Yigall Schilp policy makerspatial planner, Mscproject: windenergy on land
Planning wind energy on a national level
July 30 2010, DOB Headquarters, NYC 3
The Netherlands in Europe
July 30 2010, DOB Headquarters, NYC 4
Dutch Facts– Over 16,5 million inhabitants – Capital: Amsterdam – Surface area: 42.000 KM2 (roughly 1/3 the size of
NY State)– Very densely populated spatial planning
important
Planning system
July 30 2010, DOB Headquarters, NYC 5
Organization
T h e E n viro n m e nt
L o ca l S pa tia l P la nn ing N a tio n a l S p a tia l P o licy
P ro jec t W in d en e rgy o n la nd
S p atia l p la nn ing a nd E n v iro n m e nt- to p ics b o th e nv iron m en ta l
a n d sp a tia l
S p a tia l P la nn ing
M in is te r
July 30 2010, DOB Headquarters, NYC 6
EU sustainability goals
In 2020:
• Reduction CO2 emissions by 30%
• Renewable energy 20% percent of total energyuse
July 30 2010, DOB Headquarters, NYC 7
Project “Windenergy on land” (1)Large scale wind turbines
• Now 2000MW on land and 230MW at sea
• 6000MW on land in 2020 and 6000MW at sea in 2020
July 30 2010, DOB Headquarters, NYC 8
Project “Windenergy on land” (2)Small turbines ( up to 15m)
National objectives for small turbines:
• At least: less obstructional policies
• At most: stimulating policies
• Use small turbines for social basis/acceptance
July 30 2010, DOB Headquarters, NYC 9
Small turbines (1)
Current obstructional policies
• In Environmental bill (detailed rules and procedures for environmental permit)
• In building permit (hard to get without certification)
• In zoning plan (long and expensive procedure to change)
July 30 2010, DOB Headquarters, NYC 10
Small turbines (2)
Planned stimulating policies
• Easier to get environmental permit (strike few regulations per 1/1 2011)
• Easier to build (building permit easier with certification) • Experiments for changing rules and regulations (Crisis and
Recovery Bill)• 6 municipalities• Mini turbine (max 10m) for a period of 10 years• First step: non-residential areas• Permanent evaluation• Goal: change unnecessary rules and regulations
July 30 2010, DOB Headquarters, NYC 11
Small turbines (3)
Goal: Gain social basis for wind energy in general
• …Contribute to sustainable image / Likeability-factor
• …Fast homegrown results (you make you own power)
• …Handlings perspective (you can build and own it yourself)
July 30 2010, DOB Headquarters, NYC 12
In conclusion
• More consistency in policy • Less rules and regulations • ‘it’s easy being green’
‘The Hague Climate Neutral’
Henry Terlouw
Coordinator Climate Change
The Hague
July 30 2010, DOB Headquarters, NYC 22
Jadranka Cace, RenCom
• Renewable energy consultant • Owner of Renewable Energy Company (RenCom)
• Services:• policy development• product development • project management
• Contact:• [email protected] • http://nl.linkedin.com/in/jadrankacace• www.urbanwind.net/pdf/SMALL_WIND_TURBINES_GUIDE_final.pdf
July 30 2010, DOB Headquarters, NYC 23
How small is small?
IEC definition • rotor diameter 0,75 - 25 m• rotor surface 0,5 - 200 m2
• rated power 0,1 -50 kW
NWEA definitions (Netherlands Wind Energy Association)• Small wind turbines in built surroundings:
– rated power* ≤ 6 kW (*rated power at 12 m/s)– pole < 15 m
• Small wind turbines in industrial and rural areas:– rated power < 30 kW– pole < 25 m
July 30 2010, DOB Headquarters, NYC 24
Dutch small wind turbines with horizontal axis (HAWT) (1)
Passaat, Montana, Alize
Rated power 1,4 kW 5 kW10 kW
www.fortiswindenergy.com
Tulipo
Rated power 2,5 kW
www.thesunfactory.info
TWFi
Rated power 0,6 kW 1 kW2,7 kW6,6 kW
www.thesunfactory.info
July 30 2010, DOB Headquarters, NYC 25
Dutch small wind turbines with horizontal axis (HAWT) (2)
Energy Ball
Rated power 0,5 kW 2,25 kW
www.homeenergyamericas.com
DONQI
Rated power 1,75 kW
www.donqi.eu/engels
Piqo
Rated power 0,65 kW
www.everkinetiq.nl
July 30 2010, DOB Headquarters, NYC 26
Dutch small wind turbines with vertical axis (VAWT)
Turby
Rated power 2,8 kW
www.turby.nl
Urban Turbine by Ecofys
Rated power 2,5 kW
http://realnewenergy.com
July 30 2010, DOB Headquarters, NYC 27
UWT’s: Aspects to consider
• Location: wind conditions
• Turbine: safety, energy efficiency, noise, vibrations
• Spatial aspects: visual effects on surrounding
• Energy balance: electricity generation versus demand (saving)
• Building integration: load, force, vibrations, contact sound, accessibility
• Grid connection: requirements of the local grid operator
• Social aspects: building owner, tenants, neighbors
• Financial aspects: costs (all-in), incentives, tariff (€/kWh), maintenance
• Monitoring: kWh generated, -used, -into grid
• Maintenance, guarantees
• Permits
• Manufacturer/supplier
July 30 2010, DOB Headquarters, NYC 28
Wind conditions
h
≥ 20 x h
1. 2.
3. 4.
July 30 2010, DOB Headquarters, NYC 29
Quick scan location
Distance >20 times the height of the obstacle? Location OK
Measure wind
no
yes
no
yes
yes
no
yes
no
Location OKOpen location on the
coast?
Location higher than 20 m? Measure wind
Obstacles in the direction of the prevailing wind? Location OK
July 30 2010, DOB Headquarters, NYC 30
Stepping stones UWT project
• Quick scan location
• Pre-selection turbines
• Apply for quote
• Roof scan
• Financial feasibility
• Permit requirements
• Decision making: ‘go’ - ‘no-go’
• Agreements tenants and neighbors
• Apply for permit
• Commission, execution
• Monitoring, maintenance
Artist impression Tulipo turbines,Railway Station, The Hague
July 30 2010, DOB Headquarters, NYC
Bottlenecks UWT projects in NL
• Market not transparent
• No independent market information
• Turbines not certified
• No dedicated legal framework
• No incentives
• (Public) acceptance
Test field in Schoondijke
31
July 30 2010, DOB Headquarters, NYC
Pilot project The Hague
• Target 30 - 50 UWTs
• 6 permits in three years
• Procedures take up to 1,5 year
• 6 turbines installed
• 36 turbines in process
• 20 turbines refused
• Reasons for refusing:
o Spatial planning
o Anticipated visual disturbances
o Protests tenants and neighbors
32
Donqi turbines, Wooninvest, The Hague