.94

CUHULATIVEASH% WTL ASH%

6.10 69.60 6.1020.30 83.10 8.4128.50 87.70 9.4657.50 100.00 15.37

LAG NU:SAHPLE ID:

11948T-003

CLMULATIVEUT% ASH% UT% ASH%

68.20 8.90 68.20 8.9019.50 22.20 87.70 11.866.50 30.90 94.20 13.175.80 40.90 100.00 14.78

LAB ND: 11950SAHPLE ID: T-005

CUHULATIVEUT% ASH% UT% ASH%

50.50 10.60 50.50 10.6026.40 19.00 76.90 13.489.80 27.30 86.70 15.05

13.30 45.20 100.00 19.06

LAB NO: 11952SAHPLE ID: T-007

CUHULATIVEUT% ASH% UT% ASH%

86.40 7.10 86.40 7.105.80 15.80 92.20 7.652.70 22.10 94.90 8.065.10 36.70 100.00 9.52

Page 49: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

CLIENT: CANADIAN OCCIDENTAL PETROLEM LTD.PROJECT: SEVEN SAHPLES, T-001 TO T-007, RECEIVED DECEHEER II, 1991LAB NO: 11946-11952DATE: DECEtiBER 17, 1991

CLEAN COAL COHPOSITE ANALYSIS

LAB ND: SAMPLE ID: HOIST% ASH% VOLT. F.C.%

:1947 T-002 1.50 5.80 35.90 56.805.89 36.45 57.66

11948 T-003 1.20 8.90 34.20 55.709.01 34.62 56.38

11949 T-004 .30 5.60 9.00 85.105.62 9.03 85.36

11950 T-005 ‘20 10.60 25.00 64.2010.62 25.05 64.33

11951 T-006 .30 6.10 26.30 67.306.12 26.38 67.50

11952 T-007 .70 7.10 25.60 66.407.15 25.98 66.87

ULTMATE ANALYSIS, air dried basis

LAB NO: SAHPLE ID: R!lX cz

11946 T-001 1.55 66.71

11947 T-002 1.4B 77.55

11948 T-003 1.22 75.85

11949 T-004 .27 86.57

11950 T-005 .16 78.19

1195: T-006 .26 83.27

11952 T-007 .68 81.50

sxCV

CALlGH F.&I. H.6.1. BASIS L YIELD

.39 7204-40 7314

.67 7185

.6G 7272

1.66 80251.66 8049

2.73 76332.74 7648

2.22 80652.23 8089

2.07 78432.08 7898

3 45 adbdb

2 45 adb.db

0 49 adbdb

B-112 71 adbdb

9+ 83 adbdb

7 75 adbdb

H% N% SX ASH% Olbd

4.77 -60 856 16.60 9.21

5.10 1.22 .39 5.84 8.42

5.06 1.35 .67 B.BE 6.97

3.44 1.24 1.66 5.64 1.18

4.50 .93 2.73 10.57 2.92

4.81 1.25 2.22 6.06 2.13

4.62 1.13 2.07 7.10 2.90

72.5

68.2

11.8

50.5

69.6

86.4

@ S.6.

1.40

1.40

L40

1.40

1.40

1.40

ElulL ii2z%ngINDUSTRIES Division

Page 50: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

C L I E N T : C A N A D I A N O C C I D E N T A L PETRULEUH LTD.PROJECT : SEVEN SAHPLES, T -001 TO T -007 , RECE IVED UECEHBER 1 1 , 1991LAB NO : 1 1946- 1 1952DATE: DECEHEER 1 7 , 1 9 9 1

MINERAL ANALYSIS OF ASH

L A B N D : SAHPLE 111 Si l l2 A1203 TiU2 Fe203 caa H40 Ha20 K20 P205 SO3

11946 T-001 40.94 3 3 . 0 1 1 . 5 9 3 . 3 0 1 6 . 2 3 .23 .08 .07 -45 4.40

11947 T-002 3 3 . 5 6 1 5 . 9 1 .71 0 . 9 2 2 3 . 6 8 5 . 3 2 -13 .17 -16 1 0 . 7 4

I1948 T-003 4 8 . 9 2 3 2 . 5 0 2 . 1 1 3 . 5 7 5 . 3 2 1 . 2 4 .16 -37 -55 4.05

11949 T-004 3 2 . 2 1 2 5 . 8 1 2 . 4 2 2 2 . 2 5 8 . 3 5 .33 .05 ‘08 .26 7 . 0 7

11950 T-005 3 7 . 7 3 2 5 . 6 6 -99 1 5 . 9 6 9.40 .36 .23 1 . 1 4 .18 9 . 1 2

11951 T -006 24.68 1 3 . 9 8 -67 2 6 . 3 1 1 6 . 6 2 1 . 8 2 .09 .60 .35 1 4 . 7 1

I1952 T-007 2 1 . 5 8 2 6 . 3 2 1 . 3 6 2 3 . 3 9 10.58‘ 4 . 2 1 .I5 .42 6 . 9 2 4.25

A S H F U S I O N TEHPERATURES (DE& Fl

UXIDIZIN6-----______________------------

L A B N O : SAtlPLE I D : IDT ST HT FT IDT

11946 T-001 2620 2645

11947 T-002 2190 2210

11948 T-003 2750 28001

11949 T-004 2410 2465

11950 T-005 2420 2485

11951 T -006 2260 2315

11952 T-007 2280 2370

,” .

2660

2230

-- - -

2470 2580

2530 2655

2330 2405

2425 2550

2790

2245

R E D U C I N G

Undet.

.30

-.70

- 1 . 2 1

-. 17

-77

-. 1 7

-.82

2570

2080

2585

2155

2200

1 9 1 5

2130

S T HT

2615 2625

2120 2125

2790 28OOC

2260 2340

2280 2320

IYDO 2000

2200 2310

FT

2760

2140

__

2430

2610

2090

2530

Page 51: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

INVOICE

CANADIAN OCCIDENTAL PETROLEUM LTD.1500, 634 - 8TH AVENUE S.W.CALGARY, ALBERTAT2P 321

Invoice No. 4695Date DECEMBER 31, 1991Your P.O. No.Our Job No. BC-197

ATTENTION: MR. R. SWAREN

GST #lo22 355 04

DECEMBER 13 & 17, 1991 REPORT LAB NOS: 11946-11952REFER TO CQ-91-008-A

1. RECEIVING 7 SAMPLES, AIR DRYING, CRUSHING TO -l/,NECESSARY REPRES. SAMPLES FOR HR ANALYSIS h FLOA'

2. RAW COAL ANALYSIS:a. 7 - ADM,PROX,S,CV,FSI @$gl.lO/SETb. 1 - HGI @$52.00/EACHc. 6 - Cl @$40.45/EACH

3. FLOAT-SINK OF 3/4 PORTION OF RAW COALa. 6 SAMPLES @ 3 SEPARATIONS/SAMPLE @$35.00/SEPAIb. S.G. PREPARATIONc. 24 - ASH @$ 9.35/EACH

4. CLEAN COAL COMPOSITE ANALYSIS:a. 6 -PROX, S,CV,FSI,HGI @$134.30/SETb. 7 - C,H,N,MAA,AFT 8$473>65/SETC. 7 - ASH FUSION PREP OF CONES @$23.10/SAMPLE

SUB-

PLUS

TOTA

PAYMENT DUE 30 DAYS FROM INVOICE DATE.INTEREST @2% (24% PER ANNUM) ON OVERDUE ACCOUNTS.

SPLITTINGINK ETC.

ION

IAL:

S.T. (7%)

JT

N/C

$637.70$52.00

$242.70

$630.00N/C

$224.40

$805.80$3,315.55

$161.70 $6,069.85

$6,069.85

$ 4 2 4 . 8 9

Page 52: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

CLIENT: CANADIAN OXIDENTAL PETROLEM LTIJ.PROJECT: TUO COAL SAHPLES, RECEIVE0 ilARCH 21, 1994

P.O.I1340L A B N O : 4 6 8 7 7 I 46878DATE: HARCH 25, 1994

ANALYSIS OF COAL, air dried basis

L A B N D : SAWLE I l l ADNX HOISTZ

46077 440301 2.40 1 .403.77

46878 940302 3.70 1 .405.05

a

ASH% VOLZ F.C.%

12.39 3 4 . 4 0 5 1 . 9 0 1 .2712.00 33.57 5b.65 lo2412.47 34.89 52.64 1.29

22.96 31.60 44.102 2 . 0 5 ‘ 3 0 . 4 3 4 2 . 4 723.23 32.65 44.73

1.591.531 . 6 1

FLOAT-SINK ANALYSIS MiPLES CRUSHED TO 3/E’ X 0)

LAB NO: 46877 SLAB Nil: 4 6 8 7 8

CUmJLhTlVE CUllULATIVE5.6 . FRACTION UT6 ASH% UT% A S H ? . UT% ASH2 UT% ASHY

-1.351 . 3 5 - 1 . 4 01 . 4 0 - 1 . 4 51 . 4 5 - 1.501 . 5 0 - 1 . 5 5I..% - 1.60

t1.60

55.84 6.83 55.a4 6.8318.50 11 .82 74.34 8.0711.13 16.14 05.47 9 . 1 2

4.16 19.59 89.63 9.613.40 22.57 93,ll 10.091 .96 24.25 95.07 lo.384.33 67.14 100.90 13.18

sx

.I

c.u6n 7x1 F S I

7017 .023 26849 ‘0227 1 1 7 ,023

6029 -044 3 f/Z5806 .0426 1 1 5 .045

H6I

42

5 1

BASIS

adharb

db

adbarb

db

40.40 5,92 40.40 5.3215.93 12.5r) 56.33 7.7813.99 1 9 . 1 1 70.32 19.03

5.20 22.62 : 75,52 10.902 . 6 2 25.58. 7 8 . 3 4 11.43 .2.77 31.13 81.11 12.10

18.09 67.16 1OO:OO 22.50

8.

Birtley Coal 8Minerals Tasting

I~D~~TIIIL~ Division

Page 53: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

. .._. _ ,__--- ..--

CLIENT: CANADIAN OXIDENTAL PETROlEUfl LTDPROJECT : CLEAN COAL COWlSITESLAB NO: 46877 h 46678UATE: KARCH 3 1 , 1 9 9 4

A N A L Y S I S O F C O A L , a i r d r i e d hasir;

tiEAN COALL A B H O : SAiiPLE I D : flAKEUP HIIISTZ ASHZ

46877 9 4 0 3 0 1 FLDAT.W.45 1 . 1 7 9 . 2 2YIELD=S3.5% 9.33

46878 9 4 0 3 0 2 F L O A T S e 1 . 4 5 1 . 1 0 la.07YIELD=70,3% IO.18

ULTIflATE A N A L Y S I S , a i r d r i e d b a s i s

L A B N O : SAWPLE I D : N20 C H

46077 CLEAN COAL 1.17 7s. I1 5 . 1 046878 CLEAH COAL 1.10 74.30 4.93

A5H F U S I O N TEfIPs (DE& FI

OXIL’IZIN6LAB ND: 1DT ST NT FT

46071 2590 2685 2125 278046878 2330 2380 2330 2480

HINERAL ANALYSIS OF ASH

__...--

, . . ,r. ‘,.

.

. .

L A B N O : SAHPLE I D SiO2 ‘AI203 TiUZ Fe203

VOLX F-C.1

34.95 54.663 5 . 3 6 5 5 . 3 1

35.44 53.393 5 . 8 3 5 3 . 9 3

N S

1 . 1 3 .701 . 2 4 1.55

46877 C.C.C. 42.22 3 1 . 7 5 1.85 6 . 8 116878 c. c. c. 3 7 . 0 5 2 1 . 3 5 1 . 2 4 1 3 . 3 3

cvS% CAL/M N.&I. f.S.1, BASIS

.70 7308 39 2 l/2 adb.11 739s d b

1 . 5 5 7245 47 4 adh1.97 7326 dh

ASH Q(BY DIfF)

9 . 2 2 7:571 0 . 0 7 6 . 8 1

REI)UCIAG1I)T ST HT Fl

2495 2575 2640 2715227b .2385 2410 2400

Call I!0 Ha20

8.56 1 . 3 8 .241 2 . 5 4 1 . 4 3 JO

K20 P2OS 303 Under.

.33 .62 5.89 -3

.49 in50 9 . 9 2 -. 85

Gull1 Birtley Coal %Minerals Testing

INDUSTRIES Division

Page 54: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

1’f: CGN, # C C . PETRO. LTD.: 94-01

STRTE: : B . C .SECTION

DGt?E : 02ii7i94

E;EPTH DX ;LLF=I_. : 4 2 6 . 7LOG BDTT?x! 425 .16Lix TOP 2 . 0 9

C&SING DRILLER : iaCGSING TY?E : STEELCGSI”G TIJTC”NESS: 0 . 1 2. . _..- _.

B IT SIZE : 1 5 . 0WIGNET IC ZXL . : 13

MG T-2 TX RlrtS f T-f : 2 . 6 5FLUID 9ENSITY : +.a0NEUTXStN XGTRIX f SMQSTDNEREMARKS_______-----------

’ OTHER SERU ICES : i90309300

TOWHSH IP

3ERi‘lkNENT DRTUPt :

ELEV. PEZM. TIRTZ;M:LDG KEGSUs?ER r??m:RRL MEASUBER FROM:

LDGGIMG WITFIELD OFFICERECDRDEB B Y :

BmEHOLE F L U I D :XM4M TEMPERRTUREMRTRIX RELTA T :FLUID BELTQ T :

GL Ei.EVRTii?NS

XBCL RFGL GL

8903CRLGARYT. LEW’C’“3^ a.*

WRTER FILE : OXIGINrALTYPE : 9030RALOG : 3

1?3 FL#T : CRNDXY 9690 TH%?ESii : Z0000

Page 55: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

0n

” --------_R_E~rrtl--------~ ---__..-I”“-”

Page 56: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 57: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 58: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 59: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

240

250

260

270

290

290

Page 60: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

-.-.~--

--_,- .___,._ _ _._..

, -..... ~ _...... +.urv ........I...-.-. v.. ..-.......... I . . . . . ...--....+.. _._.__~ ------. - ._- ~- _.

3'10

320

Page 61: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

qmCALIPER

n

380

410

420

426

Page 62: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

IT SIZE111,1;IETPC DECL.%w3! fX I;EJ-s 1 TY

au133 3ENslTYciE,TRQ, HfxrRIX

- - - - - - - - - - - - - - -

: 1 5 . a 3#REH5LE F L U I D : WIlTER F I L E : PROCESSED: Is3 RM TYPE : 9038RA: 2.;;;5 RM TEHPERATURE : L5G : 5: ~.sm MwrRfX BELTR T : 1 7 3 PLOT : CRN5XY 1: SJWBST5RaE F L U I D 33EL-m T : 6 9 6 THRESH: 308I18

- - -

a

Page 63: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 64: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

3 ts % 5;: % E! !s

j: iv I i j: :-i.i-.i-.“./.li-‘r,~~,-.i /j:::/j

I---- ..4

.-s~...i--~:-.~..~-~,$l:-.: i::j

j j / j

.j:::;j;j.-;..;..;...f-.;..

; , j : i i>-+...;-..i : j j

.:!::::::

OCZJLI-7

Page 65: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

li /

Page 66: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 67: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

230 j:i ~ I . i

!.. .... . ...... ...... ..) :....... . .... ..~ ......i..

1......; .................. 2..;i j .... . ...... .._.___.___.__. ..... s.. .... . ...... . t......... ... .:.

1---- ............. .... .... ... .1...... j.. ..... .... ... . ...... , .f ....j.. ...... ....... .

i...............

i..........

. i..I.. is .................... i _.____ I____._ i ______ 1______ 1.

...... ..... ...... .. ............. ~...................... . .i . ........ ......... .... .. . ... . . .

/. i.. fi _.__; .______! _____________ >______ i............. r.. ....;;r”.j.. .i.... . ...... :‘____ . ’ ...... i ...... 7i. .... i ______ + j...... ..... < _______,_

..... .1’-. ... t.. ... .i ...... I...... ...... r.. ... i”. ... .f.. ...... .......j.. l....... I......

(‘..... I‘. .....I..

I<. ..... . ........... . .... p.....? 1”...... ... .... ..... .I ...... I....... k..

4...

..:. ...... ..I ...... (....... I.. .... , . . ......\ I...... I...... 6.. I.,....

280I I I 1 I I I I . I

.I I I

...... . ..... .I ..... . ..... j.. .... ...... .i I I I-I I 1 I...... . ..... ...... . ..... ~..$......, . .

...... p.j.... . ..[. .... ...... ...... . ..... .I. . . . . . . . . . . .I...... I....... $. ..... I.,

.... ..] ...... i’. ......I

...... . ...... ...... . .... +.. ... ...... +..j... .+. ....I ....... . ....p.... 1.. .... . ........... t.. ... ?. . . . . . . . . . . p...)...... p.. ......... .I ...... j....... E.. ... .I.. ......... .I ...... I...... ........... . ...... (...... -). .... -). ..... ...... .

/.. .j.. .I 1........ (...... ............ f.. .... ....... (“““i”

...... . .... . .... ..). ..... p.. ......... . .... . ..... I.. ... f......y.... p.. ...p

..... .I ...... I...... 4.. .. ..! ........... .I ...... $...... ..... .{...... {. .... ..$.. ... .I . .

...... j.. .... j.. .... ....... j.. .... ...... I.. .... j.. .... ......

290

I...... (...... 4.. . . .; . .

...... i.. .... I.. .... .1....... i.. .... ...... i.. .... i.. . . . . . . .... i.. . ... j i......... .... i . .

...... . ...... {. .... .I ..... . ...... ...... ,‘......;. .... ...... . ...... f.. ... .I ..... j . .

...... . ..... . ..... .I...... I...... ...... . ....... . . . . . . . . . . . p.. ... $. .....p.. .... . .

...... i.. ... .I...... I,. ..... I......

I

...... I...... j...... ...... .... . ...... .I...... /. ..... . ..... . ...... ...... i.. .... .

p .j.. f.. .I...... ...... l’. .... I”. ...I’. ....I’,

...... j...... I’.....!. ... ..!. .... .I.. .... I’...... t..... ...... !“. ... y....y....! . .

Page 68: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

i;.:,; / i ; ;

j . . . . ..I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . :.I . . . . . . . . . ...’ . . . . . . i......;, .I ___._.,. . . . . . 1..; .“.‘.~““.,...‘.,“.......~ __..._:..._._

f ~ f . . . . ..i f i_

1:::: ,_,_,,___

“‘“..“.,.““‘) . . . . . . . I_ . . . . . . . . . . . . . . . . . . . . . . i .i I....... *.......; .

j . . . . ..j i . . . . . . .. . . ...! . . . j . . . . . c . . . . ..I . . . I....... . t . j.. ,...; . . . . . . . I......

I...... j j . . . . . .‘, . . . . . . . . . iI . { . . . . . . . . . . . ..I j j

. . . ...’ . . . . . . . . . . . . ...’ . . . . . . I(....... :_ + . . . . . . I1 I i I

b...j . . . . . . .f . . . I...... I......r . . . . . . I i....-.i ____,_,: ._,__ ..) ____.. I ._.,..,._____. . . . . . . . . . . . . t _..... i, . . i . . . . .I I ’1’ ). . . . . + .j . . . .

j. . . (....... I...... i...... . . .. . I’ . I” i . 1’ . . . . .

I

. . . . f.....{ . . . . . ..i . . . ...! . . . . .k . . . . . . . ,...... I....... I

I I. . . . f. f . . . . . . 1’ . . . . . . . ...” .. . !...... j.......; . . . . ..i . . .. . . . I . . . . . . . . . . . . . . I . . . . ...! . . . . .

I I I I. . . . . . r . . . . . . . . . . . (. “...,...... . . .. . . . . . { . . . f....., -..,...... . . . I...... + . . . 1..

I I I II I I i

I

..t.. I__ . . r . . . . . (...... 1 . .. . . . . . I...... (....... ~......,...... . . . . .. . . . . . f....j......./.. . I..... . . . .. . . $. . . . . I’ . . . . . . t . . 1’ . . . . . . . . .. . . . I...... j . . . . . . . > . . . . . . . . . .._. . . . . . .. . . ~+.....j . . ./ ,...... . . . . . . j, . . . . . Tr ’ . . . . f . . . . . . . . . .. . . .1 . . . . ..j . . . . . ..I . . . . . . . . . . . . .. . . . . .. . . . . . f.....~ . . . . . + . . . . .! . . . . ~

I 1

: j :: . . . . . . i . i . . . i.. . . . .. . . . ..I . . I . ..I.. .I . . . . . . I . . . . . . . . . .. . t...... j...... -j . . . . j . . . . . . .. . . . . . I...... 2 . . . . ...) . . . . . . . . . . . . . . .. . (- . . . 3 . . . . . ./. . . . f . . . . . . .I. . . . f.. . . . j......f... y...... . . . . . .. . . . . . j.. . . . . + . . . . . . /...... / . . . . . .. . . . . .. . . . . . T”“.~...~ . . . ~ . . . . . .. . . . . . p-j.. . . . . . i...... p . . . . .. . . . . .

! I I I. . . . . . (...... f . . . . . ./ . . . . { . . . . . . .. . . . . . . . . . . . . j. . . . . . . p.. . . . . . . . . . . . . . . . .. . . . . . i . . . . .I . . . . ..I . . . I...... . . . . . . . . . . . . I....... !. . . . . . . f . . . . . . 1. . . . . . . . . . . j . . . . . . ./ . . I...... . . . . . .. . . . t . . j. . . .). . ] . . . .. . . . . . I...... J . . . . . . . { . . . . . . I...... . . . . . .. . . I...... { . . . . . . j. j . . . . . . . . . . . .. . . i” . . I‘ . . . . . . 1 . . . y.. . . . . . .. . . . . . . . . . . . .._..... (...... . . . . . . . . . . . .

I I 1 I. . . . . . I . . j . . . . . . . j . . . . . 4 . . . I...... I . . . 4 . . . . ...! . . . .++ ..I . . . . . . j . . ./. . . . . . . I....

iI

. . . . j.. . . . . tit.. . . . . i . . . . ..J . . . . . . k \...... . . . . . i . J .._ t . I... -3 I. . . . ..I . . . ...! . . . . . . I..... d . . . . . .. . . . . I......! . . . ...! . . . . . L.3 “““~--\ ..f. . . . . .~_.._.. I ._.....; .__._. J . .._.. I . . . i _,_.._ j . . . . . . . . . . .._.. . .._.. i,,::~:::::-::::::iiil-T” “-‘rr~-~i”““‘~

. ..‘....“... ~~.ii’ . ‘;‘..... i . / __._..(...._. f. . . ‘; .._ I - ___. f. I’ f...... I.. . . f . . j.. . . . p...;

I ’ i ..____ i.. . . .._._ I...... .t .._.. I...... I.. . . I......; . . . . . . . . . . j . . . . .,.... I...... j . . . i..... .$. . . . . j . . . . . . I......; . . . + . . . . . ;.... . . . ..I . . . . . . I’...... 4 . . . . . j.. . . . . f.....( ,...,. $ . . . . } _.___._......! .‘......_: ,$..._ _____ ~ I......: . . . . ...! . . . . . . t... . . . . . . . . . . . . . < . . . . . + . . . I.

Page 69: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

.+-&&&.: : : :

Page 70: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

C5MPANY : CAN...OCC. PETRO. LTD.WELL : 94-02MCATION/FiELB : Ts5uJM Rim32CSUNIY : UWPBELLRIUERSTATE : B.C.SECTION

nATE : 02/20/94----. ------IUzxIfi UYI3.IJr.K i 426.7LOG ROTTOM 426.20LOG Top 2.51

CASING BRILLEZ : 2pCASING iYPE : SiEELCASING THI tzzzNEs; 0.12

BiT SIZE : 15.8MAGNETIC DECL. :l8ZATRXX ZENSITY : 2.65r, l.Tr. zw2uc-TT"1 a"IY YYmY.. * * : 1.seNEUTPnN PIATRIX :SANDST5NEREMARKSOPEN H5x.E

1 I

TOLINSHIP RANGE :

PERPlANENT DATUM :n BLEVATTBNSI_..-v. PEE. mxTMi j;B iLOG HEASUPB FROM: GL DFDRL MEASURED FROM: GL GL

LOGGING UNIT : 8903FIELy>UFFICE : CALGARY _REamnED BY : T. LEUYCRYJ

BOREHOLE FLUID : UATER FILE : ORIGINALRM : TYPE : 9830AARH TEMPERATURE : LOG : aMATRIX DELTA T : 173 PLOT : CANOXY B 'FLUID DELTA T : 690 THRESH: 3008%

ALL SERUfCES PROVIDED SUBJECT TO STANDARD TERMS AND CONDITIONS

Page 71: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

C A L I P E RCl!

OR”‘WAT>2 0

0

10

Page 72: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

20

Page 73: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

90

100

110

120

130

140

150

Page 74: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

160

--...-‘~;.-~i~-.....--.-~~.~~

Page 75: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

230

240

-2 ‘. i I --.-..-.-!-_A__---L __..._-, 31 1 c,I i>i :I //. : :,: : --..~-_-.-.---.-__.-“.“.l’~y--‘y.. -... _^_I ..--...___.... ~ _..__.._.__.._l-.__.ll._.._..._l~-. +...

Page 76: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

. j /i

--

Page 77: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

426WCC

DEHSITY0 mm-n-------------------------~~s~~~~--------------------!

Page 78: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

ca

69% THRESH: 3%%%%

Page 79: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

wCAL!?E______-----------

‘F!

r, . . . . {..._._ j .._._ _I ______ f .__...; ______ j ______ I . . . . . / . . J . . 1(

rf . . . . . . I\ . -; . . . . i . . . . . . . . . . . + . . * . . . ;- . . j......; . . {u1--j :::::i::::::l::::::t:::::i::::~:::::~:::::~::::::~::::::1 1 1 1......

c( .... .,......, ....... I.... I.....!.I fl i .... ./. ..... i.. .......... . ....i ...... k ...... .. ..- ......+i.. ....fi...* ..

~;. ..... ..... ..... .I ...... f.....‘.... ii.. .... f.. . ..i.. .....

f f-J.. .I.. .j.. .I.. .I 1.. .I.. 1...... .... ... .... ..... ... ...... ... ....fj.. ... .I .... .I.. .... j.. ..... ... .. fi.. .... I.. ....p J.. ... .II-. ......i

t 1.... ‘_i ...... .... ........t.. ... i_. ..... ....

Page 80: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 81: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 82: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

...... j.. I....... .... i.. .... i.. .... ...... i.. .... i.. ..... i.. ....i ..! ..!{I ...... i.. j4..... .. ..... i.. .... i.. .. ....... I.. .... i.. ....i.. .... i__.___ i______./. ____ ./ _____ ./ ._____ f....... ....... . f I....... ....... ..... ...... ...... .i.. ..... _i.. .. ... ...ioo

/ ! j .. ..!.II / , t It.. ~../..... -i

...... i.. .... I i....... ...... I ...... I.. ... I...... I...... .I ... ...Ll...... i _____.!. i........ ....

f ]I..i .... ..... .I ...... I...... i...... ii i i i 1...... I”. ... I’. ..... I.. .................... +.....+.....+..... 1.. .............. .j...... ....... .I.. ... .i ................. j.. .... .). .... .j.. .. .I...... .......... .I ...... j....... 5.. .. ..). ................ .I ...... . ..... i...... I.. .... . ........... y.. ... r.. ... .I.. .... f... ... ............ t.. ... t.. .. . ..... .I ...... .....

no I...... . ...... . ...... !i.. .... ...... ........... { ...... i _.__._.). ..... [. ................ I.. .... I.. I....... .... I.. .... ........... I.. ... .I...... !r.. .. ./. ..... ........... { ...... (.......). ..... i.. I............... . ...... I.. ..... I.. .... I.. ................. ..!.i.........!. .....+..1.......). ........ . .......... ....... f.. . f.. I ........... .. ..... ....220

.I ...... ........... i.. .... i.. i....... ... .I ................. . I......... ... .I ...... I.. ...................... i........ ..!.j........... j........../.. .. +. .I ........... ................I ..... ....y.\...... ........... i’. .... I’. ..... (.. .... . ................. i.. .... {. .... ..). .... .I ..................I ...... ...... I...... I...... ........... .... .... .....

230I’. I“. T______,______I I I I...... i.. ....

i--!i’....... I...... t.. ... .I .....

......?.....!......!......I ........... i ...... f .......> ...... i ............. i ...... i.. j....... ......... . ....... 1 ...... I! : I....... ...... ............ 1 1 1 i t: ::::::1::::::j::::::i:::-:l:::;‘:-:::!::::::~:::::~~:::::~:......................- ......i ...... . ...... p.. ... , ............... j.. .... . ...... ! ...... f ...... <. ..... l..... .I.. .... i .... ..!. .....!. ..... . ...... .i...~. . ...... . .... ..!. ...... > ...... i.. . . 11....... !-. ... < . ..-.-a.. .... I.

Page 83: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

: ‘. j’ ‘8’ . . ‘. !ti .__, :... ___,._.__., ?................. 7.: . . . . . . . . ..________......... j /

................................. ............................. ..........a../

i’: ...... :‘_____ ....... . ...... . ................................................................. . ..I...... , ...... .

I............................. . .... _i ______I ........................

....................................... .............j.. ......................... .:<z.. .. j.. .... . ........ _.____: ...... :...J .I ...... f ...... (.______~ ...... :_

i.. . ............................ ??r . ..? ...................................f.~............;. ............ .:.

;. ............ . .................. .. . ............................ :.i .! ..................... i.. ....................................... .:.,/

..i !i i.

..................................i ______.______,____.__ i ...... :...~:~......~.....~~~~~.~~~~~~~~~!. ...... .... . s........ ....;.,

f::::::;::::::..::::::i::::::j::::::i::::::!:::::~:::::::::::::~:::::i::::::::: : :j::::::j:::::~;::::~::::::t

1.. .... . ...... . ......j ...... ........ j.. .... i ...... f.. ... ........................ . ...... . ...... .

+. &.j.. ........... .._..__. ;../. ..!.

. ....... f .______;....... ...(......i.. .......i..

f.............. j.. ..... ] 2

_j ______; ______ j ______ j _______ +...... ...... f_.____ i f....... .......

.... . .............. . ...... i.. .... j.. .... i.. .... .i ______;.

............. ...... . ..................... ...... i ...... j...... . .....I...... i.. ... i..

+.... _1.......!. ..... j.. j.. . f

.%:. ... . ‘.f. .I.... .... ..... ...... 3: .... /. ..... ...... j _.____; ....... ...... ...... ....... ...... t ..

l---l.~.....(__. ....i.. ... :;. ..... /. ..... . ..... :. ...... ..... it..

i f...b .g i j j.. . ...... f.. .. j.. .... ‘i.. ....!...I ..I ...... t.. ... j...... +. .. .;.

Page 84: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 85: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

------_--__________________________MC-GELT

louil GSECM

Page 86: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

---

COHPCSNY : CCIN. OCC. PETRO. LTD.UELL : 94-03LDC~TiOWFiELD : TSOLUH RIVERCOUNTY : CRMP3ELL RIVERSTKCE : B . C .SECT IctN

DATE : 02/25/94ISEPTH DRILLER : 109LOG SOTTOM 108.59LDG TLiP I.00

CRSING DRILLZX : 18.2CRS XNG TYPE : STEizLCRSXHG THXCRNESS: 0.18

BIT SIZE : x 5 . 5

MAGNETIC DECL. : 18HCITRIX DENSITY : 2.65FLUID DENSITY : 1 . 0 0

NEUTRUM K?TRIX : SaNDSTONEREHRRKS :OPEN HOLE

TOWNSHIP

PERMANENT llEIITUH :ELEV. PERH. DRTUM:LOG HEClSURED FROM:DRL HERSUREll FROM:

LOGGING UNITFIELD OFFICEREcaRnEn BY

3aREHaLE FLUInRpI.RM TEMPWISTUREMfiTRIX DEL?% TFLUX! IIELTG T

..

:

RfiNGE : .I..

GL ELEURTIONS IXB :

GL DF :GL GL

8903CfiLGFIRYT. LEUYCRYJ

;-

WCITER

173699

Page 87: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

l-l’

Page 88: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

/_.__..... ---.,.--,-~...-r-:--&-:

..-.. I ..-..~. ;.- _...,_.

DENS I TY0 onn-n I!--------------------------~~~~~~~-------------------------

Page 89: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

: CCsN. 5CC. PETRO. LT3.: 94-03

IONiF IZLD : TSOLUM R I V E R: CaMP3ELL R I V E R: B . C .

-1SECTIiX’d T5WdSH IP

I

RClNGE :i

i‘DFITE

J: 02/25/s% P3tzzNaENT BxiUM : GL ELZVRT IONS

: $x3zPTH SRILLER : 3.89 ELEXJ. PERM. 3aTUM: la3 :’108.50 L O G NESSU- F R O M : GL IkF

0 -00 ,3Z?L -MERSUREB FR5H : GL GL

CRSING 3RILLF3 :cas iNG TYPE

TH SCXNESS :

X8.8.2 LOGG IKG r%4 ITSTEEL FEZ3 OFFICE0 . 1 2 RECOR3ED B Y

1 5 . 5 3ORZHOi.z F L U I D18 RM2.6s R N TEMPZRfiTUREI.00 NflTR’X DEIITR T§#lN3STOINE FLU ID DELTR T

:

:

3 9 0 3c?IxsAx#RYT. LEWXXYS

LlClTER F I L E : PROCESSE.TYPE; : 9030aaL5G :2 _.

173 PLOT : CRNOXY690 THRESH : 30000

R L L SERVICZS PR5VIDE3 SU3.33XT TO STANBRRC TERMS RN3 CONDIT IONS

un

Page 90: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

ui ‘;j ;z;j.-., -2:;‘--------y--------;$c ;:utl; )gkR;:..- j

u?!; ,,,I, : , yyir’;l I ; j ,f5?!..... . ...... . ...... i”. ....j.. ..... / ...... / ___._.,.___._ !‘“.“,.... ....... %. ..... ,. ..... i.. .... . ....... ........ i ______ j ......y-~-,-3--~ i j ..... .._t ..................................... t..,y...: ...... I.. ..... . ..!..... . ...... . ...... /. ..... . ...... . ..... :<. ..... . ...... i.. y...... . .... ..!

ui ... . ....... 3.. ..... . ...... f.. .... + ....fi.. .... j ...... i...... i.. ....i

.... i ...... . i...... j.. .... Jr.. ... .: .....$......;. ..... i.. .... i.. ....I ”.... ..... . ...... i.. .... i.. .... .... i !...... j.. .... l’. ....ui

‘,.I.. .... . .... ..! j....‘,: i........ (...... T .... . 4.. .... i.. .... /. .... .I .......... . ...... i.. .... $. .... i ..-, i......... ..... i.. . . ..!. ... ..!. !..... .! I : i li i ! I i

k I

i, ._._;. .. ..!......( ...... $. . . . . . . . . . . . .i “....j......, .... ..k.. ...L

*p-T--r

It

.. . ..... . . . . . . . I.. . . . . . . . . . . . . . . . . . . . i.. . . . . . . . .. . . . .i . . . . . . i.. . . . . .

{.. . . . . . ;‘..... :‘.... $.

:

f...~ i.. j.. .I. . . . . i.. . . . . i . . . . . . :;. . . . . . .

4

:::: ~::::::i::::::l::::::j::::::j:::l~:::::~::::::l::::::~::::::

,,., .I.. ... . . . . . . . .I . . . . . . v.. . . i.. .. . . . . . . . . . .:::~ ...i.. k..

.I.[ I...... I...... i..

d

Li.j...I

. . . . . . . . . . . :_.. . . . . . . . . . . . . .

............

. ....... i..l’.

ii..;;

. . . . . . . . . . . . . . .J,.*)...

. . . . . . . . . . . . ..I. .

j . . i.. .I . . . . . . . .

k... . . ] .

.......

. . . . . .pi,.

......

(......1-l ; : I 1

. . . . . .;. . . . . . 6.. .... i i 1 1jI.. .... i’. . . . .; . ...). ........ i ij.. . . . .i . . . . . .

. . . . . .; . . . . . . .......

3

i_ __.__/______ j&j..I......

....

u

i.. ...._ i-‘.... I...... 1. . . . . 2 ._.__._) __I . . . . . . i . . . . . . . . . . . . i.. . . . . { __.___

I

...... .I . . . . . . I .. ._I..+..fY .$ ._____ $

.. j.. I...~ A.. .I.. I....... . . . . 4

i. . . . . _j.. . . _I.. . . . . ..!. ......... ;..4 ..I..

.......I .......... 1..

..........; . . . . . .

n

...... .. . . . . . . .. . . . . . . i.. . . . . !&.

. . . . . i...........

&I..>). (........I..

........../. pj.!r..

...... .I ...!.j....... . . F..

. . . . . . . .. ..... f

I

0

1::::::;.... . . . . . . j.. . . . .+. ... .... j.. . . . . i.. . . . . . ..... I

/ . . . . . . i . . . . . j . . . . . . p..j-&j..

. . j..” ..:. . . . . .4.. ... .I . . . . . . i......I ‘

--i- I...... iI! ! I i 1

. . . . . . i . . . . . . j...s ..;. .... ...I..~ ..j..

j.. .I.. .... i.. . . . . j. . . . . . . I . . . . . .) . . . . . . f.. . . . . . . . . . . . . . . . . . . . . . . . .

17i: .

...... . I.I

. . . . . . . . . . . ..I

’ ( I:.A..j.. .]. j_.

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

........... . . . . . . . . . . . . . . . . . . . . .

. ............. . .. __.j.. .I.. i..?;. .I ;......j.

. . . ./.

.I. I.. . . . . j.. . . . . f..~ J.. ....g ..;.

A.. ... .l...... j.. ..... . . . . . . . . . ,_I

! I.. ._I..

i. . . . i.. . . . . . . . . .). . . . . . /. . . . . . (......

.... . . . . . . . . . . .. . . .

O!\

. 1...... i’. . . . . j..~ ..i..

~

.... . ..... i.. . . . . v.. ..., 1 , .j . . . . . .

::::::~::::::~::..‘:~::::::;:::::q ..!..... .I . . . . . . I...... I.. ....... . . .

.*i !...... I.. ... .I . . . . . .

ui........ ... .;. . . . . . . . . . . i.. . . . .

I---iij..j. i.. .... i.. . . . . i . . . . . .

.; !J.. .j.. .I j . ..r i.. .j..i.. . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................ !.fi.. .... [.. .... ..... gj...... i...... j.. ... ...

n

:p..

::::::i::i:“t::::::r:::::i::::::!:~~::::::i::::::i:::::,i::::::

j

. . . . . . i...... i . . . . . i______! ...... i.; ../. . . . . ./. . . . . .I . . . . . . ~.......... .L..

“\.... I . . . . . I.. . . . . i.. . . . . ij..$l...... i.. . . ..!. . . . .., . . . . . .

1 1 I i. . . . . .r.. ....ur.+.

!~, ...... l’. 1~ .!...... r ...../ 4.. ... j ......

0,

:;

. . . . . r...;...T$ :.j......

/

...... ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .~......... 3

(_j ,,.,.,;f ._._.:

. . . . . . .

. . . . . . . . . . . .

ST ~__,___.__ j........

. . . . . ii,:??.;.

. . . . ...... I ......t.. . . . . . /. /.

j2.j... . . . . . . . . . . . i.. . . . . i.. . . . . ’

;..f! .i... . . . .i ...... i ...... i ...... I

. . . . . . i ..... . . . . . . . . . . . . . . ./. .... .I ...... I...... 1

! i j . . . . . . . . j . . . . . . . i i . . . . . . . . ,..., 2 . . . . . . . i . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i .i i . . . . .I.......;. ...... ..... !;. ..... j.. .... i.. ... .j.. .... . ....... i.. .... j

I:““’!‘..... I”” d&-..:.... ..:. ............. . ...... s......:

.I...... . ...............i ...... i . . ..f&,7.-~& ......

.... .I.. ...... ...... ............j: ..... . .... ... . . .. . . . .I ...... i i i

............ I j....... ....... i ...... j ...... l______ I....... z ....... I ...... . ...... !..r . ..i ...... 7-2.... ..i ...... j.. .... j.. ..... I ...... I.. .... i_. .... . ...... j ...... . ....... i ______i ... ..... .....

/

..... . ..... j.. .... +. ... ..!. ..... /I..

j.. .. ..!. ... ..!. ......j...... i ______!

... . . ! .....I.

., ...... 1..j

.... .: ....... . ...... /. ..... /....! f..+.

..... i .. ... . di.. ............... , ............ j.. ..)..

. . . . . . . . ......... .I i

. . . . . . . . .......

i....... k......

i. . . . . j ...... ...... I ...... . _____._! ...... ...... ;.l...:. ........... .i l.....

. .i .t.. i I ..... .if; , ! i j/;jjI: ‘;Irlti;““’...... ....... ...... ...... . ...... i .____.; __,.__.: ._____! ______‘___.__ ;.‘____:. . . I ,

. . . . . .; .......i’...... i..j;; / * I i 1,:. , j itj ii................

......... Q.... . . . . . . .

‘;............

r............

.. . . . . . . . . .

j............ i’ . . . . . . . . . . . . . . ............. . . ..... I.$................ . . .p.. . . . . +. . . . ....... . ..... f.. . . . . . ...... . . . I I.. i _.____,__,___ I i{ .... . ...... +. . . . ....... v.. ....i ...... . .... .

j $. F j * ______)...... i.. . . . .I . . . ...! .....

i... . . .I.

..!. . . . ..!. ..... . ........... .I ...... j.. . . . . . I.. . . ..I ...... I...... i..

/......

j......

.j. . . . . I.. .... . ...... i . . . . . . I ............

I . . . . . .:.‘....... I..

. . . . . . . . . . j .......... . . . . . .....1 .

.1...... ~ !...1...... 1 . . . . .

...... i.. . . . . . ) ...... i.. . . ..).. .... . . . . .

...... . . . . . . . . . . . . . . ..!.j..

I . . i..i.... .... ...... I...... j ._____f ____; ....... ...... ......

.I . <. ...... .i j...... 1 ... . :j....... .

..... . ..... ...... ..... ...... >. . . . . . . ...... 4.. . . ..( ....... . ....... j ...... i.. .... <. i...... ..... ........... i.. .... j.. . . . ..!. ..... i.. ......... .I ...... i.. .... j ._.__,,’ ...... ...... i. ..... :...... I.

j...... i ...... ‘i ...... i . . . . . . ...... i.

...... +. i. . . . .

.... i ,.‘.“” I...... I...... ........... i.. ......... . . .... Ill ’...... i.. . . . . .... ..! “““,““”

.I

.I.,......,

‘!’ ......i

I..... i...... I[.

. . . . . . !....... . . !_.

.......... j..

...!. i.......... .

.............. . . . . . . . . ,I.. .... j.. .... 1i . . . . . ...... I .....

i i.. ; .... . ...... i . . .... g.;. ....

..... .I ...... {. . . . . . I.. . . . ...... ..... . ..... i ...... i ...... j ...... i ...... ..... i ......

. . . . . . . . . . . . . . . . .

I’..... i’......;............... .. . . . . . . . . . . . . . . . .

. r’..... 4...)Fz.,i

.................. . .......... . ...... j ...... i ...... { ....... ...... [ ...... . ....&f.. . ..i.. ....

.I.. . . . . . . f.... . . . . . . . .

‘i.. .II

1.. .... (...... j..I

)......I

j$j

...... ...... 2 ...... J< . . ...I <. ...... ...... . l...... .I

........... . . . . . ............ i ............ j . . . . . .

. . . . . . . . . . . . .I . . . . . . +. .... . ..... .I.. ... . . . . . . .i.. i..

..j.. /___,._ ~______ ]I..

i j ............:L. .

i’.::::i::::::i:::~~::::~::::::...... . . . . . . . $..... ...... . .... . .

. . . . . . . . . . . . ..!. . . . . . .t . . . . . . . . . . . . . .I.. . . . . I.. . . . . . I . . . . . . . ! . . . . . . . . . . . I. . . . . . . . . . . . . . .......... . /.

. . . . .. . . . . . . . . . . . . . . . . . . . . .I . . . ijjiii...! ...... ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..! ._.___! J _______; _______; i

&.. i............... a...... ...... ... .... . . . . . . .

i %....... .

. . ../. If . ..i.. . . . . j.. . . . . . .l:~:::~i:::::~~~~~:~::::::;:::::i::::::i:::~:::::~::~:~~.::::~~...~.....~~~~

.............

i I / : i ; i-’...... . ..... e.. . . * 1../ ...... .......... ..J. . . . . . . t.. .... . . . . . . . I........

..I ............ j............

j .............. j... . . . . . . . . . . i........ . . . . . . A ...... i[ j i

, . . . . . . . ...... .I . . . . . . I.. . . . .<.. . . . . .I . . . . . . j...... 4 . . . . . . . (,.,__.; .. i. . . . . . .I

7

..... .I.. .... j.j! . ..i.. . . . .. . . . . . i.. . . . .I ...... ./. . . . . j.. .... ...... . . . . . . . {. . . . . . ./. . . . . j..

i. . . .I ..... ;...... {. . . . . . . . .... _(

. . . . . . . ...... ...... i.. . . . . j

. . . . . .I . . . . . . j....... i.. . . . .. ...“. ...... . ..... .). . . . . . j.. . . . . . . . . . . . . . . . . . t ...... > ...... . .....

... . ::I :::::: i ::::: t :::: f ::::: .j

I.. . . . .2.. . . . . . . . . . . . . . . . . . . . ........................ I.. i.. ....... (...... j,.____ .).

I . .j..

.... . . . . . . . .J.. I I i i 5 I j :. . . . . . . . . . . . . . 1’_.__., (......; I. . . . . . .) . . . . . . I . . . . . . 1’_._.__ (______ { ...... .). . . . . ............ i.......

.I.).+

........f

.........i

........... p.........

..)..I 4..

......... j...I, ..........

. .......... .......... .. . . . . . . . . .

‘r.. ........ j...........

j.. . . . . . . . . . . . ...... ...... >. ..... j.. . . . . . . . . . ....: .p$...). ..... jI.. I . . .I 4.. . . . . . . ..................

...... I. . . . . . .I.. ... j...$.

. . . . !I...... {....... I < 1 1 ! . ~..j ../. ..!

; !...... . . . . . . . . . . . . .!’ I, I

/..... ..... { + ...I i

...!...... i...... !‘...... r.. .... i.. . . . ........... . . . . . . . .:;“. p.. .(.......

+

...... it.. . . . . i.. . . . ..!. . . . . . . i .............I

...... i . . /. . . . . . . . . . . . I.. i. . . . . . . . . . . . . . . . . . i.. .... ..... i.. . . . . i..l..!. ..... .!.. . . . . . . .... .i.. . . . . j.. . . . . .I . . . . . . . . . . . . . . ...!. . . . . . . _ I

\____._ j__.___ j: i, .q. .?: i

I I i. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .&+ . . ...... i.. . .i.. . . . . . .

&: ..f...f..

. . . ....... f.. .... ...... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . I.. . . . . i.. . . . . .5.. . . . . . . . . . . .

i...... j....... i’...... I...... j.

1...... /.__.___ j+.)...... 1.. /...S J........ ....... . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . i.. . . . . /. .. . . . . ..I 4.. ...... . _j

I..i.. . . . . . ii”.{. . i

...... . . . . . . . . . . .I . . . . . . . . . . . . . . j.

...... + ..... I . . . . . . i’ . . . . .r&.‘...... i..I’ . . . . . *. .... j.. . . . . . . . . . . f.$.. f.. ....k.. ... 1

. . . . . . +. ..... >. ..... i.. .... . . . . . . . . . . . . . +. i... . . . . . . . . . . . . . . . . . . . . . . ~...... {. j. . . . . . p. ..i........ . . . . . . . . . . . . . . . . . . . .. . . . . .I.. . . . . . .... .4.. ... .I . . . . . . . . . . . . I.. . . . .1....... i . . . . . . i . . . . . . .

1 I I 1 I. . . . . . j . . . . . . j . . . . . .

I&.A..

+.....+~ t.. i.. ].... ...... k.f.!. f . ....... .... i

. . . . . . j.. . . . . ~, . . . . . . . f.. . . . . . i.. . . . . . . . . . . . i’. . . . . i’ . . . . . . . . . . . . .. I . . . . . . i . . . . . . f ii7. . . . . . i‘.~ ....... ...... I ...... ...... ......

...... f.. ... f.. . . . . ) . ..... j.. +. _.... .... . . . . ..... ..... . . . . . .....1 I 1

j_. i‘. i ._.___;. I_I

. . . . . . .i pj . ..t j j

...... . ......j!_. ........... . ...... .I . . . . . . !

I I i I i i. . . . . . i’.................... I.. ;;I.... / . . . . . . f.. . . .! . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . : I; i;;.....e __,__.: . . . . . . . . . . . . . j.. .......... ‘. . . . . . . . . . . . . . .

Page 91: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 92: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

Li 1 CGMMfi-RES-DENS I TY /--.

r!1. I --

DRTE ‘. ::-~ei/a4/94

DEPTH DRrrJ.FiR :‘ ii3q.6

LOG BOTTON :' .'- 279.34LOG TOP : 1 . 8 3

CCISING DRILLER : 6.1WING TYPE ': STEELCRSING THICRNESS: 8.b'

.TONNSHIP ,.'. : :

: :; -*.RflNGE: ;- <.

._ i‘ 5 ;. . . .j,L <-TDCLTllH :, GL EiEVClTIONS r. .' ~-*ELEU. PERM. D&M: . ...' KB : . . c.3. I.LOGHJ%SUREB‘FROn: GL .:' t..DF : . ,..-.DRLMEWUREDFRUM: GL n : . -.

LOGGING WIT : 8983FIELD OFFICE .L CCILGCIRY,

. ': ti: f..“

RECORDED BY .: T. IZNYCRYJ -.-. _.<- -i.__

BOREHO& FLUID:. 27

: URTER~ FILE<.RN l-t ..< . . . . ., -^ '4:.

.,. .RN TENPERcrTUti : - ". -;rtcrliIX DELTR T :? 173FLUID DEL'ER T t.699

.' ' .: ,,_- 2;. ._' ,._._. I

Page 93: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

IID0

Page 94: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

20~.~=~=-~~~: i i I

30

40

50

60

70

80

Page 95: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 96: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

160

170

180

190

200

210

220

Page 97: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

230

260

DEHS I TY-------------------------~~~~--------------------G

RES(flG>

Page 98: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

~XRS ING DRILLER

.:::

:::

. .:

:::.:

::CRSING TYPE

THIb:~STEELe.ti

.;.

X?.l5.9T I C D E C L .

Page 99: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

OELTRT1000 USECM

UHC-UELT----------__________--------------.

02000 USECAl

10

Page 100: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

I -- c- - - - - - c- - ---. -

Page 101: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 102: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

iii.ii iii.ii,ii i . .._.

r: , : : : : : : : : : ,Y~: : : : :v

Page 103: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

. I...... / . I..... .j . . . . . ./. . . ..I t . . . . . . b . . I....... ..I T”..‘i: . . . . . . . . . . . ./ . . . . .. . . . . . i’...... 1 . . . ...) . . ..y....... I’..... y . . . . ‘1...... [ . . . . . .( . ,. . ., . . ..,. . . . . . p ).. . . )... . ..p.... . I . . . . . . 4 . . . . . . . $ . . . ...! . . . . . .. . j. . . . . +....$ . . . . . . I......

. . /. I....... I...... i . . . . .

..I... ]_ . . ). (‘.....,“....

ZODO----------------___________________MC-DELI

~000 USEVilDELIIT

Page 104: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

- -----

n

COMPRNY : C&W. CKC. PETRO. LTD.WELL : 94-05LnCkTInWFIEiQ : TSOLUM RIVERCOUHTY : Cc.i~PE;~LI. RIVERSTRTE : B.C.SECTION

DRTE : 02/28/94DEPTH ZZRILLER : 317LOG BOTTOM 315.42LCG TOP 1.41

CflSING DRILLER : 17.4cRSIHG TYPE : STEELChSWG THICKNESS: 0.12

BIT SIZE : 15.5NvZNETIC SECL. : 18MRTRIX ;SEHSIT'I : 2.65FLUID DEHSITY : i.OONEUTRON MATRIX : SRNDSTOHEREZWRXSOPEH HOLE

TOWAISHIIJ

, I

RANGE :

?ERMZZMT Z?WU% :ELEV. PERM. IWTUM:LOG MERSUREB FROM:DRL NEASURED FROM:

LOGGING UNITFIELD OFFICE :RECORDED BY

GL ELEVRTIOHSX3 :

GL QFGL GL

8903CRLGfiRYT. LEUYCKY.3

BOREHOLE FLUID :RMRM TEHPERRTURE :MATRIX DELTA T :FLUID DELTFl T :

WTER FILE : ORIGIWLTYPE : 9030fWLOG : 1

173 PLOT : CRNOXP 0690 THRESH: 30000

OTHER SERVICES:90309300

d

fiLL SERVICES PROUIIZC SUEJECT TO -STRHQaRD TERHS AND COHCITIONS

Page 105: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

0 T~----------~~~~~~-----------~ 20.GAtlCHAT~API-GR 250 0

10

20

30

40

RESC”G>

: f.._. -_..i.-__

( i+.....q--“..;.-..*.~

j : 1 i” ---. $.*-.--i ,,,_.._ +-.-.i..-.*-

: :--;- .,_,.. *_ ..___, - .^._... -___.-..;-..-j,;.

Page 106: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

6 0

7 0

8 0

90

100

110

1I1.1;

4._“..,.,._,.._.-,.“...”__..._.-.I.._..---.-._^.-.._.-.._._-.__..-..._.._

Page 107: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

1 3 0

1 4 0

! ““’

I..,... , . ,.,

I

I

. ..I ..: . . . . ..25~~ :::.:~:.~~~=,z,~lZ ..__.

_~~~~~_“~~.~~~~~~~~~~~~.~.~=.~.~~ _..- k __.. _“--

.._ .I .J:I:~&:~~~

:_- .___

--s-i2’. ”.......C iTj--,Yr’-

; ..-....... I. F--T...” ‘;,~~~ ~. _....._. / _“. ~ .

!

I.

.._.......” $. . . . . . . . . . . . . . r ~.........................~..............,...~.-.. 1.. -...,..... - ..__...

. . . . . . . . . I . . . . . . . . . . . . . . . . .._.. <flk _..... ~ ,... .,. .._ . . . . . . . . . . . . .._..........~~.........

4

I. I _:-JA

~:‘ .._ ;.$+ I...~

I I .._.. .,...__.......... ,.._..... - .._....._...

.- .._ I......... ..~... . . ~

._.

Page 108: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

...” ,..I......I & ._..,...__...: ..-... I..., i; _i...... -__I _......,,,...._....,,....., i

Page 109: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

G/CCDEW I TY

O--------------------------~~=~-------------------------~RESCtlC>

Page 110: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,

>

q

CuMPaNY : CCIN. OCC. PETRO. L T D .WELL : 94-%5

r ,LUCATION/FIZLD : TSOLszl IiIUEs?

i COUMTY : CElflPSELL RICER\, STATE

i

: B . C .

ISECTIO:: : I_ TOWNSHIPI -

I.

OTHER SERZI ICES :983%936%

RC%NCE :

B I T S I Z E

n

: 1 5 . 5 BOREHOLE TLUIiS : MfiTEl? F I L E : PROCEFSE.‘%GNET IC DECL * : 18 RM TYPE : 9%3%UR

-!;““TR’X DEMSZTY : 2 . 6 5 RN TENPERf3TURE : LGG : 3hxL!In K3ENSKTY :

c7

1.9% MATRKX nELTa T : 573 PLOT : CANOXYfdEUTl?@N MPlTR IX : SfiNDSTGSE FLU ID DELTi-3 T : 6 9 % THRESH: 3868%pEMRR#S

5PEkd HOLE

Page 111: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 112: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 113: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 114: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 115: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 116: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 117: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 118: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 119: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 120: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 121: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 122: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 123: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 124: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 125: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 126: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 127: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 128: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 129: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 130: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 131: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,
Page 132: Tsolum River Coal Project Exploration Drilling Program ... · PDF fileTsolum River Coal Project Exploration Drilling Program February, 1994 ... 8353 through 8400 and ... R.A. Swaren,