unit test pp
TRANSCRIPT
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_01
SCENARIO: Create, Change & Display Bills of Material OWNER: PPBUSINESS CASE: Create, change & display Bills of Material (CAPTAN TECHNICAL) STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful generation of Bill Of Material RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTESMaterial master
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Creation of Bill of Material
Logistics – Production – Master Data – Bills of Material – Bill of Material – Material BOM
CS01 Following materials were selected to produce PMM. PMM is a intermediate product for CAPTAN Technical.
227 PMM – HALB (Intermediate)220 CARBON DISULPHIDE221 HYDROCHLORIC ACID222 CHLORINE224 TOLUENE
BOM for PMM (227) Created Successfully with Batch size of 1202 Kgs.
Others In Annexure BOM
PP OK
Comments:
Approval: _________________________ Date: ____/____/____
© Copyright SAP America, Inc. 1997. All rights reserved. Unauthorized duplication is strictly prohibited. document.doc
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_02
SCENARIO: Create, Change & Display Resource Characteristic OWNER: PPBUSINESS CASE: Create all Resources Characteristic required for CAPTAN TECHNICAL STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Resource Characteristic RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Creation of Resource Characteristic
Logistics – Central Function – Batch Management - Batch Determination – Selection & Sort
CT04 Resources Characteristic created with & attached to class 019.
This Characteristic is used to select a resource from a list of resources.
Created Resource Characteristic CAPTAN_AG_NEUTSCH_FILTER.
PP
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
2 of 18
2
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_03
SCENARIO: Create, Change & Display Resource Class with Class Type 019 OWNER: PPBUSINESS CASE: Create all Resources Classification required for CAPTAN TECHNICAL STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Resource Class with Class type 019 RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Resource Class With Class Type 019.
Logistics – Production Process -
CL01 Resources Class CAPTAN_ANF created using Class Type 019
Assigned Characteristic CAPTAN_AG_NEUTSCH_FI to this Class.
Created Resource class CAPTAN_ANF with class type 019.
PP Initially we There were no authorization.
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
3 of 18
3
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_04
SCENARIO: Create, Change & Display Resource With Category 0008 OWNER: PPBUSINESS CASE: Create all Resources required for CAPTAN TECHNICAL STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Resource with Category 0008 RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Resource, Define Parameters for a Resource, & attach Shift to a Resource.
Logistics – Production Process – Master Data – Resources - Resource
CRC1 Created Resources R-501
Resource Category: 0008Standard Value Key: SAP7Rules for Utility data capturing No
Checking for all parameters.
Control Key: PI01Std. Value for all Parameter is
HR
Capacity Category: 0008Processing Formula: SAPC00Other Formula: SAPC00
Attached factory calendar & Shift.
Resource No R-501 in plant ANK1 with BOM usage 1 & Alternative BOM 2.
PP Information:
Cost center AKA021 not set up in controlling area RICA on 31.12.9999
1
Comments:
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
4 of 18
4
AcceleratedSAP - March 23, 1999
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
5 of 18
5
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_05
SCENARIO: Create Production Version & Attach to a Master Recipe OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Production Version & attach the same to Master Recipe.
Logistics - Production Process – Master Data – Material Master – Production Version
C223 Create Production Version V001 for Material 1,2,4 Triazole (522) & attached the same to Recipe group 50000056 by selecting Type as Master Recipe.
Production Version V001 attached to 500000056 Version V002 attached to 500000057.
PP OK
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
6 of 18
6
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_06
SCENARIO: Create, Change & Display Master Recipe for OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful Creation of Master RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
227 – Ank1 PMM
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Master Recipe.
Logistics – Production Process – Master Data – Recipe & Material List - Create
C201 Header Material: 227Plant: Ank1
Assigned PMM manufacturing Process to this Recipe along with Resource, Control Key, Destination & approximate time to complete an operation.
Recipe for PMM created with Recipe group number 500000040.
PP While Entering control Key ZP14, it generated an error [Control Key ZP14 not defined in Table T413].
Error rectified by Mahesh.
1 Change Master Recipe & Display Phase Relationship
Logistics – Production Process – Master Data – Recipe & Material List – Change
C202 After defining all Operations & relevant Phases, select all phases – Click on Generate Relationship Icon
Comments:
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
7 of 18
7
AcceleratedSAP - March 23, 1999
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
8 of 18
8
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_07
SCENARIO: Create, Change Component Allocation in Recipe to Phases OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Allocation of Materials Assigned in BOM to a related Phase of Recipe RUN DATE: 4/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
227 – Ank1 PMM
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Master Recipe & assign materials of BOM to Phases of Recipe
Logistics – Production Process – Master Data – Recipe & Material List – Change
C202 Header Material: 227Plant: Ank1
Select a Production Version through Materials View of Recipe & check for existence of BOM.
Materials defined in BOM are assigned to Recipe.
Assigned Materials to Phase of Recipe by selecting a Phase.
Recipe for PMM created with Recipe group number 500000040 along with Component Allocation to Phases.
PP OK
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
9 of 18
9
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_09
SCENARIO: Create Reprocessing Process Order with Order type RP01 OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Successful creation of Process Order RUN DATE: 24/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Reprocessing Process order
Logistics – Production Process – Process Order - Process Order - Create
COR1 Material – 431, Plant – Ank1, Scheduling – Forward.
Process Order No. 1000262 generated & Released.
Error: Scheduling parameters have not been entered in ANK1 for Order Type RP01.
Error on release: Checking rule not maintained for RP01.
Rectified by Customization
Comments:
Approval: _________________________ Date: ____/____/____SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
10 of 18
10
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_10
SCENARIO: Create Process Order OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: Creation of Process Order RUN DATE: 24/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Process Order
Logistics – Production Process – Process Order - Process Order – Create
COR1 227 – PMM, Plant – ANK1, Order Type: PI01
Successfully Created Process Order
PP OK
1 Create Process Order (Mass)
Logistics – Production Process – Process Order - Process Order – Create
COR8 Material - 422 – Dry Captan, Plant – ANK1, Order Type – PI01
Planned order 803447 was converted to process order 1000265
PP OK
2 Release Process Order
Logistics – Production Process – Process Order - Process Order – Change
COR2 Process Order – 1000214,Material: 227, Plant: ANK1.
Changed Scheduling type to Current Date. Assigned Batch & Released
Release Process Orders 1000214 to 1000220 for PMM.
PP OKSaved with warning due to material shortage & Control Recipe not generated.
3 Release Process Order (Mass)
Logistics – Production Process – Process Order - Process Order – Release
COR5 Order Type: PI01Plant: ANK1Material: 239 (Wet Captan)
Selected Process Order 1000222 & Released with Scheduling Type as Backwards.
PP OK
4 Control Recipe Creation & Transfer to Destination
Logistics – Production Process – Process Management – Control Recipe – Control Recipe
CO53 Plant: ANK1, Click on Created & SentSelect Process Order & Click on
Send
Control recipe: 100000000000000301Order: 000001000270
PP OK
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
11 of 18
11
AcceleratedSAP - March 23, 1999Monitor
5 Process Message Monitor
Logistics – Production Process – Process Management – Control Recipe – Control Recipe Monitor
CO54 PP You are not authorized to use Transaction CO54
6 PI Sheet Data Entry and Display
Logistics – Production Process – Process Management – PI Sheet – Work list Maintain
CO55 Plant: ANK1Operating Group:
ANKLESHWAR
Temperature & Yield Data saved for Control Recipe 100000000000000301.
PP Data saved correctly, but no rights for PI sheet Display
7 PI Sheet Data Entry and Display
Logistics – Production Process – Process Management – PI Sheet – Find
CO60 Plant: ANK1 Order: 1000270
Execute
Temperature & Yield Data saved for Control Recipe 100000000000000301.
PP Data saved correctly, but no rights for PI sheet Display
8 PI Sheet Data Entry and Display
Logistics – Production Process – Process Management – PI Sheet – Work list Complete
CO64 Plant: ANK1 Order: 1000270
Execute
Temperature & Yield Data saved for Control Recipe 100000000000000301.
PP Data saved correctly, but no rights for PI sheet Display
9 PI Sheet Data Entry and Display
Logistics – Production Process – Process Management – PI Sheet – Work list Check
CO67 Plant: ANK1
Execute
PP Error: You do not have a display authorization for plant ANK1, address ANKLESHWAR
10 Define & test background jobs for process Message & Control Recipe
IMG Not to be done
11 Confirmation of process order with GR & GI COR6 Process Order: 1000214 Confirmed all phases of process order. Phases were confirmed by maintaining control key ZP14 in Master Recipe, where as for Final confirmation (Auto GR)
PP OK
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
12 of 18
12
AcceleratedSAP - March 23, 1999used control key ZPI3.
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
13 of 18
13
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_11
SCENARIO: Material Resource Planning OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: RUN DATE: 20/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 MRP Run for a manufacturing plant with Lead time scheduling and capacity Loading
Logistics – Production Process - MRP – Planning – Total Planning – Single Item-Multi level Planning
MD02 Material: 431Plant: ANK1Processing key: NETCHPlanning Mode: 3Scheduling: 2
Planned orders created as xxxx/ PI01/Re for Header & all other intermediate materials.
PP MRP run was taking almost a hour for single material. Sorted out by applying Patch
1 MRP run with Scope of Planning
Logistics – Production Process - MRP – Planning – Total Planning - Online
MD01 Scope Of Planning: DEFA
Processing key: NETCHPlanning Mode: 3Scheduling: 2
Parallel Processing: ON
Planned orders created: 4 Planned orders deleted: 2 Requisitions created: 1 Dep. Req. created: 1 Lead time sch plnd ord.: 1 Capacity req. created: 4
PP OK
2 Evaluation of MRP run for Plant, MRP Controller & Procurement type
Logistics – Production Process – Production Planning – Demand Management – Environment – Stock/requirement List
MD04 Generated MRP ElementsStockCusOrdDelvryOrd.DSPldOrd
PP OK
3Comments:
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
14 of 18
14
AcceleratedSAP - March 23, 1999
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
15 of 18
15
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_12
SCENARIO: Sales & Operation Planning, Mass Transfer of SOP to Demand Management for plant 1100 OWNER: BUSINESS CASE: Transform Sales Plan to Production Req. STATUS:DESCRIPTION: RUN NO.: 1EXPECTED RESULTS: The sales plan should be transferred from SOP version 001 to demand management 01 inactive
versionRUN DATE: 18/07/2003
SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTESMaterial master 311 & 313/ Plant 1100 Roger 1 l None
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
0 Create Product Group
Logistics – Production Process - SOP – Product Group – Create
MC84 Product Group: ROGORPlant: AKO1
Assigned all SKUs of Rogor to Rogor group.
PP OK
1 Display Product Group
Logistics – Production Process - SOP – Product Group – Display
MC85 Product Group: ROGORPlant: AKO1
Assigned all SKUs of Rogor to Rogor group.
PP OK
2 Change Product Group
Logistics – Production Process - SOP – Product Group – Change
MC86 Product Group: ROGORPlant: AKO1
Assigned all SKUs of Rogor to Rogor group.
PP OK
3 Create Sales plan for material number 311 & 313 in plant 1100 in inactive version 001
Logistics – Production Process - SOP – Planning – For Material – Change
MC88 Date 311 31301/07/0315/07/0301/08/03
600090006000
300045004000
OK
4 Mass Processing Job (202) Activation
Logistics – Production Process - SOP – Planning – Mass Processing – Change
MC8E Status of all planning objects for scheduling set to “active”
OK
5 Mass Processing Job (202) scheduled MC8G Back Ground job scheduled properly
OK
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
16 of 18
16
AcceleratedSAP - March 23, 1999Logistics – Production Process - SOP – Planning – Mass Processing – Schedule
4 Check the sales plan should be transferred from SOP version 001 to demand management 01 inactive version
MD62
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
17 of 18
17
AcceleratedSAP - March 23, 1999
Unit Test Scenario No. PP_13
SCENARIO: Sales & Operation Planning OWNER: PPBUSINESS CASE: STATUS:DESCRIPTION: RUN NO.:EXPECTED RESULTS: RUN DATE: 20/07/2003SETUP DATADATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES
TRANSACTIONAL STEPSNo. BUSINESS PROCESS STEPS /
BPP NUMBERTRANS. CODE
INPUT DATA / SPECIAL INFORMATION
OUTPUT DATA / RESULT
TESTER / TEAM
OK /ERROR
Comments:
Approval: _________________________ Date: ____/____/____
SAP, the SAP logo, R/3, AcceleratedSAP and ASAP are trademarks of SAP AG. document.doc
18 of 18
18