vinod_verma_resume_mtech_28_01_2016

2
VINOD INDRADEV VERMA B-2 , G.V.S REPAIRING WORKS , Durganagar-A , Bhimnagar Road, Boisar , Palghar , Maharashtra , Pin No.401506. [email protected], Cell No.9890899510/7769988742 CAREER OBJECTIVE I want to work with a progressive organization that provides an opportunity to learn, enhance and apply my Knowledge and skills. EDUCATION Symbiosis International University (Symbiosis Institute of Technology) Master of Technology in CAD/CAM(Pursuing) 2015-2017 Semister-1 : 9.41(GPA) University of Pune (AVCOE, Sangamner) B.E in Mechanical Engineering 2010-2014 Aggregate : 71.87% Maharashtra State Board HSC (M.K. Junior College) : 84.83% 2009-2010 SSC (Adarsh Vidyalaya) : 87.53% 2007-2008 TECHNICAL SKILLS CAD Software : CATIA , PRO-E , AUTO-CAD , SolidWorks , U.G CAM Software : MASTER-CAM(X5) CAE Software : ANSYS,HYPERMESH FLUID software : FluidSim-H,FluidSim-P Languages : Basics of C WORK EXPERIENCE GAE at Ring Plus Aqua Ltd. (A Subsidiary of Raymond Ltd.) July2014 -July2015 Worked under Manufacturing Engineering and Projects Department: o New Product development activities like Feasibility study, Modeling & Design of Product, APQP, PPAP Documents, Production, QA and Dispatch. o Process & Productivity improvement Projects like Streamlining the Flow, SMED approach, Fixture design & Automation. o Die Design and Development for New products. o Flash-less die design & Yield improvement of Products. o Tooling Cost reduction by Die life improvement Project. o OEE improvement of Forge Shop by Tracing and reducing the Downtime losses. Attended Internal Training on 7QC tools & SPC. PROJECT AS A TRAINEE Layout Improvement for Optimization of machine shop. o Process flow study, Cycle time study, Identification & Elimination of NVA Activities, Buffer Stock Defining and SOP re-modification and based on all these Proposed a Feasible Solution for Layout to achieve Optimum manufacturing time. Ensure effective utilization of available resources and feasibility study of Cell formation at Hob Tooth Chamfer section.

Upload: vinod-verma

Post on 16-Feb-2017

34 views

Category:

Documents


1 download

TRANSCRIPT

VINOD INDRADEV VERMA B-2 , G.V.S REPAIRING WORKS , Durganagar-A , Bhimnagar Road, Boisar , Palghar , Maharashtra , Pin No.401506.

[email protected], Cell No.9890899510/7769988742

CAREER OBJECTIVE

I want to work with a progressive organization that provides an opportunity to learn, enhance and apply my

Knowledge and skills.

EDUCATION

Symbiosis International University (Symbiosis Institute of Technology)

Master of Technology in CAD/CAM(Pursuing) 2015-2017

Semister-1 : 9.41(GPA)

University of Pune (AVCOE, Sangamner)

B.E in Mechanical Engineering 2010-2014

Aggregate : 71.87%

Maharashtra State Board

HSC (M.K. Junior College) : 84.83% 2009-2010

SSC (Adarsh Vidyalaya) : 87.53% 2007-2008

TECHNICAL SKILLS

CAD Software : CATIA , PRO-E , AUTO-CAD , SolidWorks , U.G

CAM Software : MASTER-CAM(X5)

CAE Software : ANSYS,HYPERMESH

FLUID software : FluidSim-H,FluidSim-P

Languages : Basics of C

WORK EXPERIENCE

GAE at Ring Plus Aqua Ltd. (A Subsidiary of Raymond Ltd.) July2014 -July2015

Worked under Manufacturing Engineering and Projects Department:

o New Product development activities like Feasibility study, Modeling & Design of Product,

APQP, PPAP Documents, Production, QA and Dispatch.

o Process & Productivity improvement Projects like Streamlining the Flow, SMED approach,

Fixture design & Automation.

o Die Design and Development for New products.

o Flash-less die design & Yield improvement of Products.

o Tooling Cost reduction by Die life improvement Project.

o OEE improvement of Forge Shop by Tracing and reducing the Downtime losses.

Attended Internal Training on 7QC tools & SPC.

PROJECT AS A TRAINEE

Layout Improvement for Optimization of machine shop.

o Process flow study, Cycle time study, Identification & Elimination of NVA Activities, Buffer

Stock Defining and SOP re-modification and based on all these Proposed a Feasible Solution

for Layout to achieve Optimum manufacturing time.

Ensure effective utilization of available resources and feasibility study of Cell formation at Hob

Tooth Chamfer section.

o Ensure effective utilization of resources like man, machine, material etc. and study the cell

formation feasibility by doing man-machine and time study.

Fixture Design & Automation for Arresting Tooth Chamfer Missing on Ring gears.

o New fixture design to arrest tooth chamfer missing and proposal for an automated system

which uses proximity sensor for detection of chamfer missing.

ACADEMIC PROJECT

B.E Project : “Dynamic Balancing of the vehicle while cornering”

“Dynamic Balancing of the vehicle while cornering” is the concept to avoid Roll-Over of the

vehicle and provide comfort to the passengers while cornering by tilting the vehicle opposite to the

centrifugal force to cancel it, which leads to shift of C.G point of vehicle and provide comfort to the

passengers.

ADVANCED COURSES

CATIA V5R19 at VENUS TECHNOLOGY, PUNE.

ANSYS 12.0 at i-Global, PUNE.

Workshop on “Hydraulic & pneumatics” by TAACT.

Aptitude & Soft Skill at SEED InfoTech.

EXTRA-CURRICULAR ACTIVITIES

Volunteered at “GLOGIFT-2015-International Conference” at Symbiosis Institute Of

Technology.

Vice-Captain, Designer & Electrician in “BAJA SAE-INDIA”

Organizer of “ROBORACE in KURUKSHETRA-A National Level Event”

Coordinator of “ROBORACE in TECHUNIQUE2K13-A National Level Event”

National level Paper Presentation: 1. TMDS at K.K.WAGH COLLEGE, Nasik.

2. TMDS at MIT, Pune.

3. TMDS in INTERNATIONAL CONFERENCE at AVCOE, Sangamner.

Attended a “Bike Workshop” at Sinhagad, Vadgaon.

AREA OF INTEREST

CAD & CAE (Analysis & Simulation) Tools

R & D Activities

New Product Development Activities

LANGUAGES

Fluent in Hindi, English, Marathi

HOBBIES

Playing Cricket, Reading Books

Vinod I. Verma