 iPASOLINK ODU V4 PASOLINK ODU TNC CONNECTOR D SUB CONNECTOR N CONNECTOR V4 PASOLINK IDU i PASOLINK IDU POWER CONNECTOR MDR D SUB CONVERSION CABLE IF CABLE IF CABLE De-installation of V4 Pasolink: 1. Identification of V4 IDU & V4 ODU to be replaced 2. Give a CALL from V4 IDU NEAR End & confirm Beep sound at FAR End 3. Switch OFF IDU at NEAR End & confirm traffick is down/ NO RSL at FAR End 4. Identify DCDB & switch off Power to IDU from DCDB 5. After confirmation of traffic down remove V4 IDU by removing Ground Cable & Power Cable/Molex Connector 6. Cut Molex Connector check Voltage & identify -48V & 0 7. Remove N - type IF Connector at IDU end. 8. Remove Grounding cable & IF Cable at V4 ODU 9. Remove V4 ODU Reinstallation of iPasolink: 1. iPASO Power Connector is available in IDU Box in plastic pack & same is to be used for iPASO Power after connctorisation V cables label same 2. Recheck Voltage at iPASO Power Connec tor & confirm -48V & 0 V. Insert Power Connector in iPASO IDU as per Voltage Marking 3. Replace IF Connector at IDU end from N-type to TNC Connector 4. Replace V4 ODU to I-Paso IHG ODU 5. Connect Grounding cable & IF Cable for iPASO ODU 6. Install MDR ( Y Cable) to iPASO IDU & connect D-Sub end to D-Sub 37 PIN Connector of PCM E1 cable 7. Interconnect E1 Cable from I-Paso IDU & from Existi ng DDF Port 8. Any blank MDR Cable end / D-Sub Cable end to be tied to Rack after wrapping with (Bubble) Plastic Sheet 9. Installation & Termination of Grounding cable for IDU. Confirm the Installation Done & "Switch ON" the IDU POWER CONNECTOR TRANSITION OF V4 PASOLINK TO i PASOLINK

Upload: aneesh-varghese

Post on 10-Feb-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: v4 to Ipaso Transition

7/22/2019 v4 to Ipaso Transition

http://slidepdf.com/reader/full/v4-to-ipaso-transition 1/2

  iPASOLINK ODUV4 PASOLINK ODU

TNC CONNECTOR

D SUB CONNECTOR

N CONNECTOR

V4 PASOLINK IDUi PASOLINK IDU

POWER

CONNECTOR

MDR D SUB

CONVERSION

CABLE

IF CABLE IF CABLE

De-installation of V4 Pasolink:

1.  Identification of V4 IDU & V4 ODU to be replaced

2.  Give a CALL from V4 IDU NEAR End & confirm Beep sound

at FAR End

3.  Switch OFF IDU at NEAR End & confirm traffick is down/

NO RSL at FAR End4.  Identify DCDB & switch off Power to IDU from DCDB

5.  After confirmation of traffic down remove V4 IDU by

removing Ground Cable & Power Cable/Molex Connector

6.  Cut Molex Connector check Voltage & identify -48V & 0

7.  Remove N - type IF Connector at IDU end.

8.  Remove Grounding cable & IF Cable at V4 ODU

9.  Remove V4 ODU

Reinstallation of iPasolink:

1.  iPASO Power Connector is available in IDU Box in plastic pack & same is

to be used for iPASO Power after connctorisation V cables label same

2.  Recheck Voltage at iPASO Power Connector & confirm -48V & 0 V. Insert

Power Connector in iPASO IDU as per Voltage Marking

3.  Replace IF Connector at IDU end from N-type to TNC Connector4.  Replace V4 ODU to I-Paso IHG ODU

5.  Connect Grounding cable & IF Cable for iPASO ODU

6.  Install MDR ( Y Cable) to iPASO IDU & connect D-Sub end to D-Sub 37

PIN Connector of PCM E1 cable

7.  Interconnect E1 Cable from I-Paso IDU & from Existing DDF Port

8.  Any blank MDR Cable end / D-Sub Cable end to be tied to Rack after

wrapping with (Bubble) Plastic Sheet

9.  Installation & Termination of Grounding cable for IDU. Confirm the

Installation Done & "Switch ON" the IDU

POWER

CONNECTOR

TRANSITION OF V4 PASOLINK TO i PASOLINK