ReportU BRAMPTON Economic Development Committeebromptonca FlOWef City Committee of the Council of
The Corporation of the City of Brampton
Date March 5 2015 Economic Development Committee Date Apr I loffFile P75CE FA P75CE BU
Subject Recommendation Report Downtown Brampton Fagade and Building Improvement Programs Extension to 2015
Wards 1 and 3
Contact Paul Aldunate Office of the Central Area (905-874-2435)
Overview
In December 2012 City Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan
The programs have been successful in stimulating positive improvements to properties in the downtown Twenty applications requesting $551000 through the programs resulting in approximately $21 million in new investment in the downtown have been approved and continue to move forward
Given the strong interest shown to date staff is recommending that the programs be extended for a further year to continue to support the ongoing revitalization of the historic downtown
Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the two programs subject to Council approval
In addition this report recommends that the Implementation Guidelines for the Fagade and Building Improvement Programs be amended
o to allow the timing of works of all proposed improvements to be completed within two (2) calendar years of the date of approving the grant rather than the previous one (1) calendar year timeframe
o to allow the City to erect signage indicating participation in the Citys Fagade and Building Improvement Programs and
o to remove the time limit of three (3) years that was approved as the duration of the Fagade and Building Improvement Programs in 2012 subject to an annual review and endorsement of the programs
Grl-Z-Z
Recommendations
1 THAT the report from Paul Aldunate Office of the Central Area dated March 5 2015 to the Economic Development Committee Meeting of April 1 2015 re Recommendation Report Downtown Brampton Facade and Building Improvement Programs Extension to 2015 be received
2 THAT Council approve the continuation of the programs for 2015 subject to Councils approval of the 2015 budget submission and further direct staff to proceed with the necessary notifications establishment of an application deadline acceptance of applications and to report back to Council with a recommended group of projects for Councils consideration and approval
3 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to allow the timing of works of all proposed improvements to be completed within two (2) years of the date of the approval of the grant
4 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to require approved projects to allow the City to erect signage indicating participation in the Citys Fagade and Building Improvement Programs and
5 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended by removing the time limit of three (3) years that was previously approved as the duration of the programs subject to an annual review and approval of the programs
Background
In December of 2012 Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan The intention of these programs is to support the revitalization of the historicdowntown and support the economic vitality and general liveability of the area More specifically the objectives for the Fagade Improvement Program are
a) To improve overall quality of building facades in the program area and support the ongoing revitalization efforts of the historic downtown area by helping to create an attractive place for people to work live be entertained shop and undertake business
b) To improve the visual appearance of building facades along downtown laneways and public spaces and support long-term objectives towards activating laneway space in the historic core
pound2-1-
c) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown
d) To support business owners in their efforts to improve their tenant space and storefronts provide a high-quality appearance for their establishments and improve the attractiveness of these establishments to potential customers
e) To encourage and support the restoration and reinstatement of historic building facades within the program area
The Building Improvement Program seeks to
a) To improve overall the qualityof commercialmixed use building stock and space in the historic downtown core
b) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown
c) To support business owners in their efforts to improve their tenant space
d) To encourage and support the ongoing active reuse of heritage buildings
A total of 24 applications have been approved since the inception of the Fagade and Building Improvement Programs with only4 applications having expired or withdrawn Twenty applications continue to move forward towards completion which represents a total construction value of $21 million The Citys financial commitment towards these 20 applications through the Citys Fagade and Building Improvement Programs has been $551 thousand
Ofthe 20 applications 4 applications involving 3 properties have resulted in complete projects The before and after pictures of these projects can be seen in Appendix 1
Current Situation
The Fagade and Building Improvement Programs are valuable in supporting the ongoing revitalization of the historic core These have helped to achieve a number of objectives including improving the visual attractiveness of the area and increasing the economic vitality of the area by supporting the general improvement of the building stock and commercial space
Given the strong support and positive feedback received to date staff is suggesting the programs continue in 2015 It is recommended that a budget of $300 thousand ($150 thousand for each program) apply to 2015
pound2-2-4shy
The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs
NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)
Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant
In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs
Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review
Corporate Implications
Urban Design Services
The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects
Financial Implications
Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval
Strategic Plan
The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area
Cl-l-S
Conclusion
The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015
Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer
pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services
Appendices
Appendix 1 Before and After Pictures
bull 6 George Street bull 60 Main Street North
bull 204 Main Street North
Appendix 2 Application Status Table
Report authored by Paul Aldunate MPL MClP RPP
Approval for Submission
Initials Date
Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW
G-M-l
APPENDIX 1
Before and After Pictures
6 George Street - File FA13-007 and File BU13-005
Picture taken June 2013 Picture taken September 2014
60 Main Street North - Cyclepath - File FA14-011
Picture taken May 2014 Picture taken February 2015
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
Grl-Z-Z
Recommendations
1 THAT the report from Paul Aldunate Office of the Central Area dated March 5 2015 to the Economic Development Committee Meeting of April 1 2015 re Recommendation Report Downtown Brampton Facade and Building Improvement Programs Extension to 2015 be received
2 THAT Council approve the continuation of the programs for 2015 subject to Councils approval of the 2015 budget submission and further direct staff to proceed with the necessary notifications establishment of an application deadline acceptance of applications and to report back to Council with a recommended group of projects for Councils consideration and approval
3 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to allow the timing of works of all proposed improvements to be completed within two (2) years of the date of the approval of the grant
4 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to require approved projects to allow the City to erect signage indicating participation in the Citys Fagade and Building Improvement Programs and
5 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended by removing the time limit of three (3) years that was previously approved as the duration of the programs subject to an annual review and approval of the programs
Background
In December of 2012 Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan The intention of these programs is to support the revitalization of the historicdowntown and support the economic vitality and general liveability of the area More specifically the objectives for the Fagade Improvement Program are
a) To improve overall quality of building facades in the program area and support the ongoing revitalization efforts of the historic downtown area by helping to create an attractive place for people to work live be entertained shop and undertake business
b) To improve the visual appearance of building facades along downtown laneways and public spaces and support long-term objectives towards activating laneway space in the historic core
pound2-1-
c) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown
d) To support business owners in their efforts to improve their tenant space and storefronts provide a high-quality appearance for their establishments and improve the attractiveness of these establishments to potential customers
e) To encourage and support the restoration and reinstatement of historic building facades within the program area
The Building Improvement Program seeks to
a) To improve overall the qualityof commercialmixed use building stock and space in the historic downtown core
b) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown
c) To support business owners in their efforts to improve their tenant space
d) To encourage and support the ongoing active reuse of heritage buildings
A total of 24 applications have been approved since the inception of the Fagade and Building Improvement Programs with only4 applications having expired or withdrawn Twenty applications continue to move forward towards completion which represents a total construction value of $21 million The Citys financial commitment towards these 20 applications through the Citys Fagade and Building Improvement Programs has been $551 thousand
Ofthe 20 applications 4 applications involving 3 properties have resulted in complete projects The before and after pictures of these projects can be seen in Appendix 1
Current Situation
The Fagade and Building Improvement Programs are valuable in supporting the ongoing revitalization of the historic core These have helped to achieve a number of objectives including improving the visual attractiveness of the area and increasing the economic vitality of the area by supporting the general improvement of the building stock and commercial space
Given the strong support and positive feedback received to date staff is suggesting the programs continue in 2015 It is recommended that a budget of $300 thousand ($150 thousand for each program) apply to 2015
pound2-2-4shy
The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs
NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)
Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant
In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs
Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review
Corporate Implications
Urban Design Services
The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects
Financial Implications
Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval
Strategic Plan
The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area
Cl-l-S
Conclusion
The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015
Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer
pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services
Appendices
Appendix 1 Before and After Pictures
bull 6 George Street bull 60 Main Street North
bull 204 Main Street North
Appendix 2 Application Status Table
Report authored by Paul Aldunate MPL MClP RPP
Approval for Submission
Initials Date
Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW
G-M-l
APPENDIX 1
Before and After Pictures
6 George Street - File FA13-007 and File BU13-005
Picture taken June 2013 Picture taken September 2014
60 Main Street North - Cyclepath - File FA14-011
Picture taken May 2014 Picture taken February 2015
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
pound2-1-
c) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown
d) To support business owners in their efforts to improve their tenant space and storefronts provide a high-quality appearance for their establishments and improve the attractiveness of these establishments to potential customers
e) To encourage and support the restoration and reinstatement of historic building facades within the program area
The Building Improvement Program seeks to
a) To improve overall the qualityof commercialmixed use building stock and space in the historic downtown core
b) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown
c) To support business owners in their efforts to improve their tenant space
d) To encourage and support the ongoing active reuse of heritage buildings
A total of 24 applications have been approved since the inception of the Fagade and Building Improvement Programs with only4 applications having expired or withdrawn Twenty applications continue to move forward towards completion which represents a total construction value of $21 million The Citys financial commitment towards these 20 applications through the Citys Fagade and Building Improvement Programs has been $551 thousand
Ofthe 20 applications 4 applications involving 3 properties have resulted in complete projects The before and after pictures of these projects can be seen in Appendix 1
Current Situation
The Fagade and Building Improvement Programs are valuable in supporting the ongoing revitalization of the historic core These have helped to achieve a number of objectives including improving the visual attractiveness of the area and increasing the economic vitality of the area by supporting the general improvement of the building stock and commercial space
Given the strong support and positive feedback received to date staff is suggesting the programs continue in 2015 It is recommended that a budget of $300 thousand ($150 thousand for each program) apply to 2015
pound2-2-4shy
The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs
NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)
Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant
In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs
Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review
Corporate Implications
Urban Design Services
The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects
Financial Implications
Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval
Strategic Plan
The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area
Cl-l-S
Conclusion
The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015
Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer
pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services
Appendices
Appendix 1 Before and After Pictures
bull 6 George Street bull 60 Main Street North
bull 204 Main Street North
Appendix 2 Application Status Table
Report authored by Paul Aldunate MPL MClP RPP
Approval for Submission
Initials Date
Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW
G-M-l
APPENDIX 1
Before and After Pictures
6 George Street - File FA13-007 and File BU13-005
Picture taken June 2013 Picture taken September 2014
60 Main Street North - Cyclepath - File FA14-011
Picture taken May 2014 Picture taken February 2015
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
pound2-2-4shy
The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs
NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)
Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant
In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs
Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review
Corporate Implications
Urban Design Services
The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects
Financial Implications
Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval
Strategic Plan
The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area
Cl-l-S
Conclusion
The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015
Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer
pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services
Appendices
Appendix 1 Before and After Pictures
bull 6 George Street bull 60 Main Street North
bull 204 Main Street North
Appendix 2 Application Status Table
Report authored by Paul Aldunate MPL MClP RPP
Approval for Submission
Initials Date
Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW
G-M-l
APPENDIX 1
Before and After Pictures
6 George Street - File FA13-007 and File BU13-005
Picture taken June 2013 Picture taken September 2014
60 Main Street North - Cyclepath - File FA14-011
Picture taken May 2014 Picture taken February 2015
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
Cl-l-S
Conclusion
The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015
Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer
pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services
Appendices
Appendix 1 Before and After Pictures
bull 6 George Street bull 60 Main Street North
bull 204 Main Street North
Appendix 2 Application Status Table
Report authored by Paul Aldunate MPL MClP RPP
Approval for Submission
Initials Date
Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW
G-M-l
APPENDIX 1
Before and After Pictures
6 George Street - File FA13-007 and File BU13-005
Picture taken June 2013 Picture taken September 2014
60 Main Street North - Cyclepath - File FA14-011
Picture taken May 2014 Picture taken February 2015
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
G-M-l
APPENDIX 1
Before and After Pictures
6 George Street - File FA13-007 and File BU13-005
Picture taken June 2013 Picture taken September 2014
60 Main Street North - Cyclepath - File FA14-011
Picture taken May 2014 Picture taken February 2015
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
61-1-1
204 Main Street North - DSB Claims Solutions - File BU13-003
Picture taken June 2014 Picture taken June 2014
Picture taken February 2015 Picture taken February 2015
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
Year File(s) Address Applicant
Proposal Building Fagade Building Fagade
27 Main Street North
1 2013 Value Asset Inc
New store frontage signage $ 30000
FA13-010
40 Queen Street
2
3
4
2013
2013
2013
Gomes Holdings Inc FA13-002
15 Main Street North
P Dinner
FA13-006
BU13-008 23-27 Queen Street East
Rucareal Ltd
FA13-007
BU13-007
6 George Street South
New Storefront singage screening of as metre
Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)
Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions
$ 300000
$ 88707
$ 51245
$ 115000
$ 70500
$ 50000
$ 30000
$ 20000
$ 50000
$ 30000
5 2013
D Kapil
FA13-005
New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors
$ 103960 $ 142357 $ 30000 $ 30000
6 2013
BU13-005
14 George Street North D Kapil FA13-004
BU13-004
204 Main Street North
New windows storefronts facade single unit renovation washrooms new roof
repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000
7 2013 D Banga Interior Renovations $ 382000 $ 30000
FA13-010
8
9
2014
2014
170 Main Street North
S Marshall
FA14-004
BU14-004
15 Main Street North
FA14-005
BU14-005
Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses
$ 74015
Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina
$ 300000
$ 64376
$ 112039
$ 30000
$ 50000
$ 30000
$ 50000
Invoice Status Payment
Submission
Expired
Expired
Withdrawn
Extension to June 312015
Completed
Extension to June 312015
Completed
$438147
$178396
Invoices
Review
Invoices
Review
under
Under
i
oO
Watting for resubmission drawings and cost estimate
BuildingPermit Issued
of
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo
APPENDIX 2
APPLICATION STATUS TABLE
Cost Estimate City Contribution
File(s) AddressYear Proposal Building Fagade Building FagadeApplicant
47 Queen Street West
New full facade (brick and stone) new doorsD Nava
and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000
space new stairs related HVAC electricalFA14-007
plumbing
BU14-007
250 Main Street North Historic restoration of front and side facades
(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated
buildingFA14-001
60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face
12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other
FA14-011 windows in facade 49 Queen Street West
Full replacement of Queen and George StreetL Nguyen (Brampton
facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000
signage Interior work required to accommodate facade changes
FA14-010
BU14-010
223 Main Street North
Restoration of facade elements of listed
Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000
FA14-003 building program work of foundation water proofing repair
BU14-003
13 Queen Street East
New storefront and signage renovation ofBrampton Denture Clinic
15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area
FA14-006
BU14-006
Total $1495752 $ 1100050 $295050 $ 406046
Total Value of Expired and Withdrawn $ 466245 - $150000
TOTAL POTENTIAL INVESTMENT $2129557 $551096
Status Invoice
Submission
Agreements signed
Waiting for resubmission of drawings and cost estimate
Payment
Waiting for resubmission drawings and cost estimate
of
Completion Immanent
Waiting for revised Drawings
Waiting for revised drawings
-0
Revised review
Drawings under
$ 616543 $
bull bdquo