updating quality results_spd
TRANSCRIPT
-
8/14/2019 Updating Quality Results_SPD
1/16
System Process DocumentUpdating Quality Results
Department
Responsibility/Role
File Name 27814654.docRevision
Document Generation Date 19/01/2010 12:23:00
Date Modified 1/19/2010 12:23:00 PM
Last Changed by
Status
Updating Quality Results
Trigger:
Concept
You can use the Quality Workbench page to update a quality result entered at any time. For
example, you can add a comment to a quality result if you have more information to share that
could aid in problem resolution. The quality results display in information columns that help you
to determine which quality result to select.
In this topic, you will update quality results.
Required Field(s) Comments
Output - Result(s) Comments
Additional Information
Last changed on: 1/19/2010 12:23:00 PM Page 1
-
8/14/2019 Updating Quality Results_SPD
2/16
System Process DocumentUpdating Quality Results
Procedure
Step Action
1. Begin by navigating to the Quality Workbench-Collection Results page.
Click the vertical scrollbar.
Page 2 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
3/16
System Process DocumentUpdating Quality Results
Step Action
2. Click the Manufacturing and Distribution Manager link.
Last changed on: 1/19/2010 12:23:00 PM Page 3
-
8/14/2019 Updating Quality Results_SPD
4/16
System Process DocumentUpdating Quality Results
Step Action
3. Click the vertical scrollbar.
Step Action
4. Click the Collection Results link.
Page 4 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
5/16
System Process DocumentUpdating Quality Results
Step Action
5. The Quality Workbenchpage includes the following tabs:
Collection Results.
Nonconformances.
Corrective Actions.
Skip Lot Inquiry.
You can perform a simple or advanced search within each tab.
Last changed on: 1/19/2010 12:23:00 PM Page 5
-
8/14/2019 Updating Quality Results_SPD
6/16
System Process DocumentUpdating Quality Results
Step Action
6. You can search and find a collection plan in all four tabs in the Quality
Workbench by first narrowing your search by organization.
Page 6 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
7/16
-
8/14/2019 Updating Quality Results_SPD
8/16
System Process DocumentUpdating Quality Results
Step Action
9. Click the Go button.
Page 8 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
9/16
System Process DocumentUpdating Quality Results
Step Action
10. Click in the Collection Plan field.
Step Action
11. Enter the desired information into the Collection Plan field. Enter "CB
COLLECTION PLAN".
Last changed on: 1/19/2010 12:23:00 PM Page 9
-
8/14/2019 Updating Quality Results_SPD
10/16
System Process DocumentUpdating Quality Results
Step Action
12. Click the Go button.
Page 10 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
11/16
System Process DocumentUpdating Quality Results
Step Action
13. Click the CB COLLECTION PLAN link.
Step Action
14. The list of quality results data previously collected for the collection plan appearsin the Quality
Workbench-View Resultspage.
Select the Update iconto update quality results.
Last changed on: 1/19/2010 12:23:00 PM Page 11
-
8/14/2019 Updating Quality Results_SPD
12/16
System Process DocumentUpdating Quality Results
Step Action
15. Click the Update button.
Page 12 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
13/16
System Process DocumentUpdating Quality Results
Step Action
16. Use the Updatepage to enter quality results.
Step Action
17. Click in the Qty Reject field.
Last changed on: 1/19/2010 12:23:00 PM Page 13
-
8/14/2019 Updating Quality Results_SPD
14/16
System Process DocumentUpdating Quality Results
Step Action
18. Enter the desired information into the Qty Reject field. Enter "2".
Page 14 Last changed on: 1/19/2010 12:23:00 PM
-
8/14/2019 Updating Quality Results_SPD
15/16
System Process DocumentUpdating Quality Results
Step Action
19. Click the Finish button.
Step Action
20. Click the Apply button.
Last changed on: 1/19/2010 12:23:00 PM Page 15
-
8/14/2019 Updating Quality Results_SPD
16/16
System Process DocumentUpdating Quality Results
Step Action
21. You have completed the Updating Quality Results procedure.
End of Procedure.
Page 16 Last changed on: 1/19/2010 12:23:00 PM