w03 mobile assest management-cook
TRANSCRIPT
Mobile Asset Management: AnManagement: An
Albuquerque Street Sign I t C St dInventory Case Study
PresenterPresenter:
William H CookWilliam H. CookV.P. Engineering
D t T f S l tiData Transfer Solutions
Project ApproachProject Approach
A t
Project Management
Image Collection ‐
MAC
Asset Inventory –
Signs/Striping/Markings/De
corative
Develop City Sign
Standards
Asset Management Software ‐ Training
MAC corative Lights/Neon
Signs
and Specs VUEWorks
Sustainable ApproachSustainable Approach
Data Collection
Data ExtractionLife‐Cycle Planning
Risk Analysis / Prioritization
Project Design / Sign Replacement
Plan
Capital Improvement
Planning
Plan
Planning
Mobile Asset Mobile Asset Collection VehicleCollection Vehicle
Assets InventoriedAssets Inventoried
4,700 Miles Evaluated
All A t Q titAll Asset Quantity
Signs 89,089
C b M ki 29 179Curb Markings 29, 179
Decorative Street Lights 1, 631
Neon Signs 620
Pavement Markings 16,879
Pavement Striping 47,200
Crosswalks 3,277
School Zone signals 292
Warning
Special/Unknown
Guide
Regulatory
Row Labels Count of CONDITIONFair 2809Guide 636
Row Labels Count of CONDITIONFair 2809Guide 636Regulatory 1455Special/Unknown 216Warning 502
Regulatory 1455Special/Unknown 216Warning 502g
Good 84055Guide 35032Regulatory 34122
gGood 84055Guide 35032Regulatory 34122Regulatory 34122Special/Unknown 5982Warning 8919
Poor 2225
Regulatory 34122Special/Unknown 5982Warning 8919
Poor 2225Poor 2225Guide 397Regulatory 1145Special/Unknown 538
Poor 2225Guide 397Regulatory 1145Special/Unknown 538Special/Unknown 538Warning 145
Grand Total 89089
Special/Unknown 538Warning 145
Grand Total 89089
Project Video LogProject Video Loghttp://albuquerquevideologger dev dtsgis com/http://albuquerquevideologger.dev.dtsgis.com/
Sign Sign ManegementManegement Implementing Implementing VUEWorksVUEWorks
ConfigurationConfigurationTwo Server Environment
Server 1 – Application Server24 Cores running at 29 GHz with 144 GB RAMA GIS S 10ArcGIS Server 10ArcGIS Desktop 10IISIISWindows Server 2008 R2
Server 2 – Database ServerSe e a abase Se e24 Cores running 2.9 GHz with 118 GB RAMSQL Server 2008 R2ArcSDE 10Windows Server 2008 R2
• Panasonic Toughbooks• Panasonic Toughbooks• VPN / Wireless connection• Work Order ApplicationWork Order Application
Management ApproachManagement Approach
Replace All Signs!
Management ApproachManagement ApproachR L b l C t f CONDITIONR L b l C t f CONDITIONRow Labels Count of CONDITIONFair 2809Guide 636Regulatory 1455Special/Unknown 216
Row Labels Count of CONDITIONFair 2809Guide 636Regulatory 1455Special/Unknown 216Warning 502
Good 84055Guide 35032Regulatory 34122Special/Unknown 5982
Warning 502Good 84055Guide 35032Regulatory 34122Special/Unknown 5982pWarning 8919
Poor 2225Guide 397Regulatory 1145Special/Unknown 538
pWarning 8919
Poor 2225Guide 397Regulatory 1145Special/Unknown 538Special/Unknown 538Warning 145
Grand Total 89089
Special/Unknown 538Warning 145
Grand Total 89089
Management ApproachManagement Approach
Management ApproachManagement Approach
Management ApproachManagement Approach
Management ApproachManagement Approach
Replace All Signs!Replace All Signs!$26 7M$26.7M
Management ApproachManagement ApproachManagement ApproachManagement Approach
Cost of Sign Per ConditionCost of Sign Per ConditionCondition Count CostCondition Count Cost
Poor 2,225 $466K
Fair 2,809 $765K
$Good 84,055 $25.4M
Total 89,089 $26.7M
Management ApproachManagement Approach
That is very Nice!
Sign Replacement StrategySign Replacement Strategy
How many do we haveHow many do we have
Where are they at
Where do we start
Sign Replacement StrategySign Replacement StrategySign Replacement StrategySign Replacement Strategy
Work by Quadrant Work by Quadrant
Work by Corridor Work by Corridor
Work by Grid Work by Grid
P liti R l Politics Rule
Prioritize
Sign ReplacementSign ReplacementSign ReplacementSign Replacement
Sign Replacement StrategySign Replacement Strategy
Prioritize – ConditionPrioritize Condition
Control Project SizeControl Project Size
Control Project Cost
Work Area Distribution
PrioritizePrioritize
Control Project SizeControl Project Size
Control Project CostControl Project Cost
Work Area DistributionWork Area Distribution
Test the StrategyTest the Strategy
Phase 1
Sign Replacement Contractg p
Test the StrategyTest the Strategy
Phase 1- Sign Replacement Plans
Phase I ProjectPhase I Project
Work Management
Work Management
Work Management
Summary• Large Scale sign inventory and condition assessment in
a timely manner – Mobile base image collection
• Asset Management system allows for a quantitative
defensible approach to meet MUTCD requirementsdefensible approach to meet MUTCD requirements
• Asset Management systems allow for life cycle analysis
and management of the asset Signsand management of the asset – Signs
QuestionsQuestions