Tunnel Segment Backfilling

with Double Shield TBMs

Page 2: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

• Factors Determining Backfilling Annulus Gap

• Pea Gravel Backfill

• Pea Gravel Grout Injection

• Combination Pea Gravel & Mortar Backfill

OVERVIEW

Page 3: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

Factors Determining

Backfilling Annulus Gap

Page 4: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

FACTORS DETERMINING BACKFILLING ANNULUS GAP

• Ring build clearance

• Tail shield thickness

• Overcut for TBM steering and cutter wear

allowance

• “Tapered” or “non-tapered” shield body

construction

• Pea gravel injection through segments

most common

General Aspects about Annulus Gap & Backfill

Page 5: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

FACTORS DETERMINING BACKFILLING ANNULUS GAP

Open Type Tail Shield

Annulus Gap,

Annulus

Volume

Overcut for TBM Steering & Cutter

Wear Allowance (Rock Tunnels)

Tail Shield Thickness

Segment Build Clearance

Inside Tail Shield

Page 6: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

Pea Gravel Backfill

Page 7: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

• Often used for PCC segments in rock tunnels

• Applied at full tail shield and open tail shield

• Open tail shield with pea gravel injection through segments is common method in rock tunneling

• Grout injection of pea gravel is often added

PCC = Pre Cast Concrete

Pea Gravel Backfill General Aspects

Page 8: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

• Invert segment placed on bored tunnel

• “Feet” on invert segment provides ring

stability during ring build

• No tail shield brushes required; tail shield

can be thinner

• No tail shield grease required

• Pea gravel backfill is simple and well

proven

Pea Gravel Backfill w/Open Type Tail Shield

Page 9: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

• Segments with invert “feet”

• The feet allow the segment ring to be built directly on the rock tunnel invert

• The feet provide four point stability

Pea Gravel Backfill w/Open Type Tail Shield 1600mm

LONG SEGMENTS

Grout in Pea Gravel

Interstices (@30%)

= 0.3 x 3.23m3 =

0.973 per ring

Pea

Gravel

3.23m3

per ring

Ø 7650

Bore w/

New

Cutters

49.5

50mm Pads on

Invert Segment

Invert Grout

0.38 per ring

(invert pads not

included) Invert Grout w/Invert Pads as

shown Approx. 0.1m3 per ring

Page 10: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

Pea Gravel Grout

Injection

Page 11: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Injection via Segments

Rings Not Completely Backfilled

No Tail Brushes

45° Angle of Repose

Pea Gravel Fill Via Hole…

#4 #3 #2 #1

Page 12: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Detail – hole for backfill

injection pointed

rearwards - no threaded

insert

Detail – hole for erector

pickup.

Pea Gravel Backfill Injection via Segments

Page 13: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Self-clamping injection nozzle.

No threaded insert required.

Pea Gravel Backfill Injection via Segments

Page 14: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Injection via Segments

Insert must be minimum Ø70mm clear to prevent clogging

Page 15: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Injection via Segments

Segment backfill via segment at crown

Page 16: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Injection via Segments

Segment backfill via segment at invert area

Page 17: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

• Pea gravel is delivered into the annulus by means of dry type rotary shotcrete pumps (“blowing”)

• Shotcrete pump should be placed as far forward as possible to minimize hose length

• Insert opening Ø70mm clear to prevent clogging

• Hose size DN60 or DN70

• Pea gravel backfill takes place separate from TBM advance, thus no waiting is time required for annulus backfill to gain strength

• Pea gravel annulus is usually grouted as a secondary operation - theoretic gravel interstices have volume 30%, but 50% more realistic

Pea Gravel Backfill Technical Method

Page 18: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Injection Equipment

Dry type rotary shotcrete pump

Page 19: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Handling in Large Tunnels

There is room for bulk material handling and bunkering of pea gravel

Page 20: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

• Limited space for pea gravel handling

systems

• Often times, there is not enough space to

bunker a sufficient volume of pea gravel

• Pea gravel will be offloaded from a rail car

during the TBM cutting stroke; this needs

attention with respect to train movements

• Train operation cycle should be carefully

considered to avoid “bottlenecks”

Pea Gravel Backfill Handling in Small Tunnels

Page 21: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

Pea Gravel Backfill Handling in Small Tunnels

Pea Gravel Bunker

and Conveyor Pea Gravel Pump

Pea Gravel Transport

Bin hauled on Flat Car

Page 22: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

PEA GRAVEL BACKFILL

• Grout is injected in pea gravel as a secondary

operation

• Theoretical interstices spaces in pea gravel at

30%

• Realistically, it is 50% since pea gravel does not

fill the gap completely

• Uses grout mixer, agitator, and piston or mono

type pump for injection via segment holes

• Grout injection will be performed at a distance

from the place of pea gravel injection

Pea Gravel Backfill Grout Injection

Page 23: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

Combination Pea Gravel

& Mortar Backfill

Page 24: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

COMBINED PEA GRAVEL & MORTAR BACKFILL

Combined Pea Gravel & Mortar Backfill

Pea Gravel Backfill

Invert Mortar Backfill

Page 25: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

COMBINED PEA GRAVEL & MORTAR BACKFILL

Combined Pea Gravel & Mortar Backfill

Invert Mortar Injection pipes built into Tail Shield

Page 26: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

COMBINED PEA GRAVEL & MORTAR BACKFILL

Robbins Double Shield TBM with Pea Gravel Backfill

DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY

DS 221 3.5 Pieve-Vergonte, Italy Limestone, Marl

DS303 3.5 Kunming, China Siltstone, Mudstone

DS234 4.1 Talave, Italy Limestone, Marl, Clay

DS301 4.3 BAM, Russia Gneiss, Hornfels

DS287 5 Busan, Korea Granite, Gneiss

DS325 10 Veligonda India Quartzite, Schist

DS318 10 AMR, India Granite, Porphry

Page 27: Tunnel Segment Backfilling with Double Shield TBMs · 2017. 5. 31. · Robbins Double Shield TBM with Pea Gravel Backfill DS TBM NUMBER BORE DIA. (m) PROJECT GEOLOGY DS 221 3.5 Pieve-Vergonte,

Thank You