• Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action taken on the basis of information contained herein.
•For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures.
Virtual Planning & Optimisation(VPO)
Imperatives for VPO
3
Varied service packages offers solutions to ad-hoc scenarios.
Cost effective especially for high cost areas.
Core expertise group available to service multiple project.
Uniform applications on tools through standard processes.
VPO Overview
VPO (Virtual Planning & Optimization) is a Process & Knowledge driven system.
Aims to perform Radio/Transmission Planning & Network Optimization from a
location that is remote to the Physical Project Location.
To split planning & optimization scope is into field and office work
� Field work (e.g. DT measurement collection, RF/TNP surveys) needs to be
done at project location.
� Office work (e.g. analysis of DT and OSS data, planning simulations and
database updating) can be done remotely, as long as results are delivered
in desired format.
What is VPO?
Objective
4
VPO Mode of Operation
5
Customer
VPO Head
VPO Tech Leads GroupWorking
Engineer
Work Distribution
Online Virtual Verification
Field Team
Verification
Reporting
VPO Center Internal Work
Flow
VPO Radio Frequency (RF) Service Offerings
6
Nominal Planning
VPO RF Services
Search Rings
Site Parameter Planning
Planning ToolUpdate
RF Optimisation
BSS ParameterVerification & Audit
Network Planning Tendering support
6
RF Service Offerings 1: Network Planning Tendering Support
7
Nominal Planning
Search Rings
Site Parameter Planning
Planning ToolUpdate
RF Optimisation
BSS ParameterVerification & Audit
Network Planning Tendering support
• Coverage and capacity criteria
• Network design guideline
• Capacity projection
• Coverage and capacity criteria
• Network design guideline
• Capacity projection
Study customer inputs and prepare Network planning tender supporting documents.
7
• Receive RFP from customer
• Highlight critical points related to network dimensioning, coverage and
capacity
• Understand Network deployment completion target and schedule
• Prepare technical summary and requirement of resources
• Prepare costing and deliverables
• Prepare tentative BoQ
Process
• Tentative network BoQ
• Network planning guideline
• Tentative network BoQ
• Network planning guideline
Output Provided
• Coverage and capacity criteria
• Network design guideline
• Capacity projection
• Coverage and capacity criteria
• Network design guideline
• Capacity projection
Inputs Required
RF Service Offerings 2: Nominal Planning
8
Search Rings
Site Parameter Planning
Planning ToolUpdate
RF Optimisation
BSS ParameterVerification & Audit
Plot all sites in planning tool and run prediction for network coverage.
Nominal Planning
Network Planning Tendering support
8
• Tentative BoQ
• Clutter Maps with vector details
• Tuned Propagation Model
• Physical RF parameters
• Coverage threshold
• Planning Tool with map
• Tentative BoQ
• Clutter Maps with vector details
• Tuned Propagation Model
• Physical RF parameters
• Coverage threshold
• Planning Tool with map
Process
• Create Projects and Plot the sites on Map
• Update RF and Antenna related parameters
• Run prediction for coverage and find out coverage holes
• Add/move sites to optimize coverage
• Finalize Site planning
• Generate Coverage plots with site location
• Prepare Nominal Planning document contain CW Model, RF. Parameter, Location
of sites, Antenna details etc
• Nominal planning validation with customer and get final approval
● Coverage Plots
• Number of sites with their locations
• Physical parameter tentative details
● Coverage Plots
• Number of sites with their locations
• Physical parameter tentative details
Output Provided
• Tentative BoQ
• Clutter Maps with vector details
• Tuned Propagation Model
• Physical RF parameters
• Coverage threshold
• Planning Tool with map
• Tentative BoQ
• Clutter Maps with vector details
• Tuned Propagation Model
• Physical RF parameters
• Coverage threshold
• Planning Tool with map
Inputs Required
RF Service Offerings 3: Search Ring
9
Nominal Planning
Site Parameter Planning
Planning ToolUpdate
RF Optimisation
BSS ParameterVerification & Audit
Generates search rings for capacity and coverage driven sites.Network Planning Tendering support
Search Rings
9
• Objective of site
• Local geographical sensitivities and
other information
• Target areas with coverage
prediction
• Planning tool data
• Objective of site
• Local geographical sensitivities and
other information
• Target areas with coverage
prediction
• Planning tool data
Process
• Search rings issued for field survey after approval of Nominal planning
• Run coverage prediction for each sites and take snap shot of coverage plot
• Generate search rings using planning tool and Google earth to give tentative sites
locations with possible candidates
• Submit search ring document to customer for approval and handover to field
survey team
• Search ring documents (tentative
location of sites, RF Antenna
parameters and interest of coverage
target area) for Field survey
• Search ring documents (tentative
location of sites, RF Antenna
parameters and interest of coverage
target area) for Field survey
Output Provided
• Objective of site
• Local geographical sensitivities and
other information
• Target areas with coverage
prediction
• Planning tool data
• Objective of site
• Local geographical sensitivities and
other information
• Target areas with coverage
prediction
• Planning tool data
Inputs Required
RF Service Offerings 4: Planning Tool Update
10
Nominal Planning
Search Rings
Site Parameter Planning
RF Optimisation
BSS ParameterVerification & Audit
Continuous update and fine tuning of planning tool.Network Planning Tendering support
10
Planning ToolUpdate
• Digital maps in required format
• Existing sites location and RF
Parameters
• Frequency Plan
• Optional for Model tuning: CW and
Drive test log files
• Digital maps in required format
• Existing sites location and RF
Parameters
• Frequency Plan
• Optional for Model tuning: CW and
Drive test log files
Process
• Planning tool to be update as per actual parameter of Network
• Remote planner will get all on going changes in the network and keep updating
Planning tool
• Changes can be Antenna parameter related, Frequency Plan, Adjacency plan,
Capacity plan
• Keep Planning tool available with updated information to generate Coverage,
Interference and Quality plot to verify network performance
• Planning tool database will be
updated as per actual network
parameters
• Optional: Propagation Model fine
tuning based on CW and drive test
log file
• Planning tool database will be
updated as per actual network
parameters
• Optional: Propagation Model fine
tuning based on CW and drive test
log file
Output Provided
• Digital maps in required format
• Existing sites location and RF
Parameters
• Frequency Plan
• Optional for Model tuning: CW and
Drive test log files
• Digital maps in required format
• Existing sites location and RF
Parameters
• Frequency Plan
• Optional for Model tuning: CW and
Drive test log files
Inputs Required
RF Service Offerings 5: Site Parameter Planning
11
Nominal Planning
Search Rings
Planning ToolUpdate
RF Optimisation
BSS ParameterVerification & Audit
New or Swap site RF parameter planningNetwork Planning Tendering support
11
Site Parameter Planning
• Site location with RF Physical
parameters details
• Frequency allocation details
• Site configuration details in terms of
Capacity
• Digital map
• Site location with RF Physical
parameters details
• Frequency allocation details
• Site configuration details in terms of
Capacity
• Digital map
Process
• Once site is acquired and RFI has been confirmed then RF planner needs to
prepare integration sheet
• RF planner will do Frequency plan + Nbr planning + BSS Parameter Planning
• Prepare Final Site integration sheet and forward to OSS team for site creation
• Planner will check new sites created parameters vs. plan parameters and find out
if any inconsistency and generate CRF
• New site integration sheet
containing BSS Parameters like
Frequency plan, Nbr Plan, Handover
and Power control parameter etc.
• Interference analysis
• OSS dump verification
• New site integration sheet
containing BSS Parameters like
Frequency plan, Nbr Plan, Handover
and Power control parameter etc.
• Interference analysis
• OSS dump verification
Output Provided
• Site location with RF Physical
parameters details
• Frequency allocation details
• Site configuration details in terms of
Capacity
• Digital map
• Site location with RF Physical
parameters details
• Frequency allocation details
• Site configuration details in terms of
Capacity
• Digital map
Inputs Required
RF Service Offerings 6: BSS Parameter Verification & Audit
12
Nominal Planning
Search Rings
Site Parameter Planning
Planning ToolUpdate
RF Optimisation
BSS parameter consistency check using plan edit or proprietary macros.Network Planning Tendering support
12
BSS ParameterVerification & Audit
• BSC dump in .xml or .dat format
from OSS
• Cell doctor 204 report
• Default, Sensitive and Specific
parameter guideline
• BSC dump in .xml or .dat format
from OSS
• Cell doctor 204 report
• Default, Sensitive and Specific
parameter guideline
Process
• BSS Parameter audit is periodically required in expanding network
• BSC dumps in .XML or .DAT format will be provided by OSS team
• MML command output like ZEEI, ZERO, ZEQO, ZEAO, help to find out inconsistency
• Import .xml or .dat format BSC dump in Plan Edit or customized macros
• Run check on actual database vs. Planned to determine inconsistencies
• Send CRF for approval
• Implement changes in Network
• Parameter inconsistency change
request
• Optional: 2nd level analysis
• Parameter inconsistency change
request
• Optional: 2nd level analysis
Output Provided
• BSC dump in .xml or .dat format
from OSS
• Cell doctor 204 report
• Default, Sensitive and Specific
parameter guideline
• BSC dump in .xml or .dat format
from OSS
• Cell doctor 204 report
• Default, Sensitive and Specific
parameter guideline
Inputs Required
RF Service Offerings 7: RF Optimisation
13
Nominal Planning
Search Rings
Site Parameter Planning
Planning ToolUpdate
BSS ParameterVerification & Audit
RF Optimization to achieve desired KPINetwork Planning Tendering support
13
RF Optimisation
• Master site database
• Local geographical sensitivities and other relevant information
• Current KPI daily reports & historical optimization records
• BSS Parameter guideline for sensitive parameters
• Vector Data & Clutter Information
• KPI Thresholds
• Drive test log files
• Cell doctor daily reports
• Master site database
• Local geographical sensitivities and other relevant information
• Current KPI daily reports & historical optimization records
• BSS Parameter guideline for sensitive parameters
• Vector Data & Clutter Information
• KPI Thresholds
• Drive test log files
• Cell doctor daily reports
Process
• Download daily KPI and cell doctor reports
• Analyze and identify bad performing cells, based on cell doctor reports & drive test
log files identify the reason.
• Optimization analysis and discussion with local field team.
• Propose solution to improve performance and CRF for implementation
• Send CRF to local team in charge for approval and implementation
• Conduct post implementation analysis on KPI
• If KPI still not as per desire then go for alternative solution
• Once KPI meet, prepare final acceptance KPI document and handover sites to local
team for continued monitoring
• Achieve Network KPI values
• Final optimization acceptance
document
• Achieve Network KPI values
• Final optimization acceptance
document
Output Provided
• Master site database
• Local geographical sensitivities and other relevant information
• Current KPI daily reports & historical optimization records
• BSS Parameter guideline for sensitive parameters
• Vector Data & Clutter Information
• KPI Thresholds
• Drive test log files
• Cell doctor daily reports
• Master site database
• Local geographical sensitivities and other relevant information
• Current KPI daily reports & historical optimization records
• BSS Parameter guideline for sensitive parameters
• Vector Data & Clutter Information
• KPI Thresholds
• Drive test log files
• Cell doctor daily reports
Inputs Required
VPO TNP Services
Link
Planning
BSC
Planning
Desktop
Planning
Transmission
Network
Optimisation
PCM
Planning
VPO Transmission Network Planning (TNP) Service Offering
TNP Service Offerings 1: Desktop Planning
15
Preparing the tentative connectivity of the new sites and provide the tentative BOQ for the same.
• Targeted New Site List
• Current Network Diagram on MapInfo
• Latest Master Site Database
• All BSC PCM Plan
• Fiber and Leased Line Details
• Upcoming New BSC Plan
• Sharing Site List
15
Process
• Obtain New Targeted Site List for the Phase
• Start nominal planning with current Network diagram on MapInfo and Upcoming
BSC plan
• Get Latest PCM Plans for All BSCs to calculate the current network’s E1 and Leased
Line Utilization
• Get relevant Site wise Details besides the master site database
• After Plotting the New Targeted sites VPO team will give tentative Possible Far ends
depending on E1 or Leased Line availability
• Then local field team to conduct LOS surveys
• Tentative Connectivity with Far end
• Repeater requirement
• Hop require d for new site
• Hop required for upgrade
• Leased Line requirement
• Tentative BOQ
Output Provided
• Targeted New Site List
• Current Network Diagram on MapInfo
• Latest Master Site Database
• All BSC PCM Plan
• Fiber and Leased Line Details
• Upcoming New BSC Plan
• Sharing Site List
Inputs Required
PCM
Planning
Desktop
Planning
Link
Planning
BSC
Planning
Transmission
Network
Optimisation
TNP Service Offerings 2: Link Planning
16
Preparing the link budget of the new or upgrade link.
16
• Local team will Provide the Site wise TSSR and Master LOS Survey Database
• Get Acquisition status of the Targeted sites & RFI tracker
• Get Latest NetAct Project dump in NetAct Planner format ,XML format and Digital maps
• Get Fixed Far End of New targeted sites with MW Antenna heights from Surveys
Conducted
• VPO team will provide the Master Link Database in the format of “New Links” ,
“Upgraded Links” , “Extra Planned Links”
• After Sending the RFI or Hop Upgrade Data to Implementation team, local team will
be informed about the Field Status of the same
Process• Latest Network Dump of Net Act
• Acquired List and RFI List
• Site TSSR
• Fixed Far-end with Antenna Height
• Guidelines from Customer
• Latest Network Dump of Net Act
• Acquired List and RFI List
• Site TSSR
• Fixed Far-end with Antenna Height
• Guidelines from Customer
Inputs Required
• Complete Link Budge
• IDU requirement on the site
Output Provided
PCM
Planning
Desktop
Planning
Link
Planning
BSC
Planning
Transmission
Network
Optimisation
TNP Service Offerings 3: PCM Planning
17
Provide the new PCM timeslot mapping and ET port for the new site or in upgrade sites.
17
Process
• Get Latest PCM Plan for All BSCs with ET Database.
• Get day to day reports ZEEI, ZERO, ZESI & ZDTI.
• Get ET Card Availability for all the BSCs.
• Get RFI Tracker on day to day basis.
• VPO team then will provide New PCM path for the New targeted site with ET Port
and Timeslot Mapping.
• VPO team will also provide the Updated PCM plan and ET Database for All BSC.
• New or Upgrade Site PCM Path
• ET Port
• Timeslot Mapping
Output Provided
• All BSC PCM Plan
• Reports ZEEI, ZERO, ZESI & ZDTI
• ET Availability
• Lease Line Availability
• Guidelines from Customer
• All BSC PCM Plan
• Reports ZEEI, ZERO, ZESI & ZDTI
• ET Availability
• Lease Line Availability
• Guidelines from Customer
Inputs Required
PCMPlanning
Desktop
Planning
Link
Planning
BSC
Planning
Transmission
Network
Optimisation
TNP Service Offerings 4: BSC Planning
18
Providing the whole new BSC connectivity plan along with the new PCM plan and link budget for the new links which are used to reroute the traffic.
18
• The Re-homing Site List
• Current Network Diagram on MapInfo
• Latest Network Dump of NetAct
• All BSC PCM Plan
• Leased Line Utilized
• Reports ZEEI of the sites BSC
from where the sites need to
be Re-homed.
• Guidelines for BSC Planning
Process
• After getting all required inputs VPO team will provide BSC Location and List of new
LOS surveys which will be conducted by local field team.
• After the LOS survey done VPO team will give the complete Link Budget for the
new as well as Upgrade Links with IDU requirement.
• VPO team will provide the New BSC PCM Plan, Metro Hub Plan, ET Ports, Leased
Line Removal or requirements, ATER requirements and Rehoming data needed.
• VPO team will provide the new connectivity Diagram for the BSC & whole network.
• New BSC PCM Plan
• New BSC A-ter requirement
• New BSC Leased Line requirement
• New BSC new link or upgrade link
requirement
• New BSC ET Port Allocation
Output Provided
• The Re-homing Site List
• Current Network Diagram on MapInfo
• Latest Network Dump of NetAct
• All BSC PCM Plan
• Leased Line Utilized
• Reports ZEEI of the sites BSC
from where the sites need to
be Re-homed.
• Guidelines for BSC Planning
Inputs Required
PCM
Planning
Desktop
Planning
Link
Planning
BSC
Planning
Transmission
Network
Optimisation
TNP Service Offerings 5 : Transmission Network Optimisation
19
Optimising the TNP network according to the customer requirement and providing them the link budget & PCM plan depending on the scope of work.
19
• Current Network Diagram on MapInfo
• Latest Network Dump of NetAct
• All BSC PCM Plan
• Latest Master Site Database
• Fiber and Leased Line Details
• Upcoming New BSC Plan
• Sharing Site List
• Guidelines for Network Optimization
Process
• After getting all required inputs VPO team will provide new optimized network topology
and List of New LOS Surveys then finalize Final connectivity of the Network
• Once the Connectivity is freezed, VPO team will start preparing Link Budgets BSC wise
and PCM also
• VPO team then will Release Optimization Plan BSC wise including:
a) MapInfo Connectivity b) Site & link List c) De-Install List
d) Loop Details e) PCM Plan f) ET details
g) Metro Hub Plan h) Complete Link Budget of all links in BSC
i) Optimisation report with final BOQ
• New Network Topology as agreed
with the customer
• New Link Budget of whole Network
• New PCM Plan for all BSC
• Optimization Report with Final BOQ
Output Provided
• Current Network Diagram on MapInfo
• Latest Network Dump of NetAct
• All BSC PCM Plan
• Latest Master Site Database
• Fiber and Leased Line Details
• Upcoming New BSC Plan
• Sharing Site List
• Guidelines for Network Optimization
Inputs Required
PCM
Planning
Desktop
Planning
Link
Planning
BSC
Planning
Transmission
Network
Optimisation
Value Proposition
20
Cost effective especially for high cost areas (e.g.
Australia, Japan, USA).
Fast Delivery cycle Quick deployment of project (e.g.
few engineers needed physically at project location
only).
Ideal solution for high-risk or hard access areas.
Low fixed Cost regardless of the project location.
Flexible service packages to meet unique customer
needs.
Expertise known and guaranteed.
– e.g. expert can be in only ONE project location;
but with VPO, same expertise is available for
MULTIPLE projects.
Virtual Optimisation Centre
2222
Remote Analytics for Design, Planning & Optimisation to achieve minimal startup time, consistent use of process and tools and concentrated expertisein one location.
State of the art VPO Centre vital stats:
Floor space: 2000 Sq. Ft.Location : Gurgaon(India)Seating capacity: 50Internet speed: 2 MbpsNo. of RF engineers: 50Total man years experience: 10 YearsTools used for VPO: Asset Connect
PL4 & MIPT
Virtual Optimisation Centre
2323
Benchmarking
Data Collection
RF and Transmission Planning
Transmission Network Verification
RF / Line of Sight Surveys
CW Testing and Model Tuning
Nominal Cell Planning
Frequency Scanning
Optimisation
CW Testing and Model Tuning
Nominal Cell Planning
Frequency Scanning
RF and Transmission Planning
RF / Line of Sight Surveys
Activities Off shore
On shore
Typical Team Structure Of VPO
2424
Remote Project Remote Project Remote Project
VPO Head
RF Head TNP Head
RF Optimization Head
RF Planning Head
Sr Optimiser
Sr Optimiser
Jr Optimiser
Jr Optimiser
Jr Planner
Jr Planner
Sr Planner
TNP Planning HeadTNP Optimization
Head
Sr Optimiser
Jr Optimiser
Jr Optimiser Jr Planner
Jr Planner
Sr Planner
Jr Planner
2525
Internet
GTL - Ahmedabad
GTL - Gurgaon
HCL InfoSecuAccess Appliance
HCL InfoWall(Optional)
Broadband with Static Public IP
Router cum Modem (Broadband)
Network Switch
Data base server
LAN
HCL Info VPNe Solution Logical Diagram
2626
Turnkey Case Study- Example
Assumptions :
To see cost impact of VPO, we look at typical RF/TNP turnkey project.
Location is a high cost area, e.g. Australia, Europe, USA etc. Duration 12 Months and 1000 Sites new rollout with specified KPI.
To simplify comparison, we will compare cost impact for manpower only.
Case study is simple example of how VPO can save cost.
Exact savings cannot be ascertained yet as VPO cost structure is still being worked out.
Typically, VPO charges by package and not man-month.
With higher volume and continuing increase in efficiency, VPO costs would typically go down.
VPO costs are actually not pure man-month but would also include center maintenance,
equipment, remote side equipment, liaison, etc.
2727
Turnkey Case Study- Example
Manpower plan needed (without VPO):
With VPO:
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
Team leaders(RF, TRS…) 2 2 2 2 2 2 2 2 2 2 2 2
Snr Planners 2 2 2 2 2 2 1 1 1 1
Network Planners 4 4 4 4 4 4 2 2 2 2 1 1
Snr Optimisers 1 1 2 2 5 5 4 3 1
Optimisation Engineers 1 4 6 6 8 8 4 4 2
Jnr Engineers 2 4 4 4 4 6 6 6 8 6 4 2
Technician (DT, Survey) 4 8 8 8 8 8 10 10 10 6 4 2
Snr TNP engineers 2 2 2 2 2 2 1 1 1 1
TRS Planners 4 4 4 3 3 3 2 2 2 1 1 1
LOS surveyors 6 6 6 4 4 4 2 2 2 1 1 1
Others (Assistance Secretaries,..) 1 1 1 1 1 1 1 1 1 1 1 1
Total 27 33 33 32 35 40 35 40 42 29 21 13
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12
Team leaders(RF, TRS…) 2 2 2 2 2 2 2 2 2 2 2 2
Snr Planners 1 1 1 1 1 1
Network Planners 2 2 2 2 2 2 1 1 1 1 1 1
Snr Optimisers 1 1 1 1 2 2 2 2 1
Optimisation Engineers 1 2 2 2 3 3 2 2 1
Jnr Engineers 2 4 4 4 4 6 6 6 8 6 4 2
Technician (DT, Survey) 4 8 8 8 8 8 10 10 10 6 4 2
Snr TNP engineers 1 1 1 1 1 1 1 1 1 1
TRS Planners 2 2 2 2 2 2 1 1 1 1 1 1
LOS surveyors 6 6 6 4 4 4 2 2 2 1 1 1
Others (Assistance Secretaries,..) 1 1 1 1 1 1 1 1 1 1 1 1
Total 21 27 27 27 28 30 27 29 31 23 18 12
2828
Turnkey Case Study- Example
VPO Manpower will be:
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 Man- Months
Team leaders(RF, TRS…)
Snr Planners 1 1 1 1 1 1 1 1 1 1 10
Network Planners 2 2 2 2 2 2 1 1 1 1 16
Snr Optimisers 1 1 3 3 2 1 11
Optimisation Engineers 2 4 4 5 5 2 2 1 25
Jnr Engineers
Technician (DT, Survey)
Snr TNP engineers 1 1 1 1 1 1 6
TRS Planners 2 2 2 1 1 1 1 1 1 12
LOS surveyors
Others (Assistance Secretaries,..)
Total 6 6 6 5 7 10 8 11 11 6 3 1 80
Total VPO outsourced is 80 man-months, out of 368 total man month
(technical only); or around 22%
2929
Turnkey Case Study- Example
Man MonthsMonthly
costTotal VPO cost Total
Snr Planners 10 9660 96600 5290 52900
Network Planners 16 8740 139840 4140 66240
Snr Optimisers 11 7360 80960 5290 58190
Optimisation Engineers 25 8740 218500 4140 103500
Snr TNP engineers 6 8280 49680 5060 30360
TRS Planners 12 6900 82800 3910 46920
Total 668380 Total 358110
Local Resources VPO Resources
Difference in cost is: $310K!
This represents a savings of around 15% of total manpower, which is
in turn typically around 60-80% of total project value (for high cost areas)
Savings in cost would be :
Figures are in (USD)
3030
Projects under VPO successfully Delivered
Volume : 176 sites. * Average 100 sites per month.
Service : 2G RF KPI Monitoring and optimisation, final site acceptance report
Client 1 - Indonesia
Volume : 2500 sites in 5 working days
Service :Sites plotting in NetAct, coverage prediction and searching preparation
Client 2 - India
Volume : 1672 KPI meeting sites
Service : RF site integration sheet preparation (Data Fill)
2G RF PLO ( Pre Launch Optimisation), Final site acceptance report.
Client 3 – India : Maharashtra, West Bengal, Madhya Pradesh