US 20 at Harmony Road Study Public Hearing August 5, 2015

Upload: others

Post on 11-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

US 20 at Harmony Road StudyPublic HearingAugust 5, 2015

Page 2: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Project Location

Page 3: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

2013 Preferred Alternative

FormerHarmony School

(Historic Property)

Page 4: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Project Development Process

PHASE IIIConstruction

PHASE IIDesign &

Land Acquisition

PHASE IPreliminary

Engineering & Environmental

Studies

• Analysis of conditions• Purpose and Need• Development of Alternatives• Preferred Alternative

•Plan Preparation•Acquire Right Of Way

Current PhaseThis improvement is included in the Department’s FY 2016-2021 Proposed Highway Improvement Program. The currentengineering efforts are targeted to enable a contract letting in the middle years of our current multi-year programcontingent upon plan readiness, land acquisition, and funding availability through future annual legislative appropriations.

Page 5: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Process and Schedule

PM #1 PH #1

Roundabout AlternativeApproved(May 2013)

Public Meeting

Project Milestone

Stakeholder Meeting

Initiate Phase I Study PHASE I

Stakeholder Meeting

Eng. & Env. Studies

Environmental Measures

• Cultural Resources

• Threatened and Endangered

Species

• Wetlands

• Woodlands

Page 6: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

2013 Roundabout

FormerHarmony School

(Historic Property)

Page 7: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Section 106/4(f) Studies

• National Register Eligible

• National Historic

Preservation Act of 1966

• National Transportation Act

of 1966

• Re-opened Phase I

• Avoidance alternatives

Page 8: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Process and Schedule

Public Meeting

Project Milestone

Stakeholder Meeting

We Are HerePH #2

Stakeholder Meeting

Stakeholder Meeting

Stakeholder Meeting

Stakeholder Meeting

Initiate Phase I Study PHASE I Begin

Phase II

PM #1 PH #1

Roundabout AlternativeApproved(May 2013)

Stakeholder Meeting

FHWA/SHPO Concurrence on

Avoidance

SHPO Designates Harmony School Property eligible for

Historic Register

Page 9: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Purpose and Need

Project Purpose• Improve Safety and Operations

Transportation Needs• Safety

– 5% Location– Fatal and Severe Crashes– Rear End, Angle Crashes

• Design– Poor sightlines, curved alignment– Lack of turn lanes

Page 10: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Existing Conditions - Traffic

I

HARMONY ROAD

US 20

8200 vehicles per day

2500 vehicles per day

Page 11: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Existing Conditions - Plan

I

HARMONY ROAD 55°

US 20

Page 12: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Existing Condition - Profile

Harmony Road

W

US 20LC

ENorthbound

Harmony centerlineUS 20

NS

Page 13: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Existing Condition - Profile

Harmony Road

W

US 20 centerline

E

Page 14: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Existing Conditions - Safety

I

17

14

11

17

Page 15: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Alternatives Considered• Do nothing• 4-way stop• Reduce Speed Limit

• Cut down hill on US 20

• Traffic signal with no reconstruction

Safety issues not addressedBack UpsNot effective as stand alone

strategyDoes not address curve and

skewDoes not address sightlines

Page 16: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

I

Additional Left Turn Lane on US 20

Extension of Left Turn Lane on Harmony Road

US 20 Right Turn Lane

Eastbound Right Turn Lane

North Leg Realigned

South Leg Realigned

Profile Flattened2015 Signal Alternative

Page 17: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

I2015 Roundabout Alternative

Raised traffic Islands

North Leg Realigned

Profile Flattened

Future Right Turn Lane (as needed)

Page 18: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Alternative ComparisonRoundabout Traffic Signal

Land Acquisition 3.3 Acres 7.9 Acres

Impacted Parcels 6 Parcels 21 Parcels

Level of Service C (AM) / B (PM) D (AM) / C (PM)

Construction Cost ± $5.0 M ± $6.4 M

Land Cost ± $0.38 M ± $1.3 M

Building Removals 1 2

Relocations 0 1

Wetland Impacts 0.72 Acres 0.8 Acres

Woodland Impacts 1.5 Acres 2.9 Acres

Expected SevereCrash Reduction

57% Decrease 9% Decrease

Page 19: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Detour Map

Closure: East Leg of IntersectionDetour: Westbound Marengo Road to Southbound US 20

Page 20: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Roundabouts

Page 21: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Roundabouts

Entry

ExitCirculatory Roadway

Truck Apron

Splitter Island

Center Island

Page 22: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Roundabouts - Safety

• Reduce conflict points

– 44% reduction in overall crashes

– 82% reduction in injury/fatal

crashes

• Motorists travel at lower

speeds

– Safer for pedestrians

– Increase driver reaction time

Page 23: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Roundabouts – Truck Apron

Truck Apron

Page 24: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Land Acquisition Procedure

• Fee Simple

• Acquisition of all rights and interest

• Permanent Easement

• Ownership retained by property owner

• IDOT allowed permanent use of property

to construct and maintain facilities

• Temporary Easement

• Ownership retained by property owner

• Temporary use to construct minor

improvements Relocation Assistance

Condemnation if Necessary

Negotiations with Property Owners

Prepare Independent Appraisal

Determine Ownership

Page 25: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Next Steps

• Browse exhibits

• Direct questions to the study team

• Please fill out a comment form – Comment period ends August 26,

2015

• Provide verbal testimony to the court reporter

Page 26: US 20 at Harmony Road Study - Illinois Department of … · 2020-01-28 · US 20 at Harmony Road Study Public Hearing August 5, 2015. Project Location. 2013 Preferred Alternative

Thank Youwww.us20atHarmony.com