up...up dn 114 i&e storage 117 140 elev. 118 124 125 123 122 120 115 116 119 141 whm storage 121...

14

Upload: others

Post on 06-Dec-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …
Page 2: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

Up

Dn

114

I&E Storage

117

112 110 109 108 107 106 105 104 103 102

150 151 152 153149148147146145144

143

140

139

Elev.

118

111

125124

123122

120

126

127

128

138

129

130

131

137

136

135

132

134

15

7

101

115116

119

Alarm Panel

142

141

Up

Dn

Up

WHM Storage

121

125A

PROJECTNORTH

TRUENORTH

NORT

HPARTIAL FIRST FLOOR PLAN - NEW DISPATCH CENTERSCALE: 1/8" = 1'-0"A-1

1

GENERAL CONSTRUCTION NOTES:THE WORK AREA FOR THIS PROJECT IS AT THE PENNSYLVANIA GAME COMMISSION (PGC) HEAD QUARTERS BUILDING LOCATED AT 2001 ELMERTONAVENUE, HARRISBURG, PA 17110. THE PROPERTY IS OWNED BY THE COMMONWEALTH OF PENNSYLVANIA. ALL WORK SHALL BE INSTALLED INACCORDANCE WITH BUILDING AND SAFETY CODES MANDATED BY FEDERAL, STATE AND LOCAL GOVERNMENT LAWS, ORDINANCES ANDREGULATIONS.

THE WORK HOURS FOR THIS PROJECT SITE ARE DURING REGULAR PGC BUSINESS HOURS WHICH ARE MONDAY THROUGH FRIDAY, 7:45 AM TO 4:00PM. WORK DURING DIFFERENT HOURS MUST HAVE THE PRIOR WRITTEN APPROVAL BY THE PGC. REQUESTS FOR DIFFERENT WORKING HOURSMUST BE SUBMITTED TWO DAYS IN ADVANCE.

ACCESS TO THE WORK AREA WILL BE AT THE BUILDING'S PARKING LOT LOCATED ADJACENT TO THE LOADING DOCK. CONTRACTOR PARKING ANDSTAGING WILL BE PROVIDED AT THE SAME LOCATION. NEW BUILDING MATERIALS MAY BE BROUGHT INTO THE BUILDING THROUGH THEOVERHEAD DOORS AT THE LOADING DOCK. THE ELEVATOR MAY BE USED TO TRANSPORT MATERIALS FROM THE GROUND FLOOR TO THE FIRSTFLOOR, TEMPORARY ELEVATOR PROTECTION MUST BE INSTALLED TO PROTECT THE INTERIOR FINISHES OF THE ELEVATOR FROM DAMAGE.

THE BUILDING WILL REMAIN OPEN FOR BUSINESS DURING THE CONSTRUCTION. THE NEW DISPATCH CENTER SPACE WILL BE SURRENDERED TOTHE CONTRACTOR FOR THE DURATION OF THIS WORK. THE CONTRACTOR MUST STAGE AND SCHEDULE HIS WORK ACTIVITIES TO AVOIDDISRUPTION TO THE BUILDING OPERATIONS.

TEMPORARY HEAT, ELECTRIC AND WATER UTILITIES WILL BE PROVIDED FOR THIS PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDINGTEMPORARY SANITARY FACILITIES NECESSARY FOR HIS WORKERS. THERE IS NO SEPARATE PAYMENT FOR PROVIDING TEMPORARY UTILITIESNECESSARY TO COMPLETE THE WORK.

THE CONTRACTOR SHALL PROVIDE SIGNS, BARRICADES, WARNING TAPE, SAFEGUARDS, ETC. TO KEEP THE PUBLIC FROM THE WORK AREASINSIDE AND OUTSIDE THE BUILDING. SAFETY AT THE WORK SITE IS THE CONTRACTORS RESPONSIBILITY.

THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF WORK AND SHALL NOTIFYTHE ARCHITECT IF ANY DISCREPANCIES OCCUR FOR CLARIFICATION.

CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING FOR SUPPORT AS REQUIRED FOR COMPLETE INSTALLATION.

1.

2.

3.

4.

5.

7.

6.

8.

PROJECT LOCATIONSEE DRAWING A-2 FOR ENLARGED PLANS

OF NEW DISPATCH CENTER

.

CT3CT2

CT1

CT5

CT4

CT6

D2

D3D4

D1

CT7

NOTE:THE DISPATCH CENTER MODULAR FURNITURE SYSTEMS SHOWNWILL BE FURNISHED AND INSTALLED BY OTHERS, VIA ASEPARATE CONTRACT, AFTER THE COMPLETION OF THISPROJECT WORK. THE MODULAR FURNITURE IS SHOWN FORINFORMATION PURPOSES ONLY. SEE ELECTRICAL DRAWINGSFOR NEW ELECTRICAL WIRING AND DEVICES TO BE INSTALLEDTO SUPPORT THE NEW MODULAR FURNITURE.

NEW DISPATCH CENTER

+/- 3'-3"

+/-3

'-7"

PENNSYLVANIA GAME COMMISSION

REVISIONS

DAUPHIN CO.

PARTIAL FIRST FLOOR PLAN

SUSQUEHANNA TWP.PGC HEAD QUARTERS BLDG.NEW CONSOLIDATED DISPATCH CENTER - PHASE 1

PROJECT NO.

DATE:SHEET NO.

DRAWN BY:PGC-HQ-20-01

A-110/13/2020C. CLOUSER

PROJECTNORTH

TRUENORTH

NORT

H

KEY PLANNO SCALE

AREA OF WORK

PARTIAL FIRST FLOOR PLAN SHOWN

FRO

NT

EN

TR

Y

PENNSYLVANIA GAME COMMISSIONHEADQUARTERS BUILDING2001 ELMERTON AVENUEHARRISBURG, PA 17110

WORK SHOWN ON THIS SHEET SHALL BE PROVIDEDBY THE GENERAL CONTRACTOR (GC-CONTRACT No. 1)UNLESS SPECIFICALLY STATED OTHERWISE.

Page 3: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

Up

Dn

114

I&E Storage

117

140

Elev.

118

125124

123 122 120

115

116

119

141

WHM Storage

121

125A

NEW DISPATCH CENTER

117A

120

117B

CLOS.

MENSRESTROOM

WOMENSRESTROOM

PLAN ROOM OFFICE

PLOTTERROOM SURVEYORS

OFFICE

BREAKROOM

CORRIDOR

CO

RR

IDO

R

(N.I.C.) (N.I.C.)

(N.I.C.)

(N.I.C.) (N.I.C.)

(N.I.C.)

(N.I.C.)

118

1 1

1

948 S.F.

F

F

F

2 3

2 3

2 3

2 3

2 3

2 3

2 3141 S.F.

(N.I.C.)

2 3

4

4

5

5

5 5

66

6

7

7

8

8

45KVA

30KVA

9

NOTE:SEE ELECTRICALDRAWINGS FOR NEWTRANSFORMERSLOCATION AND SIZES.

4

2A-3

2A-3

SIM.

1010

11V.I.F.

11V.I.F.

11V.I.F.

11V.I.F.

10

PIPE

CH

ASE

PROVIDEDBY E.C.

11V.I.F.12

V.I.F.

V.I.F.12

CRCR

1313

MAT'L.

3'-0"

120118

117A

WIDTHDOORNo.

1 3/4"7'-0"

HARDWARETHK.HEIGHT

WOOD

MAT'L. GLAZING

EXIST.

FIRERATING

FIRERATING

EXISTING TO BE REUSEDEXISTING TO BE REUSED

117B

1) REMOVE AND REINSTALL EXISTING SOLID CORE WOOD DOORS AND HARDWARE WITHIN NEW METAL DOOR FRAMES.

2) REMOVE AND DISPOSE OF EXISTING METAL DOOR FRAMES. FURNISH AND INSTALL NEW WIDER 16 GAGE MIN.STEEL DOUBLE RABBET KNOCK DOWN DOOR FRAMES TO ACCOMMODATE NEW INTERIOR WALL SOUNDPROOFING MATERIALS AND FINISHES.

3) DOOR NUMBERS 117A & 117B SHALL RECEIVE NEW ELECTRIFIED DOOR STRIKES AND DOOR ACCESS CARD CONTROLS, FURNISH AND INSTALLED BY STATE SECURITY CONTRACTOR, VIA A SEPARATE CONTRACT (ADT).COORDINATE AND SCHEDULE THE INSTALLATION OF NEW DOOR FRAMES, EXISTING DOORS AND NEW DOOR HARDWARE TO ALLOW ACCESS FOR NEW WIRING OF ELECTRIFIED STRIKES AND CARD ACCESS CONTROLS TOAVOID ANY DOOR HARDWARE CONFLICTS.

DOOR SCHEDULE NOTES:

EXIST.EXIST.EXIST.

3'-0" 7'-0"3'-0" 7'-0"3'-0" 7'-0"

1 3/4"1 3/4"1 3/4"

WOODWOODWOOD

SEE H.W. GROUP 1 NONENONENONENONE

SEE H.W. GROUP 1METAL 20 MIN. NEW WIDER DOOR FRAME REQUIRED

METALMETALMETAL

20 MIN.20 MIN.20 MIN.

REMARKS

NEW WIDER DOOR FRAME REQUIREDNEW WIDER DOOR FRAME REQUIREDNEW WIDER DOOR FRAME REQUIRED

(3)

ROOM FINISH SCHEDULE

NUM

BER

NAM

E

DISPATCH CENTER

120

117

NOTE:

BASE

NORT

H

SOUT

H

EAST

FLOO

R

(1) (3)(3)(2)WALL

REM

ARKS

WES

T

CEIL

ING

(4)(3) (5)

OFFICE

ROOM FINISH SCHEDULE KEY NOTES:

AAB

AA

A A A AA A A AC C C C

AAB

CLOSET118B

EXISTING LIGHT GAGE METAL STUD PARTITION WALLS, DOORS AND DOOR FRAMES TO BE DEMOLISHD BY PGC STAFF, NOT IN CONTRACT.

EXISTING LIGHT GAGE METAL STUD PARTITION WALLS TO REMAIN, GYPSUM PANELS AT INTERIOR WALL SURFACES TO BE DEMOLISHED BYPGC STAFF, NOT IN CONTRACT.

FURNISH AND INSTALL NEW SOUND BATT MATERIAL WITHIN ALL OPEN WALL FRAMING CAVITIES. FURNISH AND INSTALL NEW SOUND SOAKPANELS TO EXPOSED METAL WALL FRAMING (ONE SIDE ONLY). FURNISH AND INSTALL NEW 5/8-INCH THICK GYPSUM PANEL SYSTEMFASTENED THROUGH NEW SOUND SOAK PANELS TO EXISTING METAL WALL FRAMING. PROVIDE A LEVEL 4 GYPSUM WALL. FURNISH ANDINSTALL ONE COAT OF PAINT PRIMER AND TWO FINISH COATS OF NO VOC, SEMI GLOSS, LATEX ENAMEL PAINT FINISH TO ALL WALLSURFACES. FURNISH AND INSTALL NEW 6" HIGH VINYL COVE BASE TO MATCH NEW FINISH FLOORING SYSTEM. SEE PROJECTSPECIFICATIONS.

EXISTING PARTITION WALL TO REMAIN, PATCH AND REPAIR EXISTING GYPSUM FINISHES, APPLY TWO COATS OF PAINT TO ALL WALLSURFACES.

REMOVE AND REINSTALL EXISTING DOORS AND DOOR HARDWARE. STEEL DOOR FRAMES SHALL BE DEMOLISH AND REPLACED WITH NEW16 GAGE STEEL KNOCK DOWN DOOR FRAMES WITH WIDER JAMBS FOR THE NEW SOUND SOAK PANEL AND GYPSUM WALL FINISHES.REINSTALL EXISTING DOORS AND DOOR HARDWARE WITHIN NEW DOOR FRAMES. NEW FRAMES SHALL BE FACTORY PREPARED TOACCEPT EXISTING AND NEW DOOR HARDWARE. SEE DOOR SCHEDULE THIS DRAWING.

NEW AUDIBLE AND VISUAL DEVICES SHOWN ON PLAN WILL BE PROVIDED VIA A SEPARATE CONTRACT WITH STATE FIRE ALARM VENDOR,NEW GENERAL CONSTRUCTION SHALL BE COORDINATED WITH THE FIRE ALARM VENDOR TO ALLOW ACCESS FOR NEW ROUGH AND FINALWIRING TO SUPPORT THESE NEW DEVICES.

FURNISH AND INSTALL NEW STATICWORX CARPET TILE SYSTEM, CLEAN AND PREPARE EXISTING FLOORS, PROVIDE FLOOR LEVELING,PRIMERS , UNDERLAYMENTS AND ADHESIVES REQUIRED FOR INSTALLATION IN ACCORDANCE WITH THE MANUFACTURER'S PRODUCTSPECIFICATIONS. SEE PROJECT SPECIFICATIONS.

FURNISH AND INSTALL NEW 5/8-INCH THICK GYPSUM PANELS AT EXISTING COLUMN COVERS, PROVIDE ADDITIONAL LIGHT GAGE METALFRAMING AND BLOCKING AS REQUIRED FOR RECONSTRUCTION.

FURNISH AND INSTALL NEW QUIET BARRIER SPECIALTY 1 1/4-INCH COMPOSITE PANELS FASTENED TO THE EXISTING WALL SURFACES,BEHIND THE NEW ELECTRICAL TRANSFORMERS IN ROOM 123.

FURNISH AND INSTALL NEW QUIET BARRIER PIPE WRAP AT EXITING UN-INSULATED MECHANICAL AND SANITARY PIPING LOCATED WITHINTHE EXPOSED WALL CAVITIES, PIPE CHASES AND ABOVE THE CEILING.

FURNISH AND INSTALL NEW WOOD BLOCKING WITHIN EXISTING METAL STUD PARTITION WALLS FOR FUTURE INSTALLATION OF FOUR (4)NEW WALL HUNG 60 INCH FLAT SCREEN TELEVISIONS/MONITORS. NEW TELEVISION/MONITOR LOCATIONS AND MOUNTING HEIGHTS SHALLBE DETERMINED AT THE INITIAL JOB CONFERENCE. TELEVISIONS AND MOUNTING BRACKETS SHALL BE FURNISHED AND INSTALLED BYPGC STAFF.

SURFACED MOUNTED WALL HUNG DIGITAL CLOCK, TO BE FURNISH AND INSTALLED BY PGC STAFF. PROPOSED LOCATION SHOWN FORCOORDINATION PURPOSES ONLY AND FOR NEW ELECTRICAL OUTLET TO POWER CLOCK.

NEW CARD READER, WALL MOUNTED. NEW DOOR ACCESS CONTROLS AND ELECTRIC LATCH SHALL BE FURNISH AND INSTALLED BY PGCSECURITY VENDOR, COORDINATED INSTALLATION OF NEW DOOR FRAME, DOOR AND DOOR HARDWARE WITH SECURITY VENDOR TOAVOID CONFLICTS.

1

2

3

4

5

6

7

8

9

10

NEW DISPATCH CENTER FLOOR PLAN - CONSTRUCTION NOTES

MEN'S RESTROOM115WOMEN'S RESTROOM116

123 STORAGE A A A A A AAB B B B B BBA A A A A AA

11

NEW QUIET DOOR ADJUSTABLE PERIMETER SEAL, NEW QUIET DOOR AUTOMATIC DOOR SEAL, NEW ADA COMPLIANTALUMINUM DOOR THRESHOLD, NEW NORTON 8501 ADA COMPLIANT DOOR CLOSER, NEW SARGENT 8200 SERIES MORTISELATCH/LOCKSET SET WITH STOREROOM FUNCTION, EXISTING DOOR HINGES AND DOOR STOPS TO BE REUSED.

HARDWARE GROUP #1:

12

13

A.F.F. - ABOVE FINISHED FLOOR

V.I.F. - VERIFY IN FIELD

N.I.C. - NOT IN CONTRACT

ABBREVIATIONS LEGEND

PENNSYLVANIA GAME COMMISSION

REVISIONS

DAUPHIN CO.

NEW DISPATCH CENTER FLOOR PLAN, NOTES & SCHEDULES

SUSQUEHANNA TWP.PGC HEAD QUARTERS BLDG.NEW CONSOLIDATED DISPATCH CENTER - PHASE 1

PROJECT NO.

DATE:SHEET NO.

DRAWN BY:PGC-HQ-20-01

A-210/13/2020C. CLOUSER

PROJECTNORTH

TRUENORTH

NORT

HNEW DISPATCH CENTER - FLOOR PLANSCALE: 1/4" = 1'-0"A-2

1

PROJECTNORTH

TRUENORTH

NORT

H

KEY PLANNO SCALE

AREA OF WORK

FRO

NT

EN

TR

Y

PENNSYLVANIA GAME COMMISSIONHEADQUARTERS BUILDING2001 ELMERTON AVENUEHARRISBURG, PA 17110

WORK SHOWN ON THIS SHEET SHALL BE PROVIDEDBY THE GENERAL CONTRACTOR (GC-CONTRACT No. 1)UNLESS SPECIFICALLY STATED OTHERWISE.

AutoCAD SHX Text
DOOR
AutoCAD SHX Text
DOOR SCHEDULE
AutoCAD SHX Text
DOOR FRAME
AutoCAD SHX Text
(1) FLOOR FLOOR A. EXISTING TO REMAIN EXISTING TO REMAIN B. NEW LUXURY VINYL PLANK FLOORING SYSTEM (2) BASE BASE A. EXISTING TO REMAIN B. 6" VINYL WALL BASE (3) WALLS WALLS A. EXISTING FINISH TO REMAIN B. PREP. AND PAINT EXISTING WALLS WALLS C. NEW GYPSUM WALL BOARD, PAINT (4) CEILING CEILING A. EXISTING TO REMAIN B. NEW SUSPENDED ACOUSTICAL TILE CEILING SYSTEM (5) REMARKSREMARKS
Page 4: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

Up

Dn

114

I&E Storage

140

Elev.

125124

119

141

WHM Storage

125APLOTTER

ROOM SURVEYORS

OFFICE

BREAKROOM

CORRIDOR

CO

RR

IDO

R

(N.I.C.) (N.I.C.)

(N.I.C.)

(N.I.C.) (N.I.C.)

(N.I.C.)

(N.I.C.)SD

(N.I.C.)

(N.I.

C.)

SD

SD

SD

SD SD

SD

SD

SD

1

1

1

2 2

2

4

3

3

3

33 3

4 4

4

5

5

5

5

5

5 5

5

6

6 6

7

7

7

8

8

8

8

8

8

8

8

8

118CLOS.

(N.I.C.)

EX. COL.

EX. COL.

6

4

8

8

8

RCP LEGEND

SD

TYPICAL WALL SECTIONSCALE: 3/4" = 1'-0"A-3

2

NEW SUSPENDED CEILING SYSTEM

EXISTING 3 5/8" LIGHT GAGE METAL STUDPARTITION WALL FRAMING

NEW 1/4" THICK SOUND SOAK PANELS

NEW 5/8" THICK GYPSUM WALL PANELSw/ LEVEL 4 FINISH

EXISTING 1/2" THICK GYPSUM WALL FINISH,TO REMAIN AS IS

NEW SOUND BATT INSULATION TO BEINSTALLED WITHIN ALL WALL FRAMING CAVITIES

NEW 6" HIGH VINYL COVE BASE ADHERED TONEW GYPSUM WALL SURFACE

NEW STATICWORX CARPET TILE FINISHFLOORING SYSTEM

EXISTING SUSPENDED CONCRETE SUB-FLOOR

NEW SUSPENSION CABLES, ANCHOR TOEXISTING FLOOR AND ROOF STEELSTRUCTURAL MEMBERS AND METAL DECKINGABOVE

9'-0

"

5" (NEW WALL THICKNESS)

NEW CEILING WALL ANGLE, MITER CORNERS

8'-9

"123 117

(EXI

STIN

G W

ALL

HEI

GH

T)

(NEW

CEI

LIN

G H

EIG

HT)

EXISTING SUSPENDEDCEILING, TO REMAIN

FURNISH AND INSTALL A NEW 2'x2' SUSPENDED ACOUSTICAL TILE CEILING SYSTEM, 8'-9" A.F.F. AT THE NEW DISPATCH CENTER. THE NEWCEILING WITHIN THE OFFICE, ROOM 120, WILL REMAIN AT SAME ELEVATION, +/- 8'-6" A.F.F. INSTALLATION SHALL BE IN ACCORDANCEWITH THE MANUFACTURES PRODUCT SPECIFICATIONS AND INSTALLATION PROCEDURES.

EXISTING 2'x4' SUSPENDED ACOUSTICAL TILE CEILING SYSTEM TO REMAIN, PROVIDE NEW ACOUSTICAL PANELS TO MATCH EXISTING ATLOCATIONS WHERE FLUORESCENT LIGHTING FIXTURES HAVE BEEN REMOVED. SEE ELECTRICAL DRAWINGS. SCHEDULE ANDCOORDINATE THIS WORK WITH ELECTRICAL CONTRACTOR.

FURNISH AND INSTALL NEW AIR DIFFUSERS WITHIN NEW SUSPENDED CEILING SYSTEM. PROVIDE NEW INSULATED FLEX DUCT ANDHARDWARE AS REQUIRED TO RE-CONNECT AIR DIFFUSERS TO EXISTING BRANCH SUPPLY DUCT WORK ABOVE THE CEILING.

FURNISH AND INSTALL NEW PLENUM RETURN GRILLS WITHIN NEW SUSPENDED CEILING SYSTEM.

EXISTING PENDENT SPRINKLER HEADS WILL BE RAISED, VIA A SEPARATE CONTRACT WITH STATE SPRINKLER VENDOR, TOACCOMMODATE THE NEW SUSPENDED CEILING ELEVATION. NEW CEILING WORK SHALL BE COORDINATED WITH THE SPRINKLERVENDOR TO SUPPORT THESE MODIFICATIONS. SPRINKLER VENDOR SHALL PROVIDE FINISHED TRIM OR ESCUCHEONS AROUND HEAD.

RE-INSTALL EXISTING SMOKE DETECTORS WITHIN NEW SUSPENDED CEILING SYSTEM. PROVIDE ALL SUPPORTS AND HARDWAREREQUIRED FOR RE-INSTALLATION. EXISTING SMOKE DETECTOR FLEXIBLE METAL CLAD CIRCUITRY AND BACK BOX SHALL REMAIN.

FURNISH AND INSTALL NEW QUIET BATT 30 SOUNDPROOFING INSULATION OVER THE NEW SUSPENDED CEILING SYSTEMS. INSTALLATIONSHALL BE IN ACCORDANCE WITH THE MANUFACTURES PRODUCT SPECIFICATIONS AND INSTALLATION PROCEDURES.

EXISTING LIGHT FIXTURES TO BE DEMOLISHED BY ELECTRICAL CONTRACTOR. PROVIDE NEW CROSS TEES, ACOUSTICAL PANELS ANDADDITIONAL SUSPENSION CABLES, AS REQUIRED FOR INSTALLATION OF NEW LED LIGHTING FIXTURES AND DEMOLITION OF EXISTINGLIGHT FIXTURES. SEE ELECTRICAL DRAWINGS FOR NEW LIGHT FIXTURE LOCATIONS TO BE INSTALLED WITHIN EXISTING CEILINGSYSTEMS. SCHEDULE AND COORDINATE THIS WORK WITH ELECTRICAL CONTRACTOR.

1

2

3

4

5

6

7

NEW DISPATCH CENTER REFLECTED CEILING PLAN - CONSTRUCTION NOTES

8

NOTE:COORDINATE THE INSTALLATION OF NEW SUSPENDED CEILINGSYSTEMS, NEW CEILING MOUNTED COMPONENTS AND ELECTRICALDEVICES (OCCUPANCY SENSORS) WITH THE ELECTRICAL DRAWINGSTO AVOID CONFLICTS AND OBSTRUCTIONS.

PENNSYLVANIA GAME COMMISSION

REVISIONS

DAUPHIN CO.

NEW DISPATCH CENTER REFLECTED CEILING PLAN AND NOTES

SUSQUEHANNA TWP.PGC HEAD QUARTERS BLDG.NEW CONSOLIDATED DISPATCH CENTER - PHASE 1

PROJECT NO.

DATE:SHEET NO.

DRAWN BY:PGC-HQ-20-01

A-310/13/2020C. CLOUSER

PROJECTNORTH

TRUENORTH

NORT

HNEW DISPATCH CENTER - REFLECTED CEILING PLANSCALE: 1/4" = 1'-0"A-3

1

PROJECTNORTH

TRUENORTH

NORT

H

KEY PLANNO SCALE

AREA OF WORK

FRO

NT

EN

TR

Y

PENNSYLVANIA GAME COMMISSIONHEADQUARTERS BUILDING2001 ELMERTON AVENUEHARRISBURG, PA 17110

WORK SHOWN ON THIS SHEET SHALL BE PROVIDEDBY THE GENERAL CONTRACTOR (GC-CONTRACT No. 1)UNLESS SPECIFICALLY STATED OTHERWISE.

AutoCAD SHX Text
EXIST. WALL
AutoCAD SHX Text
EXIST. WALL WITH NEW SOUND BATT, SOUND SOAK PANELS & NEW GYPSUM FINISHES
AutoCAD SHX Text
EXIST. SUPPLY AIR REGISTER, TO REMAIN
AutoCAD SHX Text
EXIST. SUPPLY AIR REGISTER, TO REMAIN
AutoCAD SHX Text
EXIST. 2'x4' SUSPENDED ACOUSTICAL CEILING SYSTEM TO REMAIN, 8'-6" A.F.F.
AutoCAD SHX Text
NEW 2'x2' SUSPENDED ACOUSTICAL CEILING SYSTEM, 8'-9" A.F.F.
AutoCAD SHX Text
EXIST. BATHROOM EXHAUST REGISTER, TO REMAIN
AutoCAD SHX Text
EXIST. FLUORESCENT LIGHT FIXTURE, TO BE REMOVED BY E.C., SEE NOTE 8
AutoCAD SHX Text
NEW 2'x2' LED RECESSED LIGHT FIXTURE, NORMAL AND EMERGENCY LIGHTING, SEE ELECTRICAL DRAWINGS
AutoCAD SHX Text
EXIST. PENDENT SPRINKLER HEAD
AutoCAD SHX Text
EXIST. SMOKE DETECTOR
AutoCAD SHX Text
EXIST. PLENUM RETURN AIR REGISTER, TO REMAIN
AutoCAD SHX Text
NEW 2'x2' LED RECESSED LIGHT FIXTURE, NORMAL LIGHTING, SEE ELECTRICAL DRAWINGS
AutoCAD SHX Text
NEW SUPPLY AIR REGISTER (TO MATCH EXISTING)
AutoCAD SHX Text
NEW SUPPLY AIR REGISTER (TO MATCH EXISTING)
Page 5: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

E001

SYMBOLS &ABBREVIATIONS

AH

AH

WLS

SYMBOL SCHEDULE - ELECTRICAL ELECTRICAL LINETYPE KEY(APPLIES TO ALL ELECTRICAL SYMBOLS)

MECHANICAL ABBREVIATIONS

ABBREVIATIONS

“”

SYMBOL SCHEDULE - TELECOMMUNICATIONS

SYMBOL SCHEDULE - SECURITY

10/15/2020

Page 6: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

ED100

PARTIAL GROUNDFLOOR PLAN -DEMOLITION -ELECTRICAL

AH

AH

WLS

N

10/15/2020

Page 7: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

ED101

PARTIAL FIRSTFLOOR PLAN -DEMOLITION -ELECTRICAL

AH

AH

WLS

N

Up

Dn

114

Storage

117

112 110 109 108 107 106 105 104 103 102

150 151 152 153149148147146145144

143

140

139

Elev.

118

111

125

124

121123 122 120

126

127

128

138

129

130

131

137

136

135

132

134

15

7

101

115116

119

Alarm Panel

142

141

Up

Dn

Up

Storage

10/15/2020

Page 8: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

ED102

PARTIAL SECONDFLOOR PLAN -DEMOLITION -ELECTRICAL

AH

AH

WLS

N

10/15/2020

Page 9: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

10/15/2020

Page 10: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

E200

PARTIAL GROUNDFLOOR PLAN -

POWER & SYSTEMS

AH

AH

WLS

N

10/15/2020

Page 11: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

Up

Dn

Elev.

Alarm Panel

Up

Dn

Up

FUTURE FUTURE

FUTUREFUTURE

E201

PARTIAL FIRSTFLOOR PLAN -

POWER & SYSTEMS

AH

AH

WLS

N

EMERGDISPATCHCENTER

-

CORRIDOR123

EMERGDISPATCHCENTER

-

OFFICE120

WOMEN'SRESTROOM

115

MEN'SRESTROOM

116

OFFICE-

BREAK ROOM127

10/15/2020

Page 12: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

E202

PARTIAL SECONDFLOOR PLAN -

POWER & SYSTEMS

AH

AH

WLS

N

COMPUTERROOM

123

10/15/2020

Page 13: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

E501

DETAILS

AH

AH

WLS

10/15/2020

Page 14: Up...Up Dn 114 I&E Storage 117 140 Elev. 118 124 125 123 122 120 115 116 119 141 WHM Storage 121 125A NEW DISPATCH CENTER 117 A 120 117 B CLOS. MENS …

E601

SCHEDULES

AH

AH

WLS

LIGHTING FIXTURE SCHEDULE

LIGHTING FIXTURE SCHEDULE NOTES:

LIGHTING CONTROL SYSTEM - COMPONENT SCHEDULE (WATTSTOPPER)

SYMBOL DESCRIPTION BASIS OF DESIGN MANUFACTURER/SERIES NOTES

LIGHTING CONTROL SYSTEM - SEQUENCE OF OPERATION MATRIXSPACE DESCRIPTION GENERAL LINE VOLTAGE CONTROLS DIGITAL CONTROLS

AREA NAME AREA NUMBER LIGHTING ZONES TARGET MAINTAINEDAVERAGE (FC)

CONTROL FUNCTION:ON/OFF OR DIM

TIME-OUT SETTINGS(MINUTES)

TOGGLE SWITCHCONTROL

WALL SWITCHSENSOR CONTROL

(OCC/VAC)ANALOG SENSOR

CONTROL (OCC/VAC) MANUAL CONTROLS SENSOR CONTROL(OCC/VAC)

10/15/2020