Semi – annual Environmental Monitoring Report Semestral Report January – June 2018 August 2018 UZB: Takhiatash Power Plant Efficiency Improvement Project Prepared by Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Upload: trandung

Post on 16-May-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

Semi – annual Environmental Monitoring Report

Semestral Report January – June 2018

August 2018

UZB: Takhiatash Power Plant Efficiency

Improvement Project

Prepared by Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian

Development Bank.

This environmental monitoring report is a document of the borrower. The views expressed herein

do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may

be preliminary in nature.

In preparing any country program or strategy, financing any project, or by making any designation

of or reference to a particular territory or geographic area in this document, the Asian

Development Bank does not intend to make any judgments as to the legal or other status of any

territory or area.

Page 2: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

Environmental Monitoring Report

_________________________________________________________________________

Semestral Report January – June 2018 August 2018 Project Number: 45306-001 Loan No. 3141 – UZB

Republic of Uzbekistan: Takhiatash Power Plant Efficiency Improvement Project (Financed by the Asian Development Bank)

Prepared by:

Construction Consultant, Madina Khalmirzaeva, NBT

Tashkent, Uzbekistan

For JSC “Uzbekenergo”

Endorsed by: PIU Manager, August, 2018

August 2018

Page 3: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

Table of Contents

1 INTRODUCTION ................................................................................................. 4

1.1 Preamble ...................................................................................................... 4

1.2 Headline Information ................................................................................... 4

2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES .................................. 5

2.1 Project Description ...................................................................................... 5

2.2 Project Contracts and Management .......................................................... 5

2.3 Project Activities During Current Reporting Period ................................. 7

2.4 Description of Any Changes to Project Design ........................................ 9

2.5 Description of Any Changes to Agreed Construction methods .............. 9

3 ENVIRONMENTAL SAFEGUARD ACTIVITIES ............................................... 10

3.1 General Description of Environmental Safeguard Activities ................. 10

3.2 Site Audits .................................................................................................. 11

3.3 Issues Tracking (Based on Non-Conformance Notices) ........................ 13

3.4 Trends......................................................................................................... 14

3.5 Unanticipated Environmental Impacts or Risks ..................................... 14

4 RESULTS OF ENVIRONMENTAL MONITORING ............................................ 15

4.1 Overview of Monitoring Conducted during Current Period ................... 15

4.2 Trends........................................................................................................... 1

4.3 Summary of Monitoring Outcomes ............................................................ 1

4.4 Material Resources Utilisation ................................................................... 1

4.4.1 Current Period ..................................................................................................... 1

4.4.2 Cumulative Resource Utilisation ........................................................................ 1

4.5 Waste Management ..................................................................................... 1

4.5.1 Current Period ..................................................................................................... 2

4.5.2 Cumulative Waste Generation ............................................................................ 4

4.6 Health and Safety ........................................................................................ 4

4.6.1 Community Health and Safety ............................................................................ 4

4.6.2 Worker Safety and Health ................................................................................... 4

4.7 Training ........................................................................................................ 4

5 FUNCTIONING OF THE SEMP ........................................................................... 7

5.1 SEMP Review ............................................................................................... 7

6 GOOD PRACTICE AND OPPORTUNITY FOR IMPROVEMENT ....................... 8

Page 4: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

2

2

6.1 Good Practice .............................................................................................. 8

6.2 Opportunities for Improvement .................................................................. 8

7 SUMMARY AND RECOMMENDATIONS ........................................................... 9

7.1 Summary ...................................................................................................... 9

7.2 Recommendations ...................................................................................... 9

8 ATTACHMENTS ............................................................................................... 10

Page 5: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

3

3

Abbreviations

ADB - Asian Development Bank

CAP - Corrective Actions Plan

CC - Contractor

CCGT - Combine Cycle Gas Turbine

DAIIIP - Department of attraction of investments and implementation of

investment projects - renamed PMU

EHS - Environmental Health & Safety

EIA - Environmental Impact Assessment

EMP/SSEMP - Environmental Impact Permit Environmental

Management Plan/ Site-Specific Environmental Management

Plan

GRM - Grievance Redress Mechanism

IFC - International Financial Corporation

JC - Joint Company

RETA - Regional Technical Assistance

NCN - Non-Compliance Notice

SAEMR - Semi-annual Environmental Monitoring Report

SCEEP - State Committee on Ecology and Environmental Protection

TPP - Thermo Power Plant

Page 6: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

4

4

1 INTRODUCTION

1.1 Preamble

1. This report represents the Semi - Annual Environmental Monitoring Review (SAEMR)

for Takhiatash Power Plant Efficiency Project.

2. This report is the 5th EMR for the project.

1.2 Headline Information

3. The project has three main outputs:

(i) Energy efficient and clean energy. The project will construct two units of CCGT

with a designed capacity within the range of 230 MW to 280 MW each with at

least 52% thermal efficiency at the existing Takhiatash TPP. Three existing units

(No.1–3) will be decommissioned, and two existing units (No.7–8) will be

maintained as backup power generation units, while underutilized structures

(blocks 1 and 2) will be demolished and the land will be remediated. These

physical components will be undertaken by a single turnkey contractor.

(ii) Capacity development. The project will develop Uzbekenergo’s capacity to

become a commercially bankable utility. Tariff methodology study and training

will develop the skills required to improve the tariff determination model and

ensure cost-recovery tariff setting. Corporate performance management

capacity will be measured and managed by developing key performance

indicators.

(iii) Social development. The project will build a community social service center

adjacent to Takhiatash TPP. The community social service center will create

employment opportunities and facilities including laundry services, contributing

to improving the community’s welfare and ensuring gender equality.

Page 7: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

5

5

2 PROJECT DESCRIPTION AND CURRENT ACTIVITIES

2.1 Project Description

4. The project “Construction of two CCGT units with the capacity of 230-280 MW each at

Takhiatash TPP” is implemented in accordance with the Resolution of the Cabinet of Ministers

of RUz No. 293 dated 22.10.2014 “On high priority measures to implement the investment

project “Construction of two combined cycle gas turbine units with the capacity of 230-280 MW

each at Takhiatash TPP””.

5. This project is composed of two (2) power blocks and each power block having a

capacity of approx. 255MW±10% net at ISO conditions (15℃, 60% RH) + 37.2MWth net in

heating station with one (1) Gas Turbine Generator, one (1) HRSG, one (1) Steam Turbine

Generator, and Balance of Plant equipment.

6. Construction site is located at the city of Takhiatash, 3 km to the south-west of the city

centre, on the left bank of the Amudarya River. It is in the central part of the Republic of

Karakalpakstan (Khodjeyliy region), located in north-western Uzbekistan (Figure 1).

Figure 1: Current fence of TPP in blue, future extension in red

7. The project is classified as Category A.

2.2 Project Contracts and Management

8. A description of key staff involved in the environmental management is presented in

Table 1.

Page 8: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

6

6

Table 1: Description of staff involved in environmental management

Type of project

participant

Name of Agency/Company

Environmental Staff

Name and contact details

Lender Asian Development Bank

Head Office, Environmental Specialist, Portfolio, Results, Safeguards and Gender Unit (PSG), CWRD.

Ana Paula Araujo

[email protected]

Uzbekistan Resident Mission, Project Assistant

Feruza Insavalieva

[email protected]

ADB RETA Regional Consultant

Keti Dgebuadze

+995 577232937

[email protected]

Borrower Division of Attracting Investments and Implementation of the Investment Project (DAIIIP) under

10.

11. Environmental Specialist

12.

13. Nargiza

14.

Contractor Consortium of Hyundai Engineering Co. Ltd. jointly with Hyundai Engineering & Construction Co. Ltd.

Site Health, Safety and Environment (HSE) Manager

Go Deug Yoon

[email protected]

Deputy HSE Manager

Oh Jae Hak

[email protected]

HSE Supervisor Shuhrat Sharapov

[email protected]

Environmental Supervisor

Bayram Mambetnazarov

[email protected]

Document Controller Elena Grekova

[email protected]

Inspector Kalbay Jumabaev

Inspector Unid Umarov

[email protected]

Sub-Contractors

GOOSAN Construction

Project Manager Park Jin Young

[email protected]

HSE Supervisor Rustam Dauletov

[email protected]

WOOJU Construction

Project Manager Cho Ik Zoo

[email protected]

HSE Supervisor Nietullaev Nurjan

Page 9: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

7

7

[email protected]

HSE Supervisor Berdimuratov Chingiz

[email protected]

Changwon Cooperation

Safety Manager A.Nurbol

[email protected]

Safety Engineer TBD

Global Engineering Project Manager Lim Kwan Sun

[email protected]

HSE Supervisor Janish Khojanov

ECO Engineering Project Manager Bekhzod Usmonov

[email protected]

HSE Supervisor Alisher Umbetov

EUROBETON Project Manager Bakhodir Allaniyazov

HSE Supervisor Janish Khojanov

Construction Consultant

«Gas Natural Fenosa Ingeniria D Desarrollo De Generacion S.L.»

International Environmental Specialist

Amaya Yoldi

[email protected]

National Environmental Specialist

Madina Khalmirzaeva

[email protected]

2.3 Project Activities During Current Reporting Period

15. HEC is a General Contractor responsible for construction of two CCGTs. To implement

this assignment, the General Contractor hired 6 subcontractors (Table 1). During the reporting

period the following activities were implemented:

• Earth works for preparation of ditches for Power Blocks and chemical water

treatment department – works are completed in June 2018 by “GOOSAN

Construction”;

• Concrete works on ditches for Power Blocks, chemical water treatment

department, main buildings and sludge area – works are being implemented by

“WOOJU Construction”;

• Reallocation of railway access roads (912.6 m) – works are completed by ECO

Engineering;

• Construction of construction camps, fencing, cut of soil and embankment – Global

Engineering.

16. Some photos from construction site are provided below:

Page 10: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

8

8

General view of construction site Construction of base for Power Blocks

Concrete Mixing Plant Concrete works on construction site

Cooling tower basin lean concreate curing Main building GEF formwork

17. Summary on major works completed during the reporting period is presented in Table

2.

Table 2: Major construction works implemented during the reporting period

# Name of works Actual Date of completion

1 Commencement of Existing Railway Relocation 2017-12-18

Page 11: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

9

9

2 Completion of Demolition of Existing Railway Limes 2018-02-20

3 Completion of Soil Replacement (Power Block) 2018-04-30

4 Completion of Existing Railway Relocation 2018-05-14

5 FOB of Gas Turbine Body Delivery for Unit 1&2 2018-06-11

6 FOB of Gas Turbine Generator Delivery for Unit 1 2018-06-11

7 Completion of Soil Replacement (BOP & Etc) 2018-06-13

Source: Contractor monthly report for June 2018

18. As to date of the report preparation total number of workers working on the project site

is 444. Distribution of personnel among Contractor and Sub-Contractors is presented in Table

3.

Table 3: Information on personnel working on construction site

# Contractor/Subcontractor Number of people

From them

Engineering Workers

1 HEC 94 94

2 WOOJU Construction 261 25 236

3 GOOSAN Construction

4 ECO Engineering

5 Changwon Cooperation 14 6 8

6 EUROBETON

7 Global Engineering 75 9 66

Total 444

Source: DAIIIP, Takhiatash TPP

2.4 Description of Any Changes to Project Design

19. No changes to the project design was done.

2.5 Description of Any Changes to Agreed Construction methods

20. No changes to agreed construction methods took place. All works and using method

are being implemented by Contractor and Sub-Contractors in accordance with Contract’s

technical conditions.

Page 12: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

10

10

3 ENVIRONMENTAL SAFEGUARD ACTIVITIES

3.1 General Description of Environmental Safeguard Activities

21. Environmental Safeguards Activities were undertaken on different levels: by

Contractor and Sub-Contractors’ HSE teams, DAIIIP’s environmental staff, Supervision

Consultant and ADB RETA Regional Environmental Consultant and ABD HQ’s environmental

specialist.

22. Contractor’s environmental specialists worked on development of Site specific EMP

(SEMP) and Topic Specific EMPs and addressing comments received from SC’s

environmental expert on EMPs.

23. On regular base Contractor conducted training for workers on HSE, observations of

construction sites on compliance with environmental and health safety requirements. In June

2018, the Contractor has started environmental monitoring of air and water quality and noise

measurements on construction sites. More detail information on environmental monitoring is

provided in Chapter 4.1.

24. Contractor received all necessary permissions from State Committee on Ecology and

Environmental Protection (SCEEP) as required by national environmental legislation

(Attachment 1), particularly:

• Positive Conclusion on construction of concrete-mixing plant;

• Positive Conclusion on construction of labour camp;

• Environmental Statement on Environmental Consequences for concrete-mixing plant.

25. Contractor and Sub-Contractors have concluded agreements with local enterprises on

disposal of solid wastes and waste waters (Attachment 2).

26. International and National Environmental Specialists of Construction Consultant

revised Site Specific EMP and Topic Specific EMPs and provided comments and suggestion

in order to bring in compliance with ADB SPS (2009) and EIA requirements. The last updated

version of SEMP was submitted by Contractor on May 25, 2018 and Construction Consultant

provided his comments on June 5th. At the date of the report preparation, SEMP was not

approved yet.

27. In addition to the SEMP development Construction Consultant instructed PIU and

Contractor on permits needed to be obtained from SCEEP. Meeting with representatives of

Department of Ecological Expertise was hold in April 16 together with representatives of

Contractor, DAIIIP’s and Construction Consultant. During the meeting a list of necessary

Page 13: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

11

11

permission needed to be received by the Contractor for construction activities was agreed.

Further all required documents were submitted by the Contractor and permission received.

28. DAIIIP’s environmental team worked on completion of actions required under

Corrective Action Plan (CAP). During the reporting period environmental monitoring of air

quality, noise and vibration level and water quality in ground water wells were undertaken by

DAIIIP. For this third party company – a certified laboratory under the state company “Orgress’

was invited. The noise and vibration level measurements were undertaken in the points

indicated in EIA. More detailed information on results of monitoring is presented in Chapter

4.1.

29. Among 28 actions indicated in CAP, at the date of the current report preparation, 24

actions were completed, 2 are under the implementation and 2 will be implemented after

commissioning block ## 7 and 8. Namely action # 10 (CAP) – monitoring of air quality of

commissioning of new CCGTs, and action # 15 (CAP) – asbestos management development

– will be implemented before starting works on decommissioning of the old blocks. Status of

CAP implementation is presented in Attachment 3.

30. Takhiatash TPP has started implementation of action #14- improvements of sewage

receivers – sludge points. Rehabilitation of sludge ponds are included in the TPP Action plan

for July 2018 (Attachment 4). The design of rehabilitation works was prepared by design

institute “Teploelektroproekt”.

31. Two specialists from Takhiatash TPP (environmental specialist Kunduz And Marat

Aymbetov) participated at the regional environmental workshop organized by ADB in Batumi,

Georgia on April 19-21, 2018.

32. RETA consultant provided two training for Takhiatash TPP environmental team in

March 2018 and June 2018 on new requirements and formats of Environmental Monitoring

Report. Moreover, as part of country safeguards assessment, a team consisted of HQ, URM

and RETA Regional Environmental specialists visited project sites. During site country review

mission, the number of non-conformances were identified. Information on identified non-

conformances is provided in the Table 4.

3.2 Site Audits

33. During reporting period formal audits were undertaken by Contractors Environmental

Manager, Construction Consultant DAIIP Staff and ADB staff during review missions. The

summary of site audits is provided in Table 4.

Page 14: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

12

12

Table 4: Summary of site audits

Date of visit Name of Company

Auditors name,

Purpose of audit

Summary of any significant findings

Cross reference to Audit report

Continuously

during

reporting

period

(January-

June 2018)

HEC Go Deug Yoon,

Oh Jae Hak

Bayram

Mambetnazarov

Compliance

with HES

requirements

1. Poor housekeeping at site toilet, No follow sanitary-hygienic requirements,

2. Safety issues on construction sites

3. PPE usage on construction sites

4. Inefficient storage of hazardous materials and improper utilization of hazardous wastes

Non-compliance reports are included in the Contractor’s monthly report (Example in Attachment 5).

In accordance with Contractor report all identified non-conformances were resolved.

March 19-21, 2018

ADB HQ

URM

ADB RETA

Phuong T.T.Tran,

Feruza Insvalieva,

Keti Dgebuadze

Country safeguards

review mission

5. All national permissions related to environmental performance need to be received

6. Site Specific and and Topic Specific EMPs have to be finalized and approved by DAIIIP

7. Contractor has to conduct environmental monitoring in accordance with EIA

8. Environmental monitoring program (ground water wells) need to be revised.

Review mission’s

report was submitted to DAIIP in April

2018

April 16-17, 2018

Construction Consultant

Madina Khalmirzaeva

Review of environmental

compliance

Follow up ADB mission

notes

9. SEMP is not approved

10. Agreements with local solid wastes and sewage

Short site visit report was

sent to CC’s head office and DAIIP

Page 15: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

13

13

disposal companies need to be concluded

11. DAIIIP has conducted environmental monitoring in accordance CAP and EIA on the territory of TPP and closes settlements

12. Contractor has to start conducting environmental monitoring as indicated in EIA

June 29, 2018

ADB RETA

Construction Consultant

Keti Dgebuadze

Madina Khalmirzaeva

Site review and training

on new format of

EMR

1. SEMPs are not approved yet

2. All necessary permission received by Contractor.

3. Agreements with local solid wastes and sewage treatment companies were concluded

4. TPP has started works on rehabilitation of sludge ponds (CAP)

Mission notes were

prepared by RETA

Regional Consultant

and submitted to ADB and

DAIIIP

Every week DAIIIP Marat Aymbetov

Inspection of the

compliance with SEMPs

Monitoring of the compliance with SEMPs

Semi-annual report was

sent to ADB

34. Since construction works had started in October 2017, no many construction activities

were undertaken in the beginning. Among common issues identified during previous reporting

period (July-January 2018) absence of approved SEMPs. At the date of the report preparation,

SEMPs was not approved yet.

3.3 Issues Tracking (Based on Non-Conformance Notices)

35. Non-applicable since Non-Compliance Notice (NCN) practice was not performed for

the reporting period.

Page 16: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

14

14

3.4 Trends

36. At this stage trends could not be identified thus NCN practice was not used.

3.5 Unanticipated Environmental Impacts or Risks

37. During reporting no any unanticipated environmental impacts have been identified.

Page 17: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

15

15

4 RESULTS OF ENVIRONMENTAL MONITORING

4.1 Overview of Monitoring Conducted during Current Period

38. Environmental monitoring was implemented by Contractor in accordance with EIA on

the construction site and by Takhiatash TPP in accordance with CAP and EIA.

Results of environmental monitoring conducted by Contractor

39. The Contractor has started conduction environmental monitoring in June 2018. An

agreement between Contractor and Sanitarian Epidemiological Station in Nukus city was

concluded in May 2018. In accordance with contract measurements of dust level, quality of

soil and water and vibration. Noise level is measured on daily base by Contractor’s

environmental specialist (Attachment 6).

Noise

40. Contractor’s noise monitoring places is presented in Figure 2. There are 4 monitoring

points where noise monitoring is being implemented: 1 – next to existing sludge ponds, 2-

south-west part of construction site, 3 – border of construction camp and 4 – construction of

new sludge ponds. Points # 3 and 4 are located close to settlements, the most sensitive

receptors.

Figure 2: Contractors noise monitoring points.

Page 18: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

16

16

41. All information on conducted environmental monitoring of noise is presented in the

Contractor’s monthly report and results of noise measurements is presented in Figure 3.

Figure 3: Results of noise measurements.

42. Among monitored points, point # 3 is located close to settlements, other points are

located far away from settlements. For point # 3 applicable standards is 55 dBA (national and

IFC). As shown in the graphs, noise level in another points is below 65 dB which is also comply

with requirements for construction site. In accordance with IFC EHS Guidance (2007), noise

level on construction site shall not exceed 80 dB. National standards establish the same

requirements in 80 dB. Noise measurements on construction site are being implemented on

daily base.

Page 19: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

17

17

Figure 4: Location od noise measurements points in Google Map (measurements are conducted by Contractor in accordance with SEMP)

43. Vibration level was measured at the different work places. Results of measurements

showed that vibration level did not exceed permissible level for working places1.

Table 5: Results of vibration level measurements

Location #

Actual level, dB Allowed level, dB

1 42 92

2 45 92

3 46 92

4 45 92

5 47 92

7 47 92

8 46 92

9 42 92

10 47 92

Source: Contractor’s monthly report, June 2018

1 SanPiN 0326-2016 Permissible noise and vibration level for working places

Page 20: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

18

18

44. Measurements of dust level (Table 6) conducted by SES showed that dust

concentrations (column #12) meet national standards (column # 13). As indicated in the table,

national requirements for dust for 0.3 mg/m3 as one time maximum permissible concentration,

and 0.2 mg/m3 is average daily concentration2.

45. WHO Recommendations developed for the four common air pollutants, including:

particulate matter (PM), ozone (O3)10), nitrogen dioxide (NO2) and sulphur dioxide (SO2).

IFC/WB establishes standards for PM10 and PM2.5. Maximum admissible dust concentration

for PM10 is 0.05 mg/m3 as average 24-hours and 0.02 mg/m3 average annual concentration.

For PM2.5 the norm is 0.025 mg/m3 as average 24-hours and 0.01 mg/m3 average annual

concentration.

2 Hygienic Standards “A list of maximum permissible concentrations (MPC) of pollutants in the ambient air of

residential areas in the territory of the Republic of Uzbekistan” SanPiN 0293-11 of the Republic of Uzbekistan

Page 21: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

Table 6: Results of dust level measurements conducted by Contractor

Page 22: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

Soil quality:

46. Measurements of soil quality in 6 points within construction site also showed

compliance with national standards (Table 7, Attachment 7).There are no detailed numerical

requirements for soil quality established by IFC’s guidance. Therefore, results of soil quality

were compared with national standards.

47. Soil quality analysis taken from different points of construction site showed compliance

with national standards3.

Table 7: Soil quality on construction site

# Parameter Actual concentration, mg/kg Allowed concentration, mg/kg

851 pH 6,0 6-9

Nitrates 8.1 130,0

Cu 1,5 3,0

Pb abs 32

Zn abs 32

F 0,92 10

852 pH 6,0 6-9

Nitrates 3,3 130,0

Cu 1,2 3,0

Pb abs 32

Zn abs 32

F 0,88 10

853 pH 6,0 6-9

Nitrates 5,8 130,0

Cu 0,82 3,0

Pb abs 32

Zn abs 32

F 0,63 10

854 pH 6,0 6-9

Nitrates 15,4 130,0

Cu 1,3 3,0

3 SanPiN 0272-09 Sanitarian norms and rules for development of hygienic basis for soil protection from pollution in condition of Uzbekistan”

Page 23: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

2

2

Pb abs 32

Zn abs 32

F 0,9 10

855 pH 6,0 6-9

Nitrates 15,6 130,0

Cu 1,8 3,0

Pb abs 32

Zn abs 32

F 1,2 10

Source: Contractor’s monthly report, June 2018

Results of environmental monitoring conducted by Takhiatash TPP

48. DAIIIP conducted measurements of noise, vibration level within territory of the

Takhiatash TPP. Water quality was monitored in inflow and outflow canals.

49. To conduct noise and vibration level measurements the certified JC “UZORGRES” was

invited. The measurements were done in the points indicated in EIA (Figure 5).

Figure 5: Location of noise measurements points ((implemented by Takhiatash TPP in accordance

with EIA (2013), Figure 30)

50. As showed the results, noise exceed standards for day time in point 8 and for night

time in points #5 and 6.

Page 24: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

3

3

Table 8: Ccomparison table

of

Points

Areas

Measurement

results (dB

(A))

National

standards (dB

(A))

IFC standards, (dB (A))

Day Night Day Night Day Night

Р1 Industrial area 42 64

804 805

Р2 Industrial area 62 60

Р3 Industrial area 58 62

Р4 Industrial area 58 45

Р5 Residential area 53 50

556 45 557 45

Р6 Residential area 58 62

Р7 Residential area 53 42

Р8 Residential area 43 43

Р9 Residential area 52 43

Р10 Residential area 53 42

Р11 Residential area 53 42

Source: Contractor monthly report, June 208

51. Chemical laboratory of Takhiatash TPP conducts regular monitoring of water quality in

water intake and discharge points (Figure 6). Results of monitoring of water quality in these

canal is presented in Figure 7.

4 SanPiN 0120-01 “Sanitary standards and rules for ensuring permissible noise levels on workplaces” 5 Guidelines values are for noise levels measured out of doors. Source: Guidelines for Community Noise, World Health Organization (WHO), 1999 6 SanPiN №0267-09 “Sanitary standards and rules for ensuring permissible noise levels from both indoor and outdoor noise sources in residential areas, dwelling houses and public buildings”. 7 Guidelines values are for noise levels measured out of doors. Source: Guidelines for Community Noise, World Health Organization (WHO), 1999.

Page 25: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

4

4

Figure 6: Monitoring points on intake and outlet canals

52. Results of analysis showed that concentration does not exceed national standards on

measured 7 indicators.

53. There are no detailed numerical requirements established by IFC’s legislation to

ambient water quality. The requirements are: 1) discharges of process wastewater, sanitary

wastewater, wastewater from utility operations or storm water to surface water should not

result in contaminant concentrations in excess of local ambient water quality criteria or, in the

absence of local criteria, other sources of ambient water quality; 2) temperature of wastewater

prior to discharge does not result in an increase greater than 3°C of ambient temperature at

the edge of a scientifically established mixing zone which takes into account ambient water

quality, receiving water use and assimilative capacity among other considerations.

54. National standards for vibration level in residential houses are provided in Sanitarian

Norms and Rules (SNR) № 0146-04 “Design of the living houses in climatic conditions of

Uzbekistan”. For living houses the standards is 67 dB for night time and 72 dB for day time

with frequency in 37 and 61 Hz and for night time is 67 dB.

Table 9: National standards for vibration

Period Permanent vibration, dB

Day time 72

Night time 67

Page 26: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

5

5

55. IFC provides standards for vibration at the work place which is equivalent to 50-65 dB8.

National standards for working places is indicated permissible level as 75-92 dB9. Results of

actual measurements showed full compliance with both national and international standards,

because maximum measured vibration level was 47dB.

8 IFC EHS Guidance, 2007, Table 2.3.1 9 SanR&N No 0122-01 Sanitarian norms of general and local vibration at the working places

Page 27: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

Figure 7: Concentration of (from left to right): mineralization, sulphates, chlorides, suspended matters. Blue line is water quality in

intake canal, red line in discharge canal and line in green is Maximum allowed concentration per national standards

Солесодержания мг/л

0

200

400

600

800

1000

1200

05.07.2

01705.

08.2017

05.09.2

01705.

10.2017

05.11.2

01705.

12.2017

На

зв

ан

ие

оси

подводящий канал

отводящий канал

пдк

Хлорид мг/л

0

50

100

150

200

250

300

350

400

04.01.2

018

06.02.2

018

05.03.2

018

06.04.2

018

07.05.2

018

21.06.2

018

подводящий канал

отводящий канал

пдк

Взвешенная вещества мг/л

0

50

100

150

200

250

04.01.2

01806.

02.2018

05.03.2

01806.

04.2018

07.05.2

01821.

06.2018

подводящий канал

отводящий канал

пдк

Page 28: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

2

2

Figure 7 (continue): Concentration of (from left to right): ammonia, Fe, pH. Blue line is water quality in intake canal, red line in discharge canal and line in green is Maximum allowed concentration per national standards

Аммоний мг/л

0

0,5

1

1,5

2

2,5

04.01.2

01806.

02.2018

05.03.2

01806.

04.2018

07.05.2

01821.

06.2018

подводящий канал

отводящий канал

пдк

Железа мг/л

0

0,1

0,2

0,3

0,4

0,5

0,6

04.01.2

01806.

02.2018

05.03.2

01806.

04.2018

07.05.2

01821.

06.2018

подводящий канал

отводящий канал

пдк

pH

7,7

7,8

7,9

8

8,1

8,2

8,3

8,4

8,5

8,6

04.01.2

01808.

01.1900

05.03.2

01806.

04.2018

07.05.2

01821.

06.2018

подводящий канал

отводящий канал

пдк

Page 29: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

4.2 Trends

57. Monitoring of construction sites has started in June 2018, which means no previous

data for comparison and identification of trends.

4.3 Summary of Monitoring Outcomes

58. In accordance with results of conducted environmental monitoring, exceeding of

permissible concentration during construction site on pollutants, noise and vibration levels

were no observed. Monitored parameters comply with both – national and IFC/WB standards.

4.4 Material Resources Utilisation

4.4.1 Current Period

59. Monitoring of utilized material resources has started at the end of November 2017,

therefore information for this aspect is presented as cumulative resources utilization in the

following para. The next SAEMR will contain information on reporting period and cumulative

period as well.

4.4.2 Cumulative Resource Utilisation

60. During reporting period utilized amount of water, fuel and power is provided in Table

10.

Table 10: Information on utilized water, fuel and power

Name of resource Unit Amount

Fuel Diesel L 463,615

Petrol L 1,897

Electricity kW/h 164,567

Water Non-potable m3 579,426

Potable m3 44,215

Source: Contractor’s monitoring report for June 2018

4.5 Waste Management

61. During reporting period mainly domestic wastes generated on the construction site.

Wastes segregation procedure is being implemented on construction site: wood and metal

wastes are collected in north part construction camp and domestic wastes into bins located in

different parts of construction sites and central collection container. Collected wastes are

disposed by authorized local company – “Toza Hudud” which is under State Committee on

Ecology and Environment Protection.

Page 30: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

2

2

62. Wastes from construction sites are disposed on official municipal landfill. The

agreements on wastes disposal have been concluded between all operating Contractor and

Sub-Contractors. Example of agreement is presented in Attachment 7.

63. Sewage generated from construction site and construction camp is discharged into

isolated pits located next to each dormitory and further collected into central collection points

plastic tanks. Contractor and Sub-contractors concluded agreements with Takhiatash city

waste water treatment plant (WWTP) on disposal of waste water. Based on this agreement

WWTP’s service is responsible for timely extraction and disposal of sewage on monthly base.

64. It is expected that at the end of 3th year (2020) of the project implementation

hazardous wastes (asbestos) will be generated from demolishing of the old blocks of TPP (#

1 and 2). In accordance with preliminarily calculations, asbestos wastes will be generated in

volume 46.731tn (Table 26, EIA). The Contractor will be responsible for development of

Asbestos Management Plan, submit to Construction Consultant for revision and endorsement

and to DAIIIP for final approval.

4.5.1 Current Period

65. In accordance with information provided by Contractors, at the construction site

amount of solid wastes, generated from the beginning of construction activities is 26,852 kg.

66. Monthly waste disposal form filled by Contractor is presented on Figure 5 below.

Page 31: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

3

3

Page 32: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

4

4

Figure 5: Monthly waste disposal form filled by Contractor

4.5.2 Cumulative Waste Generation

67. Since project works have been started at the end of October 2017, information on

cumulative waste generation is presented for whole period October 2017-June 2018. Total

amount of generated and disposed wastes for this period is 26,852 kg.

4.6 Health and Safety

68. Community Liaison Officer (CLO) will be hired from July 2018 and he will be in charge

for communication with local communities, timely dealing with resolving all complaints

received from surrounded settlements or any affected persons.

69. HEC has hired international specialist on H&S who is responsible for proper

implementation of safety issues during construction. Moreover, as presented in Table 1, each

sub-contractor appointed a staff designated for H&S aspects.

4.6.1 Community Health and Safety

70. During reporting period no incidents happened.

4.6.2 Worker Safety and Health

71. In accordance with information provided by Contractor and DAIIIP records during

reporting period no accident on worker health and safety happened.

72. Safety campaigns conducted for workers were a part of HES training. Detail

information on provided training is presented in the next paras.

4.7 Training

73. Training on all environmental safeguard, H&S aspects were conducted for DAIIIP

environmental staff and for Contractor and Sub-contractor staff. For DAIIIP staff two training

on environmental aspects were conducted by ADB RETA Regional Environmental Consultant

Ketevan Dgebuadze. First training was conducted on hazardous wastes management

(January 2018) and second training was conducted on new requirements for preparation of

Environmental Monitoring Reports in ADB format (June 2018).

Page 33: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

5

5

74. Moreover, two representatives of Takhiatash TPP – Marat Aymbetov and Kunduz

participated at the regional training organized by ADB in Batumi on 19-21 April, 2018. At the

training participants were introduced to new requirements for environmental monitoring during

project implementation.

75. Contractor conducts training on EHS for all workers, including Sub-contractors’

workers as well. Information about conducted training is presented in below table.

Figure 6: Information on conducted training (Source: Contractor’s monthly report for June

2018)

76. In addition to training, Contractor’s environmental specialist conducts joint with

Takhiatash TPP environmental specialist weekly audits, fills the forms/checklists and submit

to Contractor’s management.

Page 34: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

6

6

Training on H&S aspects for subcontractors Weekly meeting of HEC’s H&S manager with sub-contractors’ H&S officers

Page 35: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

7

7

5 FUNCTIONING OF THE SEMP

5.1 SEMP Review

77. First version of SEMP Contractor submitted in October 2017 in the beginning of

commissioning of construction works. The SEMP was forwarded to CC for revision and

approval. Since first SEMP submission 4 versions of SEMPs were reviewed by CC. The final

version of SEMP was sent in June 2018 to DAIIIP and now it is in an approval process.

Page 36: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

8

8

6 GOOD PRACTICE AND OPPORTUNITY FOR IMPROVEMENT

6.1 Good Practice

78. During reporting period no examples of good practice could be presented. All

performance was implemented within planned activities.

6.2 Opportunities for Improvement

79. Condition of access road to construction site significantly deteriorated since beginning

of construction works (October 2017) due to transportation of heavy materials. Considering

duration of the project (4 years) and fact that the road is used by local population, some actions

are needed to be undertaken to improve condition of the road. It should be noted that full

rehabilitation of the road is included in the Contractor’s Scope of Works. However, in

accordance with the Scope of Works, rehabilitation has to be done after completion of the

construction.

Page 37: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

9

9

7 SUMMARY AND RECOMMENDATIONS

7.1 Summary

80. Implementation of environmental safeguards during reporting period noticeable

improved. Particularly, per ADB and DAIIIP requests all necessary environmental permission

from relevant governmental authorities were received, Takhiatash TPP and Contractor started

implementation of environmental monitoring of construction site and in accordance with

corrective action plan. During reporting period Contractor mobilized on the construction site

International HES specialist and Sub-Contractors hired or designated international or national

environmental specialists.

81. Almost all corrective actions indicated on CAP have been implemented excluding two

actions which will be implemented after CCGT commissioning and starting decommission of

old blocks.

7.2 Recommendations

82. Requirements on conduction monitoring of ground water in term of reviewed

parameters need to be revised. A list of parameters provided in EIA (Environmental Monitoring

Table) includes analysis of heavy metals which is very costly. In addition, ground water from

wells are checked on bacteriological pollution which is very unlikely occur in monitoring wells

due to construction activities. Water from these wells are not used for drinking purposes

Therefore, it is recommended to revise a list of analysed ingredients and optimise them with

consideration of types of impacts which could be caused by construction activities.

83. In summary, the following actions are recommended for the next reporting period:

• Approve the final SEMP – 3th quarter of 2018;

• Revise monitoring activities of Contractor in term of ground water – 3rd quarter of 2018;

• Provide waste collection bins within territory of Construction camp – 3rd quarter of 2018;

• Improve practice of storage oil/fuel materials on the territory of construction camp and

sites - 3rd quarter of 2018;

• Complete rehabilitation of sludge ponds – 4rd quarter of 2018.

Page 38: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

10

10

8 ATTACHMENTS

Attachment 1: Copies of required permissions from local agencies

a. Positive conclusion from Environmental Expertise for construction camp

Page 39: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

11

11

Page 40: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

12

12

b. Positive conclusion from Environmental Expertise for batching plant

Page 41: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

13

13

Page 42: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

14

14

Attachment 2: Agreements on wastes disposal concluded between Contractors and local

agencies

Page 43: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

15

15

Page 44: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

16

16

Page 45: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

17

17

Page 46: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

Attachment 3: Status of CAP implementation

Environmental corrective actions plan

№ Name of actions Execution Responsibility Notes

Implementation Supervision

General management of environmental issues, health protection and safety measures

1 Create a team on ecology, health and

safety (EHS)

Yes Technical Director

JSC “Takhitash TPP”

Director General

JSC “Takhitash TPP”

JSC “Takhitash TPP” Order №179

dated 16.04.2015

2 Provide trainings on SEMP included in

the report on an ecological

assessment.

Yes Environment protection

specialist of DAIIIP

Director for prospective

development and

investments of

JSC “Takhitash TPP”

Two sets of training were conducted by

ADB RETA Regional Environmental

Consultant Ketevan Dgebuadze: on

hazardous wastes management and new

format of environmental monitoring. SC’s

environmental specialist provides on the

job training

3 To provide a complex control system on ecology, health protection and safety (CCSEHPS)

On-going DAIIIP Director General

JSC “Takhitash TPP”

System was created and Environment, Health and Safety Team is working on this measure

Monitoring program

4 Include in the tender documentation

creation of eco-analytical laboratory

completed with the equipment for

carrying out continuous monitoring of

emissions SO2, NO, NO2, CO, O2,

CO2, the soil, drains, underground

Yes DAIIIP Director for prospective

development and

investments of

JSC “Takhitash TPP”

See Bidding Documents (BD) -

Laboratory, section 2.6.5.

Page 47: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

2

2

waters (all residual chlorine, metals

Cr, Cu, Zn, Pb, CD, Hg, As, Co, Ni),

temperatures, atmospheric pressure

and water vapor, oil and fuel);

5 Make the annual contract with "Uzhydromet" service for receiving meteorological data (speed and the direction of a wind, relative humidity, temperature, atmospheric pressure)

Yes Environment protection specialist of DAIIIP

Director for prospective

development and

investments of

JSC “Takhitash TPP”

See appendix 7

6 Include in tender documentation the installation of devices in necessary places for noise measurement; vibrations.

Yes DAIIIP Head of DAIIIP See EIA Noise standard 472

7 To provide scheduling of calibration for automated and manual systems of measurement for carrying out an environmental monitoring

On yearly basis, but with consideration

of specifications

DAIIIP Head of DAIIIP See appendix 8

8 To provide with necessary devices or other means for creation of the monitoring system of quality of sampling and the analysis including plan of works and system of electronic record.

Before mobilization

of the Contractor

DAIIIP Head of DAIIIP Not started yet

Reports

9 Develop a format of the annual report on EHS, covering each demanded parameters

Yes DAIIIP Head of DAIIIP A format of the annual report on the implementation of measures to mitigate the impact on the environment and monitoring has been elaborated.

Air quality and air missions

Page 48: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

3

3

10 Reduction of emissions of the polluting substances by replacement of the old equipment (3 and 4 turns) and an operation start of new Steam-gas installation.

According to the plan

of implementat

ion of the loan

agreement

JSC “Takhiatash TPP” Technical Director of JSC “Takhiatash TPP”

Monitoring of reduction emission will start after the CCGT commissioning

11 Include to tender documentation installation of electronic measuring device of each Steam-gas installation block for definition of emissions polluting substances in the atmosphere

Yes DAIIIP Director for prospective development and

investments of JSC “Takhitash TPP”

See BD, section 2.1.7 Control and instrumentation

Section 2.6.1 System of observation of continuous

emmission

Sewage and quality of water of environment

12 Provide transformation of the system opened coolings in temperature of the cooling water closed for reduction. The project of replacement of old equipment III-IV of turn on new Steam-gas installation from the closed cooling water system.

Partly done DAIIIP Head of DAIIIP Requirements were included in the bidding document for Contractor - 2.4.8. 36 Control and analysis system Transformation will start after commissioning of new Steam-gas installation

13 To define an origin of an oil slick. In this regard confirmation is required on

presence greasy sewage on the channel.

Yes Chemical Department Environmental Protection Engineer

Oil slicks have a temporary nature. During monitoring period no oil slicks

were observed

14 Improve a condition of receivers of sewage – sludge collectors by

additional concreting of a surface of settlers for the prevention of

infiltration of production drains to the soil.

Yes Chemical Department Technical Director of JSC “Takhiatash TPP”

Chemical department carries out quarterly works to repair sewage

receivers -waste disposal site. See. Appendix 10 photos.

Page 49: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

4

4

15 To develop the management plan asbestos for gradual removal and replacement of asbestos in the existing units.

No DAIIIP Head of DAIIIP Asbestos Management Plan will be developed General Constructor after

official launching of the contract

16 Storage place of asbestos has to be repaired on purpose to provide tightness and chemical firmness of walls of storage, the volume of the tank has to make 110% of substance which will be stored there.

Yes JSC “Takhiatash TPP” Technical Director of JSC “Takhiatash TPP”

Storage placed were repaired and joint observation with State Nature Protection Committee was conducted. See photo appendix 12

17 Include in tender documentation ensuring signs of safety of the dangerous materials seen on places of storage . Correctly mark signs of safety of dangerous materials.

Yes DAIIIP Director for prospective

development and

investments of

JSC “Takhitash TPP”

Requirement are in Contractor contracts

18 For prevention of flood, support a good shape and safety of settlers, storages and containers for fuel, oil and other chemicals.

Yes Workshops Technical Director of JSC “Takhiatash TPP”

All mazut storage places have a facilities (asphalted area with embankment) for prevention oil leakages

Waste management

19 Include new system of recycling

which has to be carried out in tender

documentation to adapt its

procedures for the international

recommendations and appropriate

practices.

Yes DAIIIP Director for prospective

development and

investments of

JSC “Takhitash TPP”

See BD 1.8.2.1 Local Law

Noise

20 Include in tender documentation

replacement of old and noisy units by

new and more effective technologies

with low noise level.

Yes DAIIIP Head of PIU Included in BD

Page 50: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

5

5

21 Annual monitoring of noise has to be

carried out for the purpose of an

assessment of compliance to

standards on level of noise.

Yes JSC “Takhiatash TPP” Director General

JSC “Takhiatash TPP”

Agreement is signed on monitoring of

noise with JSC “Energosozlash” to

conduct of assessment of all working

places as per national standards

“Methodology of work places

assessment” (1996)

The polluted soil and ground waters

22 It is necessary to expand an observation network of wells in the following points:

• In the territory of storage of dangerous materials • In the territory of an evaporator pond

Yes JSC “Takhiatash TPP” Technical Director of

JSC “Takhiatash TPP”

A registry log is kept of the results of

groundwater level in piezometer-wells,

the schedule is approved for

measurement and chemical analysis

results.

Of the existing 57 monitoring wells 14

wells are in non-working condition and

cannot be repaired. See appendix 14

23 Measures for elimination of floods and the plan of action in emergencies on elimination of emergency floods have to be to develop.

Yes JSC “Takhiatash TPP” Technical Director of JSC “Takhiatash TPP”

Each workshop has a plan of actions in emergency situations to eliminate spills.

Security system of work and health

24 Include in tender documentation the plan of health and safety for ensuring implementation of the guidelines of the World Bank. Definition of structure and duties of Management of incidents.

Yes DAIIIP Director for prospective

development and

investments of

JSC “Takhitash TPP”

See BD 2. Ambient conditions of the working places of health and safety 3.20 Environment, health and safety, and environmental audit and amenities

Training

25 Include in the program for training of the personnel of thermal power plant

Yes JSC “Takhiatash TPP” Technical Director of JSC “Takhiatash TPP”

The training program was developed and implemented at Takhiatash TPP

Page 51: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

6

6

point on ecology, behavior of the personnel improvement: ecological requirements of the personnel, especially procedures of waste management (dangerous and harmless a segregation, use of containers, etc.), and also air emissions, quality of air, meteorology, noise issues and sewage have to be also included in the program of a course.

Social management and communication

26 Create the following conditions for submission of the complaint: A) complaint book B) a box for reception of complaints C) organization of public consultations

Yes Environmental protection specialist of

DAIIIP

Director for prospective

development and

investments of

JSC “Takhitash TPP”

Done: - Book for complaints and

suggestions - box for receiving complaints - Public consultation

27 Inform local communities on ecological indicators of thermal power plant. Local communities have to be informed on results of implementation of the Management plan by environment by means of access to annual ecological reports

Yes Environmental protection specialist of

DAIIIP

Director for prospective

development and

investments of

JSC “Takhitash TPP”

Public Consultation were conducted in November 2016 with representatives of 6 makhallas living on surrounded to TPP area. Continuously public consultation will be hold during project construction and operation phases. On December 7, 2016 training was conducted with the residents of the 8 communities located in the project area in the auditorium of the College of Energy of Takhiatash. During the training information was provided about the investment project "Construction of two CCGT units with a capacity of 230-280 MW at

Page 52: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

7

7

Takhiatash TPP", on ADB's policy on environmental protection, conducted a survey of residents for the negative effects of noise coming from Takhiatash TPP.

28 Inform local communities on the plan for emergency situations on thermal power plant. Inform local population about the emergency plan of thermal power plant. Neighborhoods that has to be informed (1 Crew, collective farm of "Hamza", Hodzheyli area).

Once a year Environmental protection specialist of

DAIIIP, II department of

thermal power plant

Director General

JSC “Takhiatash TPP”

Public Consultation were conducted in November 2016 with representatives of 6 makhallas living on surrounded to TPP area. Continuously public consultation will be hold during project construction and operation phases.

Page 53: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

8

8

Page 54: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

1

1

Attachment 4: TPP’s Action Plan for July month which includes sludge rehabilitation

Page 55: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

2

2

Page 56: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

3

3

Page 57: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

4

4

Attachment 5: Contractor’s monthly report

Page 58: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

5

5

Attachment 6: Noise and vibration level measurements conducted by Contractors and DAIIP

Noise measurements conducted by Contractor's Environmental Expert

Noise and vibration noise measurements conducted by Takhiatash TPP

Page 59: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

6

6

Attachment 7: Results of soils quality measurements conducted by Contractors

Page 60: UZB: Takhiatash Power Plant Efficiency Improvement Project · Oh Jae Hak jae.oh@hec.co.kr HSE Supervisor Shuhrat Sharapov ... Fenosa Ingeniria D Desarrollo De Generacion S.L.» International

7

7

Attachment 8: Results of vibration level measurements conducted by Contractors