This is to certify that the project entitled
CONSTRUCTION TRACKING SYSTEM
Is a bonafide record of work done by
VARGHESE CHACKO PUTHANPURACKAL
(Reg.No.0538M0345)
In partial fulfillment of the requirements for the award of the degree of Master of
Computer Applications of Bharathiar University, Coimbatore.
Head of the Department Project Guide
Submitted for the viva-voce examination held on .
Internal Examiner External Examiner
-
8/2/2019 Varky Documentation
5/68
DECLARATION
I hereby declare that this project work entitled TOURISM INFORMATION
SYSTEM submitted to Bharathiar University, Coimbatore for the award of Degree of
Master of Computer Applications, is a record of original work done by me under the
supervision and guidance of Ms.B. Nirmala Devi MCA, M.Phil, Department of MCA,
Cherraans Arts Science College, Kangayam.
Place: Kangayam VARGHESE CHACKO PUTHANPURACKAL
Date: (0538M0345)
-
8/2/2019 Varky Documentation
6/68
ACKNOWLEDGEMENT
-
8/2/2019 Varky Documentation
7/68
ACKNOWLEDGEMENT
The satisfaction and euphoric that accompany the successful completion of any
task would be incomplete, without the mention of the people who made it possible,
whose constant guidance and encouragement crowned the effort with success.
I praise and thank God almighty who has been an unfailing source of strength
and inspiration in the completion of the project.
I would like to express my gratitude towards Prof.A.Samuel Leslie M.A,
M.Com, M.Phil, Ph.D Principle of Cherraans Arts Science College, Kangayam for
consenting me to resume with the project.
I have much pleasuring thanking Prof.P.Senthil Kumar M.C.A, M.Phil, Head
of the Department of M.C.A for his encouragement and support.
I would like to express my gratitude to my project guide, Ms. B.Nirmala Devi
M.C.A, M.Phil for his painstaking efforts in explaining every phases in our project.
I would like to thank all Lectures of the PG Department of computer application
and non-teaching staff for their constant encouragement and suggestion throughout the
work.
More than anybody else, I am grateful to my parents for the encouragement,
support and blessing.
VARGHESE CHACKO PUTHANPURACKAL
-
8/2/2019 Varky Documentation
8/68
SYNOPSIS
-
8/2/2019 Varky Documentation
9/68
SYNOPSIS
CONSTRUCTION TRACKING SYSTEM is an application software developed for
building constructors. It assists the staffs in the offices of the construction company.
This application system is developed using VB.Net as front-end and Oracle 8.0 as back-
end. This software is an integrated modular and menu driven program which uses
multiple databases.
The main objective of the software development is the complete computerization of the
construction company. This software maintains files of resources and employees. Each
resource is identified by a resource-id and each employee has an employee-id.
All the purchase details of the resources are recorded at the time of each purchase. The
purchase details are entered in different database files. This package gives an accurate
position of stock keeping track of resources and other consumable items are purchased,
stock of resources available.
-
8/2/2019 Varky Documentation
10/68
CONTENTS
-
8/2/2019 Varky Documentation
11/68
TABLE OF CONTENTS
1. INTRODUCTION
1.1 About the project
2. SYSTEM CONFIGURATION
Hardware Specification
2.2 Software Specification
3. SYSTEM STUDY
3.1 Problem Definition
3.2 Existing System
3.3 Proposed System
4. SOFTWARE DESCRIPTION
4.1 About Software
5. SYSTEM DESIGN
5.1 Input Design
5.2 Output Design
5.3 Database Design
6. SYSTEM TESTING
7. SYSTEM IMPLEMENTAION
8. CONCLUSION
9. APPENDIX9.1 Appendix A: Tables
9.2 Appendix B: Forms and Reports
10. BIBLIOGRAPHY
-
8/2/2019 Varky Documentation
12/68
INTRODUCTION
-
8/2/2019 Varky Documentation
13/68
ABOUT THE PROJECT
The project entitled CONSTRUCTION TRACKING SYSTEM is a big effort to ease
the difficulty caused to the construction company for whom it was difficult to maintain
stock details, sales details, purchase details, employee details, salary details and their
respective details. This project done in VB.Net is much more user friendly and also
eases the difficulty in maintaining the database of stock, purchase, sales, employee and
salary. This project uses Oracle 8.0 as the back end tool which is to use and easily
applicable.
This project also is capable of producing daily reports. These helps the company a lot to
make their calculations and it also helps a lot for their reference about various details. It
also maintains a detailed description of records and also it has the special feature of
retrieving a record using the resource- id, employee-id etc. This would display the
entire record that comes under that particular ids. This makes much user friendly and
helps in managing stock details and salary details.The Construction Tracking System consists of six modules.
1. Purchase module
2. Stock module
3. Consumption module
4. Employee module
5. Salary module
6. Report module
PURCHASE MODULE
Purchase module provides information regarding the purchased resources that can be
used for the construction. We can retrieve already purchased resource details by using
the resource-id. This module is developed for using certain details in stock module. The
user can easily identify the details of purchase from this module. We can also make
changes in this module by using the commands such as update, delete etc. But we cant
change our resource-id.
-
8/2/2019 Varky Documentation
14/68
STOCK MODULE
This module gives the information about the currently available resources in a data-
grid. Here also we can retrieve the particular resource details by using the resource-id.
When a resource has been used through the sales module, the quantity of that resource
will be reduced from the stock module. When the quantity of the resources will reached
to a minimum level, flag will be displayed.
CONSUMPTION MODULE
Using this module the user can take the required amount of particular resource for
construction. Using the resource-id we can retrieve the particular resource details.
When the quantity of the resources will reached to a minimum level, message will be
displayed.
EMPLOYEE MODULE
This module gives the information about the employees in that construction company.
That is information like employee-name, address, designation, salary per day etc. We
can retrieve the particular employee details by using the employee-id.
SALARY MODULE
This module gives the salary details of the employees. Here also we can retrieve the
salary details of the particular employee by the employee-id.
REPORT MODULE
The reports are treated as the inevitable outcome from any system. It is the documented
interaction to other systems. The reports will be generated for each module. During the
functioning of the project management need to create reports. In this module we
produce the reports for:
Purchase
Stock
Consumption
Employee
Salary
-
8/2/2019 Varky Documentation
15/68
-
8/2/2019 Varky Documentation
16/68
-
8/2/2019 Varky Documentation
17/68
PROBLEM DEFINITION
The current system of construction tracking system is implemented through
manual processing. Hence the documents are carried out manually.
The input data has to be entered into a ledger. The paper records become bulky
after few years.
The data transfer one unit to another is a time and resource consuming process.
The manual data transfer is a batch process because the data is gathered and
grouped by the end of the day and transferred to the many unit for further
processing.
The maintenance of the data manually and the manual transfer of data result in
high cost and more risk.
The users of the system have not provided with any access privilege such that
there is lack in the data security aspects.
There are many problems in maintaining data integrity. Since there is no
authentication for the users, any user can handle the sensible process such that it
may cause some serious problems.
The existing system cannot produce the reports through online. So decision
making for the management may not be accurate.
The existing cannot produce the analyze strategies and up-to-date reports to the
management.
-
8/2/2019 Varky Documentation
18/68
EXISTING SYSTEM
In existing system, all the data entries are made manually. This may result in an
increased chance of using the data, which in turn will result in a wide range of errors.
Some of the drawbacks of the existing system are:-
Time Delay :-> Manual work is time consuming. Service details will not get
updated with respect to time. As data entry process is done manually, a lot of
time and effort is needed for the system functionality.
Inaccuracy :-> Since there is a large volume of data and human does all the
calculations, they are proving to errors.
Data Redundancy :-> Since data are stored in separate registers, the same
informations have to be maintained in each register, like name, designation etc.
Security :-> Since paper files are used for storage there is a risk of loss of
information.
Vast Storage Space :-> Very large volume of space is required to store all
details. Thus the existing system is expensive in terms of space also.
Inefficiency :-> Large volume of data and unformatted outputs lead to
inefficient access of information. Boredom of repeated procedures is another
cost of inefficiency.
Report Generation :-> Since the data are stored in separate registers, retrievingdata from these registers for reporting is tedious.
-
8/2/2019 Varky Documentation
19/68
High Cost :-> A lot of manual labour is involved like paper work and
maintaining of files. Hence it is expensive.
PROPOSED SYSTEM
To overcome the limitations of the existing system, a Tourism InformationSystem
is proposed. It is easier to handle all transactions in an organization. The proposed
system will have facilities to add and delete instructions from the database.
Modifications can be done easily.
Objectives of the proposed system are:-
Quick data entry->Quick data entry methods should be provided within the
system itself.
Reduce the work of staffs->The computer must do most of the work, thus
reducing the work of staffs.
Easy access of information->Each event is given an event code, by which
we can set all the information regarding this particular project.
Quick data modification->Quick data modifications methods should be
provided within the system itself.
-
8/2/2019 Varky Documentation
20/68
Error free output->It is assumed that the input data is correct and that error
free input produces an error free output.
SYSTEM SPECIFICATION
-
8/2/2019 Varky Documentation
21/68
HARDWARE SPECIFICATION
Hardware Configuration
PROCESSOR : Intel Pentium IV
RAM : 1GB
HARD DISK DRIVE : 40GB
CD-ROM DRIVE : 32x or Higher
SOFTWARE SPECIFICATION
Software Configuration
Operating System : Windows XP, Windows 2000
RDBMS (Back End) : Oracle 8.0
Programming Tool (Front End) : VB.NET, .NET Framework 1.0 or later
-
8/2/2019 Varky Documentation
22/68
SOFTWARE DESCRIPTION
-
8/2/2019 Varky Documentation
23/68
ABOUT THE SOFTWARE
Microsoft Visual Basic VB.Net
Microsoft Visual Basic.Net is the latest version of the ever popular programming
language, with new features. Visual Basic.Net is a fully object oriented programming
language. Visual Basic.Net supports many useful tools that will help you become more
productive. These include, and or not limited to, projects, forms, templates, add-ins, and
a database manager.
Visual Basic.Net is event driven, i.e. all activities in a program. The programmers job
is to determine where, how and when an event occurs. The major changes introduced
into the VB language under Visual Basic.Net are:-
Inclusion of object oriented features such inheritance, overloading, overriding,
constructors/destructors, shared members, delegates, interfaces
Inheritance
With Visual Basic.Net, developers can define base classes from which new classes can
be derived. This has always been a fundamental feature of Object Oriented
Programming. The derived classes not only inherit the methods and properties of the
base class, they also have the capacity to extend them and/or to override the existing
methods with new ones. Visual Basic.Net does not support inheritance from multiple
classes.
Overloading
Overloading enables particular methods, properties, or procedures to be defined in a
class that may share the name but use different data types. This in turn enables multiple
implementations of a single procedure that can handle a board range of data types.
-
8/2/2019 Varky Documentation
24/68
Overriding
Overriding enables to modify properties and methods in our derived classes that have
been inherited from base classes. It makes use of the overrides keyword and is depend
on the particular member in the base class being tagged with the override keyword.
Properties and methods are tagged as not overridable by default.Additionally, when
overriding, your overrider members must have the same number of arguments as
inherited members. We ca also call the original implementation of the member in the
base class y specifying My Base before the method name.
Constructors and Destructors
Objects are created and destroyed in Visual Baic.Net using the sub new (constructor)
and sub finalize (destructor) procedures unless explicitly called VB.Net implicitly
create a sub new construction at run time. This code always runs any other code within
a class.
New data type that include the char (16 bit to store Unicode characters), Short (16 bit,
formerly integer), and Decimal (96 it signed integer scaled by the variable power of 10)
Structured exception handling (introducing the TryCatch.Finally statement to
VB)
Multithreading, where applications can be set up to run various tasks independently of
each other.
CLS (Common Language Specification) compliance.
Data Access in Visual Basic.Net
Visual Basic.Net data accessing is through ADO.Net.The basic principle behind
ADO.Net implementation lies in the fact that all data is represented in an XML-based
format. This allows vendors wishing to provide integration with relational databases or
nonrelational structures to simply development a new type of provider that manipulate
their respective data sources into XML, and handles manipulating the returned XML
back in the format understandable by the data store. This capability to consume XML as
data also allows ADO.Net understands data from any XML-compliant application or
platform.
-
8/2/2019 Varky Documentation
25/68
The basic structure of the ADO.Net object model revolves around two separate groups
of objects: Datasets and Dataproviders.Datasets and the related groups of objects
provide a database neutral view of any data that can be exposed as an XML
document.Dataproviders serve as the low level integration and mapping between XML
documents, such as those manipulating by datasets, and underlying
databases.Dataproviders essentially serve as the bridge between datasets and data
sources, which allow datasets to essentially remain isolated from any specific data
implementation or source. Beyond this ridge functionality between databases and
datasets, dataproviders also serve to provide all additional data source-specific
functionality such as data types and commands.
ORACLE 8.0
Oracle offers a comprehensive high performance internet platform for e-commerce and
data warehousing. This integrated platforms includes everything needed to develop,
deploying, and manage internet application. The Oracle Internet Platform is built on
three core pieces:
Browser-based clients to process presentation.
Application servers to execute business logic and server presentation logic to
browser-based clients.
Database to execute database-intensive business logic and serve data.
Oracle offers wide variety of the most advanced Graphical User Interface driven
development tools to build business application, as well as a large suite for software
applications for many areas of business and industry. Stored procedures, functions and
packages can be written by using SQL, PL /SQL, or Java.
Oracle is a very popular and widely used RDBMS within India and abroad. Oracle is
available on a large number of hardware platforms. Among the common platforms are
Windows NT, UNIX, and Ms-Dos etc. Seamless porting is a feature of Oracle that
means software developed on platform can be ported to another platform without
changes. This portability factor contributes to its predominant market position.
-
8/2/2019 Varky Documentation
26/68
Oracle gives security and control
Oracle has several features that ensure the integrity of our database. If an interruptionoccurs in processing, a roll back can react the database to a point before the disaster. If
a restore is necessary, oracle has roll forward command for recreating our database to
its most recent safe point.
Commit command make the transaction changes permanent and roll back commands.
Undo changes made in transactions. All changes made by user issuing the roll back
since last commit will be undone.
-
8/2/2019 Varky Documentation
27/68
SYSTEM DESIGN
-
8/2/2019 Varky Documentation
28/68
SYSTEM DESIGN
System Design is the most creative and challenging phase in the life cycle of a software
development. Design implies to description of the final system and process by which it
is developed. The first step to determine what input data is needed from the system and
the database that has to be designed to meet the requirements of the proposed system.
The next step is to determine how the required output is produced in and in what
format.
During the design of the proposed system, some thoughts that come to mind are:
What are the inputs required and the outputs produced?
How should the data be organized?
What should be the screen format?
What are the processes involved in the system?
During the design phase, the following steps are carried out:
Input design
Output design
Database design
INPUT DESIGN
The input design is the process of converting the description of the input to the
computer understandable format. The input design goal is to enter the data in to the
computer as accurate as possible. As the input data are most cause of errors in data
processing, the data entered by the users should be controlled by the input design.
Factors to be considered:
Ensure that only authorized users access the system.
To make the input forms understandable to the user.
To ensure the validation of data inputs and accuracy.
-
8/2/2019 Varky Documentation
29/68
Determine whether any necessary data have been omitted.
To produce a cost effective method of input.
Design of Inputs
The input forms are used in this system design are:
Purchase Details-> using this form, the user can make changes in the database when
resources is added, removed or updated.
Consumption Details-> using this form, the user can retrieve the required resources
from the stock data base.
Stock Details-> using this form, the user can know about the available resources in the
stock.
Employee Details-> using this form, the user will get information about the employees.
Salary Details-> using this form, the user will get information about salary details of
the employee.
OUPUT DESIGN
The output design defines the output required and the format in which it is to be
produced. Care must be taken to present the right information so that right decisions are
made. The main objective of the output design is to provide a permanent copy of the
results for later reference.
A very important and effective way of presenting information is reports. In this module,
more emphasis is given to data reports. Various reports will e generated y the system.
The proposed system generates the following reports:
Purchase report
Consumption report
Stock report
Employee report
Salary report
-
8/2/2019 Varky Documentation
30/68
DATABASE DESIGN
Database design defines the method of data organization. The operational data is stored
in entities. Relationship between entities makes up datastucture.Data structuring is
refined through structure. Data structuring is refined through process of normalization.
Entities of the proposed system are normalized up to the third normal form. This
follows that primary key is defined for every entity that has a unique identification
property. For developing an efficient database we have to fulfill certain conditions such
as:
Control redundancy
Data independence
Accuracy and integrity
Recovery from failure.
DBMS
With the increase of computer-based systems large amount of data must be stored in
support of them. The maintenance and control of a large complex set of files is a costly
and difficult task. Often data elements are recorded in several different files. These
redundant or duplicated data items cause two major problems.
They increase the total amount of storage space needed.
They necessitate multiple updates whenever a change occurs.
A solution for the problem of redundant data is to combine files with common
elements into larger, shared files. To eliminate all redundant data, all files could be
combined into one larger file. However the creation of large file that are shared by
multiple systems introduces two additional problems. Each program using the file must
input and hold all data in the record, not just the data elements used in the processing.
Data elements that do not apply to a system may become available to system users.
The solution to the problems of maintaining and controlling the data has been the
use of a database management system. A database management system is a software
system used to maintain and control large, shared files.
-
8/2/2019 Varky Documentation
31/68
SYSTEM TESTING
-
8/2/2019 Varky Documentation
32/68
SYSTEM TESTING
System testing is aimed at ensuring the system works accurately before live operation
commences. Testing is vital to the system. System testing makes a logical assumption
that if all parts of the system are correct, the goal will e successfully achieved. A series
of testing are performed for the proposed system before the system is ready for user
acceptance testing. Nothing is complete without testing, as it is vital success of the
system.
The entire testing can e divided into three phases
Unit testing
Integration testing
Validation testing
Testing Process
When a system is developed, it is hope that it performs properly. In practice, however,
some errors always occur. The main purpose of testing an information system is to find
the errors and correct them. A successful test is the one, which finds an error.
The main objectives of system testing are:
To make sure that the system is users requirements during operation.
To ensure during operation the system will perform as per specification.
To verify that the controls incorporated in the system function as indented.
To see that when correct inputs are fed to the system the outputs are correct.
To make sure that during operation incorrect output and input will be deleted.
The scope of a system test should include both manual operation and computerized.
Operations system testing is a comprehensive evaluation of the programs, manual
procedures, computer operations and controls. System testing is the process of checking
if the developed system is working according to the original objectives and
requirements.
-
8/2/2019 Varky Documentation
33/68
Unit testing
Unit testing focuses verification effort on the smallest unit of software designs the
module. To check whether each module in the software works properly so that it gives
desired outputs to the given inputs. I tested all the validations and conditions for each
unit by inputting different types of data and checking the corresponding output. Control
paths are tested to ensure the information properly flows into, and out of the program
unit under test. Boundary condition is tested ensure that the modules operate at
boundaries All independent path through the control structure ensure that all statements
in a module have been executed at least once.
Integration testing
After testing all small units, I integrated all these small units and the testing process
repeated. The major concerns of the integration testing are developing an incremental
strategy that will limit the complexity of interactions among components as they are
added to the system. Developing a component as they are added to the system,
developing an implementation and integration schedules that will make the modules
available when needed, and designing test cases that will demonstrate the viability of
the evolving system. Through each program was individually, they should work after
linking them together. This is also referred to as interfacing. Data may be lost across
interface and one module can have an adverse effect on another. Subroutines, after
linking, may not do the desired function expected by the main routine. Integration
testing is a systematic technique for constructing program structure while at same time,
conducting test to uncover errors associated with the interface. In the testing, the
programs are constructed and tested in small segments.
-
8/2/2019 Varky Documentation
34/68
Validation Testing
I made the data validations for this project by inserting different types of data to all
tables and updating the table contents many ways. Data validation is done to see
whether the corresponding entries made in the tables are correct. Proper validations are
done in case of insertion and updating of tables. If any such case arises, then proper
error messages or warning, if any, has to be displayed.
The different test cases are:
Guarantee that all independent parts within a module have been exercised
atleast once.
Exercise all logical decision on their true/false side.
Exercise all loops at their boundaries and within their operational bounds.
Exercise internal data structure to ensure their validity.
Each module was tested and the tested module were linked integration test was
carried out.
Undertaken in this project an acceptance test has the objective of selling the user on the
validity and reliability of the system it verifies that the system procedures operate to
system specification and the integrity of vital data is maintained. I tested the system
with a large collection of records. The system is found to be user friendly and working
efficiently. All the above testing was successful.
-
8/2/2019 Varky Documentation
35/68
IMPLEMENTATION
-
8/2/2019 Varky Documentation
36/68
IMPLEMENTATION
Implementation, like design, should have the primary goal of producing software that is
easy to understand and easy to modify. Single entry, single exit coding constructs
should be used, standard indentation of constructs should be observed, and a straight
forward coding style should be adopted. Ease of maintenance is enhanced by use of
symbolic constants to parameterize the software, by data encapsulation techniques and
by adequate margins on resources such as table sizes and overflow tracks on disks.
Each implemented unit should be accompanied by a program unit notebook.
The major milestone for product implementation is successful integration of source
code components into a functioning system. However, there are several intermediate
milestones that typically occur prior to integration. Product integration typically occurs
in carefully planned stages, with successful completion of each stage providing an
intermediate milestone. The ultimate milestone for the product implementation is
successful demonstration of product capabilities on the customers acceptance tests.
-
8/2/2019 Varky Documentation
37/68
CONCLUSION
-
8/2/2019 Varky Documentation
38/68
CONCLUSION
The project entitled as Construction Tracking System is useful for the maintenance ofthe reports of purchase, consumption, stock etc. This is used to reduce the errors made
in reports and reduce overloading. The user-friendly interface makes it easy that the
user can communicate easily with the system.
It is believed that almost all system objectives are being operated in a normal way. A
trial run of the system has been made and gives good results. The procedure for
processing is simple and regular in order.
The system has been developed; keeping in view of the limitations of the existing
manual system and attempt has been made to overcome these limitations. It would send
faster and better services to the user. System has got the feature of every generation of
various reports for which a new system will almost definitely be preferred over the
existing system.
However, modification can be made depending on the changing environment. For
maximum utilization of the system, user must make sure that all the data entries should
be complete. The project work is not without a drawback even through its unique in
nature.
-
8/2/2019 Varky Documentation
39/68
APPENDIX
-
8/2/2019 Varky Documentation
40/68
TABLES
-
8/2/2019 Varky Documentation
41/68
Table-Name: tplaces
---------------------------------------------------------------------------------
Name Null? Type
---------------------------------------------------------------------------------
PACK VARCHAR2 (20)
TPLACE VARCHAR2 (40)
----------------------------------------------------------------------------------
Table-Name: packentry
---------------------------------------------------------------------------------
Name Null? Type
---------------------------------------------------------------------------------
PACK VARCHAR2 (20)
DURATION VARCHAR2 (10)
STIME VARCHAR2 (15)
ETIME VARCHAR2 (20)
RPPERSON NUMBER (10, 2)
----------------------------------------------------------------------------------
-
8/2/2019 Varky Documentation
42/68
Table-Name: vdetails
---------------------------------------------------------------------------------
Name Null? Type
---------------------------------------------------------------------------------
NAME VARCHAR2 (20)
PLACE VARCHAR2 (20)
DISTRICT VARCHAR2 (15)
STATE VARCHAR2 (15)
COUNTRY VARCHAR2 (15)
PHONE VARCHAR2 (15)
DOV VARCHAR2 (15)
----------------------------------------------------------------------------------
-
8/2/2019 Varky Documentation
43/68
FORMS
-
8/2/2019 Varky Documentation
44/68
-
8/2/2019 Varky Documentation
45/68
ADMINISTRATOR LOGIN
-
8/2/2019 Varky Documentation
46/68
MAINFORM
-
8/2/2019 Varky Documentation
47/68
CINEMA HALLS
-
8/2/2019 Varky Documentation
48/68
CULTURAL CENTRES
-
8/2/2019 Varky Documentation
49/68
DISTRICT INFORMATION
-
8/2/2019 Varky Documentation
50/68
EDUCATIONAL INSTITUTIONS
-
8/2/2019 Varky Documentation
51/68
HELP LINE
-
8/2/2019 Varky Documentation
52/68
HOTELS AND HOMESTAYS
-
8/2/2019 Varky Documentation
53/68
INDUSTRIES
-
8/2/2019 Varky Documentation
54/68
IT CENTRES
-
8/2/2019 Varky Documentation
55/68
ADMINISTRATOR MAINFORM
-
8/2/2019 Varky Documentation
56/68
TOUR PACK ENTRY
-
8/2/2019 Varky Documentation
57/68
TOUR PLACE ENTRY
-
8/2/2019 Varky Documentation
58/68
RELIGIOUS CENTRES
-
8/2/2019 Varky Documentation
59/68
SERVICES
-
8/2/2019 Varky Documentation
60/68
TOUR BOOKING
-
8/2/2019 Varky Documentation
61/68
TOUR SPOTS
-
8/2/2019 Varky Documentation
62/68
-
8/2/2019 Varky Documentation
63/68
-
8/2/2019 Varky Documentation
64/68
-
8/2/2019 Varky Documentation
65/68
FORMS
-
8/2/2019 Varky Documentation
66/68
REPORTS
-
8/2/2019 Varky Documentation
67/68
BIBLIOGRAPHY
-
8/2/2019 Varky Documentation
68/68
BIBLIOGRAPHY
i) Visual Basic.Net Bible : Evjen,Bergesii) Visual Basic.Net Programming : Steven Holzner, Dreamtech Press
iii) VB.Net in a nutshell second edition: A.Keyton Weissinger
iv) Understanding Oracle : James T Perry& Joseph G Lateer
v) Oracle online manual
vi) Oracle 8.0 complete reference