PG&E’s initiative to useSF6 gas alternatives in
Gas InsulatedEquipment
3C O M E T 2 0 1 7
A B O U T T H E A U T H O R
T h o m a s R a k
M a n a g e r o f S u b s t a t i o n
a n d T - L i n e S t a n d a r d s ,
P a c i f i c G a s a n d E l e c t r i c C o m p a n y
A B O U T T H E A U T H O R
BRIEFBIO
A graduate of New Jersey Institute of Technology with a BSEE (powerconcentration) and Portland State University MSE.Over 20 years of experience in the electric utility industry managingelectrical distribution design, substation design and generation design.Presently management sponsor for the implementation of aSubstation Asset Condition Monitoring system at PG&E.
4C O M E T 2 0 1 7
The 2050 Goal
California state GHG Goal80% reduction in Green house gasemissions by 2050
PG&E Leadership CommitmentVIDEO
5C O M E T 2 0 1 7
Framing the issueCO2 is a Green house gas.§ CO2 has a GWP of 1§ CO2 has a life span in the atmosphere of about 20 years§ California is reducing its CO2 footprint
SF6 is a Green house gas.§ SF6 has a GWP of 23,500§ SF6 has a life span in the atmosphere of about 3,200 years§ CARB regulates utilities to reduce their SF6 leak-rate
PG&E alternatives to SF6 initiative§Discontinue SF6 purchases for MV (<60kV) equipment 2017§ Investigate alternatives for HV (>60kV) equipment 2016-2017§Start implementation of strategy 2018
6C O M E T 2 0 1 7RFI Supplier Selection & Evaluation Process
SupplierSelections /Invitation to
RFP
15 SuppliersIdentified fromworld-wide as
potentialcandidates to
provide GasInsulated HV
equipment
13 SuppliersIdentified
capable ofproviding≥ 70kV
10SuppliersInvited to
RFI
7 SuppliersSubmitting
response toRFI
Suppliersidentified with GIS
& Breakercapabilities ≥ 70kV
Suppliers polled forinterest in PG&E RFI
Suppliers submittingRFI based on ability
to meet PG&Erequirements
for SF6 alternative
SupplierSubmissionEvaluations
Overview of Strategic Sourcing Supplier Evaluation process to identify viable Suppliersto provide SF6 alternative for GIS and Gas Insulated Dead Tank Breakers
GEHICOHitachiMEPPISiemensABBToshiba
GEHICOSiemensABBMEPPI
7C O M E T 2 0 1 7
Pure
Gas
esG
asM
ixtu
re
Sulfur hexafluoride Clean-Air Flournitrile 4710 C5-Flourketone 5110
Chemical formula SF6N2 + O2
(80% / 20%) (CF3)2CFCN (CF3)2CFC(O)CF3
CO2-equivalent (GWP) 22,800 0 2,210 1
Boiling point (Celsius) -64° < -183° -5° +27°
Dielectric strength 1* 0.43 2.2 1.7
Carrier gas None, N2 or CF4
/
~ 95% CO2~ 90% CO2 w. N2
or O2
CO2-equivalent (GWP) 22,800 ~ 380 <1
Boiling point (Celsius) <-64°(variable) ~ -25° +5°
Dielectric strengthat same pressure 1* 0.43 0.87…0.92 2 0.7 3
Arc
Impa
ct
Decomposition productshydrofluoric acid,
sulfur dioxide,sulfur compounds
Only if failure:ozone and nitrogen oxides Incl. Carbon monoxide, carbon dioxide, hydrofluoric acid
* Relative dielectric strength, normalized to SF6 (=1)2 pressure 0,67MPa…0,77MPa, Source: Y. Kieffel, et al. „SF6 Alternative Development for High Voltage Switchgears,“ in Cigré Session, 2014.3 pressure 0,45 MPa Source: J. Mantilla, et al „Investigation of the Insulation Performance of a New Gas Mixture with Extremely Low GWP,“ in Electrical Insulation Conference, USA, 2014.
Results from PG&E RFPProperties of different SF6 gas & alternatives
HICO/GE ABBSiemens/Hitachi
8C O M E T 2 0 1 7
Results of PG&E RFPSuppliers: HV equipment availability as of June 2017
ProductVoltage
level
Non-SF6Dead Tank Breakers
Non-SF6GIS
72kV Hitachi 2007GE 2025
Siemens 2020
GE 2020Siemens 2017
HICO 2014/2021
145kV Hitachi 2018GE 2022
Siemens 2020
GE 2020(50kA)Siemens 2019HICO 2019
245kV GE 2026Siemens 2022
GE 2026Siemens 2023
HICO 2018
550kV GE 2028Siemens 2025
9C O M E T 2 0 1 7
Actions takenActions taken to move PG&E away from SF6§ Installed 2 72kV Hitachi vacuum dead tank breakers in 2010 (Pilot).§ Installed 2 72kV Hitachi vacuum dead tank breakers in 2017. (Pilot)§Ordered >30 72kV Hitachi vacuum dead tank breakers for 2018.§Ordered 3 145kV GE g3 dead tank breakers for 2022 install (Pilot)§Ordered 3 245kV GE g3 dead tank breakers for 2026 install (Pilot)§Ordered 3 550kV GE g3 dead tank breakers for 2028 install (Pilot)§Ordered 1 145kV 50kA single bay GE g3 for 2020 (Pilot).
Barriers and road-blocks to change§ Industry alignment§ IEEE standards revisions§PG&E commitment
10C O M E T 2 0 1 7PG&E Roadmap to 2030
PG&E plans to discontinue the purchase of new SF6 basedHV equipment:§72kV SF6 equipment after 2024§145kV SF6 equipment after 2026§245kV SF6 equipment after 2028§550kV SF6 equipment after 2030
California Air Resource Board amending existing regulation tomandate phase-out use of SF6 starting in 2025.
11C O M E T 2 0 1 7PG&E Roadmap to 2050PG&E: SF6 HV Equipment replacement road-map
Total replacement after 2050
Class 2012 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2050Total
Replaced
Non-SF6 Circuit Breakers (Dead Tank)
72 kV
Installed 2 2 10 17 25 25 30 35 35 35 35 35 35 35 35 819
115 kV
Installed 0 0 0 0 6 6 6 10 15 25 35 50 55 55 55 1391
230 kV
Installed 0 0 0 0 0 0 3 3 3 10 35 35 35 35 35 883
550 kV
Installed(3phase)
0 0 0 0 0 0 0 0 0 1 1 1 3 3 3 110
Non-SF6 Gas Insulated Switchgear
115 kV
Installed 0 0 0 0 0 1
13C O M E T 2 0 1 7
P A P E R Q & AC O M E T | C O L L A B O R A T E | S H A R E
K N O W L E D G E | P R O G R E S S
14C O M E T 2 0 1 7
1 - 8 0 0 - V E R Z U S+1 415 973 5066
I N S E R T E M A I [email protected]
L I N K E D I N
THOMAS RAK.
PG&EManager, Substation & T-Line Standards
GET IN TOUCH