Uniting Water and People. University of Minnesota and Minnesota Professionals Technical Advisory Committee Presentation November 1 st 2010. Simajhuleu. Previous Involvement. What We Have Learned. COCCODE Maintain current system Collect annual fee Skilled Masons Part time plumber - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/1.jpg)
Uniting Water and People
University of Minnesota and Minnesota Professionals
Technical Advisory Committee Presentation November 1st 2010
![Page 2: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/2.jpg)
Simajhuleu
![Page 3: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/3.jpg)
Previous Involvement
![Page 4: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/4.jpg)
What We Have Learned
• COCCODE
– Maintain current system
– Collect annual fee
– Skilled Masons
– Part time plumber
– Elected every two years
– Capable and Motivated
![Page 5: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/5.jpg)
Existing System
Water Area A & B(details not included)
3 Supply Springs ≈2.7 L/s
Water Area C
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
![Page 6: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/6.jpg)
3 Supply Springs ≈2.7 L/s
Existing System
Water Area A & B(details not included)
Water Area C
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
![Page 7: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/7.jpg)
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
![Page 8: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/8.jpg)
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
![Page 9: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/9.jpg)
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
![Page 10: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/10.jpg)
3 Supply Springs ≈2.7 L/s
Water Area C
Existing System
Water Area A & B(details not included)
Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
![Page 11: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/11.jpg)
![Page 12: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/12.jpg)
Design Assumptions
Requirements
• All Static Pressure below 80 psi
• All Dynamic Pressures greater than 0 psi at peak flow
Objectives
• Listed in 3.1
![Page 13: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/13.jpg)
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
![Page 14: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/14.jpg)
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
![Page 15: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/15.jpg)
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
![Page 16: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/16.jpg)
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
![Page 17: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/17.jpg)
Proposed System with Existing System Interactions
Water Area A & C(details not included)
connection3
1
2
4
connection
![Page 18: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/18.jpg)
![Page 19: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/19.jpg)
Community Involvement• At least 2 skilled
masons and plumber on site
• 10% of material costs• Digging of the entire
trench for pipeline
![Page 20: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/20.jpg)
Community Outreach
![Page 21: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/21.jpg)
Operation and Maintenance
![Page 22: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/22.jpg)
Sustainability
![Page 23: Uniting Water and People](https://reader038.vdocuments.net/reader038/viewer/2022103005/56812ac5550346895d8e983a/html5/thumbnails/23.jpg)