2300 McDermott Road Suite 200235 214.301.0000 Business Confidential ©HingePoint Plano Texas 75025 User Guide: BOM to Excel Revit App By HingePoint Overview BOM schedules are typically setup in summary detail fashion. This Plugin allows users to setup BOM schedules by defining rules for Upper and Lower BOM schedules. Typically, the Upper section would contain summary values, and the Lower section would contain detail values. However, the user can now set up both sections per BOM schedule tab. The BOM schedules use existing Revit schedules as their source of data. The schedules may be configured through the Plugins setup tab. When a Revit schedule is enabled as a BOM schedule, a tab will be added for the BOM schedule and the schedule will be added to the Excel report on the BOM tab. Installation Please see our Installation Guides at: http://www.hingepoint.com/products/bomrevitapp/help/ Launching the BOM to Excel App The BOM for Revit plugin is launched from Revit’s AddIns menu. To launch the plugin, click the BOM toolbar button.

Upload: lammien

Post on 01-Sep-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

User  Guide:  BOM  to  Excel  –  Revit  App  By  HingePoint  

Overview  BOM  schedules  are  typically  setup  in  summary  detail  fashion.    This  Plugin  allows  users  to  setup  BOM  schedules  by  defining  rules  for  Upper  and  Lower  BOM  schedules.    Typically,  the  Upper  section  would  contain  summary  values,  and  the  Lower  section  would  contain  detail  values.    However,  the  user  can  now  set  up  both  sections  per  BOM  schedule  tab.      

The  BOM  schedules  use  existing  Revit  schedules  as  their  source  of  data.    The  schedules  may  be  configured  through  the  Plugins  setup  tab.  When  a  Revit  schedule  is  enabled  as  a  BOM  schedule,  a  tab  will  be  added  for  the  BOM  schedule  and  the  schedule  will  be  added  to  the  Excel  report  on  the  BOM  tab.  

Installation  Please  see  our  Installation  Guides  at:  

http://www.hingepoint.com/products/bom-­‐revit-­‐app/help/  

Launching  the  BOM  to  Excel  App  The  BOM  for  Revit  plugin  is  launched  from  Revit’s  Add-­‐Ins  menu.    To  launch  the  plugin,  click  the  BOM  toolbar  button.    

 

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

 

Figure  1  Tool  bar  button  

Setup  After  the  Plugin  is  launched,  you  will  see  a  screen  similar  to  Figure  2.    The  setup  tab  is  divided  into  four  areas.  

 

Figure  2  

Revit  Schedule  Grid  

The  top  left  shows  the  Revit  Schedules  grid.    The  grid  shows  the  Revit  schedules  that  are  defined  in  the  drawing.    Each  row  contains  the  name  of  the  Revit  schedule,  and  a  checkbox  that  enables  the  Revit  schedule  to  be  a  BOM  schedule.  The  tab  name  is  the  name  the  Plugin  will  use  to  generate  a  new  Plugin  tab  for  the  BOM  schedule,  and  the  name  of  the  sheet  added  to  the  Excel  report.  The  Tab  Name  defaults  to  the  Revit  Schedule  Name.  As  changes  are  made  to  the  fields  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

for  the  schedule,  the  Update  Column  will  show  a  Save  button.    Click  the  button  to  save  the  settings  to  the  Revit  file.  The  Revit  file  must  be  saved  in  order  for  these  setting  to  be  remembered,  the  next  time  Revit  is  opened.  

BOM  Field  Settings  

The  bottom  left  shows  the  Fields  grid  and  the  Upper  and  Lower  schedule  section  name  fields.    The  Fields  grid  lists  the  Revit  fields  that  are  defined  for  the  selected  Revit  schedule.  Revit  formula  fields  can’t  be  used  by  generic  BOM  and  therefore,  will  not  be  listed    (this  is  a  Revit  limitation  not  an  Plugin  limitation).    The  Fields  grid  also  specifies  the  setting  for  the  generic  BOM.    We  will  cover  the  various  settings  in  the  next  section.    The  Upper  and  Lower  section  name  fields  allow  the  user  to  name  the  BOM  sections.  

Right  Side  Example  Grids  

The  right  side  grids  show  the  results  of  the  setting  that  are  applied  in  the  Fields  grid.    

 Fields  Setup  The  following  setting  can  be  applied  to  fields  in  the  schedule.  To  change  these  values  in  the  grid,  click  the  appropriate  cell.  

• Heading  Override    o The  user  can  specify  a  different  name  for  the  column  than  what  is  specified  in  

the  Revit  schedule.  • Group  By  

o The  BOM  Plugin  provides  a  grouping  mechanism  where  like  items  in  the  schedule,  can  be  grouped  together  and  totals  shown  inline  (or  at  the  bottom  of  the  group).  See  the  Group  By  section  below.  

• Include  In  o Sometimes  a  field  in  the  Revit  schedule  doesn’t  add  any  value  to  the  BOM  

schedule.  This  setting  allows  the  field  to  be  either  included  or  removed  from  both  BOM  sections  or  included  in  just  one  section  schedule.  

o If  the  field  is  removed  from  both  Upper  and  Lower  sections,  the  field  is  removed  from  both  sections.  If  the  field  is  included  in  only  one  section,  then  it  will  be  included  in  both  sections  (but  will  only  have  values  for  the  enabled  section).    

• Inline  Sum  o Inline  Sums  are  enabled  for  numeric  fields.    o If  there  are  groups  defined,  enabling  the  Inline  Sum,  causes  the  last  group  to  

collapse  to  a  single  row.    The  Inline  Sum  then  sums  the  field  for  all  rows  in  the  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

group  and  shows  the  result  in  the  cell.    See  the  Group  By  section  below  for  details.  

• Include  Subtotals  o Enables  Subtotals  for  grouped  data.    The  subtotals  are  placed  below  the  group.  

Group  By    The  Group  By  feature  is  a  powerful  Excel-­‐like  feature  that  allows  drawing  data  to  be  grouped  together.    By  enabling  Subtotals  and  Inline  Sums,  items  in  the  drawing  can  be  easily  grouped  together  and  counted.  

Using  an  example  drawing,  the  next  few  screen  shots  will  start  with  an  un-­‐configured  BOM  schedule,  and  demonstrate  the  steps  to  get  totals.  

The  example  drawing  is  a  3-­‐story  storage  building  containing  rentable  units.  The  goal  of  the  BOM  schedule  is  to  get  a  summary  of  the  Units  Types  by  floor.    The  Upper  schedule  will  show  a  Summary  of  the  Units  Types  by  Level  using  Subtotals  and  Inline  Sums.    The  Lower  schedule  will  show  a  detail  of  the  Unit  Types  by  Level  but  not  using  Inline  Sums.  This  action  will  provide  a  Detail  view  into  the  groupings.  

Figure  3  shows  the  Revit  Schedule  that  will  used  to  create  the  BOM  schedule.    

The  Revit  schedule  has  6  fields  defined.      

• The  Name  of  the  Unit  (in  this  case  just  the  size  of  the  unit).  • Revit’s  Count  field.  • Revit’s  Area  field.  • The  Unit  Type    (climate  controlled  or  not).  • Unit  Access.  • Level    (what  floor  the  unit  is  on).  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

 

Figure  3  

Without  any  configuration,  the  Upper  Lower  sections  show  a  schedule  listing  very  similar  to  the  one  provided  by  Revit.  

To  create  the  Level  group,  click  the  Group  By  cell  for  the  Level  row  and  change  it  to  Upper  &  Lower.  Also,  change  the  Inline  Sum  setting  for  the  Area  field  to  Upper.    See  Figure  4.  

 

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

Figure  4  

Now  with  just  the  Level  field  grouped  and  the  Inline  Sum  set  for  the  Area  field.    The  Upper  section  shows  an  Inline  Sum  of  the  Area  field,  for  each  floor.    With  just  this  group  specified,  the  Name  and  Unit  Access  fields  show  the  first  value  that  was  found  for  those  fields  and  don’t  make  sense.    The  Lower  section  shows  all  of  the  units  grouped  by  Level.  

Next  the  Unit  Type  grouping  is  added  to  the  schedule  and  Subtotals  are  added  for  the  Count  and  Area  fields.    See  Figure  5.  

 

Figure  5  

With  the  Level  and  Unit  Type  fields  grouped,  the  Upper  schedule  shows  Unit  Counts  and  Area  totaled  by  Level  and  Unit  Type.    The  Lower  schedule  shows  all  of  the  units  grouped  by  Level,  then  Unit  Type.    Subtotals  are  placed  below  each  group.  

The  final  group  that  will  be  used  for  the  BOM  schedule  is  for  the  Name  field.    The  Unit  Access  field  is  also  excluded  from  the  Upper  schedule  and  the  Name  field  is  overridden  to  be  Unit  Size.  The  Upper  and  Lower  Schedule  Name  are  updated.  

 See  figure  6.  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

 

Figure  6  

Now  the  BOM  schedule  provides  a  count  and  total  area  for  each  Size  of  Unit,  Unit  Type  and  Level  for  the  Storage  Building.  

In  order  for  the  settings,  for  the  BoM  schedule,  to  be  saved  to  the  Drawing,  the  BOM  checkbox  in  the  Revit  Schedules  grid  must  be  checked.    After  the  checkbox  is  checked,  the  Tab  Name  will  default  to  the  Revit  schedule  Name  and  the  save  button  is  activated.  See  figure  7.  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

 

Figure  7  

After  the  Save  button  is  clicked,  and  the  BoM  schedule  configuration  saved,  the  Plugin  will  add  a  tab  for  the  saved  BOM  Schedule.    See  Figure  8.  

 

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

 

Figure  8  

After  the  Save  button  is  clicked,  the  BOM  schedule  configuration  is  saved  to  the  drawing.    To  save  the  configuration  to  disk,  the  Revit  file  must  be  saved.  

Excel  Report  The  BOM  tab  will  create  an  Excel  document  for  the  configured  BOM  schedules.    Each  BOM  schedule  will  be  on  it’s  own  sheet.  The  Excel  document  is  saved  in  the  same  folder  as  the  Revit  drawing.    The  Excel  file  will  have  the  same  name  as  the  Revit  drawing  with  “.BOM”  added  to  the  end  of  the  file  name.  See  Figure  9.    The  Tab  will  also  show  the  time  that  the  Excel  file  was  created.    You  can  open  the  Excel  file  by  clicking  on  the  Open  BOM  file  link.    The  document  is  not  automatically  refreshed  when  BOM  schedules  change  or  if  the  Revit  schedule  data  changes.    To  refresh  the  document,  click  the  Refresh  button.  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

See  Figure  10  for  a  screen  shot  of  the  Excel  document  for  the  BOM  schedule.  The  BOM’s  Upper  section  will  be  at  the  top  of  the  sheet  with  the  Lower  section  below.  

 

Figure  9  

 

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

 

Figure  10  

 

         2300  McDermott  Road  Su i te  200 -­‐235                                        214.301.0000                                              Business  Confident ia l  ©HingePoint  

       P lano  Texas  75025          

Next  Steps    

Thank  you  from  the  HingePoint  team  for  trying  our  product.  Please  send  us  your  feedback  at:  [email protected]  

Still  Need  Help?  Contact  us  for  additional  BOM  Services  

HingePoint  can  assist  you  team  with  the  following:  

1. Custom  training  sessions  and  workshops  catered  to  your  business  and  Revit  data  and  the  getting  the  best  BOM  Reports  possible  

2. Customizations  of  the  Plugin  directly  for  your  business  and  requirements  3. Bulk  discount  orders  if  you  are  buying  the  App  in  bundles  of  5,  25  or  100  licenses  for  

your  offices  and  teams