umts psc planning

Upload: abraham-ndong

Post on 03-Jun-2018

227 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/11/2019 Umts Psc Planning

    1/18

    Scrambling Code Planning in

    UMTS Networks

    AMIT PATHAK

  • 8/11/2019 Umts Psc Planning

    2/18

    SCR MBLING CODE PL NNER FOR UMTS

    The UMTS Scrambling Code Planner is used to assign primaryscrambling codes to individual cells. Scrambling codes do not

    affect the Simulation and Reports, but the tool is useful for

    achieving code re-use efficiency in the network.

    Code planning is required for the downlink scrambling codes toensure that code reuse is as efficient as possible. Interfering cells

    should be assigned different scrambling codes. In addition ,

    consideration should be given to limiting the number of code

    groups and codes per group used by the neighboring cells.

  • 8/11/2019 Umts Psc Planning

    3/18

    The scrambling code schema allows you to create a range of codegroups and codes within a code group to plan in when using the

    Scrambling Code Planner.

    The potential number of code groups is 64 (0-63) and the numberof primary scrambling codes within each group is 8 (0-7).

    Setting up a Range of Scrambling Codes (Schemas)

  • 8/11/2019 Umts Psc Planning

    4/18

    Creating a Schema

    To create a schema:

    1 From the Configuration menu, click UMTS Scrambling Code Schemas. Thispicture shows an example of the Scrambling Code Schemas dialog box:

  • 8/11/2019 Umts Psc Planning

    5/18

    2 Click Add, and name the new schema.

    3 Select the code groups that you want to use. When you select a code group, the

    list of codes within the code group appears in the right pane. Select the codes for

    each code group.

    4 Click OK to commit the changes to the database and close the dialog box.

    Deleting a Schema

    You can delete schemas but if you do this, they cannot be restored. They are

    deleted immediately and not moved to the wastebasket.

    To delete a schema from the list:

    1 From the Configuration menu, click UMTS Scrambling Code Schemas.

    2 In the Scrambling Code Schema dialog box, select the schema that you wish to

    delete and click Remove.

    3 Click OK.

  • 8/11/2019 Umts Psc Planning

    6/18

    Running the Scrambling Code Planner

    To use the Scrambling Code Planner:

    1 Ensure you have:

    Associated UMTS carriers with cells

    Created predictions for the cells you want to include

    Created neighbours (only if you are performing optimisation planning with

    reference to the neighbouring cells)

    2If you want to plan codes by selecting a view shown in the Map View window,

    ensure you have opened a Map View window displaying the region that you want

    to use.

  • 8/11/2019 Umts Psc Planning

    7/18

    3 From the Tools menu, click UMTS Scrambling Code Planner.

  • 8/11/2019 Umts Psc Planning

    8/18

    4 .To define the area over which you want to plan codes click the Select View button then

    click next.

  • 8/11/2019 Umts Psc Planning

    9/18

    5 . select the site filters to be included in the plan.

  • 8/11/2019 Umts Psc Planning

    10/18

    6. Click Next and set the options to plan the codes for each filter.

  • 8/11/2019 Umts Psc Planning

    11/18

  • 8/11/2019 Umts Psc Planning

    12/18

    7. Click Next and set the required parameters for the scrambling code planner:

  • 8/11/2019 Umts Psc Planning

    13/18

  • 8/11/2019 Umts Psc Planning

    14/18

    8 Click Finish to produce the Scrambling Code planner report.

    About the Scrambling Code Report

  • 8/11/2019 Umts Psc Planning

    15/18

    About the Scrambling Code Report

    Scrambling code reports are produced using the Scrambling Code Planner. The report shows all

    the details that relate to the options you chose to plan. All columns can be sorted, and any

    clashing codes are marked with the clashing codes symbol.

  • 8/11/2019 Umts Psc Planning

    16/18

    In the report, depending on your selected parameters, you can view:

    The planned Code Groups and Codes for each cell included in the plan.

    Any clashing codes or broken constraints.

    In the panes on the right of the dialog box, you can also view further details (if

    selected in the plan parameters) for any cell with clashing codes:

    the clashing neighbors of the cell

    the clashing cells that are adjacent to the cell (overlapping coverage)the clashing cells that are near to the cell (code re-use distance)

    the clashing cells that are on the same node as the cell

    If you are satisfied with the planned assignments, you can save them onto the

    CellParams tab of the cells in the Site Database.

  • 8/11/2019 Umts Psc Planning

    17/18

    Snapshot of All Plan sites with Scrambling Codes

  • 8/11/2019 Umts Psc Planning

    18/18

    Thank you for listening ..