Manhole Construction: A Reusable GRP Invert Shuttering System

Upload: anthire

Post on 02-Jul-2015

537 views

Category:

Presentations & Public Speaking


11 download

DESCRIPTION

The Vertform concrete formwork system was developed by Ant Hire as an alternative to traditional construction methods for creating manhole bases and inverts in a range of sizes

TRANSCRIPT

Page 1: Vertform - manhole construction

Manhole Construction: A Reusable GRP Invert

Shuttering System

Page 2: Vertform - manhole construction

Learning Aims and Objectives

• Methods of manhole construction and the challenges faced when

constructing manholes

• How to use an invert shuttering system and its results • When can an invert shuttering system be used.

Page 3: Vertform - manhole construction

To introduce a reliable method for creating

stable, watertight manhole bases with the

required profile.

What problems are faced when

constructing manholes?

Page 4: Vertform - manhole construction

Understanding different methods of

manhole construction

Page 5: Vertform - manhole construction

Rough Forming

• Base created manually with a

shovel using semi-dry

concrete

• Finished with a layer of

smooth concrete

Page 6: Vertform - manhole construction

Rough Shuttering

• Plywood and timber boats are

used to create a channel in the

manhole base

• Finished by hand

Page 7: Vertform - manhole construction

Half Pipe Segments

• Segments set in semi-dry concrete to form the base

• Finished by hand

Page 8: Vertform - manhole construction

Bespoke Timber Formwork

• Made to suit each individual

structure

• Can accommodate additions such

as sumps and hydro-break

systems

Page 9: Vertform - manhole construction

• Made to create watertight manhole inverts

and bases in a single operation

• Eliminates the need for concrete remedial

work

• No hand finishing required

• Correct profile can be created consistently

• Reusable

Page 10: Vertform - manhole construction

How To Use The Vertform

Shuttering System

Page 11: Vertform - manhole construction

• Base components are selected to form the required angle

• Any angle between 90 degrees and 180 degrees can be accommodated

Page 12: Vertform - manhole construction

• The side components are attached to the base, and the

Verform is secured in place using jacks

Page 13: Vertform - manhole construction

• Once complete, the entire shutter is sprayed with releasing

agent and vibrated concrete is poured around the mould

• Once set, the Vertform can be easily removed

Page 14: Vertform - manhole construction

Vertform Applications

Page 15: Vertform - manhole construction

Pipe Diameter Changes

Page 16: Vertform - manhole construction

T Connections

Page 17: Vertform - manhole construction

Extra Long Channels

Page 18: Vertform - manhole construction

Landing Bays

Page 19: Vertform - manhole construction

Single End Fixing

Page 20: Vertform - manhole construction

Side Connections

Page 21: Vertform - manhole construction

Rebate for Double Step Irons

Page 22: Vertform - manhole construction
Page 23: Vertform - manhole construction
Page 24: Vertform - manhole construction
Page 25: Vertform - manhole construction

Summary - Learning Outcomes

• An understanding of manhole construction

• An understanding of how the different methods compare

• An understanding of how to use the Vertform system

Page 26: Vertform - manhole construction

Ant Hire Solutions www.anthire.co.uk 0845 125 9595

Manhole construction using an Invert Shuttering System