visit to new st. john building tuesday 20 april 2021. · 2021. 4. 24. · visit to new st. john...

2
Visit To New St. John Building Tuesday 20 th April 2021. Members & family assembled in training room before beginning. Members & family being shown around by Gordon Handy in the area where ambulances are parked awaiting a call-out. Roller door in front of building (RHS of photo) takes approx 3 seconds to open once activated.

Upload: others

Post on 06-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Visit To New St. John Building Tuesday 20 April 2021. · 2021. 4. 24. · Visit To New St. John Building Tuesday 20th April 2021. Members & family assembled in training room before

Visit To New St. John Building Tuesday 20 th April 2021.

Members & family assembled in training room before beginning.

Members & family being shown around by Gordon Handy in the area where ambulances are parked awaiting a call-out. Roller door in front of building (RHS of photo) takes approx 3 seconds to open once activated.

Page 2: Visit To New St. John Building Tuesday 20 April 2021. · 2021. 4. 24. · Visit To New St. John Building Tuesday 20th April 2021. Members & family assembled in training room before

A board with various cloth uniform badges from around the world.