washington dulles landscape maintenance€¦ · horse pen dam area in contract washington dulles...

7
Landscape Maintenance and Sidewalk Snow Removal Plans 2010 Washington Dulles International Airport Metropolitan Washington Airports Authority Maintenance Engineering Division Sheet Number L-1 Date: 03/01/10 Scale: no scale Drawn by: T.F. Approved by: Accepted by: N.T. METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Horse Pen Dam Area in Contract Washington Dulles International Airport Landscape Maintenance and Sidewalk Snow Removal Plans 2010 Table of Contents L-1 - Coversheet L-2 - Landscape Maintenance Plan A L-3 - Landscape Maintenance Plan B L-4 - Landscape Maintenance Plan C Details for Horse Pen Dam and JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic Irrigation Systems L-6 - Landscape Maintenance Plan E Turf Mowing Details L-7 - Sidewallk Snow Removal Plan F N

Upload: others

Post on 18-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

Landscape Maintenanceand Sidewalk Snow Removal

Plans 2010Washington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-1

Date: 03/01/10Scale: no scale

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

Horse Pen DamArea inContract

Washington Dulles International Airport Landscape Maintenance

and Sidewalk Snow RemovalPlans2010

Table of ContentsL-1 - CoversheetL-2 - Landscape Maintenance Plan AL-3 - Landscape Maintenance Plan BL-4 - Landscape Maintenance Plan C

Details for Horse Pen Dam and JP Morgan BldgL-5 - Landscape Maintenance Plan D

Automatic Irrigation SystemsL-6 - Landscape Maintenance Plan E

Turf Mowing DetailsL-7 - Sidewallk Snow Removal Plan F

N

Page 2: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

HOTEL

COUNCOURSE A

SIGNATUREFLIGHT

SUPPORT

LSGSKY

CHEFS

LSGSKY

CHEFSAIR BP

INTL.ARRIVALS

BLDG.

WESTUTIL.BLDG.

EASTUTIL.BLDG.

CARGOBUILDINGS1 AND 2

CARGOBUILDINGS3 AND 4

OFFICEBUILDING

OFFICEBUILDING

J P MorganChase Bldg.

OFFICEBUILDING

GATEGOURMETFLIGHT

KITCHEN

GMRCARGO

UNITEDGSE

CARGOBUILDING

5

DAILY GARAGE NO. 1

HOURLY PARKING

SIGNATUREGSE

BUILDING

Y

Z3 Z3

Z

A

A1

B

BRAVO RAMP III

BRAVO RAMP V

Y2 Y2

Y

Z

Y4

Y7

Y

Z

D

C

D

Future C

Future D

Y4

D

C C

D

J3J3

BB

A5

A

A4

J

A

K

J2J2

J K

JJ1 J

A2

B

A

A3

COMMERCIAL VEHICLE CONNECTOR

AVIATION DRIVEAVIATION DRIVE (Eastbound)AVIATION DRIVE (Westbound)

AUTO

PILO

T DR

IVE

(Sou

thbo

und)

AUTO

PILO

T DR

IVE

(Nor

thbo

und)

DULLES AIRPORT ACCESS HIGHWAY (Southbound)

DULLES AIRPORT ACCESS HIGHWAY

(Northbound)

AIR

AIRF

REIG

HT L

ANE

CARG

O DR

IVE

OFFICEPARKING

OFFICEPARKING OFFICE

PARKINGOFFICE

PARKING

OFFICEPARKING

OFFICEPARKING

EMPLOYEEPARKING

EMPLOYEE /TENANTPARKING

WIN

DSOC

K DR

IVE

(Sou

thbo

und)

WIN

DSOC

K DR

IVE

(Nor

thbo

und)

COMPASS COURTPROPELLER COURT

MOBILELOUNGE

MAINTENANCE

USPSAIR

MAILFACILITY

ENGINEERINGAND

MAINTENANCE

TEMPORARYBAG BLDG.

CONCOURSE B

DULLESJET CENTER

K1

DAILYGARAGENO. 2

AnimalReliefArea MAIN

TERMINAL

P

VALET LOT

DPSK9

Kennel

AirportCommissary

E

Limits of contract to bottom of ditch

P

E

D

P

PE

E

E

EE

E

E

EAnimalReliefAreas

B

B

Dulles Airport Access Highway

MAT

CHLI

NE T

HIS

SHEE

T

MAT

CHLI

NE T

HI

Trim growth along lakeshore 1x per year

to ate e

Maintain 15' on each side of road

E

Note: Planters behindsecurity fence

INTL.ARRIVALS

BLDG.

VIP LOT

E

LandscapeMaintenance Plan A

Washington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-2

Date: 03/01/10Scale: 1" = 600'

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

Estimated quantities of landscape and parking lot areasLandscsape Areas = 221 acres; Public Parking Lots = 170 acres;Employee Parking Lots = 87 acres; Quantities estimated from plans, Contractor shall verify quantities in field.

Denotes limit of contract to tree line.

Denotes limit of contract to fence line

Denotes limit of contract to the curb/edge of road.

Denotes limit of contract to the building line.

A

B

C

D

General Notes for Limits of Contract: (All work to be performed according to the contract documents unless otherwise indicated on the maps)Limits of contract

Limits of Interior areas not in contract

Areas to be mechanically swept by contractorEmployee lots to be swept as needed

Legend: (unless otherwise indicated in the contract documents.)

Limits of area to police trash twice daily

Color Key: (All work to be performed according to the contract documents unless otherwise indicated on the maps)

Aircraft Maintenance Hanger

Non Structure Public Parking

Garage 1 Public Parking

Garage 2 Public Parking

JP Morgan Chase Bldg.

Car Rental Facilities Common Area

Employee Parking

Contractor Staging Area

P

P

P

E

600'-0"

Limits of contract to bottom of ditch

Limits of contract to the west edge of pavement at crossover 2

Limits of contract to the cable rail

MAT

CHLI

NE T

HIS

SHEE

T

Dulles LakeIsland

Note: no pavement maintenance

Note: no pavement maintenance

LOT

Matchline sheet L-3

E N

Page 3: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

R.O.

W

BLUE LOT

GREEN LOT

HERTZ

AVIS

NATIONAL

DOLLAR

BUDGET

RED LOT

ALAMO

GOLD LOT

ENTERPRISE

GATEGOURMET

CARGOBUILDING

6

ORANGELOT

MOBILHANGAR

MCIHANGAR

GANNETTHANGAR

HAWTHORNEAVIATION

GROUNDTRANSPORTATION

CENTER SALT / SANDSTORAGEBUILDING

SERVICESTATION

COLLECTIONBOOTHS

BUSMAINTENANCE

FACILITY

PURPLE LOT

NORTH EMPLOYEEPARKING LOT

Y1

Z1

ZY

Y2 Y2

Z2

Z1

Z2

T DR

IVE

(Sou

thbo

und)

OT D

RIVE

(Nor

thbo

und)

AUTO

PILO

T DR

IVE

(Sou

thbo

und)

AUTO

PILO

T DR

IVE

(Nor

thbo

und)

MATERIALS ROAD

ARIA

NE W

AY

(future)

AUTO

PILO

T DR

IVE

(Nor

thbo

und)

AUTO

PILO

T DR

IVE

(Sou

thbo

und)

RUDDER ROAD (Westbound - Prop.)RUDDER ROAD (Eastbound - Prop.)

RUDDER ROAD (Eastbound)

RUDDER ROAD (Westbound)

AIRF

REIG

HT L

ANE

BLUE LOT

GREEN LOT

ARIA

NE W

AY (S

outh

boun

d - F

utur

e)

ARIA

NE W

AY (N

orth

boun

d - F

utur

e)

Z

E

EE

E

E

GATE

GATE

MAINTENANCEHANGAR

SESTSTSTS OOO

ERVRVERVICRTATIOTIOTIOOON

CCEEEON

P

P PP

P

P

VALET LOT

DPSK9

Kennel

AirportCommissary

ORANGE LOT

Police/FireFacility

A

A

Limits of contract tosouth end of bridge

Limits of contract to north edge of drainage ditch

Limits of contract tofence on both sides of road

B

B A

B

Note: no pavement maintenance

E

E

B

MAT

CHLI

NE T

HIS

SHEE

T

E

E

E

ContractorStagging

Area

Trim growth along lake

Limits of contract to water line.

Limits of contract to bottom of ditch

Maintain 15' on each side of road

Dulles LakeIsland

Note: no pavement maintenance

Note: no pavement maintenance

CELL PHONE LOT

Note: no pavement maintenance

FED EX LOT

E

Matchline sheet L-2

LandscapeMaintenance Plan B

Washington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-3

Date: 03/01/10Scale: 1" = 600'

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

N

Water Supply

Page 4: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

Moran Rd. Rt. 606

Greenway Exit

Dam

spillway

HorsepenLakeOverflow

Inlet

Outfall

Horse Pen Dam and spillway shall be mowed 4x per growing season.Trash shall be policed before each mowing.The spillway shall be mowed to the woodline.Mow to a height of 6-8".Woody vegetation shall be cut back on the dam.The shoulders of Rt 606 shall be trimmed.The overlfow inlet shall be kept clean of debris.

woodline

woodline

Access from AOA

Access from Rt. 606

Area to be maintianed

Horse Pen Dam and Lake Maintenance

J P MorganChase Bldg.

AVIATION DRIVE

OFFICEPARKING

Areas with automatic irrigtion systemRainbird Controller 8 zones

Annual flower rotation spring and fall300 6" pots per rotation

JP Morgan Chase Office Building

Trash policing and pavemet maintenance notrequired.

Landscape Maintenance Plan CDetails for Horse Pen Dam

and JP Morgan Bldg.Washington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-4

Date: 02/23/10

No Scale

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

NN

Page 5: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

NORTH EMPLOYEEPARKING LOT

E

E

E

HOTEL

SIGNATUREFLIGHT

SUPPORT

LSGSKY

CHEFS

LSGSKY

CHEFS

AIR

BP

INTL.ARRIVALS

BLDG.

WESTUTIL.BLDG.

EASTUTIL.BLDG.

OFFICEBUILDING

OFFI

CEBU

ILDI

NG

J P MorganChase Bldg.

OFFICEBUILDING

GMRCARGO

DAILYGARAGENO. 1

HOURLY PARKING

SIGNATUREGSE

BUILDING

A

J2

J1

A

COM

MER

CIAL

VEH

ICLE

CON

NECT

OR

AVIA

TION

DRI

VEAV

IATI

ON D

RIVE

(Ea

stbo

und)

AVIA

TION

DRI

VE (

Wes

tbou

nd)

DULLES AIRPORT ACCESS HIGHWAY

CARGO DRIVE

OFFICEPARKING

OFFI

CEPA

RKIN

G

OFFICEPARKING

OFFICEPARKING

OFFICEPARKING

OFFICEPARKING

EMPLOYEEPARKING

EMPLOYEE /TENANTPARKING

WINDSOCK DRIVE (Southbound)WINDSOCK DRIVE (Northbound)

COM

PASS

COU

RT

MOBILELOUNGE

MAINTENANCE

TEM

PORA

RYBA

G BL

DG.

DULL

ESJE

T CE

NTER

DAILYGARAGENO. 2

MAINTERMINAL

INTL.ARRIVALS

BLDG.VI

P LO

T

Garage 212 Zones1 Rainbird Controller

Garage 124 Zones 1 Rainbird Controller

Hourly Lot17 Zonee1 RainMaster Controller18 Zones1 Rainmaster Controller

JP Morgan Chase Bldg8 Zones1 Rainbird Controller

North Employee Lot1 Zone1 Rainbird Controller

N

Landscape Maintenance Plan DAutomatic Irrigation SystemsWashington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-5

Date: 02/01/10

Scale: 1" = 400'

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

Page 6: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

GOLD LOT

PURPLE LOTRUDDER ROAD (Eastbound)

DULLES AIRPORT ACCESS HIGHWAY (Southbound)

DULLES AIRPORT ACCESS HIGHWAY

(Northbound)

GREEN LOT

DULLESJET CENTER

P P

P

NORTH EMPLOYEEPARKING LOT

EE

E

E

E

Mow regularly from curb to concrete ditchMow from ditch to fence 3x per year as directed

Mow all areas regularly, unless otherwise indicated

Mow from paving to fence regularly. Mow from fenceto property line 3x per year

Mow from paving to ditch regularly

Mow/trim guardrail regularly

Mow 10' in from curbregularly. Mow interior3x per year

Mow regularly from paving to fence

Landscape Maintenance Plan ETurf Mowing Details

Washington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-6

Date: 03/01/10Scale: 1" = 600'

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

Note: All other turf areas to be mowed as specified in the Contract Documents

Remote Lot - Employee ParkingAirport Entrance

Roadway and interchange areas shaded in green.Landscape Maintenance shall include:1. Policing for trash daily2. Turf maintenance:

a. Trim shoulders up to guardrails and 4' beyond guardrail b. Trim shoulder without guardrails 10' behind paving. c. Trim to and behind roadway lights. d. Allow remainder of turf areas to grow mowing a maximum of 4 x per year.3. All other turf areas to be maintained according to contract specifications.

Dulles Airport Access Hwy.

RT.

28

N

N

Page 7: Washington Dulles Landscape Maintenance€¦ · Horse Pen Dam Area in Contract Washington Dulles International Airport ... JP Morgan Bldg L-5 - Landscape Maintenance Plan D Automatic

R.O.W.

HOTEL

BLUE LOT

GREEN LOT

HERT

Z

AVIS

NATI

ONAL

DOLL

AR

BUDG

ET

RED LOT

ALAM

O

GOLD LOT

ENTE

RPRI

SE

SIGNATUREFLIGHT

SUPPORT

LSGSKY

CHEFS

LSGSKY

CHEFS

AIR

BP

INTL.ARRIVALS

BLDG.

WESTUTIL.BLDG.

EASTUTIL.BLDG.

CARGOBUILDINGS1 AND 2

CARGOBUILDINGS3 AND 4

OFFICEBUILDING

OFFI

CEBU

ILDI

NG

J P MorganChase Bldg.

OFFICEBUILDING

GATEGOURMET

FLIGHTKITCHEN

GMRCARGO

UNITEDGSE

CARGOBUILDING

5

CARG

OBU

ILDI

NG6

ORAN

GELO

T

DAILYGARAGENO. 1

HOURLY PARKING

SIGNATUREGSE

BUILDING

MOB

ILHA

NGAR

MCIHANGAR

GANNETTHANGAR

HAWTHORNEAVIATION GROUND

TRANSPORTATIONCENTER

SALT / SANDSTORAGEBUILDING

SERVICESTATION

COLL

ECTI

ONBO

OTHS

BUSMAINTENANCE

FACILITY

PURPLE LOT

NORTH EMPLOYEEPARKING LOT

Z3

Z

A

Z1

Z

Y2

Z

Z2

Z1

Z2

Y4

A

J

A

K

J2J2

J

K

JJ1

J

A

COM

MER

CIAL

VEH

ICLE

CON

NECT

OR

AVIA

TION

DRI

VEAV

IATI

ON D

RIVE

(Ea

stbo

und)

AVIA

TION

DRI

VE (

Wes

tbou

nd)

AUTOPILOT DRIVE (Southbound)

AUTOPILOT DRIVE (Northbound)

AUTOPILOT DRIVE (Southbound)

AUTOPILOT DRIVE (Northbound)

MAT

ERIA

LS R

OAD

ARIANE WAY

(fut

ure)

AUTOPILOT DRIVE (Northbound)AUTOPILOT DRIVE (Southbound)

RUDD

ER R

OAD

(Wes

tbou

nd -

Prop

.)RU

DDER

ROA

D (E

astb

ound

- Pr

op.)

RUDD

ER R

OAD

(Eas

tbou

nd)

RUDD

ER R

OAD

(Wes

tbou

nd)

DULLES AIRPORT ACCESS HIGHWAY

AIRFREIGHT LANEAIRFREIGHT LANE

CARGO DRIVE

OFFICEPARKING

OFFI

CEPA

RKIN

G

OFFICEPARKING

OFFICEPARKING

OFFICEPARKING

OFFICEPARKING

EMPLOYEEPARKING

EMPLOYEE /TENANTPARKING

WINDSOCK DRIVE (Southbound)WINDSOCK DRIVE (Northbound)

COM

PASS

COU

RT

PROP

ELLE

R CO

URT

MOBILELOUNGE

MAINTENANCE

USPSAIR

MAILFACILITY

ENGINEERINGAND

MAINTENANCE

TEM

PORA

RYBA

G BL

DG.

ARIANE WAY (Southbound - Future)

ARIANE WAY (Northbound - Future)

DULLESJET CENTER

K1

S

E

E

E

E

E

GATE

GATE

MAINTENANCEHANGAR

DAILYGARAGENO. 2

MAINTERMINAL

VALET LOT

DPSK9

Kennel

AirportCommissary

ORANGE LOT

Police/FireFacility

B

INTL.ARRIVALS

BLDG.

VIP

LOT

N

Sidewalk Snow Removal Plan FWashington Dulles International Airport

Metropolitan WashingtonAirports Authority

Maintenance Engineering DivisionSheet Number

L-7

Date: 03/01/10

Scale: 1" = 700'

Drawn by: T.F.

Approved by:

Accepted by: N.T.METROPOLITAN WASHINGTON

AIRPORTS AUTHORITY

12

8

7

5

4

3

1315

1718

16

9

7

5

STEP

S6

5

19

22

22

1 2

10

11

11

11

14

20 21

1. WEST BUILDING GROUP2. EMPLOYEE LOT E AND GATE 127

4. MAIN TERMINAL ARRIVALS LEVEL

7. EAST EMPLOYEE LOT, COMMERCIAL VEHICLE DRIVE (EAST SIDE)

9. UTILITY BUILDINGS10. EAST LOADING DOCK AND GATE 34 TURNSTILES11. ANIMAL RELIEF AREAS (3)12. PMC TRAILERS13. DULLES WEST BLDG. AND GATEWAY BLDG. CONNECTOR14. HOTEL SIDEWALK AVIATION DRIVE15. COMMISSARY BUILDING16. K-9 FACILITY

8. SIGNATURE AVIATION AND GATE 141

5. MAIN TERMINAL COMMERCIAL VEHICLE LEVEL

3. MAIN TERMINAL DEPARTURE LEVEL

18. RENTAL CAR PATHWAY17. JOINT POLICE/FIRE FACILITY

6. IAB, COMMERCIAL VEHICLE DRIVE (WEST SIDE)

LOCATION960 S.Y.

2,875 S.Y.1,460 S.Y.2,400 S.Y.

45 S.Y.

4,200 S.Y.1,750 S.Y.

250 S.Y.

300 S.Y.292 S.Y.

85 S.Y.

1,135 S.Y.

80 S.Y.207 S.Y.

AREAS-SQUARE YARDS

155 S.Y.

130 S.Y.

563 S.Y.

564 S.Y.

19. CARGO BUILDING NO. 6 AND GATE 11420. NORTH MAINTENANCE HANGER21. GROUND TRANSPORTATION CENTER22. NORTH EMPLOYEE LOT

195 S.Y.607 S.Y.296 S.Y.282 S.Y.

Note: Area quantities are estimated from plans. Contractor shall verify quantities in the field. = PORTIONS OF SIDEWALKS THAT ARE IN CONTRACT

LEGEND:700'-0"