IVYMOUNTAINMASTERPLAN
• Master Plan Approved by BOV in March 2017
• Returning to B&G Committee in June for Musculoskeletal Center/ Orthopedics Building Project Approval and A/E Selection ( for 1st Building)
SITE CONTEXT | AERIAL VIEW
4
IVY MOUNTAIN SITE
LEWIS MOUNTAIN
TO GROUNDSAND CHARLOTTESVILLE
COCHRANHOUSE
OLD IVY ROAD SITE
IVY MOUNTAIN VISION
5
“The Garden”
Ivy Road (Rt. 250)
Poplar Glen
Rivanna Trail
I-29
Future signalized intersection
“the grove”
3-4 STORY200,000-215,000 GSF
2-3 STORY50,000-60,000 GSF55 PARKING SPACES
2-3 STORY50,000-60,000 GSF60 PARKING SPACES
PARKING GARAGE 350 TO 360 SPACES
ON GRADE PARKING 20 SPACES
BIO-REMEDIATION AREA
A
B
C
D
E
F
D
A
C
B
F
Lewis Mountain
Cochran House
E
0 160
320
Service
IVY MOUNTAIN VISION | POTENTIAL MASSING
6
7
BRANDONAVENUEMASTERPLAN
• Master Plan Approved by BOV September 2016
• Perkins & Will hired for design of Green Street Utility Infrastructure
• Goody Clancy hired for design of Upper Class Student Housing ‐ Schematic Design Approval June 2017
• New Student Health Project – BOV Approval June –Financial Plan & A/E Approval September 2017
Brandon Avenue Upper Class Student Housing
8
Academic Mixed-Use
Academic Mixed-Use
Residential
Student Health
Residential
ABCDE
Green Street Master Plan and Phasing Diagram
Brandon Avenue Upper Class Student Housing
9
10
IVYCORRIDORREDEVELOPMENTEFFORT
• Update on Phase I and Recommendation for Future of Cavalier Inn at June BOV B&G Meeting
11
Revisionsto2016‐2022CapitalProgram
• Revised 2016‐22 Capital Plan to be approved by BOV June 2017 includes new projects, removes projects that are no longer a priority, and aligns high‐priority projects across timeframes based on when project will be initiated:– Near‐term – currently in progress and/or expect to expend resources within next 18 months
– Mid‐term – to be initiated during 2018‐20– Long‐term – to begin after June 30, 2020
• Aligns with State‐required Six‐Year Capital Plan
12
2016‐2022UVACapitalProgram
Category (in millions)Academic Division Health System College at
Wise
Authorized projects under construction $ 354.1 $ 517.7 $ ‐‐‐
Authorized projects in planning $ 195.9 $ 97.1 $ 0.5
Authorized projects not yet initiated $ 432.2 $ 33.1 $ 154.4
SUBTOTAL (Program Approved June 2016) $ 982.2 $ 647.9 $ 154.9
GRAND TOTAL FOR UVA, HEALTH SYSTEM, COLLEGE AT WISE: $2.43+ BILLION
Proposed new projects $ 285.0+ $ 364.0+ $ ‐‐‐
TOTAL (Revised 2016‐22 Capital Program) $1,267.2+ $1,011.9+ $ 154.9
13
AcademicDivisionProposedCapitalProjects
Project Budget Source
Softball Facility Renovation $8.0M‐$10.0M TBD
Brandon Avenue Upper‐Class Residence Hall $52.3M‐$58.3M Debt
Brandon Avenue ‐ Green Street & Infrastructure $32.0M UIA, Debt
Ivy Corridor Landscape and Infrastructure ‐ Phase I $27.7M Debt
Main Heat Plant ‐ New Boiler $8.0M‐$11.0M UIA, Debt
Ivy Mountain District Energy Development Zone $12.0M‐$16.0M UIA, Debt
Low Temperature Hot Water Conversion, Phase 1 $14.0M‐$20.0M TBD
TOTAL $154.0M — 175.0M
Near‐Term Proposed Projects (2016‐2018)
14
AcademicDivisionProposedCapitalProjects
Project Budget Source
Carr's Hill Renovation and Event Structure TBD TBD
McIntire Academic Facility TBD Gifts
Thornton Hall B Wing Renovation (SEAS) TBD TBD
Student Activities Building TBD TBD
Alderman Road Residence Area ‐ Buildings 7 & 8 $60.0M‐$110.0M DebtHousing Funds
TOTAL $60.0M+ — $110.0M+
Mid‐Term Proposed Projects (2018‐2020)
GRAND TOTAL PROPOSED PROJECTS : $214.0M+ — $285.0M+
15
HealthSystemProposedCapitalProjects
Project Budget Source
Translational Research Building $150.0M‐$200.0M TBD
Ivy Mountain Development $146.0M‐$164.0M Debt, Cash
TOTAL $296.0M — $364.0M
Near‐Term Proposed Projects (2016‐2018)
Project Budget Source
Pinn Hall Renovation, Phase II TBD TBD
Consumer‐Based Ambulatory Clinic Building TBD TBD
Mid‐Term Proposed Projects (2018‐2020)
Project Budget Source
Multi‐Disciplinary Ambulatory Clinic Building TBD TBD
Long‐Term Proposed Projects (2020 and beyond)
16
StudiesLikelytoResultinCapitalProjectsNear‐Term (2016‐2018)
– North Grounds/Athletics Precinct*
– Darden Master Facility Plan & Roadmap*
– Ivy Mountain Redevelopment Planning*
– Fontaine Master Plan & Transportation
– Student Activities Building
– Architecture School Space Needs
– Curry School Space Needs
– Engineering School Space Needs
– Environmental Health & Safety
Mid‐Term (2018‐2020)– University Police Department/Public
Safety Space Needs
– O'Hill Dining Hall Expansion
– UVA Technology Center
* Study approved June 2016 and in progress
17
PROJECTPOINTOFCONTACT
• Academic & Wise Projects – Tim Roland Director ‐[email protected]
• Health System / Medical Center Projects – George Southwell Director ‐ [email protected]
18
SELECTIONCOMMITTEEPARTICIPATION
• Clients / Users
• Associate V.P. & Chief Facilities Officer
• Architect for the University
• FP&C Department Directors (Academic, HS, & Contracts)
• University Project Managers / Construction Admin Managers
• A/E Advisor
19
DESIREDA/E/CFIRMPROJECTQUALITIES
• UVA “Chemistry” with On‐Site Team Members
• Recent Similar Team Experience
• Strong Past Performance by Key Team Members
• Team With Experience Working Together
• Project Safety Record & Proposed Plan
• SWaM Firm Plan & Past Utilization
20
SWAMGOALS
MBE ‐ 6%WBE ‐ 7%SBE ‐ 30%Total = 43%
21
UVACONTRACTADMINWEBPAGE
• http://www.fm.virginia.edu/depts/fpc/contractadmin/index.html