Ql-1~\ Report U BRAMPTON Economic Development Committee brompton.ca FlOWef City Committee of the Council of The Corporation of the City of Brampton Date: March 5, 2015 Economic Development Committee Date: Apr/' I/ lo/ff File: P75CE FA, P75CE BU Subject: Recommendation Report Downtown Brampton Fagade and Building Improvement Programs Extension to 2015 Wards 1 and 3 Contact: Paul Aldunate, Office of the Central Area (905-874-2435) Overview: In December 2012, City Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan. The programs have been successful in stimulating positive improvements to properties in the downtown. Twenty applications requesting $551,000 through the programs, resulting in approximately $2.1 million in new investment in the downtown, have been approved and continue to move forward. Given the strong interest shown to date, staff is recommending that the programs be extended for a further year to continue to support the ongoing revitalization of the historic downtown. Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the two programs, subject to Council approval. In addition, this report recommends that the Implementation Guidelines for the Fagade and Building Improvement Programs be amended: o to allow the timing of works of all proposed improvements to be completed within two (2) calendar years of the date of approving the grant, rather than the previous one (1) calendar year timeframe; o to allow the City to erect signage indicating participation in the City's Fagade and Building Improvement Programs; and, o to remove the time limit of three (3) years that was approved as the duration of the Fagade and Building Improvement Programs in 2012, subject to an annual review and endorsement of the programs.

Upload: others

Post on 14-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Ql-1~

ReportU BRAMPTON Economic Development Committeebromptonca FlOWef City Committee of the Council of

The Corporation of the City of Brampton

Date March 5 2015 Economic Development Committee Date Apr I loffFile P75CE FA P75CE BU

Subject Recommendation Report Downtown Brampton Fagade and Building Improvement Programs Extension to 2015

Wards 1 and 3

Contact Paul Aldunate Office of the Central Area (905-874-2435)

Overview

In December 2012 City Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan

The programs have been successful in stimulating positive improvements to properties in the downtown Twenty applications requesting $551000 through the programs resulting in approximately $21 million in new investment in the downtown have been approved and continue to move forward

Given the strong interest shown to date staff is recommending that the programs be extended for a further year to continue to support the ongoing revitalization of the historic downtown

Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the two programs subject to Council approval

In addition this report recommends that the Implementation Guidelines for the Fagade and Building Improvement Programs be amended

o to allow the timing of works of all proposed improvements to be completed within two (2) calendar years of the date of approving the grant rather than the previous one (1) calendar year timeframe

o to allow the City to erect signage indicating participation in the Citys Fagade and Building Improvement Programs and

o to remove the time limit of three (3) years that was approved as the duration of the Fagade and Building Improvement Programs in 2012 subject to an annual review and endorsement of the programs

Grl-Z-Z

Recommendations

1 THAT the report from Paul Aldunate Office of the Central Area dated March 5 2015 to the Economic Development Committee Meeting of April 1 2015 re Recommendation Report Downtown Brampton Facade and Building Improvement Programs Extension to 2015 be received

2 THAT Council approve the continuation of the programs for 2015 subject to Councils approval of the 2015 budget submission and further direct staff to proceed with the necessary notifications establishment of an application deadline acceptance of applications and to report back to Council with a recommended group of projects for Councils consideration and approval

3 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to allow the timing of works of all proposed improvements to be completed within two (2) years of the date of the approval of the grant

4 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to require approved projects to allow the City to erect signage indicating participation in the Citys Fagade and Building Improvement Programs and

5 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended by removing the time limit of three (3) years that was previously approved as the duration of the programs subject to an annual review and approval of the programs

Background

In December of 2012 Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan The intention of these programs is to support the revitalization of the historicdowntown and support the economic vitality and general liveability of the area More specifically the objectives for the Fagade Improvement Program are

a) To improve overall quality of building facades in the program area and support the ongoing revitalization efforts of the historic downtown area by helping to create an attractive place for people to work live be entertained shop and undertake business

b) To improve the visual appearance of building facades along downtown laneways and public spaces and support long-term objectives towards activating laneway space in the historic core

pound2-1-

c) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown

d) To support business owners in their efforts to improve their tenant space and storefronts provide a high-quality appearance for their establishments and improve the attractiveness of these establishments to potential customers

e) To encourage and support the restoration and reinstatement of historic building facades within the program area

The Building Improvement Program seeks to

a) To improve overall the qualityof commercialmixed use building stock and space in the historic downtown core

b) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown

c) To support business owners in their efforts to improve their tenant space

d) To encourage and support the ongoing active reuse of heritage buildings

A total of 24 applications have been approved since the inception of the Fagade and Building Improvement Programs with only4 applications having expired or withdrawn Twenty applications continue to move forward towards completion which represents a total construction value of $21 million The Citys financial commitment towards these 20 applications through the Citys Fagade and Building Improvement Programs has been $551 thousand

Ofthe 20 applications 4 applications involving 3 properties have resulted in complete projects The before and after pictures of these projects can be seen in Appendix 1

Current Situation

The Fagade and Building Improvement Programs are valuable in supporting the ongoing revitalization of the historic core These have helped to achieve a number of objectives including improving the visual attractiveness of the area and increasing the economic vitality of the area by supporting the general improvement of the building stock and commercial space

Given the strong support and positive feedback received to date staff is suggesting the programs continue in 2015 It is recommended that a budget of $300 thousand ($150 thousand for each program) apply to 2015

pound2-2-4shy

The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs

NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)

Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant

In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs

Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review

Corporate Implications

Urban Design Services

The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects

Financial Implications

Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval

Strategic Plan

The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area

Cl-l-S

Conclusion

The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015

Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer

pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services

Appendices

Appendix 1 Before and After Pictures

bull 6 George Street bull 60 Main Street North

bull 204 Main Street North

Appendix 2 Application Status Table

Report authored by Paul Aldunate MPL MClP RPP

Approval for Submission

Initials Date

Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW

G-M-l

APPENDIX 1

Before and After Pictures

6 George Street - File FA13-007 and File BU13-005

Picture taken June 2013 Picture taken September 2014

60 Main Street North - Cyclepath - File FA14-011

Picture taken May 2014 Picture taken February 2015

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

Grl-Z-Z

Recommendations

1 THAT the report from Paul Aldunate Office of the Central Area dated March 5 2015 to the Economic Development Committee Meeting of April 1 2015 re Recommendation Report Downtown Brampton Facade and Building Improvement Programs Extension to 2015 be received

2 THAT Council approve the continuation of the programs for 2015 subject to Councils approval of the 2015 budget submission and further direct staff to proceed with the necessary notifications establishment of an application deadline acceptance of applications and to report back to Council with a recommended group of projects for Councils consideration and approval

3 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to allow the timing of works of all proposed improvements to be completed within two (2) years of the date of the approval of the grant

4 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended to require approved projects to allow the City to erect signage indicating participation in the Citys Fagade and Building Improvement Programs and

5 THAT the Implementation Guidelines for the Fagade and Building Improvement Programs be amended by removing the time limit of three (3) years that was previously approved as the duration of the programs subject to an annual review and approval of the programs

Background

In December of 2012 Council approved the Fagade and Building Improvement Programs under the Central Area Community Improvement Plan The intention of these programs is to support the revitalization of the historicdowntown and support the economic vitality and general liveability of the area More specifically the objectives for the Fagade Improvement Program are

a) To improve overall quality of building facades in the program area and support the ongoing revitalization efforts of the historic downtown area by helping to create an attractive place for people to work live be entertained shop and undertake business

b) To improve the visual appearance of building facades along downtown laneways and public spaces and support long-term objectives towards activating laneway space in the historic core

pound2-1-

c) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown

d) To support business owners in their efforts to improve their tenant space and storefronts provide a high-quality appearance for their establishments and improve the attractiveness of these establishments to potential customers

e) To encourage and support the restoration and reinstatement of historic building facades within the program area

The Building Improvement Program seeks to

a) To improve overall the qualityof commercialmixed use building stock and space in the historic downtown core

b) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown

c) To support business owners in their efforts to improve their tenant space

d) To encourage and support the ongoing active reuse of heritage buildings

A total of 24 applications have been approved since the inception of the Fagade and Building Improvement Programs with only4 applications having expired or withdrawn Twenty applications continue to move forward towards completion which represents a total construction value of $21 million The Citys financial commitment towards these 20 applications through the Citys Fagade and Building Improvement Programs has been $551 thousand

Ofthe 20 applications 4 applications involving 3 properties have resulted in complete projects The before and after pictures of these projects can be seen in Appendix 1

Current Situation

The Fagade and Building Improvement Programs are valuable in supporting the ongoing revitalization of the historic core These have helped to achieve a number of objectives including improving the visual attractiveness of the area and increasing the economic vitality of the area by supporting the general improvement of the building stock and commercial space

Given the strong support and positive feedback received to date staff is suggesting the programs continue in 2015 It is recommended that a budget of $300 thousand ($150 thousand for each program) apply to 2015

pound2-2-4shy

The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs

NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)

Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant

In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs

Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review

Corporate Implications

Urban Design Services

The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects

Financial Implications

Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval

Strategic Plan

The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area

Cl-l-S

Conclusion

The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015

Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer

pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services

Appendices

Appendix 1 Before and After Pictures

bull 6 George Street bull 60 Main Street North

bull 204 Main Street North

Appendix 2 Application Status Table

Report authored by Paul Aldunate MPL MClP RPP

Approval for Submission

Initials Date

Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW

G-M-l

APPENDIX 1

Before and After Pictures

6 George Street - File FA13-007 and File BU13-005

Picture taken June 2013 Picture taken September 2014

60 Main Street North - Cyclepath - File FA14-011

Picture taken May 2014 Picture taken February 2015

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

pound2-1-

c) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown

d) To support business owners in their efforts to improve their tenant space and storefronts provide a high-quality appearance for their establishments and improve the attractiveness of these establishments to potential customers

e) To encourage and support the restoration and reinstatement of historic building facades within the program area

The Building Improvement Program seeks to

a) To improve overall the qualityof commercialmixed use building stock and space in the historic downtown core

b) To support property owners in their efforts to upgrade their properties and improve the viability of the buildings for new quality businesses to locate in the downtown

c) To support business owners in their efforts to improve their tenant space

d) To encourage and support the ongoing active reuse of heritage buildings

A total of 24 applications have been approved since the inception of the Fagade and Building Improvement Programs with only4 applications having expired or withdrawn Twenty applications continue to move forward towards completion which represents a total construction value of $21 million The Citys financial commitment towards these 20 applications through the Citys Fagade and Building Improvement Programs has been $551 thousand

Ofthe 20 applications 4 applications involving 3 properties have resulted in complete projects The before and after pictures of these projects can be seen in Appendix 1

Current Situation

The Fagade and Building Improvement Programs are valuable in supporting the ongoing revitalization of the historic core These have helped to achieve a number of objectives including improving the visual attractiveness of the area and increasing the economic vitality of the area by supporting the general improvement of the building stock and commercial space

Given the strong support and positive feedback received to date staff is suggesting the programs continue in 2015 It is recommended that a budget of $300 thousand ($150 thousand for each program) apply to 2015

pound2-2-4shy

The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs

NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)

Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant

In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs

Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review

Corporate Implications

Urban Design Services

The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects

Financial Implications

Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval

Strategic Plan

The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area

Cl-l-S

Conclusion

The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015

Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer

pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services

Appendices

Appendix 1 Before and After Pictures

bull 6 George Street bull 60 Main Street North

bull 204 Main Street North

Appendix 2 Application Status Table

Report authored by Paul Aldunate MPL MClP RPP

Approval for Submission

Initials Date

Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW

G-M-l

APPENDIX 1

Before and After Pictures

6 George Street - File FA13-007 and File BU13-005

Picture taken June 2013 Picture taken September 2014

60 Main Street North - Cyclepath - File FA14-011

Picture taken May 2014 Picture taken February 2015

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

pound2-2-4shy

The following provides a proposed timeline for the implementation of the 2015 FagadeBuilding Improvement Programs

NotificationMailing (May 2015) Public Information Session (MayJune 2015) Application close deadline (August 2015) Staff review (August 2015) Report to Economic and Development Committee (SeptemberOctober 2015) Deadline for signing of Agreement (February 2016)

Given the time it takes for some applicants to complete the work which includes the approval of the final drawings and the completion of construction staff is recommending that the deadline for completing the works be extended to two (2) calendar years from the date of approving the grant

In addition staff is recommending that the Programs Implementation Guidelines be amended to allowthe City to erect signage indicating the project is supported by the Citys Fagade and Building Improvement Programs which will assist with the general marketing of the incentive programs

Furthermore staff is recommending that the Program Implementation Guidelines be amended to remove the time limit of three (3) years allocated to the Fagade and Building Improvement Programs subject to an annual review

Corporate Implications

Urban Design Services

The Urban Design Services section of the Planning and Building Division will assist with the review of fagade improvement applications and continue to provide support and advice to applicants through the approval process This will serve to encourage a better design and architecture of projects

Financial Implications

Funding of $300 thousand has been included in the 2015 Capital Budget recommendation for the Fagade and Building Improvement initiatives subject to Council approval

Strategic Plan

The Downtown Brampton Fagade and Building Improvement Programs support the Growth Management priority of the Strategic Plan in particular the key strategic initiative to Increase the Prominence of the Central Area

Cl-l-S

Conclusion

The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015

Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer

pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services

Appendices

Appendix 1 Before and After Pictures

bull 6 George Street bull 60 Main Street North

bull 204 Main Street North

Appendix 2 Application Status Table

Report authored by Paul Aldunate MPL MClP RPP

Approval for Submission

Initials Date

Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW

G-M-l

APPENDIX 1

Before and After Pictures

6 George Street - File FA13-007 and File BU13-005

Picture taken June 2013 Picture taken September 2014

60 Main Street North - Cyclepath - File FA14-011

Picture taken May 2014 Picture taken February 2015

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

Cl-l-S

Conclusion

The Fagade and Building Improvement Programs have received strong interest to date The recommendations of this report will ensure the Fagade and Building Improvement Programs will continue in 2015

Paul Aldunate MPL MClP RPP Thomas Plant Director Central Area Planner Strategic and Enterprise Services Office of the Central Area Office of the Chief Operating Officer

pul S^e^CIP RPP Director development Services Planningand Building Division Planning and Infrastructure Services

Appendices

Appendix 1 Before and After Pictures

bull 6 George Street bull 60 Main Street North

bull 204 Main Street North

Appendix 2 Application Status Table

Report authored by Paul Aldunate MPL MClP RPP

Approval for Submission

Initials Date

Chair SMT amp 1SMM Department Chief jriacilligtChief Administrative Officer WW

G-M-l

APPENDIX 1

Before and After Pictures

6 George Street - File FA13-007 and File BU13-005

Picture taken June 2013 Picture taken September 2014

60 Main Street North - Cyclepath - File FA14-011

Picture taken May 2014 Picture taken February 2015

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

G-M-l

APPENDIX 1

Before and After Pictures

6 George Street - File FA13-007 and File BU13-005

Picture taken June 2013 Picture taken September 2014

60 Main Street North - Cyclepath - File FA14-011

Picture taken May 2014 Picture taken February 2015

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

61-1-1

204 Main Street North - DSB Claims Solutions - File BU13-003

Picture taken June 2014 Picture taken June 2014

Picture taken February 2015 Picture taken February 2015

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

Year File(s) Address Applicant

Proposal Building Fagade Building Fagade

27 Main Street North

1 2013 Value Asset Inc

New store frontage signage $ 30000

FA13-010

40 Queen Street

2

3

4

2013

2013

2013

Gomes Holdings Inc FA13-002

15 Main Street North

P Dinner

FA13-006

BU13-008 23-27 Queen Street East

Rucareal Ltd

FA13-007

BU13-007

6 George Street South

New Storefront singage screening of as metre

Historic estorarion of front facde (windows brick mansard) new storefront interior renovation (ground and 2nd floor)

Restoration of front facade (windows masonry repair) new store front renovation of commercial space incl HVAC electrical new partitions

$ 300000

$ 88707

$ 51245

$ 115000

$ 70500

$ 50000

$ 30000

$ 20000

$ 50000

$ 30000

5 2013

D Kapil

FA13-005

New front facade incl new storefronts structural for new facade new stairs electrical ductwork partitions hallway floors

$ 103960 $ 142357 $ 30000 $ 30000

6 2013

BU13-005

14 George Street North D Kapil FA13-004

BU13-004

204 Main Street North

New windows storefronts facade single unit renovation washrooms new roof

repairrepaint including AC $ 134470 $ 119187 $ 30000 $ 30000

7 2013 D Banga Interior Renovations $ 382000 $ 30000

FA13-010

8

9

2014

2014

170 Main Street North

S Marshall

FA14-004

BU14-004

15 Main Street North

FA14-005

BU14-005

Restoration of facade (new windows and doors restore or refinish brick removal of porch repair replacement in kind of woodwork (fascia sills eaves)) renovation of interior renovation of interior space for new commercial uses space for new commercial uses

$ 74015

Historic restoration of front facade (windows cleaningpainting brick mansard) new storefront interior renovation (ground and 2nd floor) Heritaae-desionated buiidina

$ 300000

$ 64376

$ 112039

$ 30000

$ 50000

$ 30000

$ 50000

Invoice Status Payment

Submission

Expired

Expired

Withdrawn

Extension to June 312015

Completed

Extension to June 312015

Completed

$438147

$178396

Invoices

Review

Invoices

Review

under

Under

i

oO

Watting for resubmission drawings and cost estimate

BuildingPermit Issued

of

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo

APPENDIX 2

APPLICATION STATUS TABLE

Cost Estimate City Contribution

File(s) AddressYear Proposal Building Fagade Building FagadeApplicant

47 Queen Street West

New full facade (brick and stone) new doorsD Nava

and windows new ground floor interior tenant10 2014 $ 62500 $ 42100 $ 20000 $ 20000

space new stairs related HVAC electricalFA14-007

plumbing

BU14-007

250 Main Street North Historic restoration of front and side facades

(stabilization renovation of porch windows11 2014 A Carreiro $ 72422 $ 20000doors trim stucco) Heritage designated

buildingFA14-001

60 Main Street North New facade at rear of building facing Rose Theatre remove existing wood face

12 2014 Cyclepath (NDuic) replacerepair brick new ground floor storefront $ 69204 $ 30000 windows and entrance replacement of other

FA14-011 windows in facade 49 Queen Street West

Full replacement of Queen and George StreetL Nguyen (Brampton

facades with new design including new 13 2014 Dentist Centre) $ 45200 $ 186625 $ 22600 $ 30000

signage Interior work required to accommodate facade changes

FA14-010

BU14-010

223 Main Street North

Restoration of facade elements of listed

Kania Lawyers heritage building (porch columns window trim 14 2014 brick repointing) Recommended limit to $ 4900 $ 22905 $ 2450 $ 20000

FA14-003 building program work of foundation water proofing repair

BU14-003

13 Queen Street East

New storefront and signage renovation ofBrampton Denture Clinic

15 2014 interior tenant space for use including high $ 32090 $ 16046 quality lobby area

FA14-006

BU14-006

Total $1495752 $ 1100050 $295050 $ 406046

Total Value of Expired and Withdrawn $ 466245 - $150000

TOTAL POTENTIAL INVESTMENT $2129557 $551096

Status Invoice

Submission

Agreements signed

Waiting for resubmission of drawings and cost estimate

Payment

Waiting for resubmission drawings and cost estimate

of

Completion Immanent

Waiting for revised Drawings

Waiting for revised drawings

-0

Revised review

Drawings under

$ 616543 $

bull bdquo