Water Plant Weekly Report For the week of: To: Total Raw Water Pumped MG High Low Average 1 2 3 A B High 0.0 0.0 0.0 11.6 15.5 low 0.0 0.0 0.0 0.0 0.8 Average 0.0 0.0 0.0 5.5 7.1 sample Chlorine-Free Chlorine-Total Fluoride Phosphate Iron Manganese Ph Chemical Demand Chlorine Flouride Phosphate Well Maintenance Routine Well 2 x Well 3 x Well 4 x Well 5 x Regulatory Samples Number Date Bacti Fluoride xylenes 10/06/21 action levels 10/06/21 Operator Comments: 1.06 0.64 1.48 10/01/21 Plant Hours 10,013,000 1,430,429 0.020 Daily Sample Results Mg/L (average) 0.71 10/07/21 16.7 9,887,000 1,843,000 1,843,000 1,068,000 12.4 Finished 1.68 1,061,000 Low 1,412,429 High service Pump Hours 1.43 0.02 253 10.0 Average 7.20 Average Mg/L dose 3.60 0.55 Distribution 0.94 368 Other Comments 4.39 Total Finished Water Pumped MG 10/1: fill post Cl2 analyzer 10/7: cleaned Cl2 quil and strainer 10/6: installed sump drain line @ DQ 10/6: xylenes & action level samples in 10/1: looked @ DQ pumps mech. Seal piping & check valves w/ MWMuniciple 10/1: looked @ sump pump drain line w/ Derik 10/4: Suez here for tank insp. 10/4: MW municiple rep here for DQ check valves 10/5: saftey training High Pounds Used 2401 1.76

Upload: others

Post on 07-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Water Plant

Weekly Report

For the week of: To:

Total Raw Water

Pumped MG

High

Low

Average

1 2 3 A B

High 0.0 0.0 0.0 11.6 15.5

low 0.0 0.0 0.0 0.0 0.8

Average 0.0 0.0 0.0 5.5 7.1

sample

Chlorine-Free

Chlorine-Total

Fluoride

Phosphate

Iron

Manganese

Ph

Chemical Demand

Chlorine

Flouride

Phosphate

Well Maintenance Routine

Well 2 x

Well 3 x

Well 4 x

Well 5 x

Regulatory Samples Number Date

Bacti

Fluoride

xylenes 10/06/21

action levels 10/06/21

Operator Comments:

1.06

0.64

1.48

10/01/21

Plant Hours

10,013,000

1,430,429

0.020

Daily Sample Results Mg/L (average)

0.71

10/07/21

16.7

9,887,000

1,843,000 1,843,000

1,068,000

12.4

Finished

1.68

1,061,000Low

1,412,429

High service Pump Hours

1.43

0.02

253

10.0

Average

7.20

Average Mg/L dose

3.60

0.55

Distribution

0.94

368

Other

Comments

4.39

Total Finished Water

Pumped MG

10/1: fill post Cl2 analyzer

10/7: cleaned Cl2 quil and strainer

10/6: installed sump drain line @ DQ

10/6: xylenes & action level samples in

10/1: looked @ DQ pumps mech. Seal piping & check valves w/ MWMuniciple

10/1: looked @ sump pump drain line w/ Derik

10/4: Suez here for tank insp.

10/4: MW municiple rep here for DQ check valves

10/5: saftey training

High

Pounds Used

2401

1.76

Ray Bailey

Lead Operator

CITY OF TROY

WASTEWATER REPORT

FROM: 9/30/2021 TO: 10/7/2021

TOTAL GALLONS OF WASTEWATER TREATED:

DAILY FLOW AVERAGE

HIGH

LOW

ABNORMAL TEST RESULTS:

LIFT STATION REPORT:

MISCELLANEOUS WORK/COMMENTS:

GENERATOR HOURS:

CV 240.4 PLANT 927 TLS 782 TRIAD 188.1 SB 196.7

MD 788.5 HG 391.9 ZENK 241.4 HLP 178.3 SV 88

ML 111.8 FO W.C. 111.8 T.L. 103.6 SW 57.2

SCHEDULED OFF:

RAY 8-Oct GREG

JOSH JAMES

8,457,000

1,208,000

1,337,000

1,002,000

None

Rob Hancock

Director of Public Works

City of Troy

Public Works Report

FOR THE WEEK OF: 1-Oct TO: 7-Oct

INSTALLED SUMP PUMP LINE AT DQ TOWER

BARRICADES TO FRIEDENS CHURCH

METER READER:

WIRE REPAIR; 0

RE-READ/CHECK FOR LEAK; 5; 2 LEAKS

MOWING

USED TIRES TO MADISON COUNTY TIRE COLLECTION

TURN WATER ON; 0

REPLACE LID/COLLAR; 0

MISC:

BROKEN METER REPLACEMENT; 1

TURN WATER OFF; 6

READ AND LEAVE ON; 11

REPAIRED SERVICE LEAK AT 612 BRENTMOOR

WATER/SEWER:

READ METERS

INSTALLED NEW SERVICE AT 322 & 326 McCLELLAND

REPAIRED SERVICE LEAK AT 412 TROY AVE

INSTALLED NEW SERVICE AT 7521 & 7525 CLARENCE CT

REPAIRED MANHOLE ON E. MARY DR

READ METERS

INSTALLED STREET CREEP JOINT ON REMMINGTON CT

REPAIRED SERVICE LEAK AT 521 B MOCKINGBIRD

STREETS: