Page 1: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK carrier

M.Morel01.04.2014

Page 2: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 2

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

01/04/2014

Page 3: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 301/04/2014

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

Page 4: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 401/04/2014

1V2 Digx 10 ch

1V2 AX 10 ch

1 x 2V5 Dig1 x 3V3 Dig1 x 5V Dig 3 x 5V3 Dig

3 modules in each EASY crateInterlocked with Temperature(OR of cooling and TDCpix)

Common to the 3 stations.Supplies the Temp logic(VDD_temp and 3V3_NI)

Low Voltage A3009 and A3009K modules

2 x A3009K + 1 x A3009

1 x A3009

Page 5: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 5

- 3 x EASY CRATES 3000 - 6 x 3009K 3 x Analog and 3 x Digital 1V2- 1 x 3009K (prototype module) - 3 x 3009 2V5, 3V3, 5V- 1 x 3009 5V3 non interlocked*- 1 A3486 48V power supply

- 1 mainframe SY2527: 80CHF/month- 1 branch controller A1676A: 40CHF/m- 1 HV module A1821: 38CHF/m

- 1 SY4527: 5862 euros (profitable after 7 years)- 1 A1676A: 1800 euros (profitable 5 years)- 1 A1821: 5260 euros (profitable after 14 years)

* 5V3 non interlocked is connected to rad hard voltage regulatorswhich provide VDD_temp (1V2) and temp_logic (3V3)

What do we need?

Bought

Rented

Bought

01/04/2014

Page 6: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 6

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

01/04/2014

Page 7: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 701/04/2014

TCC8

Page 8: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier

Each Patch Panel:10 x 1.2V Digital10 x 1.2V Analog1 x 3.3V Dig1 x 2.5V Dig1 x 5V Dig1 x Analog senses1 x digital senses1 x 5.3V dig (NON interlocked)1 x Bias (~500 to 1000V)1 x 10 temperature interlocks

PatchPanel3

PatchPanel2

PatchPanel1

GTKStation 1

GTKStation 2

GTKStation 3

Electronic

Rack 2

Electronic

Rack 1

Electronic

Rack 3

Electrical cables routing scheme

8

4m

4m

4m

01/04/2014

18m9m20m

Page 9: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 901/04/2014

• All the cables have been ordered• All the connectors and accessories have also been ordered• The company CONFECTRONIC (Yvonand) will assemble the connectors (318 cables)

Page 10: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1001/04/2014

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

Page 11: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1101/04/2014

GTK_CARRIER

Page 12: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 12

Due to the complexity of the PCB, we would select a company capable to work with special techniques as:

• Small pitch• Blind and burried vias• Controlled impedance• Filled and capped vias• Nelco 4203-13• Ni/Au on the edges of the board• countersink

1. CERN.

2. GS Swiss PCB. KÜSSNACHT (CH) www.swisspcb.ch

3. ELTOS SAN ZENO Arezzo (IT) www.eltos.it

4. STEVENAGE circuits www.stevenagecircuits.co.uk

01/04/2014

PCB production

Page 13: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1301/04/2014

1. CERN. 2 x 2866CHF + tooling 1039CHF

2. GS Swiss PCB. 3 x 6103CHF + 2935CHF

3. ELTOS SAN ZENO 3 x 1485CHF + 1500CHF

4. STEVENAGE circuitsno answer

5 boards will be produce: expected delivered time: mid May

GTK_CARRIER production

Page 14: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1401/04/2014

1. Power Supplies2. Cables3. GTK_carrier4. Probe tester

Page 15: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1501/04/2014

Wentworth Prober

Missing part: small vacuum pumpNeeds modification of the carrier support

Page 16: Update on Power Supplies  and GTK carrier  M.Morel 01 .04.2014

Update on Power Supplies and GTK_carrier 1601/04/2014

Conclusion

1. Status of the Power Supplies: ordered2. Status of the Cables: ordered3. Status of the GTK_carriers: ordered4. Prober: needs small modifications