DEPARTMENT OF TRANSPORTATION
CONTRACT T201606902 PAGE 2 OF 43
SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
CONTRACT DESCRIPTION & LOCATIONS THE PURPOSE OF THIS CONTRACT IS TO CONVERT EXISTING SURFACE TREATED ROADS IN SUSSEX COUNTY TO WARM MIX. THE LOCATIONS ARE LISTED BELOW, HOWEVER THE DEPARTMENT RESERVES THE RIGHT TO ADD OR DELETE LOCATIONS AND/OR QUANTITIES WITH NO CHANGES TO UNIT PRICES. THE WORK SHALL INCLUDE WARM MIX OVERLAYS, WARM MIX WEDGING, WARM MIX PATCHING, PIPE REPLACEMENTS, STRIPING, TOPSOILING, SEEDING, MULCHING, RESTORATION, MOT AND ANY OTHER WORK ASSOCIATED WITH EACH LOCATION.
Location Rd Description From To Length
1 S206 (Cedar Neck Rd) New Hot Mix near S14 S210 (Bucks Rd) 0.23 miles
2 S247 (Log Cabin Hill Rd) S258 (Hudson Rd) Rt. 9 Project Limits 1.74 miles
3 S251 (Neptune Rd) S248 (Gravel Hill Rd) S319 (Sand Hill Rd) 1.35 miles
4 S252 (Huff Rd) S248 (Gravel Hill Rd) S319 (Sand Hill Rd) 1.83 miles
5 S291 (Martin Farm Rd) S22 (Indian Mission Rd) S262 (Fisher Rd) 2.01 miles
6 S337 (Handy Rd) S113 (DuPont Blvd) Hot Mix Pavement 0.34 miles
7 S342 (Sandy Landing Rd) S26 (Vines Creek Rd) End of Roadway 0.97 miles
8 S472 (Phillips Hill Rd) S62 (E Trap Pond Rd) S431 (Conaway Rd) 4.42 miles
9 S505 (Rider Rd) S24 (Sharptown Rd) S76 (Columbia Rd) 1.33 miles
10 S50A (Turn Point Rd) New Hot Mix End State Maintenance 0.17 miles
11 S557 (Briarhook Rd) S554 (Hill Rd) S30 (Atlanta Rd) 2.39 miles
12 S585 (Woodbridge Rd) Hot Mix Pavement S32 (Scotts Store Rd) 0.93 miles
13 S613 (Memory Rd) S36 (Shawnee Rd) Kent County Line 1.12 miles
Total 18.83 miles
Unofficial Website Copy
DELAWARE DEPARTMENT OF TRANSPORTATION
LOCATION MAP
PAGE 3 OF 43CONTRACT T201606902
1
1
SOUTHSHORES
CEDAR
VILLAGE
WHITEOAK
DAM
AndersonCrossroads
Argos Corner
Davis Landing
Island
Todds
Sheppards
Island
Slaughter Creek
Beaver
dam Bra
nch MILFORD NECKWILDLIFE AREA
CEDAR CREEK UNIT
Cedar Creek
Pond
Mill Pond
CEDAR CREEKESTATES
Cedar
Creek
Slaughte
r Creek
HIDDEN
MEADOWS
MATLINDSESTATES
NATURE PRESERVECEDAR CREEK
ALT
RD
BRIC
KG
RAN
ARY
RD
36
30
204
36 205
205
202 206
206
201
36
210
206
7
38
224
207207A
212
212
14
211
208
200 224
218
38
224A
224
224B 22014E
14F
217216A
224
216224
214
214
212
212216
214
215
636637
627
215
14
215A215
221
222
219
220
14
14E
CEDAR BEACH RD
KIRB
Y RD
BUCKS
RD
SAPP RD
MILLS RD
MILLS RD
WILKE
NS
RD
BAY A
VE
RU
TT R
D
SLAU
GHTE
R BEA
CH
RD
BAKERFIELD RD
BAKERFIELD RD
DR
APER
SLAU
GHTE
R NEC
K RD
SUGAR HILL RD
DA
NIE
LS R
D
CHURCH RD
BEN
SON
RD
CUBBAGE POND RD
JOHNSO
N RD
ELKS LODGE RD
CO
ASTAL H
WY
COASTAL HWY
CO
ASTA
L HW
Y
CED
AR CREEK
FORK R
D
RD
RD RD
NEC
K
CEDAR
CED
AR
NEC
K
RD
RD
DA
VIS LA
NDIN
G
ARGOS CORNER
RD
WELLS
BUTTO
NWOOD
RD
RD
HERRIN
G BRANCH
RD
CROOKED RD
CED
AR C
REEK R
D
RD
RD
FLEATO
WN
RD
CUBBAGE POND
RD
RD
JOHNSO
N
RD
CED
AR C
REEK
RD
NECK
SLAUGHTER
NEAL RD
30
210
BUCKS RD
SH
ARPS R
D
SHARP
S RD
PINE
HAVEN
SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
TO S210 (BUCKS RD)
FROM S14 (COASTAL HWY)
S206 (CEDAR NECK RD)
LOCATION 1
Unofficial Website Copy
DELAWARE DEPARTMENT OF TRANSPORTATION
LOCATION MAP
PAGE 4 OF 43CONTRACT T201606902
1
EAST SIDEVILLAGEVILLAGE
COLLINS AND
RUSSELL DEV.
COLONY
CAVE
SU-SAXACRES
HERONWOOD
CARSYLIANCARSYLIANACRES
ARABIANACRES
LAZY LAKE
COOL SPRINGMANOR
BRIARBRIARWOODWOODMANOR
LOGCABIN
OVER-BROOKSHORES
CRIPPLECREEK
Shingle Point
BroadkillStation
Harbeson
Bennum
GravelHill
CoolSpring
Pinetown
Branch Branch
Pemberton
Pond
PondWagamons
Pond
Diamond
Bra
nch
Imgram
Ditch
Dutton
Bra
nch
Rou
nd
Pole
Creek
Beaverda
m
DEERWOOD
Mill
Crooked
Branch
FARMS
COOL
SPRING
Lavinia
BROADKILL
SA
MLU
CAS
RD
HWY
MILTONELLENDALE
HWY
MARTINS
FARM
RD
R. R. CO.
R. R. CO.
H
MILTON MS
BRITTINGHAM
ES
MILTON MS
BRITTINGHAM
ES
H
9
404
16
530
MILTON
16
22
B
212A
22A
197
250
89
16
8822
22
319256
22
249
249255
22
257
88
260
259
88
88
258
258
257
14
261
264258
14D
238
319
319
252
251
248
248
248A
254
255
242
319
248
264
258
261261A
247247
18
281 282290
262
290258
262
262
290 286294 29322
18
18254
249
249
291
253
HU
DSO
N
RD
DIA
MO
ND
FA
RM
RD
WALKER RD
DAIRY FARM
RD
PINETO
WN RD
SWEETBRIAR RD
AR
ABIA
N
AC
RES R
D
CAVE NECK RD
CAVE NECK RD
CAVE NECK RD
FRONT ST
MU
LBERRY ST
FED
ERAL
ST
UNIO
N
ST
HA
RBESO
N
RD
JOSEPH
S R
D
LOG CABIN HILL RD
FISHER RD
DO
DDTO
WN RD
BRIARWOOD R
D
SA
ND
HIL
L RD
SA
ND
HIL
L
SAND HILL RD
HUFF R
D
PRETTYMAN RD
PET
TYJO
HN
RD
CARPENTER RD
RD
GR
AVEL HIL
L
RD
RD
BURTON
RD
RD
DO
NO
VA
N
NEP
TUNE
RD
LOCKERMAN
RD
HU
DSO
N
RD
RD
CO
UNTR
Y
RD
MO
RRIS
EXT
AVE
LAVI
NIA S
T
HARBESO
N
RD
GRAVEL
HILL R
D
EAGLES CRES
T RD
SPRIN
G
CO
OL
RD
RD
POIN
T
SHIN
GLE
BENNUM
ATLANTIC RD
SHIN
GLE
POIN
T R
D
RO
UN
D
POLE BRIDGE
RDWEB
B
HARBESO
N
RD
5A
5A
5A
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
TO RT. 9 PROJECT LIMITS
FROM S258 (HUDSON RD)
S247 (LOG CABIN HILL RD)
LOCATION 2
TO S319 (SAND HILL RD)
FROM 248 (GRAVEL HILL RD)
S251 (NEPTUNE RD)
LOCATION 3
TO S319 (SAND HILL RD)
FROM S248 ( GRAVEL HILL RD)
S252 (HUFF RD)
LOCATION 4
TO S262 (FISHER RD)
FROM S22 (INDIAN MISSIN RD)
S291 (MARTIN FARM RD)
LOCATION 5
Unofficial Website Copy
DELAWARE DEPARTMENT OF TRANSPORTATION
LOCATION MAP
PAGE 5 OF 43CONTRACT T201606902
RIVER VIEW
WARWICK
PARK
HOLIDAYACRES
DIAMONDACRES
KERSEY'SEVERGREEN
ACRES
HELMSLANDING
SANDYBEACH
DOGWOODACRES
PINE
POINT
RiverdaleRosedale
Beach
SandyLanding
Bra
nch
Bra
nch
INDIAN
RIVER
Creek
Swan
Gut
Warwick
Pepper
Creek
Creek
Creek
H
DO
WNS
LANDIN
G
RD
SUSSEX
CENTRAL MS
EAST
MILLSBORO
ES
SUSSEX
CENTRAL MS
H
26113
5
DAGSBORO
MILLSBORO326
24
305
331
339
338
339
2482
82
337
337A
113
331A
331B
332
331
331
333
333
83
310A
313
313A
312312
312
311
297A
312
346
26
344
342
342
345
342
342A341
341 341A327343
336
336
335
335
335A
336
330
335
332
331
334A
334
334
407
407
393
26
26
20
20
336A
336B 341B
JOHN J. WILLIAMS HWY
JERS
EY R
D
RIVER
RD
OAK O
RCHARD AVE
AVE
DEL
AW
ARE
POSS
UM POIN
T RD
MITC
HELL ST
BUNTIN
G RD
BUNTING RD
AD
AM
S RD PINEY N
ECK RD
BALLAST POINT RD
SUSSEX R
D
GR
AY R
D
WEST BEA
CH
RD
VINES C
REEK R
D
VINES
CREEK R
D
IRON BRANCH RD
IRON BRAN
CH RD
BUNTING
RDTH
OROGOODS
RD
DIC
KERS
ON RD
HAN
DY
RD
RD
WARW
ICK
RDRIVER RD
PO
WER PLA
NT R
D
IRO
N
BR
AN
CH
RD
RD
DAGSBORO
CRICKE
T
ST
ST
RD
NEC
K
PINEY HUDSON
RD
FALLI
NG PO
INT
RD
CREE
K RD
DO
GW
OO
D
AC
RES R
D
WIN
GATE
RD
HELM
S
LAN
DIN
G
RD
RD
BREASU
RE
RD
SA
ND
Y
LA
NDIN
G
VINES CREEK
RD
PEP
PER
RD
MA
RIN
A
RD
FIRE
TOW
ER
CHIE
FS RDRD
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
TO HOT MIX JOINT
FROM S113 PROJECT LIMITS
S337 (HANDY RD)
LOCATION 6
TO END OF ROADWAY
FROM S26 (VINES CREEK RD)
S342 (SANDY LANDING RD)
LOCATION 7
Unofficial Website Copy
DELAWARE DEPARTMENT OF TRANSPORTATION
LOCATION MAP
PAGE 6 OF 43CONTRACT T201606902
Whaleys
Crossroads
Crossroads
Pusey Crossroads
Lowes Crossroads
Branch
Grays
Pond
Trap
STATE PARK
Branch
Sanders
Pond
Pepper
Branch
Cowhouse
EAST
24
424
424
425
61 445A
421
440
441436
439439
421
424
436
436472
472
421
431
472
434A
434
434
448
62
447
449A
24
437A
449
62
62
437
450
450
422A
422A437
437
438
472
24
WH
ALE
YS RD
LAUREL RD
LAUREL RD
PARADISE R
D
PA
RA
DIS
E R
D
CAREY
S CA
MP
RD
SAMUEL HILL RD SU
BSTATIO
N
RD
RD
SAUNDERS
CU
RLE
Y D
R
CU
RLE
Y D
RPU
SEY'S R
D
WO
MAC
H
RD
JESTIC
E FA
RM
RD
SC
OTT LA
ND
RD
PHILLIPS HILL RD
PHILLIPS HILL RD
CR
OSS KEYS R
D
RD POIN
T RD
ROSS
TRAP
PO
ND
RD
SAMUEL HILL RD
SA
MU
EL HIL
L R
D
ENGLISH RD
FOX
CURLEY
DR
GOOSE NEST RD
LITTLE HILL R
D
PO
ND
RD
CAM
P RD
PEAR TR
EE R
D
LONE CYPRESS
RD PEAR
TREE
JOHNSON RD
TRAP
ADAMS
RD
EAST TRAP PO
ND
RD
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
TO S431 (CONAWAY RD)
FROM S62 (EAST TRAP POND RD)
S472 (PHILLIPS HILL RD)
LOCATION 8Unofficial Website Copy
DELAWARE DEPARTMENT OF TRANSPORTATION
LOCATION MAP
PAGE 7 OF 43CONTRACT T201606902
ESTATES
HOLLY
PARK
DICKERSONMANOR
PUSEYDEV.
Portsville
Creek
Cod
Owens
Branch
Branch
Tussock
y
Pond
Tussock
Mill
Pond
Portsville
Bra
nch
Mill
ESTATES
KNOLLFOREST
ROBERT L. GRAHAM
ROBERT L. GRAHAM
WILDLIFE AREA
WILDLIFE AREA
LA
OLD
24
24
LAUREL
501
501
515
515
510
510
509
510
510A
24
494
494
492
24
492
493495 497
495
494
494
500
498
493
497
49724
514509
509505
76
505
505B
506
506
498
498A
494
24
MT. PLE
ASA
NT RD
MT. P
LEASA
NT R
D
WATSON RD
DIC
KERSO
N
RD
AIRPORT RD
ELLIS G
RO
VE R
D
WILLIA
MS R
D
SHOCKL
EY R
D
RID
ER RD
JOHN COOPER RD
BLUE
BIRD LA
NE
CO
LU
MBIA
RD
SHAR
PTOWN
RD
PORT
SVILLE
RD
RD
PORTSVILLE
RD
OLD S
HARPTO
WN
RD
ELLIS
GROVE
RD
AIRP
ORT
RD
HIC
KO
RY
RD
CHANDLER RD
RD
CH
URC
H
HORS
EY
HO
RSEY C
HU
RC
H
RD
BACONS
RD
SUSA
N
BEA
CH
RD
HIC
KO
RY
RD
BR
AN
CH SC
HO
OL R
D
SHARPTOWN RD
SHO
CKLE
Y R
D
SAIN
T G
EO
RG
E R
D
DO
GW
OO
D
OLD
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
TO S76 (COLUMBIA RD)
FROM S24 (SHARPTOWN RD)
S505 (RIDER RD)
LOCATION 9
Unofficial Website Copy
DELAWARE DEPARTMENT OF TRANSPORTATION
LOCATION MAP
PAGE 8 OF 43CONTRACT T201606902
OCEAN
MEYLEESTATES
ROGERSHAVEN
MURRAYESTATES
BAY
SHORE
DENTONMANOR
LAND OFPLEASANT
LIVING
BANKS-VILLEPARK
HOLLYRIDGE
PINEYPT.
LYNNLEELEE
COLLINS
CREEKESTS.
THERESERVATION
QUILLENPOINT
BAYSIDEHAMLETCEDAR
SHORES
RIVER
BAY
Creek
Collins W
hite
Creek
Assa
woman
Canal
BeachBethany
SaltPond
Simon
Glade
Indian River Inlet
DELAWARE NATIONAL
GUARDHAVEN
MURRAYS
LORD
BALTIMORE ES
LORD
BALTIMORE ES
COAST GUARD
STATION
INDIAN RIVER INLET
26
MILLVILLE
OCEAN
VIEW
50A
357A
357
358
50359357
360
351
350
26
361
361
84
35726
346A
347
349
350
352
353
352
CO
ASTAL H
WY
CO
ASTAL H
WY
WEST A
VE
WHIT
ES N
EC
K R
DOLD
MILL RD
RAIL
WAY
RD
SANDY COVE RD
CED
AR
NEC
K R
D
CEN
TRAL
AVE
GARFIELD PARKWAY
ATLANTIC AVE
RD
QUILLENS POINT
RD
HICKMAN
RD
FRED HUDSON RD
CLU
B
HOUSE R
D
WIN
DMIL
L D
R
WIN
DMILL
DR
AVECENTRAL
BENNETT ST
349A
BLUFF
SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
TO END OF STATE MAINTENTANCE
FROM NEW HOT MIX
S50A (TURN POINT RD)
LOCATION 10
Unofficial Website Copy
LOCATION MAP
PAGE 9 OF 43CONTRACT T201606902
13
13
13BR
K E
N T
HICKORY
RIDGE
COLLINS POND
ACRES
MESSICK
DEV.
MIDDLEFORDACRES
FISHER MILLPARK
BRYAN
PARK
GREENACRES
LAKESHORES
BIG PINEESTATES CANNON
BRANCHVIEW
DEVONSHIREWOODS
ATLANTA
ESTATES
THEOAKS
HERITAGE
VILLAGE
RIVERSEND
LAKEWOOD
WATERVIEWACRES
ALEXANDERLANE
SHUFELT
ACRES
GARDENS
NEWTONWOODS
PASS-
WATERSESTS.
BROAD ACRESWOODLANDSTATION
MEADOWACRES
KENMOREPARK
COLLINSMILL
Scotts
Corner
Jacobs Crossroads
Atlanta
GREENWOOD
BRIDGEVILLENORTH
CANTERBURY APTS.
RICLANDHEIGHTS
FlowerStation
Wesley
CannonCannon
BowdensGarage
Clarksons
Crossroads
Dublin Hill
Cocked Hat
Blanchard
Staytonville
OwensSt.Johnstown
Gully Camp
CedarCorners
CoverdaleCrossroads
Old Furnace
Middleford
Concord
GumCrossroads
Oakley
Church
TomsDam
Bra
nch
Branch
Nantico
ke
Bra
nch
Cart
Bra
nch
Grubby
Nanticoke
Neck
River
Bra
nch
Bee
Polk
Branch
Branch
Double Fork
Parker&
Ditch
Sampson
Ditch
Branch
Branch
Mine
Stafford
Branch
Gla
de
Branch
Long
BranchCronypond
Bra
nch
Tom
sDa
m
Bra
nch
Owens
Branch
WestBranch
Gum
Branch
Parker N
o.
Prong
1
Maple
Beaver
Branch
&
Da
m
ELLENDALESTATE
OWENS
TRACT
Deep
Rum Bridge
Layton
Deep
Creek
Ditc
h
Shorts
Pond
Collins
Branch
Gra
velly
ChurchCokesburyB
ranch
Gravelly
Ditch
Tussocky
Nantico
ke
River
Gu
m
Bra
nch
Branch
Bridgeville
BranchTurkey
DitchAke
Newto
nDitch
Willia
mH.
Clear
Bro
ok
Pron
g
Freid
el
Branch
Bucks
Pond
Hearns
PondConcord
Herring
Run
Chapel
Branch
Branch
Brights
Branch
Briar
Creek
DeepR.R.
Pond
Fleetwood
Tyndall
REDDEN
FOREST
BRIARHOOK
MARATHON
ESTATES
PARK
BRIDGEVILLE
CHASE
WRIGHTTRACT
B
B
R
R
WEBB
FAR
MRD
CENTURY
FAR
M
TU
LL R
D
WEB
B
FAR
M
RD
ELLENDALE GREENWOOD
HWY
ELLENDALE
R.R.
AVE
OAK
OA
K
RD
OA
K
WEBB
FARM
RD
NANTICOKEACRES
NO
RF
OLK S
OU
TH
ER
N
NO
RF
OLK S
OU
TH
ER
N
H
WOODBRIDGE
ES
WOODBRIDGE
CENTER
WEST
SEAFORDES
SEAFORD
CENTRAL ES
SEAFORD
MS
SEAFORDSHS
DOUGLASSCHOOL
WOODBRIDGE
ES
WOODBRIDGE
CENTER
WEST
SEAFORDES
SEAFORD
CENTRAL ES
SEAFORD
MS
SEAFORDSHS
DOUGLASSCHOOL
H
20
20
18
16
404
404
404
404
404
404
18
16
36
36
18
16
36
SEAFORD
GREENWOOD
BRIDGEVILLE
36
42
626
594
44
42
624
224
224
594
594
224
224
36
613
613
613
613A
629
614
628
632
612
612A
631
16
4
4
589
589A
589
600583A
632
36
16
16
58134
34
570
569
580
578
34
578
404
580
575 575B
31
31
574
573
586
16
585
585
587A
587
589
588
1616
32 16C
590
583
583
585
34
32
562
404
562
562
31
576
563
563
563A
404
582
563
600
600
600
565
599
4
5584
4040
40565
591
611
611
598
597597
600
594
600
601
602
602
611
611
611
44
44
630
16
16
630
603594
594
603
610
604
42
596
638
63842
42
595
40
565
594
594
591
42
595
595
595
609
606
40
565
565
484
517A
46
46
484529
18
527
579
528
579
592
42545
545
18
18
6
5
4
532
532531
533
46
525
46531
526
525
526
527
526
529516
4646
594 42
591592
18
642
17
17
546
561
564
566A566
562
562560
1718
560A
30
30
554554
560
560561
561
18
18
559557557
30
553A
555 543
544
546
546
18
544
13
544B
544A
30
547547
553
554
554
18
30
30
552
21
553
536
535
21
20
13
93
539
543 3
534534
556
639
535
535
530
526A
525
48320A524
486A20A
516
524
483
484
525
446A
444A
46
444
2
3
486
569
34B
535A
STCH
URC
H
MAIN
ST
DELA
WA
RE D
R
SHAW
NEE R
D
SHA
WNEE R
D
STAYTO
NVILLE R
D
STAYT
ON
VILLE R
D
HIC
KM
AN
RD
ME
MO
RY R
D
MESSOBOV RD
UTICA RD
BLA
CKS
MIT
H
SH
OP R
D
BENDER FARM RD
OA
K R
D
OA
K R
D
OAK
RD
DEER FOREST RD
DEER FOREST RD
SUNNYSID
E RD
SUNNYSIDE RD
N. U
NIO
N
CH
URC
H
RD
S. U
NIO
N
CH
URC
H
RD
LORD R
D
GREEN
WO
OD RD
MARKET ST
FIR
ST ST
McDOWELL RD
WO
ODBRID
GE RD
MILE ST
RET
CH
RD
FARM LAN
E
BLANCHARD RD
SHIRLEY'S RD
SHIRLEY'S RD
DO
UBLE FO
RK RD
SEASHORE H
IGH
WAY
SEASHORE HIGHWAY
SEASHORE H
IGHWAY
SEASHORE HIG
HWAY
FEDER
ALSB
URG R
D
BARNES R
D
RAY RD
RAY RD
MAR
TIN
RD
RABBIT RUN RD
DEE
RFI
ELD
RD
HARTZELL R
D
ATLA
NTA RD
ATLA
NTA RD
ATLANTA RD
ATLA
NTA RD
DUBLIN HILL RD
POLK RD
SMIT
H RD
MELSON RD
SCOTTS STORE RD
SCOTT
S ST
ORE R
D
RD
FAW
N RD
TUCKERS RD
SU
GA
R
HIL
L R
D
SHARPS
MIL
L RD
OW
EN
S RD
OW
ENS
RD
SA
W
MIL
L R
D
REDDEN RD
REDDEN RD
BEA
VER
DA
M
RD
TRUIT
T RD
OA
KLE
Y RD
STATE
FORES
T RD
NEWTON RD
WES
LEY
CH
URCH
RD
BRIARHOOK RD
OWLS NEST RD
RO
SS STATIO
N
RD
BOYCE RD
BOYCE RD
HIL
L R
D
HIL
L RD
BAKER RDBAKER RD
BLO
XO
M
SC
HO
OL R
D
SH
UFELT R
D
THARP RD
THAR
P RD
SWAIN RD
STEIN HWY
HIGH ST EXT.
ELKS R
D
OLD FU
RNAC
E RD
OLD FURNACE RD
OLD FU
RNACE RD
SU
SSEX HIG
HW
AY
SU
SSEX HIG
HW
AY
RIFLE RANGE RD RIFLE RANGE RD
UNIVE
RSITY R
D
MID
DLEFO
RD RD
NORTH SH
ORE
DR
OLD
MEA
DO
W
RD
DO
VE RD
CO
VERD
ALE R
D
CO
VER
DALE R
D
CO
VER
DALE R
D
GER
MAN RD
CO
NC
ORD
PO
ND
RD
CO
NCO
RD PO
ND
RD
HAS
TINGS FA
RM
RD
HAS
TINGS FA
RM
RD
HASTINGS FARM RD
COKESBU
RY RD
COKE
SBURY R
D
RE
MEN
TER RD
FLEETWOOD
POND RD
ESKRIDGE RD
ESKRID
GE
RD
SA
NFILIP
PO
RDC
AM
P R
D
BAKER MILL RD
WALLER RD
GRAVEL
LY B
RAN
CH
RD
RUSS
ELL
RD
APPLE TREE RD
RD
MEM
ORY
COON DEN RD
WO
ODYA
RD
RD
HIG
HW
AY
SU
SSEX
GREEN
HURST
FAR
M
RD
RD
BLA
NC
HAR
D
RD
HICKMAN
RD
RD
RD
RD
C
HU
RC
H
TRINITY
RAY
RD
RD
MEN
NO
NITE
SC
HO
OL R
D
RD
BLANCH
ARD
AD
AM
S R
D
C
HU
RC
H
RD
EPW
ORTH
ST JO
HN
STO
WN
RD
RD
SC
HO
OL
PR
OG
RESS
RD
DUBLIN HILL
NEW
TON
RD
FAW
N R
D
NEW
TO
N
RD
BLA
CKS
MIT
HSH
OP RD
RD
JUD
Y
RD
HU
NTERS
CO
VE R
D
FA
WN R
D
RD
TUCKERS
LO
NG
BRANCH
RD
SH
ARPS
MIL
L
RD
APPLE
TREE
RD
RD
APPLE TREE
RD
DEER FOREST
RD
CH
APLAIN
S
CH
APEL
RD
RD
HAVEN
CED
AR
CO
RN
ERS
RD
N. U
NIO
N
CHURC
H RD
RD
BEA
VER
DA
M
RD
S. U
NIO
N
CH
URC
H
BEAVER DAM RD
BIG PINE RD
RU
M
BRID
GE
RD
RD
CH
APLAIN
S
CH
APEL
RD
PR
OG
RESS SC
HO
OL R
D
RD
SU
SSEX HIG
HW
AY
BU
CKS
BRAN
CH
RD
WESLE
Y C
HU
RC
H
RD
BU
CKS BR
AN
CH
RD
HEA
RN
S
MIL
L R
D
HEARNS POND RD
RD
HENSLE
Y
BRIARHOOK RD
SCHOOL
RD
NEALS
SCH
OOL
RD
HERRING RUN RD
BRID
GEVIL
LE
HW
Y
ATLA
NTA
RD
ROSS
STATIO
N
RD
RD
RU
M BRID
GE
RD
RD
KIN
G
CO
NC
OR
D
PO
ND
RD
SU
SSEX
AVE
MINERAL SPRING RD
BOWDEN
S GAR
AGE RD
BOW
DENS GARAGE RD
NIN
E FO
OT
RD
STAYTONVILLE RD
RD
STAYTONVILLE
RD
CONCORD
CH
APEL
BR
AN
CH
RD
HORSESHOE R
D
STATE FO
REST
RD
MAPL
E
BRANCH
WO
ODENHAW
K RD
WHEATFIELD
516
AD
AM
S RD
ADAMS RD
CART
BRANCH
404
582582
TU
LL R
D
WO
OD
BRID
GE R
D
APPEL'S R
D
WO
OD
BRID
GE RD
BRANCH
B&R RD
SMITH HAVEN RD
WIL
SO
N
FA
RM
RD
RD
RD
CHAP
LAIN
S CH
APEL
WILS
ON HI
LL R
D
DEER MEADOWS RD
HARTZELL
ALLEYANTIQUE
STORE
SCOTT
S
GUM
RD
CO
NR
AIL
647648
TO KENT COUNTY LINE
FROM S36 (SHAWNEE RD)
S613 (MEMORY RD)
LOCATION 13
TO S32 (SCOTTS STORE RD)
FROM HOT MIX JOINT
S585 (WOODBRIDGE RD)
LOCATION 12
TO S30 (ATLANTA RD)
FROM S554 (HILL RD)
S557 (BRIAR HOOK RD)
LOCATION 11
DELAWARE DEPARTMENT OF TRANSPORTATION
SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 10 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
GENERAL CONTRACT NOTES
1. CONSTRUCTION OF THIS CONTRACT SHALL CONFORM TO DELAWARE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS DATED AUGUST 2001 AS AMENDED BY THE SUPPLEMENTAL SPECIFICATIONS, THE SPECIAL PROVISIONS, THE MOST RECENT STANDARD CONSTRUCTION DETAILS, THE DELAWARE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES AND THESE PLANS.
2. ALL WORK ADDED SHALL BE PERFORMED AT CONTRACT UNIT PRICES. IN THE CASE WHERE
CONTRACT UNIT PRICES ARE NOT AVAILABLE, THE PRICES ARE TO BE NEGOTIATED PRIOR TO COMMENCEMENT OF WORK.
3. THE CONTRACTOR SHALL SUBMIT THE REQUIRED COPIES OF A DETAILED PROGRESS SCHEDULE (PSC)
AS OUTLINED IN STANDARD SPECIFICATION 108.04 PRIOR TO OR AT THE PRECONSTRUCTION MEETING. DETAILS SHALL INCLUDE A DESCRIPTION OF EACH WORK ACTIVITY, THE PLANNED DAYS OF WORK, MULTIPLE CREWS OR SHIFTS, AND SCHEDULED WORKING HOURS. DURING THE CONTRACT, THE CONTRACTOR SHALL SUBMIT TWO-WEEK (OR AS REQUIRED) “LOOK AHEAD” SCHEDULES TO THE AREA ENGINEER/ MANAGER NO LATER THAN NOON OF EACH THURSDAY. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
4. LOCATION LISTINGS INDICATE GENERAL LIMITS OF CONSTRUCTION, MAJOR TYPES OF
IMPROVEMENTS, AND ESTIMATED QUANTITIES. DURING THE BIDDING PERIOD, ANY QUESTIONS PERTAINING TO LOCATIONS SHALL BE DIRECTED TO THE CONTRACT ADMINISTRATOR. AFTER THE AWARD, SUCH QUESTIONS SHALL BE REFERRED TO THE DISTRICT ENGINEER OR HIS REPRESENTATIVE.
5. ANY AND ALL CONSTRUCTION ENGINEERING SHALL BE INCIDENTAL TO THE CONTRACT.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 11 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
PROJECT NOTES 6. UNLESS SPECIFIED, OVERLAY WIDTHS SHALL MATCH EXISTING WIDTHS.
7. THE COST OF CLIPPING BACK THE EDGES OF THE ROADWAY, SHOULDERS, AND THE FIRST 3’ OF
UNPAVED DRIVEWAY ENTRANCES, PICKING UP AND DISPOSING OF WASTE AND EXCESS MATERIAL, AND CLEANING THE EXISTING PAVEMENT PRIOR TO OVERLAY SHALL BE INCIDENTAL TO SECTION 401. PREPARING UNPAVED DRIVEWAY ENTRANCES BEYOND THE FIRST 3’ SHALL BE PAID UNDER THE APPROPRIATE CONTRACT ITEMS: 202000 AND/ OR 302005.
8. BUTT JOINTS SHALL BE PLACED AT ALL INTERSECTING BITUMINOUS ROADS AND ANY OTHER
LOCATIONS AS DIRECTED BY THE ENGINEER. BUTT JOINTS AT DRAINAGE STRUCTURES NOT TO BE RESURFACED SHALL BE AS PER THE INCLUDED PLAN DETAIL OR LOCATION NOTES. BUTT JOINTS CUT PRIOR TO THE DAY OF THE PAVEMENT OVERLAY SHALL BE RAMPED WITH WARM MIX TRM. WARM MIX TRM SHALL BE INCIDENTAL TO THE CORRESPONDING BUTTJOINT / MILLING ITEM. PAVEMENT MILLINGS WILL NOT BE ALLOWED FOR THIS PURPOSE. IN PAVEMENT MILLING AREAS, THERE WILL BE NO SEPARATE PAYMENT FOR BUTT JOINTS.
9. DRAINAGE INLET GRATES WITHIN THE LOCATION LIMITS THAT DO NOT MEET THE STANDARD DETAIL
FOR A TYPE 1 GRATE (I.E. DON'T HAVE 45 DEGREE SLOTS) SHALL BE REPLACED. THE ENGINEER SHALL DETERMINE THE ACTUAL LOCATIONS AND NEED FOR GRATE OR FRAME MODIFICATIONS. DRAINAGE INLET FRAMES SHALL INCLUDE NECESSARY ADJUSTMENTS TO MEET PROPOSED GRADES INCIDENTIAL TO THE DRAINAGE INLET FRAME ITEM. ALL REPLACED GRATES/FRAMES SHALL BE DELIVERED TO THE NEAREST DISTRICT MAINTENANCE YARD WITH DELIVERY COSTS INCIDENTAL TO THE APPROPRIATE BID ITEMS. PAYMENT FOR REPLACED GRATES/FRAMES SHALL NOT BE MADE UNTIL RECEIPT OF DELIVERED MATERIALS IS PRODUCED AND SIGNED BY A DELDOT MAINTENANCE YARD SUPERVISOR. THE COST FOR THE WORK SHALL BE NEGOTIATED PRIOR TO THE REPLACEMENT OF ANY DRAINAGE INLET GRATES.
10. EXCAVATION FOR P.C.C. CURBS, SIDEWALK OR VALLEY GUTTER SHALL BE INCIDENTAL TO THE BID
PRICE FOR THESE RESPECTIVE ITEMS. EXCAVATED MATERIAL, NOT NEEDED ON THE PROJECT, SHALL BE REMOVED FROM THE CONTRACT AT THE CONTRACTORS EXPENSE. ITEM 908001 TOPSOIL, SHALL BE USED AS BACKFILL MATERIAL FOR CURB AND SIDEWALK WHEN SO DIRECTED BY THE ENGINEER. TOPSOIL SHALL BE SCREENED/SIFTED SO AS NO MATERIAL GREATER THAN .5" SHOULD BE PRESENT IN MATERIAL USED FOR BACKFILL. WHEN REPLACEMENT OF CURB AND GUTTER HAS BEEN COMPLETED AND THE FORMS REMOVED AT EACH LOCATION OF THIS CONTRACT, BACKFILLING SHALL BE DONE IMMEDIATELY. COMPLETE RESTORATION, TOPSOIL, SEEDING, AND REMOVAL OF ALL MATERIALS FOR CURB & GUTTER OR SIDEWALK; SEALING OF VALLEY GUTTERS AND PARGING OF DRAINAGE INLETS, SHALL BE COMPLETED WITHIN SEVEN (7) CALENDAR DAYS. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
11. THE COST OF FINE GRADING, COMPACTING, AND PREPARING EXISTING SHOULDERS FOR PAVING
SHALL BE INCIDENTAL TO SECTIONS 401( ). 12. MATERIALS USED TO FILL SHOULDER AREAS ADJACENT TO NEW WARM MIX OVERLAYS MAY BE ONE
OR MORE OF THE FOLLOWING MATERIALS: ITEMS 908001- TOPSOIL OR 302005- GRADED AGGREGATE BASE COURSE TYPE B. THE UNIT PRICE SHALL INCLUDE FURNISHING, PLACEMENT, GRADING AND COMPACTING THE MATERIAL. WHERE A WEDGE COURSE IS PLACED, THE SHOULDER SHALL BE FILLED WITH ITEM 209013 BORROW, TYPE F PRIOR TO THE TOP LIFT OF TYPE C. THE TOP 2” SHALL BE FILLED WITH TOPSOIL.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 12 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
PROJECT NOTES (CONT.) 13. AFTER PAVEMENT MILLING, ALL TRANSVERSE VERTICAL DIFFERENCES, RAISED EDGES OF
MANHOLES, CATCH BASINS, WATER VALVE BOXES, ETC. SHALL BE RAMPED WITH WARM-MIX TRM AT A 20:1 OR FLATTER SLOPE PRIOR TO OPENING THE ROADWAY TO TRAFFIC. PAVEMENT MILLINGS WILL NOT BE ALLOWED FOR THIS PURPOSE. PAYMENT SHALL BE INCIDENTAL TO THE WARM MIX ITEM.
14. TAPER MILLING IS INTENDED FOR MILLING IN THE AREA OF FIXED STRUCTURES (I.E. CURBS
GUARDRAIL, ETC.) THE MILLED DEPTH AT THE STRUCTURE SHALL BE THE DEPTH OF THE PROPOSED OVERLAY AND 0" AT A DISTANCE OF +/- 6½' FROM THE STRUCTURE. THE COMPUTED DEPTH FOR PAYMENT PURPOSES IS THE AVERAGE OF THE TWO DEPTHS.
15. ALL MILLED MATERIAL SHALL REMAIN THE PROPERTY OF THE CONTRACTOR UNLESS OTHERWISE
STATED. 16. ALL ADJUSTMENTS SHALL BE MADE NO MORE THAN SEVEN (7) CALENDAR DAYS PRIOR TO THE
PLACEMENT OF THE FINAL COURSE OF WARM MIX UNLESS OTHERWISE APPROVED BY THE ENGINEER. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
17. ALL PAVING, INCLUDING TURN LANES, SHOULDERS AND INTERSECTIONS, IS TO BE COMPLETED
WITHIN SEVEN (7) CALENDAR DAYS OF EACH DAY'S MILLING OPERATION. FAILURE TO COMPLY WILL RESULT IN A SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
18. THE CONTRACTOR SHALL TAKE CARE IN REMOVING PAVEMENT AROUND UTILITIES, BUTT JOINTS,
CURBS, ETC. SO AS TO NOT DISTURB THE EXISTING PAVEMENT BEYOND THE SPECIFIED DEPTH. ANY DAMAGE CAUSED BY CONTRACTORS OPERATION MAY RESULT IN PLACING LEVELING COURSES AT THE CONTRACTOR'S EXPENSE. THE REMOVAL AND CLEAN UP OF THE BITUMINOUS RESIDUE WEDGE REMAINING AFTER MILLING OPERATIONS SHALL BE INCIDENTAL TO THE MILLING ITEM. THE REMOVAL OF EXISTING RAISED PAVEMENT MARKERS (RPM’S) SHALL BE INCIDENTAL TO THE APPLICABLE MILLING ITEMS AND/OR RECLAMATION ITEMS.
19. WHERE SIDEWALKS EXIST WITHIN THE LOCATION LIMITS, CURB RAMPS SHALL BE EITHER NEWLY
INSTALLED OR RETROFITTED AS DIRECTED BY THE ENGINEER IN COMPLIANCE WITH THE MOST CURRENT DELAWARE STANDARD CONSTRUCTION DETAILS OR AS SHOWN ON THE PLANS. PAYMENT WILL BE MADE UNDER THE APPROPRIATE CURB RAMP AND DETECTABLE WARNING SYSTEM ITEMS.
20. ALL PORTLAND CEMENT CONCRETE MUST BE RECEIVED FROM AN APPROVED PRODUCTION PLANT
UNLESS OTHERWISE APPROVED BY THE ENGINEER. ONLY CALIBRATED VOLUMETRIC CONCRETE TRUCKS WILL BE PERMITTED TO PROVIDE ON-SITE MIXTURES. THIS PERTAINS TO BOTH WORK OCCURRING DURING NORMAL WORKING HOURS AND NIGHTTIME RESTRICTED WORK.
21. DRAINAGE INLETS, WHICH ARE 4' OR GREATER IN DEPTH AND ARE SLATED FOR REPAIR WILL HAVE
STEPS INSTALLED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. PAYMENT SHALL BE INCIDENTAL TO THE UNIT PRICE BID FOR THE DRAINAGE INLET ITEM.
22. THE PORTLAND CEMENT CONCRETE USED FOR - ADJUSTING AND REPAIRING EXISTING MAN HOLES
AND- ADJUSTING WATER VALVE BOXES SHALL CONFORM TO THE REQUIREMENTS OF CLASS A CONCRETE AS STATED WITHIN SECTION 503.02 OF THE STANDARD SPECIFICATIONS.
23. A 2.5” OVERLAY SHALL BE 2 EQUAL LIFTS OF 1¼” TYPE C WARM MIX. A 3” OVERLAY SHALL BE 2
EQUAL LIFTS OF TYPE C WARM MIX. A 3½" OVERLAY SHALL BE A 1¼" TYPE C LIFT OVER A 2¼" TYPE B LIFT UNLESS OTHERWISE NOTED IN THE PLANS.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 13 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
PROJECT NOTES (CONT.) 24. THE MINIMUM AND MAXIMUM SINGLE LIFT THICKNESSES OF MATERIALS SHALL BE AS FOLLOWS:
-TYPE C WARM-MIX: 1.25" - 2.00" -TYPE B WARM-MIX: 2.25" - 4.00" -BCBC: 3.00" - 6.00" -GABC: 2.00” - 8.00"
25. THE PURPOSE OF THE WARM MIX WEDGE COURSE, WHEN SPECIFIED, IS TO REMOVE EXISTING
EXCESSIVE CROWN RESULTING IN A FINAL CROSS SLOPE OF BETWEEN 2% AND 4% OR AS DIRECTED BY THE ENGINEER.
26. THE CONTRACTOR SHALL GIVE TWO (2) WEEKS NOTICE TO THE PROPERTY OWNER WHEN ANY
FIXTURE, SHRUB OR OTHER OBJECT MUST BE REMOVED FROM THE RIGHT OF WAY OR EASEMENT AREA. IF THE OWNER HAS NOT ATTEMPTED TO SALVAGE THIS PROPERTY, THE CONTRACTOR SHALL REMOVE IT WITHOUT OBLIGATION. REMOVAL WORK SHALL BE INCIDENTAL TO THE CONTRACT.
27. WHEN REPLACING EXISTING PIPES, THE REMOVAL OF THE EXISTING PIPES SHALL BE INCIDENTAL TO
THE EXCAVATION ITEM REQUIRED FOR THAT PIPE. NO SEPARATE PAYMENT SHALL BE MADE FOR REMOVAL AND DISPOSAL OF PIPES.
28. THE CONTRACTOR, PRIOR TO LAYING A RUN OF DRAINAGE PIPE OR OTHER INVOLVED CONSTRUCTION,
SHALL EXCAVATE WITHIN THE ALIGNMENT AT POINTS OF POSSIBLE CONFLICT TO DETERMINE IF A CONFLICT EXISTS. ANY CONFLICTS SHALL BE COORDINATED BY THE CONTRACTOR WITH THE ENGINEER. ANY UTILITY CONFLICTS SHALL BE COORDINATED BY THE CONTRACTOR WITH THE ENGINEER AND A REPRESENTATIVE OF THE UTILITY OWNER. EXCAVATING AND BACKFILLING OF THE TEST HOLES SHALL BE MEASURED AND PAID FOR IN ACCORDANCE WITH ITEM 208000, EXCAVATION AND BACKFILL FOR PIPE TRENCHES, BUT ONLY TO THE ACTUAL DEPTH EXCAVATED.
29. FOR THIS CONTRACT, SECTION 612 OF THE STANDARD SPECIFICATIONS SHALL BE MODIFIED SUCH
THAT PAYMENT FOR PIPE EXCAVATION AND BACKFILLING WILL BE MEASURED AND PAID REGARDLESS OF THE PIPE SIZE TO BE UTILIZED.
30. ALL DEWATERING METHODS, STREAM DIVERSION, TRENCH BOXES, AND OTHER WORK ASSOCIATED
WITH THE INSTALLATION OF THE PIPE SHALL BE INCIDENTAL TO THE CORRESPONDING PIPE ITEM.
31. TRENCH BOXES SHALL BE UTILIZED AT ALL LOCATIONS AS REQUIRED BY FEDERAL AND STATE GUIDELINES. IF THE CONTRACTOR CHOOSES TO STEP BACK THE TRENCH IN LIEU OF USING A TRENCH BOX, THE CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH THE ADDITIONAL EXCAVATION, BACKFILLING AND PATCHING. PAYMENT SHALL BE MADE IN ACCORDANCE WITH SECTION 208000.
32. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THE REQUIRED CLEARANCES AND
INSURANCES FOR EACH RAILWAY COMPANY INVOLVED IF THE RAILROAD PROPERTY AND/OR FACILITIES ARE LOCATED WITHIN OR NEAR THE PROPOSED LIMITS OF WORK AND/OR IF THE PROPOSED WORK ENCROACHES UPON THE RAILROAD’S RIGHT OF WAY; IN ACCORDANCE WITH DELDOT MAINTENANCE OF RAILROAD TRAFFIC ITEM NO. 763502. THE CONTRACTOR MUST CONTACT DELDOT’S RAILROAD SECTION MANAGER AT 302-760-2183 PRIOR TO ANY WORK STARTED TO COORDINATE THE EXECUTION OF THE APPROPRIATE AGREEMENTS AND AUTHORIZATIONS REQUIRED FROM ANY RAILWAY COMPANY INVOLVED, INCLUDING COORDINATION OF RAILROAD FLAGGING, IF NECESSARY.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 14 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
MAINTENANCE OF TRAFFIC AND PAVEMENT MARKINGS 33. ALL WORK SHALL BE PERFORMED IN A MANNER THAT WILL REASONABLY PROVIDE THE LEAST
PRACTICAL OBSTRUCTION TO ALL ROAD USERS, INCLUDING VEHICULAR, PEDESTRIAN AND BICYCLE TRAFFIC AND SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST DELAWARE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) PART 6, HEREIN REFERRED TO AS THE TRAFFIC CONTROL MANUAL (INCLUDING REVISIONS IN EFFECT AT THE TIME OF ADVERTISEMENT FOR BIDS).
34. AT THE PRECONSTRUCTION MEETING, THE CONTRACTOR SHALL SUBMIT TO THE SOUTH DISTRICT
SAFETY OFFICER THE NECESSARY NCHRP 350 / MASH CERTIFICATIONS FOR ALL TRAFFIC CONTROL DEVICES EXPECTED TO BE USED ON THE CONTRACT. WRITTEN APPROVAL MUST BE RECEIVED BEFORE THE START OF WORK AT EACH AND EVERY LOCATION.
35. THE CONTRACTOR SHALL SUBMIT TO THE SOUTH DISTRICT SAFETY OFFICER THEIR PROPOSED LANE
CLOSURE TIMEFRAMES FOR APPROVAL. THIS SHALL BE SUBMITTED A MINIMUM OF 2 WEEKS PRIOR TO THE START OF WORK.
36. AN AMERICAN TRAFFIC SAFETY SERVICES ASSOCIATION (ATSSA) CERTIFIED TRAFFIC CONTROL
SUPERVISOR SHALL BE REQUIRED FOR ALL LOCATIONS SPECIFIED IN THE CONTRACT PLANS. A COPY OF THE CERTIFICATION CARD FOR THE ATSSA TRAFFIC CONTROL SUPERVISOR SHALL BE SUBMITTED AT THE PRECONSTRUCTION MEETING. THE PAPER CERTIFICATE IS NOT ACCEPTABLE.
37. THE CONTRACTOR SHALL USE TYPICAL APPLICATION 10 FROM THE DELAWARE MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES AS OUTLINED IN THE BREAKOUT SHEET FOR ITEM 763643, MAINTENANCE OF TRAFFIC. WHERE ROADWAYS UTILIZE TEMPORARY ROAD CLOSURES FOR PIPE REPLACEMENTS, THE CONTRACTRACTOR SHALL SUBMIT DETOUR PLANS 4 WEEKS PRIOR TO SCHEDULED IMPLEMENTATION FOR REVIEW AND APPROVAL BY THE DEPARTMENT’S TRAFFIC SECTION. ALL ROAD CLOSURE MOT SHALL ALSO BE INCLUDED IN ITEM 763643, MOT, ALL INCLUSIVE.
38. NO SEPARATE PAYMENT SHALL BE MADE FOR THE USE OF TRAFFIC CONES. TRAFFIC CONES AND/OR
WORK ASSOCIATED WITH THEIR USE SUCH AS SETUP, REMOVAL, CLEANING, ETC. SHALL BE INCIDENTAL TO THE WORK FOR WHICH THEY PROTECT.
39. ALL TRAFFIC CONTROL DEVICES SHALL BE IN NEW OR REFURBISHED CONDITION, SHALL COMPLY
WITH THE TRAFFIC CONTROL MANUAL, SHALL BE NCHRP 350 / MASH APPROVED, AND SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.
40. ALL TRAFFIC CONTROL DEVICES SHALL BE SUITABLY MAINTAINED AT ALL TIMES, INCLUDING SUCH
MAINTENANCES AS WASHING SIGN FACES, REPLACING DEFICIENT BATTERIES AND LIGHTS, ALIGNING PROPERLY, REPLACING REFLECTIVE MATERIALS, RELOCATING BARRIERS, AND ANY OTHER MAINTENANCE OF TRAFFIC CONTROL DEVICES DEEMED NECESSARY BY THE ENGINEER OR DESIGNEE TO MAINTAIN TRAFFIC IN A SAFE AND EFFECTIVE MANNER. UPON COMPLETION OF WORK, ALL DEVICES SHALL BE REMOVED IN A TIMELY MANNER.
41. ALL PERSONS WORKING WITHIN THE STATE RIGHT-OF-WAY SHALL WEAR A MINIMUM OF AN ANSI
CLASS II SAFETY VEST MEETING THE ANSI 107-2004 REQUIREMENTS.
42. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT THE TRAFFIC MANAGEMENT CENTER (1-302-659-4600) IS NOTIFIED EACH AND EVERY DAY WHEN WORK IS BEING PERFORMED IN STATE RIGHT OF WAY. THE CONTRACTOR MUST IDENTIFY THE TYPE OF WORK, ANY LANES OR SHOULDERS CLOSED, LENGTH OF TIME FOR WORK, WHEN LANE RESTRICTION IS IN PLACE AND WHEN LANE RESTRICTION IS PICKED UP, CONTACT PERSON/NUMBER, AND STATE INSPECTOR.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 15 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
MAINTENANCE OF TRAFFIC AND PAVEMENT MARKINGS (CONT.)
43. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE LOCAL 911 CENTER, LOCAL SCHOOLS, AND THE DELDOT PUBLIC INFORMATION CENTER OF ALL ROADS AND LANES TO BE CLOSED A MINIMUM OF SEVEN CALENDAR DAYS BEFORE THE CLOSURE. IF TEMPORARILY BLOCKING ACCESS TO A FIRE HYDRANT, NOTIFICATION MUST BE GIVEN TO SUSSEX COUNTY, THE LOCAL FIRE FIGHTING AUTHORITIES, AND THE 911 CENTER.
44. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THEIR WORK WITH OTHER
CONTRACTORS IN THE AREA. 45. THE CONTRACTOR SHALL PROVIDE ALL RESIDENTS WHO LIVE ADJACENT TO THE WORK ZONE WITH A
MINIMUM 48 HR. PRIOR WRITTEN NOTICE FOR THE START OF CONSTRUCTION WORK. THIS NOTIFICATION SHALL INCLUDE THE SCOPE OF WORK, WORKING HOURS, ANTICIPATED START AND COMPLETION DATES, CONTRACTOR NAME & ADDRESS, AND DELDOT CONTACT NUMBERS. FAILURE TO GIVE PROPER NOTICE WILL RESULT IN A SUSPENSION OF WORK REQUIRING NOTICE, UNTIL PROPER NOTICE IS PROVIDED.
46. ACCESS TO ALL BUSINESSES AND RESIDENCES WITHIN THE PROJECT LIMITS SHALL BE MAINTAINED
THROUGHOUT THE DURATION OF THE CONTRACT. ANY TEMPORARY CLOSURE OF AN ENTRANCE FOR TIE IN PURPOSES SHALL BE COORDINATED WITH THE ENGINEER AND / OR PROPERTY OWNER IN ADVANCE OF THE CLOSURE.
47. ALL ROADWAY EXCAVATION IN OR ADJACENT TO TRAVEL WAYS SHALL BE PROPERLY BACKFILLED
AT THE END OF EACH DAY PRIOR TO TRAFFIC RETURNING TO UNRESTRICTED TRAVEL PER SECTION 6G.20 OF THE TRAFFIC CONTROL MANUAL. THIS INCLUDES ALL UTILITIES AND/OR OBSTACLES WITHIN OR ADJACENT TO THE TRAVEL WAYS AS OUTLINED IN THE TRAFFIC CONTROL MANUAL.
48. AT THE END OF EACH WORK DAY, THE CONTRACTOR SHALL CORRECT ALL PAVEMENT EDGE DROP
OFFS ACCORDING TO SECTION 6G.20 OF THE DELAWARE MUTCD. ANY CORRECTIVE MEASURES TAKEN BY THE CONTRACTOR SHALL BE INCIDENTAL TO THE MOT ITEMS. SEE TABLE 6G.1
49. PRIOR TO ADDITIONAL LIFTS, ALL DROP OFFS SHALL BE SECURED BEFORE NEXT LIFT PER DELAWARE
MUTCD 6G.1.
50. THE CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE OF EXISTING PAVEMENT WITHIN THE PROJECT LIMITS FOR THE DURATION OF THE CONTRACT OR AS DIRECTED BY THE ENGINEER OR DESIGNEE.
51. WHEN REQUIRED BY THE DE MUTCD, “PERMANENT” ADVANCE WARNING SIGNS SHALL BE INSTALLED
WITH THE LEGENDS “ROAD WORK 1500 FT”, “ROAD WORK 1000 FT” AND “ROAD WORK 500 FT” IN ADVANCE OF THE WORK AREA IN BOTH DIRECTIONS. AN “END ROAD WORK” SIGN SHALL BE LOCATED 500 FEET DOWNSTREAM FROM THE WORK AREA. ON INTERSECTING ROADWAYS WITHIN THE PROJECT LIMITS, A “ROAD WORK AHEAD” SIGN SHALL BE PLACED AT A DISTANCE NOT LESS THAN 500 FEET IN ADVANCE OF THE WORK AREA AND AN “END ROAD WORK” SIGN SHALL BE LOCATED 500 FEET DOWNSTREAM OF THE WORK AREA. ALL PERMANENT ADVANCE WARNING SIGNS SHALL BE GROUND MOUNTED ON TWO NCHRP-350 OR MASH APPROVED BREAK-AWAY POSTS AND SHALL BE MOUNTED IN COMPLIANCE WITH THE TRAFFIC CONTROL MANUAL. PERMANENT ADVANCE WARNING SIGNS SHALL BE MOUNTED AT A HEIGHT OF 7 FEET, MEASURED FROM THE ROADWAY TO THE BOTTOM OF THE SIGN. THE USE OF SKID MOUNTED SIGN SUPPORTS IS NOT ALLOWED UNLESS THE CONTRACTOR CAN DEMONSTRATE THAT A UTILITY CONFLICT EXISTS, WHICH SHALL BE VERIFIED BY THE ENGINEER; OR CONCRETE MEDIANS PREVENT THE INSTALLATION OF THE PERMANENT SIGNS IN THE APPROPRIATE LOCATION. THESE “PERMAMENT” SIGNS SHALL BE INCIDENTAL TO ITEM 763643, MOT, ALL INCLUSIVE.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 16 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
MAINTENANCE OF TRAFFIC AND PAVEMENT MARKINGS (CONT.)
52. ALL ROADWAYS AND ENTRANCES NOT OPEN TO TRAFFIC SHALL BE CLOSED USING TYPE III BARRICADES AND SHALL BE PLACED PER THE TRAFFIC CONTROL MANUAL, SECTION 6F.63 & 6F.68.
53. A SAFETY EDGE SHALL BE USED ON ALL OVERLAYS.
54. THE CONTRACTOR SHALL MAINTAIN ACCESS TO AND ALONG PEDESTRIAN FACILITIES AT ALL TIMES
DURING CONSTRUCTION. EARTH, STONE AND GRAVEL SURFACES ARE NOT ACCEPTABLE FOR PROVIDING PEDESTRIAN ACCESS. WHERE PEDESTRIAN ROUTES ARE CLOSED OR BLOCKED, ALTERNATE PEDESTRIAN ACCESS SHALL BE PROVIDED USING TA-28 OR TA-29 OF THE TRAFFIC CONTROL MANUAL OR TO THE SATISFACTION OF THE ENGINEER AND SHALL BE ADA COMPLIANT. THE COST FOR ANY PROVISIONS ON OPEN END CONTRACTS SHALL BE NEGOTIATED PRIOR TO THE COMMENCEMENT OF WORK, WHILE THESE COSTS ON KNOWN LOCATION CONTRACTS SHALL BE INCIDENTAL TO ITEM 763643 – MAINTENANCE OF TRAFFIC, ALL INCLUSIVE.
PEDESTRIAN MAINTENANCE OF TRAFFIC: THIS WORK SHALL CONSIST OF PROVIDING AND MAINTAINING AN ACCESSIBLE PEDESTRIAN ROUTE THROUGHOUT THE PROJECT’S LIMITS IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT OF 1960 (ADA) TITLE II, PARAGRAPH 35.130. THE CONTRACTOR SHALL BE REQUIRED TO REVIEW EACH CURB RAMP LOCATION AND SUBMIT THE APPROPRIATE MAINTENANCE OF TRAFFIC DETAIL AND DEVICES TO THE ENGINEER FOR EACH LOCATION AT LEAST 2 WEEKS BEFORE CONSTRUCTION FOR REVIEW, COMMENT, AND APPROVAL. THE FOLLOWING CONSIDERATIONS SHALL BE TAKEN INTO ACCOUNT WHEN ADDRESSING ACCESSIBLE PEDESTRAIN MAINTENANCE OF TRAFFIC:
ALL PEDESTRIANS, INCLUDING PERSONS WITH DISABILITIES, SHALL BE PROVIDED WITH A REASONABLY SAFE, CONVENIENT, AND ACCESSIBLE PATH THAT REPLICATES AS MUCH AS PRACTICAL THE EXISTING PEDESTRIAN FACILITIES.
MAINTAIN ACCESS TO ALL BUSINESSES AND RESIDENCES AT ALL TIMES. PROVIDE PEDESTRIAN ACCESS THROUGH OR AROUND THE WORK ZONE. IF A DETOUR IS
CHOSEN THE CONTRACTOR MUST SUBMIT THE DETOUR ROUTE TO THE ENGINEER FOR REVIEW AND APPROVAL. THE DETOUR ROUTE MUST MEET OR EXCEED THE CURRENT CONDITIONS.
WORK SHOULD BE PHASED SO THAT ALL AREAS OF AN INTERSECTION / SIDEWALK PATH ARE NOT UNDER CONSTRUCTION AT THE TIME UNLESS A CLEAR PATH IS PROVIDED AND IDENTIFIED.
TRAFFIC CONTROL DEVICES AND OTHER CONSTRUCTION MATERIALS AND FEATURES SHALL NOT PROTRUDE INTO THE USABLE WIDTH OF THE SIDEWALK, TEMPORARY PATHWAY OR OTHER PEDESTRIAN FACILITY.
SIGNS AND OTHER DEVICES MOUNTED LOWER THAN 7 FT ABOVE THE TEMPORARY PEDESTRIAN PATHWAY SHALL NOT PROJECT MORE THAN 4” INTO ACCESSIBLE PEDESTRIAN ROUTE.
A SMOOTH, CONTINUOUS HARD SURFACE SHALL BE PROVIDED THROUGHOUT THE ENTIRE LENGTH AND WIDTH OF THE PEDESTRIAN ROUTE THROUGHOUT CONSTRUCTION. THERE SHALL BE NO CURBS OR VERTICAL ELEVATION CHANGES GREATER THAN ¼” IN GRADE OR TERRAIN THAT COULD CAUSE TRIPPING OR BE A BARRIER TO WHEELCHAIR USE.
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 17 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
MAINTENANCE OF TRAFFIC AND PAVEMENT MARKINGS (CONT.) 55. ALL STORAGE OF EQUIPMENT AND MATERIAL SHALL COMPLY WITH SECTION 6G.21 OF THE TRAFFIC
CONTROL MANUAL.
56. ALL FLAGGERS SHALL COMPLY WITH CHAPTER 6E OF THE TRAFFIC CONTROL MANUAL. 57. AT THE END OF EACH DAY’S OPERATION AND BEFORE TRAFFIC IS RETURNED TO UNRESTRICTED
ROADWAY USE, TEMPORARY STRIPING SHALL BE UTILIZED AT LOCATIONS THAT REQUIRE PERMANENT STRIPING PER THE LATEST VERSION OF THE PERMANENT MARKING SECTION OF THE DELAWARE MUTCD. TEMPORARY PAVMENT MARKINGS SHALL BE PAID AT THE APPLICABLE CONTRACT UNIT PRICE.
58. FINAL PAVEMENT MARKINGS SHALL CONFORM TO ALL EXISTING PATTERNS UNLESS OTHERWISE
DIRECTED BY THE ENGINEER. THE FINAL PAVEMENT MARKINGS SHALL BE PLACED WITHIN FIVE (5) CALENDAR DAYS AFTER THE COMPLETION OF THE WORK. FAILURE TO COMPLY WILL RESULT IN SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED.
59. THE CONTRACTOR SHALL SUBMIT DETAILED DRAWINGS (INCLUDING BUT NOT LIMITED TO LANE AND
SHOULDER WIDTHS, TURN LANE LENGTHS, LOCATIONS OF STOP BARS, TURN ARROWS, CROSSWALKS AND RAILROAD CROSSINGS) THAT DEPICT THE EXISTING PAVEMENT MARKINGS FOR EACH PROJECT LOCATION AT THE PRECONSTRUCTION MEETING. THESE DRAWINGS WILL BE REVIEWED BY THE DEPARTMENT’S TRAFFIC SECTION TO DETERMINE IF ANY CHANGES TO THE FINAL PAVEMENT MARKINGS ARE REQUIRED. FINAL PAVEMENT MARKINGS SHALL CONFORM TO ALL EXISTING PATTERNS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. THE FINAL PAVEMENT MARKINGS SHALL BE PLACED WITHIN FIVE (5) CALENDAR DAYS AFTER THE PLACEMENT OF THE FINAL COURSE OF WARM-MIX. FAILURE TO COMPLY WILL RESULT IN SUSPENSION OF ALL OTHER CONTRACT WORK WITH TIME CHARGES CONTINUING TO BE ASSESSED. THE DEPARTMENT WILL PROVIDE STRIPING LAYOUT AT LOCATIONS WHERE NO PAVEMENT MARKINGS PREVIOUSLY EXISTED. IF DEPARTMENT FORCES PROVIDE STRIPING LAYOUT ON LOCATIONS WHERE MARKINGS PREVIOUSLY EXISTED, THEN THE CONTRACTOR SHALL REIMBURSE THE DEPARTMENT FOR THE LAYOUT COSTS.
60. THE CONTRACTOR SHALL BE REQUIRED TO SHOW PROOF THAT HE HAS SUFFICIENT APPROVED
STRIPING MATERIALS ON HAND TO ENSURE STRIPING IS COMPLETED PRIOR TO FULL OPENING ROADWAY TO TRAFFIC.
61. ANY ERRONEOUS MARKINGS WILL NOT BE PAID FOR AND SHALL BE CORRECTED IMMEDIATELY AT
THE CONTRACTORS EXPENSE. ERRONEOUS MARKINGS OR SHADOWS THAT EXCEED ONE (1) INCH IN WIDTH SHALL BE REMOVED BY WATER BLASTING. NO OTHER REMOVAL METHODS WILL BE ALLOWED. A FLAT BLACK PAINT OR DRIVEWAY SEALER SHALL BE APPLIED IN THE AREA OF THE REMOVED MARKING TO MASK THE REPAIR. ANY DAMAGE TO THE PAVEMENT CAUSED BY REMOVAL OF ERRONEOUS MARKINGS SHALL BE REPAIRED / REPLACED TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTORS EXPENSE.
62. ALL MARKINGS THAT ARE NO LONGER IN USE AND CONFLICT WITH THE PAVEMENT MARKINGS IN USE
BY THE TRAVELING PUBLIC ARE TO BE REMOVED AND MUST BE COMPLETELY OBLITERATED BY A METHOD APPROVED BY THE ENGINEER. PAINTING OVER THE CONFLICTING STRIPING WILL NOT BE ACCEPTED AS A METHOD OF REMOVAL.
63. YELLOW CENTERLINES SHALL BE CONTINUOUS AROUND MEDIAN ISLANDS. ALL DOUBLE YELLOW
CENTERLINES SHALL BE PLACED IN A 5-6-5 CONFIGURATION (2 EACH, 5” YELLOW WITH A 6” GAP BETWEEN).
Unofficial Website Copy
DEPARTMENT OF TRANSPORTATION CONTRACT: T201606902 PAGE 18 OF 43 SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
MAINTENANCE OF TRAFFIC AND PAVEMENT MARKINGS (CONT.) 64. THE CONTRACTOR, WITH THE ENGINEER, SHALL INVENTORY ALL SIGNS ON ALL ROADS SUBJECT TO
IMPROVEMENTS. NECESSARY SIGNS SHALL BE MAINTAINED IN OPERATION DURING CONSTRUCTION AND ANY OTHER SIGNS SHALL BE PROPERLY STORED BY THE CONTRACTOR, WHO SHALL BE RESPONSIBLE FOR ANY LOSS OR DAMAGE. IMMEDIATELY PRIOR TO FINAL INSPECTION, THE CONTRACTOR AND ENGINEER SHALL AGAIN INVENTORY THE TRAFFIC SIGNS AND ACCOUNT FOR ANY LOST OR DAMAGED SIGNS.
65. TRAFFIC DETECTION LOOPS SHALL BE PLACED IN THE FINAL WEARING SURFACE UNLESS OTHERWISE DIRECTED BY THE ENGINEER.
66. TRAFFIC DETECTION LOOPS THAT ARE CURRENTLY 5’X7’ SHALL BE REPLACED WITH LOOPS THAT ARE
6’X6’ AT THE SAME LOCATION. STOP BAR DETECTION LOOPS SHALL BE THE SAME SIZE AS CURRENTLY EXISTING, AND SHOULD BE PLACED STARTING TWO FEET BEHIND THE STOP BAR, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. IF SEPARATE SIGNAL PLANS HAVE BEEN DEVELOPED, THE PLANS SUPERCEDE THIS NOTE.
67. STOP LINES “BARS” SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 3B.16 OF THE LATEST
TRAFFIC CONTROL MANUAL.
68. ALL CROSSWALKS SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 3B.18 OF THE LATEST TRAFFIC CONTROL MANUAL.
69. INTERNATIONAL CROSSWALK SYMBOLS WILL BE PLACED AT ALL EXISTING CROSSWALK LOCATIONS
OR OTHER LOCATIONS AS DIRECTED BY THE ENGINEER. PAYMENT WILL BE UNDER THE APPLICABLE STRIPING ITEMS.
Unofficial Website Copy
32 +-2
32 +-2
CONCRETE PAVEMENTS
3"
N.T.S.
N.T.S.
BITUMINOUS CONCRETE PAVEMENTS AND OVERLAYS
SAFETY EDGE
PAVEMENT
EDGE OF
TOPSOIL
PAVEMENT
EDGE OF
TOPSOIL
OR IN SITU MATERIAL
COMPACTED FILL
OR IN SITU MATERIAL
COMPACTED FILL
1 1/4"
FINAL OVERLAY
>
NEW PAVEMENT
EXISTING OR
PAGE
DETAILS SHEET
DELAWARE DEPARTMENT OF TRANSPORTATION
CONTRACT T201606902 19 OF 43
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
Unofficial Website Copy
PAGE
INTERSECTING ROAD, STREET, AND DRIVEWAYS
THE LENGTH OF RESURFACING SHALL BE TO THE RADIUS POINT
ENGINEER, THIS DISTANCE MAY BE EXTENDED UP TO AND INCLUDING
OF THE INTERSECTING ROAD OR STREET. IF SO DIRECTED BY THE
SECTION 401696 IS A SURCHARGE ONLY FOR ADDITIONAL LABOR AND EQUIPMENT FOR NON-MAINLINE PAVING.
NOTES:
THIS PAYMENT WILL APPLY FOR STATE NUMBERED ROAD PAVING WORK ONLY.
THIS ITEM / PAYMENT DOES NOT APPLY TO SUBDIVISION STREETS.
100 LF FROM THE RADIUS POINT PAVED AS PART OF THE TIE-IN.
INTERSECTING ROAD OR STREET
INTERSECTING ROAD OR STREET
R/W
R/W
OR MATCH EXISTING
R/WR/W
PLACE GABC TO MEET EXISTING
FOR IMPROVED DRIVEWAYS,
FOR UNIMPROVED DRIVEWAYS,
DRIVEWAY MATERIAL.
DRIVEWAY
R/W R/W
20 OF 43
DETAILS SHEET
CONTRACT T201606902
DELAWARE DEPARTMENT OF TRANSPORTATION
THE COST OF THE ACTUAL WARM-MIX PLACED SHALL BE PAID UNDER THE RESPECTIVE WARM MIX ITEM.
PAYMENT SHALL BE UNDER SECTION 401696.
FOR IMPROVED DRIVEWAYS, WARM MIX TO MATCH EXISTING DRIVEWAY MATERIAL AT A
MAXIMUM DISTANCE OF 3' FROM THE EDGE OF TRAVELWAY OR AS DIRECTED BY THE ENGINEER.
PLACE 3' WARM MIX APRON
AT ALL DRIVEWAYS.
30' MIN. RADIUS
INSTALL 3' WIDE BUTT JOINT.
SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
Unofficial Website Copy
PAGE
NOTES:
1. ALL EDGES TO BE SAWCUT.
CROSSROAD PIPE REPLACEMENT - DETAIL
PIPE O.D.
SAWCUT
DELAWARE DEPARTMENT OF TRANSPORTATION
18" 18"
401822 - 3" SUPERPAVE, TYPE B WM, 160 GYRATIONS, PATCHING
2. THIS DETAIL SHALL BE USED FOR ALL WARM MIX PATCHES UNLESS OTHERWISE NOTED ON THE PLANS.
3. DEPTH OF WARM MIX PATCHING, 3" OR AS DIRECTED BY THE ENGINEER.
CONTRACT T201606902 21 OF 43
SOUTH DISTRICT CONVERSION ROADS, SOUTH, 2016
CROSSROAD PIPE REPLACEMENT DETAIL (WITH OVERLAY)
401800 - SUPERPAVE TYPE C WM OVERLAY
302005 - 1'-0" GABC, TYPE B
REUSED IF IT MEETS REQUIREMENTS OF TYPE 'C' BORROW.
210000 - BORROW, TYPE C OR EXISTING MATERIAL MAY BE
12"(TYP.)
Unofficial Website Copy
SAWCUT
NOTE: ALL EDGES TO BE SAWCUT. CUTTING BY USE OF AIR
HAMMERS MAY BE SUBSTITUTED FOR SAWCUTTING IF THE AREA
IS TO BE OVERLAID UNDER THE SAME CONTRACT.
160 GYRATIONS, PATCHING
401821 - 2" SUPERPAVE TYPE C WMA,
1'
SAWCUT
DETAILS SHEET
(AS DESIGNATED ON THE LOCATION SHEETS)
(AS DESIGNATED ON THE LOCATION SHEETS)
OTHERWISE NOTED ON THE PLANS.
EXISTING PAVEMENT
PAGE
DIRECTED BY THE ENGINEER
NOTE: DEPTH OF PATCHING, 3" OR AS
DIRECTED BY THE ENGINEER
NOTE: DEPTH OF PATCHING, 8" OR AS
22 OF 43CONTRACT T201606902
DELAWARE DEPARTMENT OF TRANSPORTATION
401822 - 3" WMA, SUPERPAVE, TYPE B, 160 GYRATIONS, PATCHING
THIS DETAIL SHALL BE USED FOR ALL WARM-MIX PATCHES UNLESS
WARM-MIX PATCH WITH OVERLAY
WARM-MIX PATCH DETAIL
(DEPTH DETERMINDED BY ENGINEER)
401822 - 3" WMA, SUPERPAVE, TYPE B, 160 GYRATIONS, PATCHING
(TYP.)
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
Unofficial Website Copy
CONTRACT T201606902 PAGE 23 OF 43
DELAWARE DEPARTMENT OF TRANSPORTATION
DETAILS SHEET
ADJUSTING MANHOLE
TO EXISTING GRADE
SPLIT BRICK TO ADJUST FRAME
ALL JOINTS IN ADJUSTED BRICKWORK SHALL BE
COMPLETELY FILLED WITH CEMENT MORTAR
REMOVE HOT MIX AND CONCRETE COLLAR
FROM AROUND MANHOLE.PLACE NEW OR EXISTING FRAME AND COVER
NOTE:MANHOLES IN CONCRETE ROADWAYS
SHALL BE SAWCUT FULL DEPTH TO THE
SPECIFIED DIMENSIONS PRIOR TO ANY
ADJUSTMENT BEING MADE. THE SAWCUTTING
SHALL BE INCIDENTAL TO ITEM 710002.
IF REQUIRED, PLACE CONTINUOUS
(AS REQUIRED), TO CORRECT ELEVATION,
1'
16"
UTILIZED IN THE ADJUSTMENT.
AND COVER AS DIRECTED BY OWNER, IF NOT
REMOVE AND DISPOSE OF EXISTING FRAME BE PROVIDED BY OWNER.
NEW FRAME AND COVER (IF REQUIRED), TO
RECOLLAR, AND PLACE WARM MIX PATCH.
SOUTH DISTRICT CONVERSION ROADS , SOUTH, 2016
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy
Unofficial Website Copy