SISTEMA: 4G LTE
Page 1 - COVER PAGE – BASIC DATA
NOMBRE DEL SITE: URA_SAN JERÓNIMO Jr. Junin 1019 San Jeronimo, Huancayo, Junin.
PROVINCIA: HUANCAYO JUNÍN
DIA: 3/28/2016 Operador: TEM
ELABORADO POR: PAOLO HINOSTROZA CRUZ
ACCESO AL SITE X LLAVES FOTOCHECK
HORARIO DE TRABAJO 24 horas X Restringido/Especificar Horario
Latitude: 11° 57' 01.59'' S 75° 16' 58.28"OTIPO DE SITE
X Indoor BTS (room) Indoor BTS (cabin/shelter)
TIPO DE LOCACION
Rooftop Telecommunications Building
X Greenfield Existing / shared Tower
ESTRUCTURA
Tipo de estructura Autosoportada
INSTALACION DE RBS 6601
MASTIL X GABINETE DISTRIBUIDA
Participantes
SUPERVISOR JOSÉ ALBERTO FLORES YAURIVILCA
TECNICO RICHARD VALDIVIA SIGUENZA
Foto Fachada principal
Technical Site Survey Report (TSSR) MANDATORY
DIRECCION:
DEPARTAMENTO:
Longitude: W
![Page 2: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/2.jpg)
Nombre de propietario(Contacto) - TELEFONO
EL LOCAL LE PERTENECE A TDP
Se requiere carta ( SI / NO ) a nombre de quien va direccionada
No se requiere carta para el ingreso, solo permiso por parte de TDP para el ingreso al site.
Diagrama o referencias de como llegar al site ( MAPINFO - GOOGLE _ GUIA DE CALLES)
![Page 3: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/3.jpg)
Tipo de acceso (LLAVES - MAIL - CARTA - SYS)
Llaves
Horarios de acceso y trabajo(confirmar i se puede trabajar fines de semana y feriados)
Lunes a Domingo de 8:00 am a 6:00 pm.
Problemas de poblacion(Si / NO)
NOLlaves completas
SIDE DONDE SACAN LAS LLAVES , SE REQUIERE LLAVE ZONAL ( SI / NO)
LAS LLAVES SE RETIRAN DE LA CENTRAL TELEFONICA DE HUANCAYO. EL CONTACTO EN TDP HUANCAYO ES ENCARNACIÓN SANDOVAL #580329 .ESTACION RIESGO DE SEGURIDAD( BAJO _ MEDIO - ALTO)
BAJOObservaciones
1.- El acceso a la sala celular y a las otras salas está a nivel del ingreso principal. 2.- El acceso a la torre ubicada en un nivel superior es por medio de una escalera de gato que inicia en el primer nivel.3.- Se debe tener cuidado con el piso donde inicia la escalerilla de la torre, ya que es de calaminas metálicas.
![Page 4: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/4.jpg)
![Page 5: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/5.jpg)
SISTEMA: 4G LTE
Page 1 - COVER PAGE – BASIC DATA
Jr. Junin 1019 San Jeronimo, Huancayo, Junin.
JUNÍN
TEM
PAOLO HINOSTROZA CRUZ
CARTA EMAIL
Restringido/Especificar Horario De 8:00 am a 6:00 p.m
75° 16' 58.28"O Ground Elevation: 685
TIPO DE SITE
Indoor BTS (cabin/shelter) Outdoor BTS
TIPO DE LOCACION
Telecommunications Building Other
Existing / shared Tower
ESTRUCTURA
Autosoportada Altura de estructura (m) 22
Altura de Antenas (m) 25
DISTRIBUIDA MONTADA EN PARED
Participantes
JOSÉ ALBERTO FLORES YAURIVILCA *414907
RICHARD VALDIVIA SIGUENZA 945072944
Foto Fachada principal
MANDATORY
![Page 6: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/6.jpg)
Nombre de propietario(Contacto) - TELEFONO
EL LOCAL LE PERTENECE A TDP
Se requiere carta ( SI / NO ) a nombre de quien va direccionada
No se requiere carta para el ingreso, solo permiso por parte de TDP para el ingreso al site.
Diagrama o referencias de como llegar al site ( MAPINFO - GOOGLE _ GUIA DE CALLES)
![Page 7: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/7.jpg)
Tipo de acceso (LLAVES - MAIL - CARTA - SYS)
Llaves
Horarios de acceso y trabajo(confirmar i se puede trabajar fines de semana y feriados)
Lunes a Domingo de 8:00 am a 6:00 pm.
Problemas de poblacion(Si / NO)
Llaves completas
DE DONDE SACAN LAS LLAVES , SE REQUIERE LLAVE ZONAL ( SI / NO)
LAS LLAVES SE RETIRAN DE LA CENTRAL TELEFONICA DE HUANCAYO. EL CONTACTO EN TDP HUANCAYO ES ENCARNACIÓN SANDOVAL #580329 .ESTACION RIESGO DE SEGURIDAD( BAJO _ MEDIO - ALTO)
Observaciones
1.- El acceso a la sala celular y a las otras salas está a nivel del ingreso principal. 2.- El acceso a la torre ubicada en un nivel superior es por medio de una escalera de gato que inicia en el primer nivel.3.- Se debe tener cuidado con el piso donde inicia la escalerilla de la torre, ya que es de calaminas metálicas.
![Page 8: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/8.jpg)
![Page 9: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/9.jpg)
Technical Site Survey Report (TSSR)
INFORMACION DEL SISTEMA RADIANTE EXISTENTE
RF EXISTING INSTALLATION (LTE 4G)
CONFIGURATION # OF SECTORS
Antenna Sector 1 Sector 2 Sector 3
Frequency Band
Model of Antenna:
Type of Antenna:
Number of Antennas:
Antenna Height above ground (m)
Azimuth
Electrical Tilt
Mechanical Tilt
Bandas Libres (850/1900)Mhz
RF EXISTING INSTALLATION UMTS (850)
CONFIGURATION # OF SECTORS
Antenna Sector 1 Sector 2 Sector 3
Frequency Band 850 850 850
Model of Antenna: COMBA COMBA COMBA
Type of Antenna: TETRABAND TETRABAND TETRABAND
Number of Antennas: 1 1 1
Antenna Height above ground (m) 25 25 25
Azimuth 315° 90° 210°
Electrical Tilt 5º 3º 6º
Mechanical Tilt 0 0 0
Bandas Libres (850/1900)Mhz 1/ 2 1/ 2 1/ 2
![Page 10: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/10.jpg)
RF EXISTING INSTALLATION (UMTS (1900)
CONFIGURATION # OF SECTORS
Antenna Sector 1 Sector 2 Sector 3
Type of Antenna:
Model of Antenna:
Number of Antennas:
Antenna Height above ground (m)
Azimuth
Electrical Tilt
Mechanical Tilt
Bandas Libres (850/1900)Mhz
RF EXISTING INSTALLATION GSM - MAIN
CONFIGURATION # OF SECTORS
Antenna Sector 1 Sector 2 Sector 3
Frequency Band 850/1900 850/1900 850/1900
Model of Antenna: NO SE VE
Type of Antenna: DUAL BAND DUAL BAND DUAL BAND
Number of Antennas: 1 1 1
Antenna Height above ground (m) 25 25 25
Azimuth 330° 80° 200°
Electrical Tilt 3º/4º 4º/5º 4º/5º
Mechanical Tilt 0 0 0
Bandas Libres (850/1900)Mhz 0 / 0 0 / 0 0 / 0
RF EXISTING INSTALLATION GSM EXTENSION
CONFIGURATION # OF SECTORS
Antenna Sector 1 Sector 2 Sector 3
Frequency Band
Model of Antenna:
Type of Antenna:
Number of Antennas:
Antenna Height above ground (m)
Azimuth
Electrical Tilt(expansion 1900)
Mechanical Tilt
Bandas Libres (850/1900)Mhz
OBS:
CBXD-65806580-M
CBXD-65806580-M
Exiten antenas TETRABAND con la tecnologia 3G-850MHZ y 04 puertos libres para la instalacion de la tecnologia 4G. Existen antenas DUAL BAND 2G (850MHZ y 1900MHZ) para los 3 sectores.
![Page 11: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/11.jpg)
OBS:
Exiten antenas TETRABAND con la tecnologia 3G-850MHZ y 04 puertos libres para la instalacion de la tecnologia 4G. Existen antenas DUAL BAND 2G (850MHZ y 1900MHZ) para los 3 sectores.
![Page 12: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/12.jpg)
Technical Site Survey Report (TSSR)
1.- DETALLE DE EQUIPOS PROPUESTOS
1.- UBICACIÓN DE LA MU EN SALA
3.- UBICACIÓN DE RRU 2DO SECTOR
RRU4G
EXISTE ESPACIO EN RECTIFICADOR HUAWEI PARA
COLOCAR LA MU 6601 4G
SE PROPONE INSTALAR LA RRU 4G ADOSADA EN MASTIL EXISTENTE, AL LADO DE LA ANTENA 4G EXISTENTE.
![Page 13: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/13.jpg)
5.- UBICACIÓN DE ANTENA 1ER SECTOR
7.- UBICACIÓN DE ANTENA 3ER SECTOR
SE REUTILIZARA LOS PUERTOS LIBRES DE LA ANTENA TETRABAND PARA LA INSTALACION DE LA TECNOLOGIA 4G.
SE REUTILIZARA LOS PUERTOS LIBRES DE LA ANTENA TETRABAND PARA LA INSTALACION DE LA TECNOLOGIA 4G.
![Page 14: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/14.jpg)
2.- DETALLE DE EQUIPOS EXISTENTES
8.- SISTEMA RADIANTE GENERAL
10.- SISTEMA RADIANTE: 2DO SECTOR
ANTENA TETRABAND 3G(850MHZ) (DERECHA), ANTENA DUAL BAND 2G
(850MHZ/1900MHZ) (IZQUIERDA).
ANTENA TETRABAND 3G(850MHZ) (IZQUIERDA), ANTENA DUAL BAND 2G
(850MHZ/1900MHZ) ( DERECHA).
![Page 15: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/15.jpg)
12.- EQUIPOS EXISTENTES EN SALA (1)
14.- EQUIPOS EXISTENTES EN SALA (3)
RECTIFICADOR HUAWEI
TELLABS 8609
Caja By Pass 4G existehnte
GABINETESEXISTENTES
Caja By Passexistente
![Page 16: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/16.jpg)
3.- ENERGIA
N/A
16.- TABLERO GENERAL
18.- BREACKER DEL RECTIFICADOR
![Page 17: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/17.jpg)
20.- BREACKER DEL BY PASS EXISTENTE
EXISTEN BREAKERS ADECUADOS PARA LA TECNOLOGÍA 4G
![Page 18: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/18.jpg)
4.- TRANSMISION
22.- EQUIPO TX
24.- RECORRIDO DE CABLE DE TX PROPUESTO
5.- CABLES DE F.O Y ENERGIA (RECORRIDO EN SALA Y TORRE)
EXISTE TELLABS 8609CON PUERTOS DISPONIBLES.
CABLE TX PROPUESTO INGRESA A SALA A TRAVÉS DE PASAMURO
CABLE TX PROPUESTO LLEGA A
TELLABS 8609 EXISTENTE
![Page 19: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/19.jpg)
25.- RECORRIDO DE F.O Y D.C (SALA)
27.- OTROS RECORRIDOS DE CABLE DE F.O Y ENERGIA PROPUESTOS
SE PROPONE EL RECORRIDO POR LAS ESCALERRILAS EXISTENTES
YA QUE EXISTE ESPACIO.
![Page 20: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/20.jpg)
6.- ATERRAMIENTO
28.- BARRA DE TIERRA EN SALA
30.- RECORRIDO DE CABLE DE TIERRA PROPUESTO
7.- OTROS
SE PROPONE ATERRAR LA M.U 6601 4G EN BARRA CON BORNERAS LIBRES
EXISTENTE EN RECTIFICADOR .
![Page 21: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/21.jpg)
31.- GPS
33.- PERIMETRO DE SALA (1)
35.- PERIMETRO GENERAL DEL SITE
![Page 22: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/22.jpg)
Technical Site Survey Report (TSSR)
1.- DETALLE DE EQUIPOS PROPUESTOS
2.- UBICACIÓN DE RRU 1ER SECTOR
4.- UBICACIÓN DE RRU 3ER SECTOR
RRU4G
RRU4G
SE PROPONE INSTALAR LA RRU 4G ADOSADA EN MASTIL EXISTENTE, AL LADO DE LA ANTENA 4G EXISTENTE.
SE PROPONE INSTALAR LA RRU 4G ADOSADA EN MASTIL EXISTENTE, AL LADO DE LA ANTENA 4G EXISTENTE.
![Page 23: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/23.jpg)
6.- UBICACIÓN DE ANTENA 2DO SECTOR
SE REUTILIZARA LOS PUERTOS LIBRES DE LA ANTENA TETRABAND PARA LA INSTALACION DE LA TECNOLOGIA 4G.
.
![Page 24: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/24.jpg)
2.- DETALLE DE EQUIPOS EXISTENTES
9.- SISTEMA RADIANTE: 1ER SECTOR
11.- SISTEMA RADIANTE: 3ER SECTOR
ANTENA TETRABAND 3G(850MHZ) (DERECHA), ANTENA DUAL BAND 2G
(850MHZ/1900MHZ) (IZQUIERDA).
ANTENA TETRABAND 3G(850MHZ) (IZQUIERDA), ANTENA DUAL BAND 2G
(850MHZ/1900MHZ) ( DERECHA).
![Page 25: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/25.jpg)
13.- EQUIPOS EXISTENTES EN SALA (2)
15.- EQUIPOS EXISTENTES EN SALA (4)
BASTIDORES
Equipo RBS 2106 existente
GABINETE
![Page 26: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/26.jpg)
3.- ENERGIA
17.- RECTIFICADOR EXISTENTE
19.- CONSUMO DE EQUIPOS (Amp.) Y (Volt.)
GABINETE RECTIFICADOR EXISTENTE, CON 3 MÓDULOS
RECTIFICADORES Y MU 6601 3G EXISTENTE
![Page 27: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/27.jpg)
21.- UBICACIÓN DEL BY PASS PROPUESTO
EXISTE BY PASS ADECUADO PARA LA TECNOLOGIA
4G-LTE
![Page 28: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/28.jpg)
4.- TRANSMISION
23.- POSICIONES LIBRE DE EQUIPO TX
24.- RECORRIDO DE CABLE DE TX PROPUESTO
5.- CABLES DE F.O Y ENERGIA (RECORRIDO EN SALA Y TORRE)
EXISTEN PUERTOS
DISPONIBLES.
CABLE TX PROPUESTO INGRESA A SALA A TRAVÉS DE PASAMURO
CABLE TX PROPUESTO LLEGA A
TELLABS 8609 EXISTENTE
![Page 29: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/29.jpg)
26.- RECORRIDO F.O Y D.C (SISTEMA RADIANTE)
27.- OTROS RECORRIDOS DE CABLE DE F.O Y ENERGIA PROPUESTOS
SE PROPONE EL RECORRIDO POR LAS ESCALERRILAS DE LA
TORRE YA QUE EXISTE ESPACIO.
![Page 30: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/30.jpg)
6.- ATERRAMIENTO
29.- BARRA DE TIERRA EN TORRE
30.- RECORRIDO DE CABLE DE TIERRA PROPUESTO
7.- OTROS
SE PROPONE ATERRAR LAS RRU's 11 Y A2 EN BARRA
EXISTENTE CON BORNERAS LIBRES
![Page 31: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/31.jpg)
32.- PASAMURO
34.- ELEVACION DE TORRE
35.- PERIMETRO GENERAL DEL SITE
![Page 32: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/32.jpg)
Technical Site Survey Report (TSSR)
FOTOS PANORAMICAS
N/A
0° T.N.
![Page 33: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/33.jpg)
N/A
60° T.N
![Page 34: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/34.jpg)
120° T.N
N/A
180° T.N
N/A
240° T.N
![Page 35: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/35.jpg)
300° T.N
![Page 36: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/36.jpg)
Technical Site Survey Report (TSSR)
FOTOS PANORAMICAS
N/A
30° T.N
![Page 37: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/37.jpg)
N/A
90° T.N
![Page 38: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/38.jpg)
N/A
150° T.N
210° T.N
N/A
270° T.N
![Page 39: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/39.jpg)
330° T.N
![Page 40: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/40.jpg)
Technical Site Survey Report (TSSR)
PLANOS EQUIPOS EXISTENTES
![Page 41: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/41.jpg)
SALA GENERAL EXISTENTE
![Page 42: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/42.jpg)
SISTEMA RADIANTE EXISTENTE
![Page 43: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/43.jpg)
![Page 44: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/44.jpg)
ELEVACION DE TORRE EXISTENTE
![Page 45: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/45.jpg)
PLANOS EQUIPOS EXISTENTES
![Page 46: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/46.jpg)
SALA GENERAL EXISTENTE
![Page 47: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/47.jpg)
SISTEMA RADIANTE EXISTENTE
![Page 48: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/48.jpg)
![Page 49: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/49.jpg)
ELEVACION DE TORRE EXISTENTE
![Page 50: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/50.jpg)
![Page 51: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/51.jpg)
![Page 52: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/52.jpg)
![Page 53: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/53.jpg)
![Page 54: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/54.jpg)
![Page 55: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/55.jpg)
Technical Site Survey Report (TSSR)
PLANOS EQUIPOS PROPUESTOS
![Page 56: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/56.jpg)
SALA GENERAL PROPUESTO
![Page 57: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/57.jpg)
SISTEMA RADIANTE PROPUESTO
![Page 58: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/58.jpg)
![Page 59: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/59.jpg)
ELEVACION DE TORRE PROPUESTO
![Page 60: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/60.jpg)
PLANOS EQUIPOS PROPUESTOS
![Page 61: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/61.jpg)
SALA GENERAL PROPUESTO
![Page 62: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/62.jpg)
SISTEMA RADIANTE PROPUESTO
![Page 63: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/63.jpg)
![Page 64: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/64.jpg)
ELEVACION DE TORRE PROPUESTO
![Page 65: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/65.jpg)
![Page 66: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/66.jpg)
![Page 67: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/67.jpg)
![Page 68: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/68.jpg)
![Page 69: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/69.jpg)
![Page 70: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/70.jpg)
Technical Site Survey Report (TSSR)
1.- DETALLE DE EQUIPOS PROPUESTOS EN SALA
SE SUGIERE INSTALAR LA MU 6601-4G EN RECTIFICADOR EXISTENTE (DEBAJO DE MU 6601 3G).
2.- DETALLE DE EQUIPOS EXISTENTES
3.- ENERGIA
SE CUENTA CON CAJA BY-PASS DESIGNADO PARA LA TECNOLOGIA 4G-LTE.
Modelo del Rectificador HUAWEI
Capacidad del rectificador 200A
Voltaje del rectificador 53.2V
Amperaje del rectificador 17.9A
Modulos del Rect instalados 3
Modulos del Rect. Vacios 1
Capacidad de c/u Modulo 50A
Posiciones libres para Breaker SI
Capacidad de Baterias 100AH
Breakers Disponibles SI
Breaker Disponibles
Capacidad Cantidad
80A 1
32A 6
16A 2
Nota:
EXISTEN RRU's 3G EN MÁSTILES AL LADO DE LAS ANTENAS. SE PROPONE INSTALAR LOS RRU'S 4G ADOSADOS EN MÁSTILES AL LADO DE LAS ANTENAS EXISTENTES.
LAS ANTENAS TETRABAND EXISTENTES TIENEN 04 PUERTOS LIBRES DE 1900Mhz, LOS CUALES SERAN USADOS PARA LA TECNOLOGIA 4G-LTE.
ACTUALMENTE EL RECTIFICADOR ALIMENTA A LA CAJA BY-PASS 4G ADECUADO PARA EL SISTEMA LTE.
![Page 71: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/71.jpg)
ACTUALMENTE EL RECTIFICADOR CUENTA CON UNA MU 6601 DE LA TECNOLOGIA 3G.
![Page 72: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/72.jpg)
4.- TRANSMISION
SE CUENTA CON EQUIPO TX TELLABS 8609 CON PUERTOS DISPONIBLES PARA LA TECNOLOGÍA 4G-LTE.
5.- CABLEADO DE F.O Y D.C
6.- ATERRAMIENTO
SE CUENTA CON BARRA DISPONIBLE PARA ATERRAR LOS EQUIPOS DEL SISTEMA 4G-LTE, TANTO EN SALA COMO EN TORRE.
7.- OTROS
CABLEADO PROPUESTO PARA TECNOLOGIAS (2G-3G-4G-SWAP)
LONGITUD DE CABLE ETHERNET 18.00 Mts
LONGITUD CABLE DC (AZUL Y ROJO) hacia BY-PASS 0 Mts
LONGITUD DE CORRUGADO 20.00 Mts
LONGITUD CABLE DE ATERRAMIENTO 25MM (MU 6601) 2.00 Mts
LONGITUD CABLE DE ATERRAMIENTO RRU's (11 Y A2) 1er SECTOR 6.00 Mts
LONGITUD CABLE DE ATERRAMIENTO RRU's (11 Y A2) 2do SECTOR 6.00 Mts
LONGITUD CABLE DE ATERRAMIENTO RRU's (11 Y A2) 3er SECTOR 6.00 Mts
LONGITUD CABLE DE ATERRAMIENTO BY-PASS N/A Mts
LONGITUD CABLE D.C 1er SECTOR 45.00 Mts
LONGITUD CABLE D.C 2doSECTOR 45.00 Mts
LONGITUD CABLE D.C 3er SECTOR 45.00 Mts
LONGITUD CABLE F.O 1er SECTOR 50.00 Mts
LONGITUD CABLE F.O 2doSECTOR 50.00 Mts
LONGITUD CABLE F.O 3er SECTOR 50.00 Mts
LONGITUD JUMPER LTE 1er SECTOR 2 Mts ( 4 X SECTOR)
LONGITUD JUMPER LTE 2do SECTOR 2 Mts ( 4 X SECTOR)
LONGITUD JUMPER LTE 3er SECTOR 2 Mts ( 4 X SECTOR)
SE CUENTA CON ESPACIO DISPONIBLE EN LAS ESCALERILLAS PARA EL RECORRIDO DE CABLEADO DE LA TECNOLOGIA 4G-LTE.
![Page 73: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/73.jpg)
Acceso a torre por medio de escalerilla. Piso de acceso a torre de calaminas.
Technical Site Survey Report (TSSR)
![Page 74: Tss Ura San Jeronimo 4g Tm Rev1](https://reader035.vdocuments.net/reader035/viewer/2022081800/577c7fe61a28abe054a6744f/html5/thumbnails/74.jpg)
Piso de acceso a torre de calaminas.