unlicensed 21698257 presntation of ktps new

14

Upload: mohitkhurana

Post on 10-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 1/14

Page 2: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 2/14

STAGE I

2x110 MWSTAGE Il

2x210 MW

STAGE Ill

1x210 MW

STAGE IV

1x195 MW

STAGE I

1x195 MW

Net Power Generation = 1240 MW

Page 3: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 3/14

1). The project was proposed By the Central Electricity Authority In 1973.

2). In 1975, project was revised by the Consultant Thermal Design

Organization.

3). The planning commission cleared the project report in Sept., 1976.

4). The first 2x110 MW units were manufactured by BHEL, Hyderabad

in 1st

stage.

5). First estimated cost at that time was 143 crores rupees.

Page 4: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 4/14

LOCATION

Ideally on the left

bank of Chambal

River at Up

Stream of Kota

Barrage

The 220 KV GSS

is within ½ Kms.

LAND

Land measuring

approx. 250hectares was

required for the

project in 1976

COAL

Coal India limitedsupply coal from

its coal producing

subsidiaries

BCCL, SECL &

ECL through

railway wagons

WATER

The source of water for power 

station is

reservoir formed

by Kota Barrage

on the Chambal

River 

Page 5: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 5/14

Four Main Circuits

Fuel and Ash

Circuit

Air and Gas

Circuit

Feed water and

Steam Circuit

Cooling Water 

Circuit

Page 6: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 6/14

1). The thermal power station burns the fuel and use the heat to raise the

steam.

2). Heat from the coal is absorbed by kilometers long tubes in boiler walls by

³Boiler Feed Water´ and transferred to the turbine blades rotating them.

3). When turbine rotates, the rotor housed inside the stator turns with it.

4). Electricity is produced by the movement of magnetic field created by

rotor.

5). This electricity passes to the transformer which steps up the voltage for 

effective transmission.

6). The used steam is changed back into water in the condenser for reuse.

Page 7: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 7/14

1). 220 KV SYSTEM :-

i). CIRCUIT BREAKERS

ii). ISOLATOR

iii). CIRCUIT TRANSFORMER

220 KV System :-

Each of the generator is connected to this system through a step up of 

125 MVA 240/ 11 KV yard generator transformer. There are two step

down transformer each feeding 6.6 KV system (Station Switchyard ).

Four feeder take off from 220 switch yard two to SAKATPURA ,GSS and

other to HEERAPURA,Jaipur GSS.

Page 8: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 8/14

220 KV System

CIRCUIT BREAKERS

Minimum oil circuit

breaker of BHEL make

is used.

rated for 245 KW, 2500

 A and 13400 MVA.

ISOLATOR

Provided in 220KV switchyard and are motor operated

Triple pole double breaker type, L&T make, rated for 

245 KV and 1250 A.

CIRCUIT TRANSFORMER

Provided for measuring

and protection.

They are BHEL make,

single phase, oil filled

nitrogen sealed outdoor 

type.

Page 9: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 9/14

(Static excitation system)

1). Rectified transformer 

2). Thyristor converter 

3). AVR

4). Field suppression equipment

Parts of DC system

1). Rectifier 2). Filter 3). Blocker Diode 4).Charger

Mode Of Operation Of Charger 

1). Constant Voltage Mode

2). Constant Current Mode

Page 10: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 10/14

Excitation System 

A). Operation

1). Operated at 3000 r.p.m.

2). Used for synchronizing theGenerator 

B.) Synchronization

Five conditions must be satisfied

1). Voltage2). Frequency

3). Phase displacement

4). Phase sequence

5). Waveform

Page 11: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 11/14

Pr inciple of ope r ation 

1). Working depend on Dynamic action of steam

2). Steam is passed through passage of nozzle

3). Heat energy is converted into mechanical kinetc energy

4). The turbine suffers a change of momentum and rotates

110 MW

Rated O/P 110MW

Economic O/P 95 MW

Rated Speed 3000rpm

Rotation C/W

195 MW

Rated O/P 195MW

Economic O/P 180MW

Rated Speed 3000rpm

Rotation C/W

210 MW

Rated O/P 210MW

Economic O/P 205MW

Rated Speed 3000rpm

Rotation C/W

STEAM TURBINES

Page 12: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 12/14

D esc r iption 

Steam Flow

HP Turbine

IP Turbine

LP Turbine

Page 13: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 13/14

Introduction 

Used Purely For the electrical power generation.

Heat energy released from the combustion of fossil fuels.

Technical Specification 

1).Type Direct fired natural circulation

balanced draft water tube boiler 

2).Make BHEL

3).Capacity 375 tonnes per hour  4).Steam pressure 139 kg/ sq. cm

5).Efficiency 86.6%

6).Steam temperature 540 deg.

Page 14: Unlicensed 21698257 Presntation of Ktps New

8/8/2019 Unlicensed 21698257 Presntation of Ktps New

http://slidepdf.com/reader/full/unlicensed-21698257-presntation-of-ktps-new 14/14

Heat Transfer Mode

1). Conduction

2). Convection

3). Radiation

Heat Transfer Section

1). Furnace

2). Super Heater 

3). Economizer 

4), Air Heaters