1. Identify the problem or necessity.
2. Search for information.
3. Design and construction.
4. Evaluation of what have been constructed.
Steps of technological process
![Page 3: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/3.jpg)
Problem: Cross a river from one side to the other side
1.- Identify the problem
![Page 4: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/4.jpg)
Additional problems:
◦ ¿Is it too deep to cross by feet?
◦ ¿Is there too much water stream or cold temperature to cross swimming?
1.- Identify the problem
![Page 5: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/5.jpg)
Possible Solutions:
a) A boat or canoe b) A bridge
2.- Search for information
![Page 6: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/6.jpg)
We look for information about different kind of bridges:
2.- Search for information
Girder bridge
Rope Bridge
Arc bridgeTriangulate
bridge
![Page 7: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/7.jpg)
We look for information about different kind of bridges:
2.- Search for information
Cable-stayed bridge
Suspension Bridge
![Page 8: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/8.jpg)
Drawing the plans (CAD tools):
3.- Design and Construction
![Page 9: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/9.jpg)
Simulation tests (CAE tools):
3.- Design and Construction
![Page 10: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/10.jpg)
Construction planning:
3.- Design and Construction
![Page 11: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/11.jpg)
Load tests:
4.- Evaluation
Static test Dynamic Test
![Page 12: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/12.jpg)
Tacoma Narrows Bridge
![Page 13: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/13.jpg)
Tacoma Narrows Bridge First design by Clark Eldridge (11$ million).
Another design, by Leon Moisseiff, was chosen, reducing the total cost (8$ million).
Features:
◦ Total length of 1600 metres.
◦ Main span of 853 metres.
◦ The first one built using plate girders.
◦ Collapsed four months after its opening.VIDEO
![Page 14: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/14.jpg)
Tacoma Narrows Bridge After its collapse, the new Tacoma
Narrows Bridge, built in 1950, replaced plate girders by adding trusses.
![Page 15: Unit 1 technological process](https://reader034.vdocuments.net/reader034/viewer/2022042507/54bf32754a7959c94e8b45d5/html5/thumbnails/15.jpg)
In 2007 it was open to the traffic new Tacoma Narrows Bridge.
Tacoma Narrows Bridge