upic internship 2015

21
Baruch Summer Interns 2015 Rebecca Glover Biosystems Engineering Bioprocessing Emphasis Minor: Sustainability Alston Loper Biosystems Engineering Ecological Emphasis Minor: Sustainability

Upload: ashleigh-hough

Post on 12-Apr-2017

163 views

Category:

Education


0 download

TRANSCRIPT

Page 1: UPIC Internship 2015

Baruch Summer Interns 2015 Rebecca Glover

Biosystems Engineering

Bioprocessing Emphasis

Minor: Sustainability

Alston Loper Biosystems Engineering Ecological Emphasis Minor: Sustainability

Page 2: UPIC Internship 2015

Ashleigh HoughBiosystems Engineering Ecological Emphasis Minor: Environmental

Engineering

Raymond MiddleswarthBiosystems Engineering

Bioprocessing Emphasis

Page 3: UPIC Internship 2015

Samplingwe collected grab samples monthly along

flow paths in eight different locations between DeBordieu and Strawberry

Page 4: UPIC Internship 2015

DeBordieu (Pond-Wetland)

Page 5: UPIC Internship 2015

Strawberry (“Natural”)

4

1

23

Page 6: UPIC Internship 2015

Parameters Sampled in the Field

• pH• dissolved oxygen • water level• water temperature• specific

conductance• turbidity • oxygen reduction

potential

Page 7: UPIC Internship 2015

Lab Work

• water sampling procedure/handling

• filtration of TSS/VSS (suspended solids)

• bacteria processing/analysis• filtration for nutrient analysis • standard curve/reagent for

nutrient analysis– creating a work list/file

designation • digestions for TKN and TKP• organic carbon analysis

Page 8: UPIC Internship 2015

Changes in E-coli bacteria levels (MPN) in Strawberry and Debordieu (6/1/14 -10/1/14)

Page 9: UPIC Internship 2015

Membrane Filter Technique

• Used for enumerating coliforms and fecal coliforms in drinking water

• Precise and easy to replicate

Page 10: UPIC Internship 2015

Membrane Filter Technique

After 22 hr incubation at 350C

Dark colonies with metallic sheen are verified total coliforms

Fecal coliforms: • tested simultaneously• Dark blue colonies are

positive

Page 11: UPIC Internship 2015

Membrane Filter Technique

Verification:• Lauryl Tryptose-Total coliform • Test positive for total coliforms

if gas produced within 48hr

Confirmed Phase• Brilliant Green Bile Broth 2%• Positive for fecal coliforms;gas

production within 48hr

Gas production within 18hr goes to confirmed phase

Page 12: UPIC Internship 2015
Page 13: UPIC Internship 2015

Digital Elevation Models (DEMs)

Entire Black Creek Watershed= 2,100 acres

Northwoods Watershed(includes elementary school)= 58 acres

Belhaven Watershed (includes Harvest Church site) = 257 acres

Page 14: UPIC Internship 2015
Page 15: UPIC Internship 2015
Page 16: UPIC Internship 2015
Page 17: UPIC Internship 2015
Page 18: UPIC Internship 2015

Northwoods Elementary School Watershed

Page 19: UPIC Internship 2015

0.1 0.25 0.5 1-0.10.00.10.20.30.40.50.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

0.1 0.25 0.5 1-0.10.00.10.20.30.40.50.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

0.1 0.25 0.5 10.0

0.1

0.2

0.3

0.4

0.5

0.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

0.1 0.25 0.5 10.0

0.1

0.2

0.3

0.4

0.5

0.6

Simulated Rainfall (in.)

Pred

icte

d Ru

noff

Volu

me

(in.)

5% Impervious Area

25% Impervious Area 50% Impervious Area

10% Impervious Area

Northwoods Elementary School Watershed (58 acres)

Page 20: UPIC Internship 2015
Page 21: UPIC Internship 2015