Joanne Kehoe, Manager of Purchasing, Construction Services Michael Pacholok Director Purchasing & Materials Management Division City Hall 100 Queen Street West 18 th Floor, West Tower Toronto, Ontario M5H 2N2 Tel: 416-392-7323 Fax: 416-397-7779 [email protected] toronto.ca March 28, 2017 VIA INTERNET POSTING 3 Pages + 1 Attachment ADDENDUM NO. 2 Request for Quotation No. 9115-17-5025 Re: Material Testing for Six-Points Interchange Project REVISED CLOSING DATE: April 3, 2017, 12:00 O'CLOCK NOON (LOCAL TIME) Please refer to the above Request for Quotation in your possession and be advised of the following revisions. I. REVISIONS The pricing pages have been revised. Bidders must use the revised pricing pages dated March 28, 2017, failure to use the revised pricing form pages will result in your quotation being declared non-compliant. II. ATTACHMENTS i. Revised Pricing Form Addendum 2 (March 28, 2017) III. QUESTIONS AND ANSWERS Q1. Price Form Item 19: What is the test procedure or reference? A1. Refer to the attached revised Price Form (Appendix C). Q2. Price Form Item 22: What is the required hole diameter? A2. The core hole diameter shall be greater or equal to 37.5 mm. Refer to the revised Price Form (Appendix C). Q3. Price Form Item 42: What are the test parameters? A3. Refer to the revised Price Form (Appendix C). Q4. Price Form Item 66: Is the contingency supposed to be $70,000.00 or $75,000.00? A4. The contingency amount is $75,000.00. Refer to the revised Price Form (Appendix C). Q5. Can the City please clarify if the Bidders can utilize sub-consultants in order to comply with the following required qualifications listed in Section 6.7 Bidder Qualifications: 1 of 10

Upload: others

Post on 25-Mar-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Joanne Kehoe, Manager of Purchasing, Construction Services

Michael Pacholok

Director

Purchasing & Materials Management Division City Hall 100 Queen Street West 18th Floor, West Tower Toronto, Ontario M5H 2N2

Tel: 416-392-7323

Fax: 416-397-7779

[email protected]

toronto.ca

March 28, 2017 VIA INTERNET POSTING

3 Pages + 1 Attachment

ADDENDUM NO. 2

Request for Quotation No. 9115-17-5025

Re: Material Testing for Six-Points Interchange Project

REVISED CLOSING DATE: April 3, 2017, 12:00 O'CLOCK NOON (LOCAL TIME)

Please refer to the above Request for Quotation in your possession and be advised of the

following revisions.

I. REVISIONS

The pricing pages have been revised. Bidders must use the revised pricing pages dated March

28, 2017, failure to use the revised pricing form pages will result in your quotation being

declared non-compliant.

II. ATTACHMENTS

i. Revised Pricing Form – Addendum 2 (March 28, 2017)

III. QUESTIONS AND ANSWERS

Q1. Price Form Item 19: What is the test procedure or reference?

A1. Refer to the attached revised Price Form (Appendix C).

Q2. Price Form Item 22: What is the required hole diameter?

A2. The core hole diameter shall be greater or equal to 37.5 mm. Refer to the revised Price

Form (Appendix C).

Q3. Price Form Item 42: What are the test parameters?

A3. Refer to the revised Price Form (Appendix C).

Q4. Price Form Item 66: Is the contingency supposed to be $70,000.00 or $75,000.00?

A4. The contingency amount is $75,000.00. Refer to the revised Price Form (Appendix C).

Q5. Can the City please clarify if the Bidders can utilize sub-consultants in order to comply

with the following required qualifications listed in Section 6.7 Bidder Qualifications:

1 of 10

o Visual Inspectors must have a minimum Level II, CSA Standard W178.2

o Ultrasonic testing personnel must be certified under CAN/CGSB 48.9712-

2000, Qualification and Certification of Non-Destructive Testing Personnel,

Level II, Option A.

o Certified by the Canadian Welding Bureau to the requirements of CSA

Standard W178.1 (Certification of Welding Inspection Organizations) by the

specified Test Method.

A5. Yes, the Bidder may utilize sub-consultants to meet the required qualifications.

Q6. Will the City allow for an annual increase in the unit prices within the 5 year term?

A6. The unit price shall be fixed for the duration of the assignment up to the completion

date of the project. The City will consider requests for unit price adjustment, should the

duration of the project extend beyond the proposed schedule due to delays beyond the

Consultant’s control. The unit price adjustment shall not exceed the average consumer

price index for Toronto, Ontario for the year previous to the start of the extension. Unit

price adjustment will not be considered for delays caused by the Consultant or its sub-

consultant.

Q7. As the Ontario Association of Certified Engineering Technicians and Technologists

(OACETT) does not govern/implement any of the required certification programs, will

the City consider waiving its requirement for OACETT certifications for the testing

technicians?

A7. Yes, the requirement for OACETT is waived.

Q8. We would like to verify if Items 5 and 6 of Appendix “C” Price Form - cover site visit,

sampling, testing and mix design review. These are the descriptions provided in the Price

Form;

“5 – Visit plant, retrieve batch sample test and review the asphalt mix design

prior to commencement of contract work. Refer to Note 1.”

“6 – Visit concrete batching plant, check concrete mix design, test proportion and

materials, including casting and testing of concrete cylinders. Refer to Note 1. “

A8. Refer to the attached revised Price Form (Appendix C).

NOTE: Bidders are reminded that the following statement appears on the Request for

Quotation Form:

“I/WE ACKNOWLEDGE THE RECEIPT OF ADDENDUM

NO____TO____DATED____TO____.

THIS FORM MUST BE COMPLETED, SIGNED AND RECEIVED ON OR BEFORE

THE DATE AND TIME SPECIFIED, OR YOUR QUOTATION WILL NOT BE

CONSIDERED”.

2 of 10

As such, bidders are required to acknowledge all addenda in the space(s) provided on the

Request for Quotation Form or your quotation will not be considered.

Should you have any questions regarding this addendum, contact Marianne Gonzalez Angulo at

[email protected]

Yours truly

Joanne Kehoe

Manager, Construction Services

3 of 10

March 28, 2017 Addendum 2

APPENDIX “C” REVISED PRICE FORM – ADDENDUM 1 (MARCH 28, 2017)

UNIT PRICES QUOTED SHALL INCLUDE Supply of labour, equipment and materials necessary for Material Specification Compliance Tests and Project Quality Assurance services for the Six Points Interchange Reconfiguration Project. EXCLUDING HARMONIZED SALES TAX (HST)

IN THE EVENT OF MATHEMATICAL ERRORS FOUND IN THE PRICING PAGES, THE UNIT PRICES

QUOTED SHALL PREVAIL. EXTENSIONS AND TOTALS WILL BE CORRECTED ACCORDINGLY AND

ADJUSTMENTS RESULTING FROM THE CORRECTION WILL BE APPLIED TO THE TOTAL PRICE

QUOTED.

Item

No.

Description Estimated

Quantity

Unit Price Extended Price

(Estimated Quantity x

Unit Price)

Site Visits and Travel (A)

1

Standby time for field technician at the

request of City.

1000 hours

$ _______/hour

$ ___________

2

Hourly rates for field technician over 12

hours per day Monday – Friday. Refer to

Note 2.

800 hours

$ _______/hour

$ ___________

3

Hourly rates for field technician on

weekends or statutory holidays. Refer to

Note 2.

1200 hours

$ _______/hour

$ ___________

4

Mileage paid at 0.52 cents per kilometer for

sampling at plants or locations outside of the

project locations. Provisional Sum

9600 Km

0.52 / Km

$ 4992.00

Batch Testing and Mix Design Review (B)

5

Visit asphalt plant, retrieve batch sample,

test and compare with the reviewed asphalt

mix design prior to commencement of

contract work. Refer to Note 1.

12 each

$ _______/each

$ ___________

6

Visit concrete batching plant, test proportion

and material, including casting and testing

of concrete cylinders, and compare with the

reviewed concrete mix design.

Refer to Note 1.

12 each

$ _______/each

$ ___________

7

Visit granular material supplier, recover

material sample, and deliver to laboratory,

perform gradation analysis and modified

proctor test. Refer to Note 1.

24 each

$ _______/each

$ ___________

8

Review Asphalt Mix design prepared by

others to verify compliance with City

specifications and procedures outlined in

City Specification TS 1101, TS 1150 and

provide comments. Includes all engineering

and administrative costs, report writing and

report submission.

12 each

$ _______/each

$ ___________

4 of 10

March 28, 2017 Addendum 2

9

Review Concrete Mix design prepared by

others to verify compliance with City

specifications and procedures outlined in

City Specification TS 1350, TS 13.10 and

provide comments. Includes all engineering

and administrative costs, report writing and

report submission.

12 each

$ _______/each

$ ___________

Asphalt Sampling / Testing (C)

10

Retrieve asphalt sample from Project site

during paving operation, (plate samples or

MTO specified sampling methods). Refer to

Note 2.

108 each

$ _______/each

$ ___________

11

Full Marshall compliance check (stability,

flow, Air voids and voids mineral

aggregate) with 3 briquettes. Includes cost

of emailing and faxing preliminary report

and writing/submission of written report.

40 each

$ _______/each

$ ___________

12

Extraction and gradation compliance check

of asphalt sample (washed and unwashed).

Includes cost of performing testing and

sending preliminary results by telephone

and email and fax for unwashed sample

within two (2) hours of sampling and for

washed sample within five (5) hours of

sampling.

26 each

$ _______/each

$ ___________

13

Recovered penetration test (Abson recovery,

penetration and viscosity). Includes cost of

faxing and emailing preliminary results and

writing/submission of report.

9 each

$ _______/each

$ ___________

14

PGAC binder grade verification

9 each

$ _______/each

$ ___________

15

Determination of the ash content of asphalt

cement and asphalt emulsions as per MTO

Laboratory Testing Manual LS-227.

3 each

$ _______/each

$ ___________

16

Determination of asphalt cement’s

resistance to ductile failure using double

edge notched tension test (dent) as per MTO

Laboratory Testing Manual LS-299.

3 each

$ _______/each

$ ___________

17

Determination of performance grade of

physically aged asphalt cement using

extended bending beam rheometer (BBR)

method as per MTO Laboratory Testing

Manual LS-308.

2 each

$ _______/each

$ ___________

18

Multiple Stress Creep Recovery (MSCR)

Test Of Asphalt Binder Using A Dynamic

Shear Rheometer (DSR) as per AASHTO T

350.

6 each

$ _______/each

$ ___________

5 of 10

March 28, 2017 Addendum 2

19 Tack coat testing (TS 3.20), including

sampling, pick up, travel expenses and

laboratory testing and reporting.

9 each $ _______/each $ ___________

Field Sampling (D)

20

Field air entrainment and slump tests on

fresh concrete. Includes cost of leaving copy

of results on-site and mailing of report with

invoice. Refer to Note 2.

2000 each

$ _______/each

$ ___________

21

Casting of concrete cylinder for

compressive tests, including mailing and

reporting with invoice. Price per cylinder

cast. Refer to Note 2.

5000 each

$ _______/each

$ ___________

22

Core drilling 37.5mm(or greater) diameter

core for in-situ testing of the depth of

concrete / asphalt. Refer to Note 2.

100 each

$ _______/each

$ ___________

23

Core drilling 100mm diameter core for in-

situ testing of concrete road base. Refer to

Note 2.

100 each

$ _______/each

$ ___________

24

Asbestos content determination from asphalt

cores including full depth coring, cutting

cores to the desired thickness, laboratory

testing and reporting of test results. Refer to

Note 2.

6 each

$ _______/each

$ ___________

Concrete Sample Testing (E)

25

Compressive strength test (CSA A23.2) of

150mm x 300mm or 150mm x 200mm

cylinder. Price per cylinder tested. Includes

cost of all labour and faxing and emailing

preliminary report and writing/submission

of written report.

5000 each

$ _______/each

$ ___________

26

Pick-up, cure, grind, perform compression

test, report per Special Requirements for

High-Strength Concrete (Def’n. A23.1).

Prices per cylinder to include travel to site

expenses.

250 each

$ _______/each

$ ___________

27

Pick-up, cure, test, report per Special

Requirements for Standard Test Method for

preconstruction and construction evaluation

of Mortars for plain and reinforced unit

masonry (ASTM C 780).

Prices per cylinder to include travel to site

expenses.

50 each

$ _______/each

$ ___________

6 of 10

March 28, 2017 Addendum 2

Aggregate and Soil Sample Laboratory Testing (F)

28

Retrieve soil or aggregate sample from

Project site. Refer to Note 2.

100 each

$ _______/each

$ ___________

29

Shrinking Test, 7th day and 28th day

10 each

$ _______/each

$ ___________

30

On site concrete hammer test for onsite

strength test. Refer to Note 2.

10 each $_______/each $ ___________

31

Perform test on sample to determine

percentage volume of asphalt coated

particles. Includes cost of faxing and

emailing preliminary results and

writing/submission of report.

20 each

$ _______/each

$ ___________

32

Perform gradation analysis with wash in

accordance with MTO procedure, including

cost of all labour and reporting, faxing and

emailing preliminary results and

writing/submission of report.

50 each

$ _______/each

$ ___________

33

Perform 5-point Modified Proctor test on

sample, including cost of all labour.

Includes cost of faxing and emailing

preliminary results and writing/submission

of report.

50 each

$ _______/each

$ ___________

34

X-ray diffraction (XRD) testing by an

accredited environmental analytical

laboratory to identify gypsum, ettringite and

thaumasite.

15 each

$ _______/each

$ ___________

35

Sieve analysis on granular fill, bedding

material, base courses and aggregates in

accordance with ASTM C136 or MTO Lab

Test No. LS602report.

30 each

$ _______/each

$ ___________

36

Standard Proctor test. ASTM D698.

30 each

$ _______/each

$ ___________

Field Nuclear Density (G)

37

All-inclusive on-site rate for nuclear testing.

Refer to Note 2.

5600 hours

$ _______/hour

$ ___________

38

All-inclusive on-site rate for nuclear testing

over 12 hours per day Mon-Fri. Refer to

Note 2.

400 hours

$ _______/hour

$ ___________

39

All-inclusive on-site rate for nuclear testing

during weekends or statutory holidays,

Refer to Note 2.

400 hours

$ _______/hour

$ ___________

7 of 10

March 28, 2017 Addendum 2

Sampling, testing and written report in accordance with MOEE guidelines (H)

40

Sulphate, chloride ion, electrical

conductivity, PH, and redox potential

analysis. Refer to Note 2.

65 samples

$ _____/sample

$ ___________

41

Reg. 558 Leachate chemistry with VOCs,

SVOCs, inorganics and PCBs.

Refer to Note 2.

65 samples

$ _____/sample

$ ___________

42A

Inorganic and General Chemistry for Soil

under MOECC Soil, Groundwater and

Sediment Standards for Use Under Part

XV.1 of the Environmental Protection Act,

2011.

Refer to Note 2.

65 samples

$ _____/sample

$ ___________

42B

PHCs and BTEX for soil under MOECC

Soil, Groundwater and Sediment Standards

for Use Under Part XV.1 of the

Environmental Protection Act, 2011.

Refer to Note 2.

65 samples

$ _____/sample

$ ___________

42C

VOCs for soil under MOECC Soil,

Groundwater and Sediment Standards for

Use Under Part XV.1 of the Environmental

Protection Act, 2011.

Refer to Note 2.

65 samples

$ _____/sample

$ ___________

42D

PAHs for soil under MOECC Soil,

Groundwater and Sediment Standards for

Use Under Part XV.1 of the Environmental

Protection Act, 2011.

Refer to Note 2.

65 samples

$ _____/sample

$ ___________

42E

PCBs for Soil under MOECC Soil,

Groundwater and Sediment Standards for

Use Under Part XV.1 of the Environmental

Protection Act, 2011.

Refer to Note 2.

65 samples

$ _____/sample

$ ___________

Brick Testing (I)

43

Sample, pick up and test bricks as per

A.S.T.M. Spec. C-902, C.S.A. A82.2 and

City standards, including travel to site

expense.

20 each

$ _______/each

$ ___________

Visual & Dye Penetrant Welding Inspection (J)

44 All-inclusive on-site rate for visual and

welding inspection. Refer to Note 2. 900 hrs

$ _______/hour $ ___________

8 of 10

March 28, 2017 Addendum 2

45 All-inclusive on-site rate for visual and

welding inspection over 12 hours per day

Mon-Fri. Refer to Note 2.

180 hrs

$ _______/hour

$ ___________

46 All-inclusive on-site rate for visual and

welding inspection during weekends or

statutory holidays, Refer to Note 2.

90 each

$ _______/hour

$ ___________

Inspect Steel Structures as per OPSS 906 and CAN/CSA-S16.1 (K)

47 All-inclusive on-site rate for steel structure

inspection. Refer to Note 2. 100 hrs $ _______/hour

$ ___________

48 All-inclusive on-site rate for steel structure

inspection over 12 hours per day Mon-Fri.

Refer to Note 2.

20 hrs

$ _______/hour

$ ___________

49 All-inclusive on-site rate for steel structure

inspection during weekends or statutory

holidays, Refer to Note 2.

10 hrs

$ _______/hour

$ ___________

Radiographic Testing (L)

50 Radiographer team (Radiographer &

Helper) all-inclusive on-site rate. Refer to

Note 2.

100 hrs

$ _______/hour $ ___________

51 Radiographer team (Radiographer &

Helper) all-inclusive on-site rate over 12

hours per day Mon-Fri. Refer to Note 2.

20 hrs

$ _______/hour

$ ___________

52 Radiographer team (Radiographer &

Helper) all-inclusive on-site rate during

weekends or statutory holidays, Refer to

Note 2.

20 hrs

$ _______/hour

$ ___________

53 Radiographic film – 114mm x 216mm 20 $ _______/each $ ___________

54 Radiographic film – 114mm x 432mm 30 $ _______/each $ ___________

Ultrasonic Testing (M)

55 All-inclusive on-site rate for ultrasound

testing. Refer to Note 2.

20 hrs $ _______/hour $ ___________

56 All-inclusive on-site rate for ultrasound

testing over 12 hours per day Mon-Fri.

Refer to Note 2.

8 hrs

$ _______/hour

$ ___________

57 All-inclusive on-site rate for ultrasound

testing during weekends or statutory

holidays. Refer to Note 2.

4 hrs

$ _______/hour

$ ___________

Quality Assurance Report (N)

58

Compile test results for the Project,

comment and provide remedial

recommendations where necessary, and

submit monthly QA report.

48 each

$ _______/each

$ ___________

9 of 10

March 28, 2017 Addendum 2

59

Compile test results, provide summary

charts and final QA reports during

Construction and Post-Construction phases.

2 each

$ _______/each

$ ___________

Provisional Items (O)

60

Review soil analysis reports for the

suitability of sub grade material

30 each

$ _______/each

$ ___________

61

Senior Professional Engineer

100 hours

$ _______/hour

$ ___________

62

Professional Engineer

500 hours

$ _______/hour

$ ___________

63

Field Technician/Certified Engineering

Technician

600 hours

$ _______/hour

$ ___________

64

Clerical/secretarial

200 hours

$ _______/hour

$ ___________

65 Hardened Air-Void analysis (ASTM C457

Test Procedures). The item to include,

coring for samples, polishing, testing and

reporting.

50 each

$ _______/each

$ ___________

Contingency (P)

66

Contingency Allowance (Provisional Sum)

P.S.

$75,000.00

$75,000.00

(A+B+C+D+E+F+G+H+I+J+K+L+M+N+O+P) Subtotal

$ ___________

HST @ 13%

$ ___________

TOTAL BASE BID PRICE (This amount to be transcribed to page 1)

$ ___________

Notes:

1) Traveling expense is paid under Item No. 4

2) Traveling expense is included in the unit price.

10 of 10