v4 to ipaso transition
TRANSCRIPT
7/22/2019 v4 to Ipaso Transition
http://slidepdf.com/reader/full/v4-to-ipaso-transition 1/2
iPASOLINK ODUV4 PASOLINK ODU
TNC CONNECTOR
D SUB CONNECTOR
N CONNECTOR
V4 PASOLINK IDUi PASOLINK IDU
POWER
CONNECTOR
MDR D SUB
CONVERSION
CABLE
IF CABLE IF CABLE
De-installation of V4 Pasolink:
1. Identification of V4 IDU & V4 ODU to be replaced
2. Give a CALL from V4 IDU NEAR End & confirm Beep sound
at FAR End
3. Switch OFF IDU at NEAR End & confirm traffick is down/
NO RSL at FAR End4. Identify DCDB & switch off Power to IDU from DCDB
5. After confirmation of traffic down remove V4 IDU by
removing Ground Cable & Power Cable/Molex Connector
6. Cut Molex Connector check Voltage & identify -48V & 0
7. Remove N - type IF Connector at IDU end.
8. Remove Grounding cable & IF Cable at V4 ODU
9. Remove V4 ODU
Reinstallation of iPasolink:
1. iPASO Power Connector is available in IDU Box in plastic pack & same is
to be used for iPASO Power after connctorisation V cables label same
2. Recheck Voltage at iPASO Power Connector & confirm -48V & 0 V. Insert
Power Connector in iPASO IDU as per Voltage Marking
3. Replace IF Connector at IDU end from N-type to TNC Connector4. Replace V4 ODU to I-Paso IHG ODU
5. Connect Grounding cable & IF Cable for iPASO ODU
6. Install MDR ( Y Cable) to iPASO IDU & connect D-Sub end to D-Sub 37
PIN Connector of PCM E1 cable
7. Interconnect E1 Cable from I-Paso IDU & from Existing DDF Port
8. Any blank MDR Cable end / D-Sub Cable end to be tied to Rack after
wrapping with (Bubble) Plastic Sheet
9. Installation & Termination of Grounding cable for IDU. Confirm the
Installation Done & "Switch ON" the IDU
POWER
CONNECTOR
TRANSITION OF V4 PASOLINK TO i PASOLINK
7/22/2019 v4 to Ipaso Transition
http://slidepdf.com/reader/full/v4-to-ipaso-transition 2/2