Welcome• Welcome to our Community Information Session on the Yancoal
Canada Resources Company Limited (Yancoal) Southey Project.• We have invited you here to:
• Introduce ourselves;• Provide information about the proposed Yancoal
Southey Project;• Provide information about the Saskatchewan Environmental
Assessment process; • Provide a summary of the Environmental Assessment findings;
and• Receive your comments and questions.
Yancoal Canada Resources Company Limited
Southey Project
About Yanzhou Coal• Yanzhou Coal Mining Company Limited (Yanzhou Coal) is an
international mining company established in 1976, and listed in New York, Hong Kong, Shanghai and Sydney.
• More than 107,000 employees in China, Australia and Canada.
• Core business is in coal mining, coal chemical and fertilizer production, power generation and equipment production.
• Headquarters are located in Jining City, Shandong Province of East China.
Yancoal Canada Resources Company Limited
Southey Project
About Yancoal Canada Resources• Yancoal is a wholly-owned subsidiary of Yanzhou Coal.• Yancoal was established in 2011 and has an office in Saskatoon,
Saskatchewan.• There are currently 10 employees in the Saskatoon office.• Yancoal’s primary business is mineral resource exploration,
development and construction.
Yancoal Canada Resources Company Limited
Southey Project
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
_̂KP 377 KP 392
SOUTHEYPROJECT
KutawaganLake
LastMountain
Lake
PasquaLake
EchoLake
KatepwaLake
Qu'Appelle River
ArmRiver
BuffaloPoundLake
Qu'Appel le River
MooseJaw River
LittleManitou
Lake
ReginaMoose
Jaw RM OFMONTMARTRE
RM OFFRANCIS
RM OFWOLSELEY
RM OFINDIANHEAD
RM OFSOUTH
QU'APPELLE
RM OFEDENWOLD
RM OFSHERWOOD
RM OFPENSE
RM OFMOOSE
JAWRM OFCARON
RM OFMCLEOD
RM OFABERNETHYRM OF
NORTHQU'APPELLERM OF
LUMSDENRM OFDUFFERIN
RM OFMARQUIS
RM OFSTANLEY
RM OFTULLYMETRM OF
LIPTON
RM OFCUPAR
RM OFLONGLAKETON
RM OFMCKILLOP
RM OFSARNIA
RM OFCRAIK
RM OFGARRY
RM OFITUNA
BON ACCORD
RM OFKELLROSSRM OF
TOUCHWOOD
RM OFLAST MOUNTAIN
VALLEYRM OFBIG ARMRM OF
ARMRIVER
RM OFINSINGER
RM OFFOAMLAKERM OF
EMERALDRM OF
KUTAWA
RM OFMOUNTHOPE
RM OFWREFORDRM OF
WOODCREEK
RM OFMCCRANEY
RM OFINVERMAY
RM OFELFROS
RM OFBIG QUILL
RM OFPRAIRIE
ROSERM OF
USBORNERM OF
MORRIS
!(6
!(363!(33
!(2
!(48
!(54
!(20
!(47
!(56
!(364
!(46
!(617
!(15
!(354
!(310
!(322
!(11
!(16
!(35
!(202
!(22
!(301
!(99
!(39
!(365
!(10
!(1
!(42
!(52
!(220
IndianHead
SintalutaWolseley
Qu'Appelle
FortQu'Appelle
Lemberg
Balcarres
Ituna
Foam Lake
Davidson
PilotButte
White CityBalgonie
Cupar
ReginaBeach
Lumsden
Southey
Raymore
Imperial
Craik
Nokomis
Strasbourg
Govan
Watrous
EarlGrey
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
12 -
Sta
keho
lder
Eng
agem
ent\T
ask
1020
- C
omm
unity
Info
rmat
ion
Ses
sion
s\Ju
ly 2
015\
12-1
362-
0197
- G
ener
al P
roje
ct L
ocat
ion
- C-s
ize.
mxd
D
ate:
7/1
0/20
15 3
:23:
14 P
M
About the Project• The Project is a greenfield potash mine that will produce potash
through solution mining.• Yancoal is proposing to develop the Southey Project approximately
60 km north of Regina, in the Rural Municipalities of Longlaketon and Cupar.
• The Project is located within subsurface mineral permits KP377 and KP392, west of Highway 6 and north of secondary Highway 731.
• The nearest communities are Earl Grey (21 km southwest of the Project), Strasbourg (23 km west of the Project), and Southey (28 km southeast of the Project).
Yancoal Canada Resources Company Limited
Southey Project
• The Southey Project will extract potash ore from the Patience Lake, Belle Plaine, and Esterhazy members of the Saskatchewan Prairie Evaporite Formation.
• The Project will be designed to produce 2.8 million tonnes of potash per year.
• The anticipated life span of the Project is 65 to 100 years.• Underground pipelines will transport water and brine from the core
facilities area to the mine field.
COREFACILITIES
AREA
65 YEARMINE FIELD
INDICATEDRESOURCEBOUNDARY
UV731
UV641
R.M
. OF TO
UC
HW
OO
D
R.M. OF LONGLAKETON
R.M
. OF
LON
GLA
KE
TON
R.M
. OF C
UPAR
R.M. OF TOUCHWOODR.M. OF CUPAR
23-19-W2M
24-20-W2M
23-20-W2M
25-18-W2M
24-18-W2M
23-17-W2M
24-17-W2M
25-17-W2M
25-20-W2M
24-19-W2M
25-19-W2M
23-18-W2M
R.M. OF MOUNT HOPE
R.M
. OF
LON
GLA
KE
TON
East Loon
Creek
West Loon Creek
Oak Lake
(!6
08
28
31
21
32
04
35
17
21
09
28
12
02
30
01
36
20
33 34
27
32
25
07
20
26
21
33
35
04
19
16
06
18
08
29
09
20
20
04
13
05
29
18
32
20
29
35 36
08
27
24
19 22
27
32
14
25
36
08
20
10
31
2625
12
2930
32
32
33
09
34
20 2219
31
15
23
04
22
33
27
14
23
32
24
36
04
25
30
20
35
23
21
09
33
24
03
19
32
30 29
30
2120
05
17
34
19
19
03
11
23
10
17
28
01
19
02
13 17
28
33
21
02
36
24
06
18
13
08
04
16
22
35
30
32
22
16
03
32
26
36 35
32
02
21
04
23
16
29
01
12
35
05
07
35
06
30
20
31
11
28 25
3028
12
23
07
33
28
21
03
07
20
29
22
03
22
34
26
25
03
24
18
36 31
07
02
35
09
29
34
25
19
17
34
06
27
22
29
33
27
34
10
16 13
05
17
11
33
08
18
31
26
11
01
29
05
09
24
11
04
34
29
21
09
17
33
08
05
33
06
21
26 25
15
11
24
31
26
10
05
21
02
08
34
10
23
28
33
05
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
12 -
Sta
keho
lder
Eng
agem
ent\T
ask
1020
- C
omm
unity
Info
rmat
ion
Ses
sion
s\Ju
ly 2
015\
12-1
362-
0197
- C
once
ptua
l Min
efie
ld -
C-s
ize
- RM
Sty
le.m
xd
Dat
e: 7
/2/2
015
3:2
9:47
PM
About the Project
Yancoal Canada Resources Company Limited
Southey Project
The core facilities area will include: • Process plant;• Administration building and dry facilities
(safety and first aid, lab and security);• Mill warehouse;• Maintenance shop;• Product storage;• Rail loadout; and • Tailings management area.
About the Project
Yancoal Canada Resources Company Limited
Southey Project
Core Facilities Area Layout
FILE No.
SCALE AS SHOWN
FIGURE:4.6-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
GENERAL SITE LAYOUT
REVIEWSaskatoon, Saskatchewan
LMS/AK 26/05/15
12-1362-0197
BrineReclaim
Pond(Stage II)
CrystallizationPond
RawWaterPond
ProductStorage
MillFacility
Salt Storage Area(Stage II)
Salt Storage Area(Stage I)
Site RunoffCollectionPond
Sewage Lagoon
BrineReclaim
Pond(Stage I)
31
02
36
1314 17
01
32
05
07
35
06
08
18
11 12
TWP
24
TWP
25
RGE 20 W2M RGE 19 W2M
521000 522000 523000 524000 525000 526000 527000
5659
000
5660
000
5661
000
5662
000
5663
000
5664
000
5665
000
ROAD
TOWNSHIP AND RANGE BOUNDARY
SECTION BOUNDARY
PROPOSED ACCESS ROAD
PROPOSED RAIL LOOP
CORE FACILITIES AREA
PROPOSED SITE INFRASTRUCTURE
TAILINGS MANAGEMENT AREA
500 5000
1:25,000
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
107
5 E
IS N
on-D
isci
plin
e S
peci
fic\4
_Pro
ject
Des
crip
tion\
12-1
362-
0197
- G
ener
al S
ite L
ayou
t.mxd
D
ate:
5/2
6/20
15 4
:32:
27 P
M
INFRASTRUCTURE DERIVED FROM AMEC DRAWING NO.100110-2000-DD10-GAD-0002 REV. BTMA DESIGN REVISED BY GOLDER, 2014BASE DATA: CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13N
REFERENCE
LEGEND
SCALE METRES
YANCOALSOUTHEY PROJECT
BC 26/05/15
MT 26/05/15
FILE No.
SCALE AS SHOWN
FIGURE:4.6-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
GENERAL SITE LAYOUT
REVIEWSaskatoon, Saskatchewan
LMS/AK 26/05/15
12-1362-0197
BrineReclaim
Pond(Stage II)
CrystallizationPond
RawWaterPond
ProductStorage
MillFacility
Salt Storage Area(Stage II)
Salt Storage Area(Stage I)
Site RunoffCollectionPond
Sewage Lagoon
BrineReclaim
Pond(Stage I)
31
02
36
1314 17
01
32
05
07
35
06
08
18
11 12
TWP
24
TWP
25
RGE 20 W2M RGE 19 W2M
521000 522000 523000 524000 525000 526000 527000
5659
000
5660
000
5661
000
5662
000
5663
000
5664
000
5665
000
ROAD
TOWNSHIP AND RANGE BOUNDARY
SECTION BOUNDARY
PROPOSED ACCESS ROAD
PROPOSED RAIL LOOP
CORE FACILITIES AREA
PROPOSED SITE INFRASTRUCTURE
TAILINGS MANAGEMENT AREA
500 5000
1:25,000
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
107
5 E
IS N
on-D
isci
plin
e S
peci
fic\4
_Pro
ject
Des
crip
tion\
12-1
362-
0197
- G
ener
al S
ite L
ayou
t.mxd
D
ate:
5/2
6/20
15 4
:32:
27 P
M
INFRASTRUCTURE DERIVED FROM AMEC DRAWING NO.100110-2000-DD10-GAD-0002 REV. BTMA DESIGN REVISED BY GOLDER, 2014BASE DATA: CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13N
REFERENCE
LEGEND
SCALE METRES
YANCOALSOUTHEY PROJECT
BC 26/05/15
MT 26/05/15
Yancoal Canada Resources Company Limited
Southey Project
Roads• Yancoal will upgrade the access road to the core facilities area to
accommodate additional traffic and heavy loads.• This will include Grid Road 731 from Highway 6 to the core
facilities area.• Some existing road closures will be necessary within the core
facilities area.• Yancoal will work with the Rural Municipality to discuss the need
for road alterations or upgrades to facilitate local traffic movement around the core facilities area.
FILE No.
SCALE AS SHOWN
FIGURE:4.8-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
PROPOSED SITE ACCESS
REVIEWSaskatoon, Saskatchewan
LMS/AK 04/05/14
12-1362-0197
West Loon
Creek
UV731
!(6
08
31
21
12
0712
02
36
27 25
18
29
13 18
24
1314
32
14
04
35
06
19
30 29
13
11
23
10
17
01
19
30
32
16
12
05
07
20
28
0707
20 23
18
03
36 3135
09
34
14
17
06
22
13
11
14
08
18
26
15
24
11
16
09
17
33
08
01
26 25
15
11 12
02
10
05
TWP
25
TWP
24
RGE 20 W2M RGE 18 W2MRGE 19 W2M
522000 523000 524000 525000 526000 527000 528000 529000 530000 531000 532000 533000 534000 535000 536000
5653
000
5654
000
5655
000
5656
000
5657
000
5658
000
5659
000
5660
000
5661
000
5662
000
5663
000
5664
000
5665
000
HIGHWAY
ROAD
TOWNSHIP ANDRANGE BOUNDARY
SECTION BOUNDARY
CORE FACILITIES AREA
PROPOSED RAIL LOOP
PROPOSED ACCESS ROAD
1 10
1:50,000
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
12 -
Sta
keho
lder
Eng
agem
ent\T
ask
1020
- C
omm
unity
Info
rmat
ion
Ses
sion
s\Ju
ly 2
015\
12-1
362-
0197
- P
ropo
sed
Site
Acc
ess.
mxd
D
ate:
7/7
/201
5 8
:49:
20 A
M
INFRASTRUCTURE DERIVED FROM AMEC DRAWING NO.100110-2000-DD10-GAD-0002 REV. BTMA DESIGN REVISED BY GOLDER, 2014CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
SCALE KILOMETRES
YANCOALSOUTHEY PROJECT
MT 04/12/14
BC 27/05/15
MT 27/05/15
FILE No.
SCALE AS SHOWN
FIGURE:4.8-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
PROPOSED SITE ACCESS
REVIEWSaskatoon, Saskatchewan
LMS/AK 04/05/14
12-1362-0197
West Loon
Creek
UV731
!(6
08
31
21
12
0712
02
36
27 25
18
29
13 18
24
1314
32
14
04
35
06
19
30 29
13
11
23
10
17
01
19
30
32
16
12
05
07
20
28
0707
20 23
18
03
36 3135
09
34
14
17
06
22
13
11
14
08
18
26
15
24
11
16
09
17
33
08
01
26 25
15
11 12
02
10
05
TWP
25
TWP
24
RGE 20 W2M RGE 18 W2MRGE 19 W2M
522000 523000 524000 525000 526000 527000 528000 529000 530000 531000 532000 533000 534000 535000 536000
5653
000
5654
000
5655
000
5656
000
5657
000
5658
000
5659
000
5660
000
5661
000
5662
000
5663
000
5664
000
5665
000
HIGHWAY
ROAD
TOWNSHIP ANDRANGE BOUNDARY
SECTION BOUNDARY
CORE FACILITIES AREA
PROPOSED RAIL LOOP
PROPOSED ACCESS ROAD
1 10
1:50,000
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
12 -
Sta
keho
lder
Eng
agem
ent\T
ask
1020
- C
omm
unity
Info
rmat
ion
Ses
sion
s\Ju
ly 2
015\
12-1
362-
0197
- P
ropo
sed
Site
Acc
ess.
mxd
D
ate:
7/7
/201
5 8
:49:
20 A
M
INFRASTRUCTURE DERIVED FROM AMEC DRAWING NO.100110-2000-DD10-GAD-0002 REV. BTMA DESIGN REVISED BY GOLDER, 2014CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
SCALE KILOMETRES
YANCOALSOUTHEY PROJECT
MT 04/12/14
BC 27/05/15
MT 27/05/15
Yancoal Canada Resources Company Limited
Southey Project
Project Utilities• Yancoal will require the following utility services:
• Water - Provided by SaskWater.• Power - Provided by SaskPower.• Natural Gas - Provided by TransGas.• Telecommunications - Provided by SaskTel.• Rail Line - Provided by either Canadian National (CN) or Canadian
Pacific (CP).• Yancoal will select the rail line provider by end of 2015.
• Yancoal will work directly with each utility provider, however they will be responsible for their route selection, environmental assessment, land acquisition, engineering and construction.
Yancoal Canada Resources Company Limited
Southey Project
Construction Camp• A temporary camp will be built for workers during construction.
It is anticipated that the camp will be built to house up to 1,500 workers.
• Yancoal is still in the process of evaluating options for the location of the camp.
• It is anticipated that the camp will be located as close to the core facilities area as possible to reduce the amount of traffic on the roads.
• Part of the feasibility study currently underway is to explore options to optimize the camp.• This includes options for on site water and effluent treatment (e.g.
a closed system).• Camp Security and Emergency Services are also being
considered.
Yancoal Canada Resources Company Limited
Southey Project
Anticipated Milestones• December 2015: Complete Feasibility Study;• 2016 (Q1): Anticipate Environment Assessment Approval;• 2016 (Q2): Make internal decision to proceed;• 2016 (Q2): Environmental Permitting; • 2016 (Q3 and Q4) to 2019: Initiate Construction;
• Site Grading• Road upgrades• Engineering• Procurement• Construct buildings
and plant facilities• Drill wells for
preliminary cavern development
• 2020: Commissioning and operation.
Yancoal Canada Resources Company Limited
Southey Project
ScheduleProject Phase
Year2013 2014 2015 2016 2017 2018 2019
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3
Environmental Impact AssessmentBaseline Study
EIS Preparation
EIS Review and Approval
Construction Approvals
Construction/OperationConstruction
Wellfield Development
Begin Operations
Yancoal Canada Resources Company Limited
Southey Project
Potash• Potash is a common name for Potassium Chloride or KCl.• Saskatchewan has the largest potash industry in the world,
accounting for approximately 40% of the worlds trade in potash.• The leading use of potash is for fertilizer.
Yancoal Canada Resources Company Limited
Southey Project
Sump Connection
Sump Development
OVERBURDEN
HALITE
HALITE
SYLVINITE - PATIENCE LAKE MEMBER
SYLVINITE - BELLE PLAINE MEMBER
SYLVINITE - ESTERHAZY MEMBER
HALITE
SURFACE
HALITE
FLUID BLANKET
BRINE
WATER
FLUID BLANKET
BRINE
WATER
1. SUMP DEVELOPMENT
OVERBURDEN
HALITE
HALITE
SYLVINITE - PATIENCE LAKE MEMBER
SYLVINITE - BELLE PLAINE MEMBER
SYLVINITE - ESTERHAZY MEMBER
HALITE
SURFACE
HALITE
FLUID BLANKET
WATER
BRINE
FLUID BLANKET
WATER
BRINE
2. SUMP CONNECTION
Yancoal Canada Resources Company Limited
Southey Project
OVERBURDEN
HALITE
HALITE
SYLVINITE - PATIENCE LAKE MEMBER
SYLVINITE - BELLE PLAINE MEMBER
SYLVINITE - ESTERHAZY MEMBER
HALITE
SURFACE
HALITE
FLUID BLANKET
HEATED WATER FLUID BLANKET
BRINE
3. ROOF DEVELOPMENT
OVERBURDEN
HALITE
HALITE
SYLVINITE - PATIENCE LAKE MEMBER
SYLVINITE - BELLE PLAINE MEMBER
HALITE
SURFACE
HALITE
SYLVINITE -
ESTERHAZY MEMBER
FLUID BLANKET
FLUID BLANKET
5. PRIMARY DEVELOPMENT
INSOLUABLES INSOLUABLES
BRINE HEATED WATER
Primary Mining
Roof Development
Yancoal Canada Resources Company Limited
Southey Project
Production of Potash
PRIMARY CAVERNS
EVAPORATION
CRYSTALLIZATION
SALT HANDLING & TAILINGS
SATURATOR
SECONDARY CAVERNS
CRYSTALLIZATION POND
PRODUCT SCREENING
LOADOUT PRODUCT STORAGE
COMPACTIONCENTRIFUGING & DRYING
UTILITY: STEAM/
WATER/ AIR
REAGENT STORAGE &
PREPARATION
TO RAIL
RAW WATER
STANDARD
PR
OD
UC
T
PR
OD
UC
T
FINES & OVERSIZE
GR
AN
ULA
R
Yancoal Canada Resources Company Limited
Southey Project
Environmental Assessment• An Environmental Assessment evaluates and identifies potential
changes caused by Project interactions with the existing biophysical and socio-economic environments.
• The Environmental Assessment process involves:• Issue scoping;• Engagement;• Baseline (or existing conditions) data collection and required
scientific studies;• Identifying recommended mitigation practices, procedures and
policies; and• Analyzing and predicting positive and negative effects.
• Details are presented to regulatory agencies and the public as an Environmental Impact Statement.
• Once the Environmental Impact Statement has been submitted the regulatory agencies will determine if a project is acceptable and can proceed.
Yancoal Canada Resources Company Limited
Southey Project
Environmental Assessment
Proponent interested in proposed project
Proponent conducts self screening as per Technical
Proposal Guidelines†
Proponent proceeds with required licences and
permits
no
Proponent submits application to EAB,
prepares and submits Technical Proposal
yes or not sure
Ministerial determination provided as to whether or
not project is a development under 2(d) of
EAA
not a development
development
Proponent to develop and submit TOR to EAB
Public notice that environmental assessment is being conducted as per
s.10 of the EAA
Draft TOR and Technical Proposal reviewed by EAB
and SEARP
Final TOR approved by EAB
Proponent conducts EIA and submits EIS to EAB
START HERE
The Saskatchewan Environmental Assessment Process
EAB and SEARP conduct technical review of EIS
EAB prepares Technical Review Comments
Public notice issued for public reivew of the EIS and
TRCs
EIS and TRCs released for 30 day public review
period*
Public comments received by EAB
EAB submits EIS, TRCs, public comments and any inquiry findings and their recommendations to the
Minister**
Minister decides to either approve or not approve the
development
Proponent may proceed with the development
subject to the Ministers approval and any other provincial and federal
legislative or permitting requirements
approvedwith or without
conditions
Proponent may not proceed with development
not approved
EAB provides deficiency statement to proponent
Proponent to prepare and submit addendums or revisions of EIS to EAB
New information reviewed by EAB and SEARP
inadequate
adequate
Development?
KeyTPG – Technical Proposal GuidelinesEAB – Environmental Assessment BranchEAA – The Environmental Assessment ActTOR – Terms of ReferenceSEARP – Saskatchewan Environmental Assessment Review PanelEIA – Environmental Impact AssessmentEIS – Environmental Impact StatementTRCs- Technical Review Comments
* Any person may: make a written submission to the minister within 30 days from the date when the minister first gives notice or if the minister considers it appropriate, within an additional period of 30 days.**Minister may require public meetings or public inquiry into all or any aspect of the development at any time prior to making a decision about the development
Proposal Development
Screening
Application
Scoping
Impact Assessment
Review
Public Comment
Decision by Minister
†Changes to a development with prior Ministerial Approval require review by EA Branch
Yancoal Canada Resources Company Limited
Southey Project
Atmospheric EnvironmentWhat was assessed:• Carbon monoxide (CO);• Sulphur dioxide (SO2);• Nitrogen dioxide (NO2);• Potash (KCl); • Greenhouse gases
(GHGs) including:• Carbon dioxide (CO2); • Nitrous oxide (N2O);
and• Methane (CH4).
• Particulate matter (PM) including:• Particulate matter with aerodynamic diameter less
than 2.5 micrometres (µm) (PM2.5); • Particulate matter with aerodynamic diameter less
than 10 µm (PM10);• Total suspended particulate matter with
aerodynamic diameter less than 40 µm (TSP);
YANCOALSOUTHEY PROJECT
FILE No.
SCALE AS SHOWN
FIGURE: 7.5-1
REV. 1
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
LOCATION OF GRID RECEPTORSAND COMMUNITY RECEPTORS
REVIEWSaskatoon, Saskatchewan
SBM 27/05/15
12-1362-0197
!.!. !.!.
!.
!.
!.
!.
!. !.
!.
!.!.!.!.
!.
!.
!.!.
!.
!.
!.
!.
!.
Last Mountain Lake
WillowLake
Oak Lake
BriceLake
GrassyLake
Eas
tLoonCreek
Loon Creek
West Loon
Creek
West
Loon
C reek
!(354
!(20
!(22
!(15
!(322
!(6
!(220
CuparSouthey
Strasbourg
Govan
Markinch
Island View
Grandview Beach
Glen Harbour
Bulyea
Earl GreyAlice Beach
Quinton
Punnichy
Duval
Lipp'sBeach
SpringBay
ColesdalePark
Sorenson'sBeach
Mohr'sBeach
Gibbs
Uhl'sBay
Serath
CollingwoodLakeshoreEstates
TWP
28
TWP
27A
TWP
27
TWP
23
TWP
26
TWP
25
TWP
24
TWP
22
TWP
21
RGE 18 W2MRGE 21 W2M RGE 19 W2MRGE 22 W2MRGE 23 W2M RGE 16 W2MRGE 17 W2MRGE 24 W2M RGE 20 W2M
485000 490000 495000 500000 505000 510000 515000 520000 525000 530000 535000 540000 545000 550000 555000
5635
000
5640
000
5645
000
5650
000
5655
000
5660
000
5665
000
5670
000
5675
000
5680
000
5685
000
5690
000
COMMUNITY
HIGHWAY
ROAD
RAILWAY
TOWNSHIP AND RANGE BOUNDARY
CORE FACILITIES AREA / FENCE LINE
EFFECTS STUDY AREA
RECEPTOR BY TYPE
!. COMMUNITY
!. RESIDENCE
GRID
5 50
SCALE 1:250,000 KILOMETRES
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
108
0 - A
ir an
d N
oise
\12-
1362
-019
7 - L
ocat
ion
of G
rid a
nd C
omm
unity
Rec
epto
rs.m
xd
Dat
e: 5
/27/
2015
9:0
7:37
AM
BASE DATA: CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
CM 27/05/15
CM 27/05/15
YANCOALSOUTHEY PROJECT
FILE No.
SCALE AS SHOWN
FIGURE: 7.5-1
REV. 1
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
LOCATION OF GRID RECEPTORSAND COMMUNITY RECEPTORS
REVIEWSaskatoon, Saskatchewan
SBM 27/05/15
12-1362-0197
!.!. !.!.
!.
!.
!.
!.
!. !.
!.
!.!.!.!.
!.
!.
!.!.
!.
!.
!.
!.
!.
Last Mountain Lake
WillowLake
Oak Lake
BriceLake
GrassyLake
Eas
tLoonCreek
Loon Creek
West Loon
Creek
West
Loon
C reek
!(354
!(20
!(22
!(15
!(322
!(6
!(220
CuparSouthey
Strasbourg
Govan
Markinch
Island View
Grandview Beach
Glen Harbour
Bulyea
Earl GreyAlice Beach
Quinton
Punnichy
Duval
Lipp'sBeach
SpringBay
ColesdalePark
Sorenson'sBeach
Mohr'sBeach
Gibbs
Uhl'sBay
Serath
CollingwoodLakeshoreEstates
TWP
28
TWP
27A
TWP
27
TWP
23
TWP
26
TWP
25
TWP
24
TWP
22
TWP
21
RGE 18 W2MRGE 21 W2M RGE 19 W2MRGE 22 W2MRGE 23 W2M RGE 16 W2MRGE 17 W2MRGE 24 W2M RGE 20 W2M
485000 490000 495000 500000 505000 510000 515000 520000 525000 530000 535000 540000 545000 550000 555000
5635
000
5640
000
5645
000
5650
000
5655
000
5660
000
5665
000
5670
000
5675
000
5680
000
5685
000
5690
000
COMMUNITY
HIGHWAY
ROAD
RAILWAY
TOWNSHIP AND RANGE BOUNDARY
CORE FACILITIES AREA / FENCE LINE
EFFECTS STUDY AREA
RECEPTOR BY TYPE
!. COMMUNITY
!. RESIDENCE
GRID
5 50
SCALE 1:250,000 KILOMETRES
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
108
0 - A
ir an
d N
oise
\12-
1362
-019
7 - L
ocat
ion
of G
rid a
nd C
omm
unity
Rec
epto
rs.m
xd
Dat
e: 5
/27/
2015
9:0
7:37
AM
BASE DATA: CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
CM 27/05/15
CM 27/05/15
Yancoal Canada Resources Company Limited
Southey Project
Results:• Maximum predicted NO2, SO2, CO, PM2.5, and TSP
concentrations, and KCl deposition for all averaging periods complies with their respective ambient air quality standards.
• Results for the Yancoal project predict a daily maximum plus background concentration for PM10 of 53.4 µg/m3, which is slightly above the Saskatchewan Ambient Air Quality Standard of 50 µg/m3.
• The Ministry of Environment requires that a background value of 36.3 µg/m3 be used as the background concentration for PM10 in the Southeastern region of the Province. This background value was derived from urban measurements, and may not accurately reflect background rural air quality at the Project.
• Yancoal is currently measuring particulate matter concentrations at the proposed Project location to better determine the actual background concentrations.
• It is concluded that the Project’s cumulative effects on the atmospheric environment are not significant.
Atmospheric Environment
Yancoal Canada Resources Company Limited
Southey Project
Noise• In Saskatchewan, there are no provincial noise requirements
or standard methods that govern noise levels associated with industrial activities. The Alberta Energy Regulator (AER) regulates noise through directive 038: Noise Control. The AER Directive 038 represents best operating practices for facilities in Alberta and commonly is used in noise assessments for industrial facilities in Saskatchewan.
What was assessed:• The focus of the acoustic environment assessment is on
determining changes to existing ambient noise levels resulting from the Project and comparing the cumulative noise levels due to the Project to the thresholds specified in the AER Directive 038.
• Noise receptors are considered to be any permanent or seasonally-occupied dwellings used at least six weeks out of the year within 1.5 km of the Project boundaries. A total of 60 relevant receptors were identified.
Yancoal Canada Resources Company Limited
Southey Project
Results:• Noise levels associated with Project operations will not exceed
thresholds specified in Directive 038 for any receptor with the exception of R101.
Noise
Receptor Location
AER Cumulative
Noise Level(a) (dBA)
Permissible Sound Level
(PSL)(b) (dBA)
Difference (PSL – AER Cumulative Noise Level) (dB)
Ambient Sound Level
(PSL)(c) (dBA)
Difference (AER Cumulative Noise Level - ASL) (dB)
Daytime Nighttime Daytime Nighttime Daytime Nighttime Daytime Nighttime Daytime Nighttime
101 53.0 45.6 50 40 -3.0 -5.6 45 35 8.0 10.6Above Criteria Limits
(a) Consists of the logarithmic addition of predicted Project noise level and ASL.
(b) PSL values defined according to Directive 038 and presented in Table 12.
(c) ASL values defined according to Directive 038 and presented in Table 13.
dBA = A-weighted decibels; PSL = Permissible Sound Level; ASL = Ambient Sound Level; AER = Alberta Energy Regulator. To mitigate this, equipment will be maintained and will comply with federal and provincial air emission standards, and operational activities (e.g., movement of rail cars) will be limited to daytime hours.
Yancoal Canada Resources Company Limited
Southey Project
HydrogeologyWhat was assessed:
• Groundwater chemistry;• Groundwater levels; and• Vertical and horizontal migration.
Results:• Long term changes to groundwater quality are expected to occur
only within the footprint of the TMA. • The details of the monitoring program, as well as various threshold
criteria for implementation of mitigation, will be determined in the detailed design in support of licensing the Project.
• Changes to groundwater from the Project are predicted to have no significant effect on the continued suitability of groundwater for human use.
Yancoal Canada Resources Company Limited
Southey Project
1000-year groundwater flow pathlines remain within the Proposed Core Facilities Area boundary.
Barrier Wall surrounding Proposed Core Facilities Area
1000-year groundwater flow pathlines remain within the
Proposed Core Facilities Area boundary.
Salt Storage Area
Brine Reclaim Pond
YANCOALSOUTHEY PROJECT
FILE No.
SCALE AS SHOWN
FIGURE:8.5-2
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
1000-YEAR PARTICLE PATHLINESWITH GROUNDWATER CONTAINMENT
BARRIER WALL LOCAL MODEL
REVIEWSaskatoon, Saskatchewan
SM/LS 22/04/15
12-1362-0197
CHECK
REVIEW
G:\CLIENTS\YANCOAL\Figures\12-1362-0197\WP025 - EIS Preparation\Task 1085 - Hydrogeology\12-1362-0197 - ESA 1000 Year Particle Pathlines.mxd Date: 5/27/2015 3:19:49 PM
NOTE
LEGEND
JR 01/05/14
PARTICLE PATHLINESURFACE WATERCOURSE/WATERBODY
BARRIER WALL
PERMIT BOUNDARYCORE FACILITIES AREA
1. THE PARTICLE PATHLINES SHOWN REPRESENT 1000-YEAR PARTICLE TRAVEL RESULTING FROM STEADY-STATE GROUNDWATER FLOW CONDITIONS,THEIR THREE-DIMENSIONAL DIRECTION PROJECTED TO SURFACE ON A TWO-DIMENSIONAL PLANE.2. CONTOURS SHOWN REPRESENT THE SURFACE TOPOGRAPHY AT A 10 METRE CONTOUR INTERVAL.
MAT 27/05/15
CK 14/04/15
1000-year groundwater flow pathlines remain within the Proposed Core Facilities Area boundary.
Barrier Wall surrounding Proposed Core Facilities Area
1000-year groundwater flow pathlines remain within the
Proposed Core Facilities Area boundary.
Salt Storage Area
Brine Reclaim Pond
YANCOALSOUTHEY PROJECT
FILE No.
SCALE AS SHOWN
FIGURE:8.5-2
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
1000-YEAR PARTICLE PATHLINESWITH GROUNDWATER CONTAINMENT
BARRIER WALL LOCAL MODEL
REVIEWSaskatoon, Saskatchewan
SM/LS 22/04/15
12-1362-0197
CHECK
REVIEW
G:\CLIENTS\YANCOAL\Figures\12-1362-0197\WP025 - EIS Preparation\Task 1085 - Hydrogeology\12-1362-0197 - ESA 1000 Year Particle Pathlines.mxd Date: 5/27/2015 3:19:49 PM
NOTE
LEGEND
JR 01/05/14
PARTICLE PATHLINESURFACE WATERCOURSE/WATERBODY
BARRIER WALL
PERMIT BOUNDARYCORE FACILITIES AREA
1. THE PARTICLE PATHLINES SHOWN REPRESENT 1000-YEAR PARTICLE TRAVEL RESULTING FROM STEADY-STATE GROUNDWATER FLOW CONDITIONS,THEIR THREE-DIMENSIONAL DIRECTION PROJECTED TO SURFACE ON A TWO-DIMENSIONAL PLANE.2. CONTOURS SHOWN REPRESENT THE SURFACE TOPOGRAPHY AT A 10 METRE CONTOUR INTERVAL.
MAT 27/05/15
CK 14/04/15
Hydrogeology
Yancoal Canada Resources Company Limited
Southey Project
HydrologyWhat was assessed:
• Spatial distribution of water including the spatial extent and location of waterbodies, runoff pathways, and streams;
• Temporal distribution of water including changes in water levels and flows through time;
• Drainage boundaries; and • Stream channel gradients.
Results:• Ground subsidence due to solution mining will occur overlying the
mine well field. • Maximum subsidence is calculated to be approximately 6 metres in
some locations; however, maximum subsidence will not occur for more than a century.
• Subsidence will be monitored on a regular basis over the period of operation and following Project decommissioning and reclamation.
• The isolation of the core facilities area (and the well pads) from the surrounding local drainages will slightly reduce runoff and irreversibly change drainage patterns in the immediate area.
Yancoal Canada Resources Company Limited
Southey Project
FILE No.
SCALE AS SHOWN
FIGURE:9.5-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
PREDICTED CHANGES INSURFACE ELEVATIONS
REVIEWSaskatoon, Saskatchewan
LMS 26/05/15
12-1362-0197
East Loon Creek
West Loon Creek
!(731
!(6
!
¾
!B !
¾
!B'
! ¾! A'
! ¾! A!
¾
!C
!¾
!C'!
¾
!F'
!
¾
!D'
! ¾! D!
¾
!F
-5
-4
-3-2
-1
-0.0
1-6
-5 -4-3
-2-1
-6
-3
-2-1
-0.01
-4-3
-2-1
-0.0
1
-0.01
TWP
23
TWP
25
TWP
24
RGE 18 W2MRGE 19 W2MRGE 20 W2M
520000 525000 530000 535000 540000
5650
000
5655
000
5660
000
5665
000
HIGHWAY
ROAD
TOWNSHIP AND RANGE BOUNDARY
!'! !'! PROFILE LINE
SUBSIDENCE CONTOUR (0.5 METRE INTERVAL)
LIDAR EXTENT
ELEVATION (masl)HIGH : 688.32
LOW : 530.33
1.5 1.50
SCALE 1:75,000 KILOMETRES
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
109
0 - H
ydro
logy
- Su
bsid
ence
\Hyd
rolo
gy E
IS\1
2-13
62-0
197
- Pre
dict
ed C
hang
es in
Sur
face
Ele
vatio
ns.m
xd
Dat
e: 5
/26/
2015
10:
13:5
3 A
M
ELEVATION SURFACE DERIVED FROM LIDAR PROVIDED BY LSICANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
SM 20/03/15
YANCOALSOUTHEY PROJECT
BT 26/05/15
JH 26/05/15
FILE No.
SCALE AS SHOWN
FIGURE:9.5-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
PREDICTED CHANGES INSURFACE ELEVATIONS
REVIEWSaskatoon, Saskatchewan
LMS 26/05/15
12-1362-0197
East Loon Creek
West Loon Creek
!(731
!(6
!
¾
!B !
¾
!B'
! ¾! A'
! ¾! A!
¾
!C
!¾
!C'!
¾
!F'
!
¾
!D'! ¾! D!
¾
!F
-5
-4
-3-2
-1
-0.0
1-6
-5 -4-3
-2-1
-6
-3
-2-1
-0.01
-4-3
-2-1
-0.0
1
-0.01
TWP
23
TWP
25
TWP
24
RGE 18 W2MRGE 19 W2MRGE 20 W2M
520000 525000 530000 535000 540000
5650
000
5655
000
5660
000
5665
000
HIGHWAY
ROAD
TOWNSHIP AND RANGE BOUNDARY
!'! !'! PROFILE LINE
SUBSIDENCE CONTOUR (0.5 METRE INTERVAL)
LIDAR EXTENT
ELEVATION (masl)HIGH : 688.32
LOW : 530.33
1.5 1.50
SCALE 1:75,000 KILOMETRES
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
109
0 - H
ydro
logy
- Su
bsid
ence
\Hyd
rolo
gy E
IS\1
2-13
62-0
197
- Pre
dict
ed C
hang
es in
Sur
face
Ele
vatio
ns.m
xd
Dat
e: 5
/26/
2015
10:
13:5
3 A
M
ELEVATION SURFACE DERIVED FROM LIDAR PROVIDED BY LSICANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
SM 20/03/15
YANCOALSOUTHEY PROJECT
BT 26/05/15
JH 26/05/15
HydrologyResults Continued:• The effects in annual runoff volume was estimated to be about a
2.3% decrease of the runoff reporting to the low-topography area within the West Tributary sub-basin of West Loon Creek, and negligible for West Loon Creek during the operations phase.
• The Project is not expected to affect the continued availability of surface water quantity for human use and ecosystems.
Yancoal Canada Resources Company Limited
Southey Project
Surface Water QualityWhat was assessed:
• Surface water quality (i.e., physical analytes, chemical properties)
• Although there are no lakes present in the water quality effects study area, there are numerous ephemeral wetlands present.
• Water quality samples were collected during the spring, summer, and fall of 2013.
Results:• Total predicted surface water concentrations of potassium and
chloride are expected to be within the natural range of variability for West Loon, East Loon, and Loon creeks (e.g., a few mg/L). It is therefore considered unlikely that deposition of potassium and chloride will adversely affect surface water quality
• The Project is not expected to affect the continued suitability of surface water for human use.
Yancoal Canada Resources Company Limited
Southey Project
Fish and Fish HabitatWhat was assessed:
• Fish habitat quantity and fragmentation
• Fish habitat quality• Abundance and distribution of fish
species• Fish inventory surveys were
completed in West Loon Creek, East Loon Creek, Loon Creek, and three disconnected land-locked waterbodies during the spring, summer, and fall of 2013.
Results:• Brook Stickleback and Fathead Minnows were the only fish
species captured or observed. • No large-bodied fish species were captured. • Changes to fish and fish habitat from ground subsidence will occur
gradually and maximum subsidence will not occur for more than a century.
• West Loon Creek will continue to support small-bodied fish. • The residual effects from the Project are not likely to contribute to
significant effects on self-sustaining and ecologically effective fish populations.
Yancoal Canada Resources Company Limited
Southey Project
SoilsWhat was assessed:
• Soil quality (i.e., physical, biological, and chemical properties)
• Soil quantity and distributionResults:• Two most dominant agricultural
capability classes are Class 3 (48.9%), moderately severe limitations that restrict the range of crops or require special conservation practices, and Class 2 (20.7 %), moderate limitations that restrict the range of crops or require special conservation practices.• Most common limitation is moisture
• The Project footprint, with the exception of the TMA will be reclaimed to an equivalent agriculture capability during decommissioning and reclamation.
• The Project is not expected to affect the capability of soil to support agriculture and other plant communities.
Yancoal Canada Resources Company Limited
Southey Project
VegetationWhat was assessed:
• Quantity, arrangement, and connectivity (fragmentation) of plant communities
• Abundance and distribution of habitat for listed plant species
• Abundance and distribution of habitat for traditional use plant species
• Presence of weed and invasive plant speciesResults:• Dominant land cover is cultivated (58%).• Modified grassland covers 16%, wetlands 13% and native grassland
8%.• Majority of the patches of Native Grassland associated with the
Project footprint are 0.6 hectares and smaller. • Removal of vegetation by the Project should not disrupt the
existing connectivity of native grassland, wetlands, and wooded vegetation types.
• The Project is not expected to affect the ability of plant communities, listed plants, and traditional use plants to be self-sustaining and ecologically effective.
Yancoal Canada Resources Company Limited
Southey Project
WildlifeWhat was assessed:
• Habitat quantity, arrangement, and connectivity (fragmentation)• Habitat quality• Survival and reproduction• Abundance and distribution of wildlife such as:
■ White-tailed Deer ■ Elk ■ Upland Birds ■ Ferruginous Hawk ■ Waterbirds ■ Short-eared Owl ■ Northern Leopard Frog
Results:• Cumulative changes from sustained agricultural practices over
the last 100 years have likely resulted in adverse effects on some wildlife populations in the effects study area.
• Most of the habitat types expected to be affected by the Project are widely distributed in the effects study area, including native grassland and wetland habitats; subsequently the Project should have little influence on grassland and wetland wildlife.
• The Project is not expected to affect the ability of wildlife to be self-sustaining and ecologically effective.
Yancoal Canada Resources Company Limited
Southey Project
Heritage ResourcesWhat was assessed:• Archaeological and sacred sitesResults:• No known heritage resources are located within the core facilities
area, and the land is not considered heritage sensitive by the Saskatchewan Ministry of Parks, Culture and Sport-Heritage Conservation Branch.
• The Project is not predicted to affect heritage resources.
YANCOALSOUTHEY PROJECT
FILE No.
SCALE AS SHOWN
FIGURE:15.2-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
LOCATION OF THE HERITAGE RESOURCESBASELINE AND EFFECTS STUDY AREAS
REVIEWSaskatoon, Saskatchewan
LMS 25/05/15
12-1362-0197# # ##
###
#
#
#
")C
")C
")C
")C")C
")C
")C
")C
")C
"
"")C"")C
"")C
n
n
n
n
n
n
n
n
nn
n
n
WillowLake
Oak Lake
BriceLake
GrassyLake
East Loon Cr
eek
Loon Creek
West Loon
Creek
W
est
Loon
Cre
ek
KP 377 KP 392
!(22
!(6
CuparSouthey
MarkinchEarlGrey
Serath
EhNb 1
EfNb 3
EhNb 2EhNe 1
CaldwellCemetery
ChristusLutheranCemetery
East MountCemetery
HartCemeteryKainz
Cemetery
SerathBaptist
Cemetery
St. Anne'sOld Cemetery
St. Paul'sLutheran
Cemetery
ZionLutheran
Cemetery
ZionLutheran
Church
St. Anne'sChurch &Cemetery
St. Paul'sLutheran Church
& Cemetery
Lunner NorwegianLutheran Church& Cemetery
HazelwoodSchoolDistrict
ButtertonSchoolDistrict
East MountSchoolDistrict
Sunny NorthSchoolDistrict
Glen AftonSchoolDistrict
CrosswoodsSchoolDistrict
CoynachSchoolDistrict
SnowdropSchoolDistrict
SnarumSchoolDistrict
Eddy SchoolDistrict
Bryn MawrsSchoolDistrict
GregherdSchoolDistrict
EfNc 1 EfNc 2 EfNc 3
EfNc 4EfNb 2
EfNb 1EfNb 5
EgNb 1
EhNd 1
EgNb 2
TWP
23
TWP
26
TWP
25
TWP
24
RGE 18 W2MRGE 19 W2MRGE 21 W2M RGE 20 W2M RGE 16 W2MRGE 17 W2M
515000 520000 525000 530000 535000 540000 545000 550000 555000
5645
000
5650
000
5655
000
5660
000
5665
000
5670
000
5675
000
COMMUNITY
HIGHWAY
ROAD
RAILWAY
TOWNSHIP AND RANGE BOUNDARY
URBAN MUNICIPALITY
PROPOSED ACCESS ROAD
PROPOSED RAIL LOOP
PERMIT BOUNDARY
65 YEAR MINE FIELD
CORE FACILITIES AREA
INDICATED RESOURCE BOUNDARY
")C CEMETERY
" CHURCH BUILDING
n SCHOOL DISTRICT MARKER
# KNOWN HERITAGE RESOURCE
ASSESSED AREA
BASELINE STUDY AREA
EFFECTS STUDY AREA
HERITAGE SENSITIVE AREA
KNOWN HERITAGE RESOURCE
3 30
SCALE 1:150,000 KILOMETRES
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
122
0 - C
ultu
ral E
nviro
nmen
t\12-
1362
-019
7 - H
erita
ge E
SA.
mxd
D
ate:
5/2
5/20
15 1
:51:
57 P
M
HERITAGE RESOURCES: HERITAGE CONSERVATION BRANCH, MINISTRY OF PARKS,CULTURE AND SPORT, 2014.PERMIT BOUNDARY: POTASH DISPOSITION © 2012, GEOLOGICAL ATLAS OFSASKATCHEWAN, MINISTRY OF ENERGY AND RESOURCES SASKATCHEWANINFRASTRUCTURE DERIVED FROM AMEC DRAWING NO.100110-2000-DD10-GAD-0002 REV. BBASE DATA: CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
PY 08/04/15
BC 25/05/15
PY 25/05/15
YANCOALSOUTHEY PROJECT
FILE No.
SCALE AS SHOWN
FIGURE:15.2-1
REV. 0
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
LOCATION OF THE HERITAGE RESOURCESBASELINE AND EFFECTS STUDY AREAS
REVIEWSaskatoon, Saskatchewan
LMS 25/05/15
12-1362-0197# # ##
###
#
#
#
")C
")C
")C
")C")C
")C
")C
")C
")C
"
"")C"")C
"")C
n
n
n
n
n
n
n
n
nn
n
n
WillowLake
Oak Lake
BriceLake
GrassyLake
East Loon Cr
eek
Loon Creek
West Loon
Creek
W
est
Loon
Cre
ek
KP 377 KP 392
!(22
!(6
CuparSouthey
MarkinchEarlGrey
Serath
EhNb 1
EfNb 3
EhNb 2EhNe 1
CaldwellCemetery
ChristusLutheranCemetery
East MountCemetery
HartCemeteryKainz
Cemetery
SerathBaptist
Cemetery
St. Anne'sOld Cemetery
St. Paul'sLutheran
Cemetery
ZionLutheran
Cemetery
ZionLutheran
Church
St. Anne'sChurch &Cemetery
St. Paul'sLutheran Church
& Cemetery
Lunner NorwegianLutheran Church& Cemetery
HazelwoodSchoolDistrict
ButtertonSchoolDistrict
East MountSchoolDistrict
Sunny NorthSchoolDistrict
Glen AftonSchoolDistrict
CrosswoodsSchoolDistrict
CoynachSchoolDistrict
SnowdropSchoolDistrict
SnarumSchoolDistrict
Eddy SchoolDistrict
Bryn MawrsSchoolDistrict
GregherdSchoolDistrict
EfNc 1 EfNc 2 EfNc 3
EfNc 4EfNb 2
EfNb 1EfNb 5
EgNb 1
EhNd 1
EgNb 2
TWP
23
TWP
26
TWP
25
TWP
24
RGE 18 W2MRGE 19 W2MRGE 21 W2M RGE 20 W2M RGE 16 W2MRGE 17 W2M
515000 520000 525000 530000 535000 540000 545000 550000 555000
5645
000
5650
000
5655
000
5660
000
5665
000
5670
000
5675
000
COMMUNITY
HIGHWAY
ROAD
RAILWAY
TOWNSHIP AND RANGE BOUNDARY
URBAN MUNICIPALITY
PROPOSED ACCESS ROAD
PROPOSED RAIL LOOP
PERMIT BOUNDARY
65 YEAR MINE FIELD
CORE FACILITIES AREA
INDICATED RESOURCE BOUNDARY
")C CEMETERY
" CHURCH BUILDING
n SCHOOL DISTRICT MARKER
# KNOWN HERITAGE RESOURCE
ASSESSED AREA
BASELINE STUDY AREA
EFFECTS STUDY AREA
HERITAGE SENSITIVE AREA
KNOWN HERITAGE RESOURCE
3 30
SCALE 1:150,000 KILOMETRES
G:\C
LIE
NTS
\YAN
CO
AL\
Figu
res\
12-1
362-
0197
\WP0
25 -
EIS
Pre
para
tion\
Task
122
0 - C
ultu
ral E
nviro
nmen
t\12-
1362
-019
7 - H
erita
ge E
SA.
mxd
D
ate:
5/2
5/20
15 1
:51:
57 P
M
HERITAGE RESOURCES: HERITAGE CONSERVATION BRANCH, MINISTRY OF PARKS,CULTURE AND SPORT, 2014.PERMIT BOUNDARY: POTASH DISPOSITION © 2012, GEOLOGICAL ATLAS OFSASKATCHEWAN, MINISTRY OF ENERGY AND RESOURCES SASKATCHEWANINFRASTRUCTURE DERIVED FROM AMEC DRAWING NO.100110-2000-DD10-GAD-0002 REV. BBASE DATA: CANVEC © NATURAL RESOURCES CANADANAD83 UTM ZONE 13
REFERENCE
LEGEND
PY 08/04/15
BC 25/05/15
PY 25/05/15
Yancoal Canada Resources Company Limited
Southey Project
Socio-Economic EnvironmentWhat was assessed:• Employment• Labour income• Tax revenue• Gross domestic product• Project workforce requirements• Potential changes in the demand for housing, accommodations,
social, health, emergency and protective services, and physical infrastructure
• Commitments regarding employment training• Project traffic volumes• Commitments regarding safety measures and reducing traffic• Changes in land use• Changes in visual aesthetics • Changes in noise levels and air quality• Changes in water quality and quantity
Yancoal Canada Resources Company Limited
Southey Project
Socio-Economic EnvironmentResults:• Employment and Economy
• An employment strategy will be developed once a decision has been made to proceed with the project.
• Skilled local workers will be given priority, however, the Project is expected to require some out of province work force.
• During construction there will be high demand for trades people and labourers such as:
■ Carpenters, ■ Electricians, ■ Welders, ■ Concrete workers,
■ Equipment operators, ■ Pipe fitters, and ■ Sheet metal workers.
• During operation the types of positions required will include: ■ Millwrights, ■ Process engineers, ■ Electricians, ■ Mechanics,
■ Drillers, ■ Safety, health and environment personnel and
■ Other trades.
• Project spending will result in increased Gross Domestic Product and Project operations will generate tax revenue for municipal, provincial and federal governments.
Yancoal Canada Resources Company Limited
Southey Project
Socio-Economic EnvironmentResults Continued:• Community Services and Infrastructure
• The Project workforce will result in an increased population in the local area which will result in an effect on housing, schools and health care facilities that are operating near or at capacity.
• Most of these residual effects are expected to occur in Regina. The City of Regina and service providers are aware of the rapid increase in population and corresponding demand for services and infrastructure and are planning accordingly for the future.
• Traffic and Transportation• Traffic is expected to increase north of Regina on Project access
routes.• A traffic impact assessment was completed and identified required
road upgrades and mitigation to reduce the residual effects on traffic and transportation.
• Yancoal will work with the rural municipalities and governments to facilitate local traffic movement around the core facilities area.
Yancoal Canada Resources Company Limited
Southey Project
Socio-Economic EnvironmentResults Continued:• Quality of Life
• Air modelling indicated that emissions will be within guideline values.
• Water assessment determined that there would be no significant residual effects on water quality.
• Noise levels were predicted to be within guideline values at all noise receptors except one.
• Visual aesthetics will be altered for some farmyards, and residences.
• Available agricultural land will be reduced.• No known traditional land use exists within the Project footprint.
Yancoal Canada Resources Company Limited
Southey Project
Visual Aesthetics
FILE No.
SCALE AS SHOWN
FIGURE: 1REV. A
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
VISUALIZATION VIEWPOINTSOVERVIEW MAP
REVIEWSaskatoon, Saskatchewan
JE 10/06/15
12-1362-0197
!>
!>
!>
!> !>
!>
!>
!>
!>Earl Grey
Bulyea
Southey
Strasbourg
West Loon Creek
OakLake
!(322
!(20
!(6
!(22
!(220
20
31
20
13
21
14
09
21
35
27
17
09
36
01
08
09
04
20
04
29
22
28
3331
29
01
10
21
29
09
16 15
13
26
36
26
28
24
19
32
04
28
14
02
16
23
13
21
30
18
24
22
12
23
36
02
35
35
13
24
23
02
12
24
24
35
05
14
25
30
14
15
25
01
31
32
15
29
33
20
02
34
11
34
33
12
14
05
31
21
22
1717
28
14
23
21
32
08
33
18
22
0304
24
33
34
34
34
26
25
12
14
08
15
2830
07
06
31 32
20
20 22
29
03
10
16
20 21
23
26
07
18
33
09
28
27
11
01
11
23
32
03
08
34
25
14
05 04
18
11
03
13
27
11
35
07
27
02
26
06
06
34
24
23
22
12
19
30
16
05
01
34
32
07
25
07
12
22
01
32
12
16
23
27
08
22
34
26
36
28
30
06 03
21
05
09 10
17 16
22
28
05
15
03
03
26
19
02
12
25
11
23
28
01
27
35
10
25
36
01
29
21
11
02
11
16
25
06
33
22
07
31
06
22
20
04
17
10
03
1923
18
29
08
13
21
05
08
1110
20
09
36
19
35
30
36
18
10
02
36
27
17
11
24
33
11
15
21
35
16
32
30
26
09
19
33
11
25
05
19
32
34
13
21
27
28
3533
10
10
35
07
26
01
11
27
03
27
13
27
19
17
21
25
01
09
08
05
36
36
23
14
11
13
03
11
11
24
28
1112
34
03
20
20
09
27
34
10
07 08
03
15
11
19
30
07
24
33
02
09
05
31
09
04
09
04
18
10
30
2423
27
22
31 33
04
34
23
14
24
23
12
22
34
10
21
03
27
35
17
08
32
17
01
10
34
10
15
31
02
31
01
29
20
34
26
17
28
02
26
09
20
28
29
14
26
30
24
23
04
16
22
28
29
04
12
06
29
08
20
26
33
09
27
10
25
16
28
23
12
15
34
29
31 32
24
01
12
23
05
16
05
29
31
07
2826
17
15
30
34
15
33
11
29
01
17
28
04
28
16
33
24
04
17
16
22
29
14
11
26
20
32 33
12
13 15
35
25
36
05
10
35
20
06
26
11
09
0203
20
25
24
05
33
32
28
17
11
10
36
13
28
23
16
22
01
16
13
16
18
17
22
07
36
03
29
12
31
31
04
29
08
05
08
10
27
1207
13
10
27
02
18
21
34
19
12
14
35 36
07 09
1618
02 01
1314
01
12
02
13
04
03
04
16
21
12
13
36
23
15
30
12
27
24
24
08
22
34
19
14
26
30
10
03
16
23
04
33
12
18 14
35
02
27
04
15
24
25
08
16
06
18
10
21
35
08
18
35
06
31
35
06
19
1418
09
30
31
13
05
17
03
32
07
04
08
18
06 03
21
09
32
07
1921
26
36
11
14
03
35
06
06
2219
18
02
15
04
09
25
10
14
08
01
15
27
09
15
22
02 06
25
01
13
36
07
17
19
25
12
36
26
25
15
11
02
26
13
15
30
11
09 1012
01
19
09
12
15
07
02
36
07
33
09
30
14
32
07
21
32
33
08
35
06
VP05
VP03
VP02
VP07
VP06
VP08
VP04
VP01
VP09
500000 520000 540000
5640
000
5660
000
COMMUNITY
HIGHWAY
ROAD
RAILWAY
TOWNSHIP AND RANGE BOUNDARY
URBAN MUNICIPALITY
SECTION BOUNDARY
CORE FACILITIES AREA
FIELD OF VIEW
5 50
KILOMETRES
I:\20
12\1
2-13
62\1
2-13
62-0
197\
Map
ping
\MXD
\Vis
ualiz
atio
n\vi
ewpo
ints
_ove
rvie
w_2
0150
610.
mxd
D
ate:
6/1
0/20
15 4
:10:
01 P
M
MINISTRY OF ENERGY AND RESOURCES SASKATCHEWANCANVEC © NATURAL RESOURCES CANADANTS MAPSHEET: 62L/M, 72I/J/O/PNAD83 UTM ZONE 13
REFERENCE
LEGEND
YANCOALSOUTHEY PROJECT
GM 13/04/15
SCALE 1:150,000
FILE No.
SCALE AS SHOWN
FIGURE: 1REV. A
PROJECT
TITLE
PROJECT
DESIGN
GIS
CHECK
VISUALIZATION VIEWPOINTSOVERVIEW MAP
REVIEWSaskatoon, Saskatchewan
JE 10/06/15
12-1362-0197
!>
!>
!>
!> !>
!>
!>
!>
!>Earl Grey
Bulyea
Southey
Strasbourg
West Loon Creek
OakLake
!(322
!(20
!(6
!(22
!(220
20
31
20
13
21
14
09
21
35
27
17
09
36
01
08
09
04
20
04
29
22
28
3331
29
01
10
21
29
09
16 15
13
26
36
26
28
24
19
32
04
28
14
02
16
23
13
21
30
18
24
22
12
23
36
02
35
35
13
24
23
02
12
24
24
35
05
14
25
30
14
15
25
01
31
32
15
29
33
20
02
34
11
34
33
12
14
05
31
21
22
1717
28
14
23
21
32
08
33
18
22
0304
24
33
34
34
34
26
25
12
14
08
15
2830
07
06
31 32
20
20 22
29
03
10
16
20 21
23
26
07
18
33
09
28
27
11
01
11
23
32
03
08
34
25
14
05 04
18
11
03
13
27
11
35
07
27
02
26
06
06
34
24
23
22
12
19
30
16
05
01
34
32
07
25
07
12
22
01
32
12
16
23
27
08
22
34
26
36
28
30
06 03
21
05
09 10
17 16
22
28
05
15
03
03
26
19
02
12
25
11
23
28
01
27
35
10
25
36
01
29
21
11
02
11
16
25
06
33
22
07
31
06
22
20
04
17
10
03
1923
18
29
08
13
21
05
08
1110
20
09
36
19
35
30
36
18
10
02
36
27
17
11
24
33
11
15
21
35
16
32
30
26
09
19
33
11
25
05
19
32
34
13
21
27
28
3533
10
10
35
07
26
01
11
27
03
27
13
27
19
17
21
25
01
09
08
05
36
36
23
14
11
13
03
11
11
24
28
1112
34
03
20
20
09
27
34
10
07 08
03
15
11
19
30
07
24
33
02
09
05
31
09
04
09
04
18
10
30
2423
27
22
31 33
04
34
23
14
24
23
12
22
34
10
21
03
27
35
17
08
32
17
01
10
34
10
15
31
02
31
01
29
20
34
26
17
28
02
26
09
20
28
29
14
26
30
24
23
04
16
22
28
29
04
12
06
29
08
20
26
33
09
27
10
25
16
28
23
12
15
34
29
31 32
24
01
12
23
05
16
05
29
31
07
2826
17
15
30
34
15
33
11
29
01
17
28
04
28
16
33
24
04
17
16
22
29
14
11
26
20
32 33
12
13 15
35
25
36
05
10
35
20
06
26
11
09
0203
20
25
24
05
33
32
28
17
11
10
36
13
28
23
16
22
01
16
13
16
18
17
22
07
36
03
29
12
31
31
04
29
08
05
08
10
27
1207
13
10
27
02
18
21
34
19
12
14
35 36
07 09
1618
02 01
1314
01
12
02
13
04
03
04
16
21
12
13
36
23
15
30
12
27
24
24
08
22
34
19
14
26
30
10
03
16
23
04
33
12
18 14
35
02
27
04
15
24
25
08
16
06
18
10
21
35
08
18
35
06
31
35
06
19
1418
09
30
31
13
05
17
03
32
07
04
08
18
06 03
21
09
32
07
1921
26
36
11
14
03
35
06
06
2219
18
02
15
04
09
25
10
14
08
01
15
27
09
15
22
02 06
25
01
13
36
07
17
19
25
12
36
26
25
15
11
02
26
13
15
30
11
09 1012
01
19
09
12
15
07
02
36
07
33
09
30
14
32
07
21
32
33
08
35
06
VP05
VP03
VP02
VP07
VP06
VP08
VP04
VP01
VP09
500000 520000 540000
5640
000
5660
000
COMMUNITY
HIGHWAY
ROAD
RAILWAY
TOWNSHIP AND RANGE BOUNDARY
URBAN MUNICIPALITY
SECTION BOUNDARY
CORE FACILITIES AREA
FIELD OF VIEW
5 50
KILOMETRES
I:\20
12\1
2-13
62\1
2-13
62-0
197\
Map
ping
\MXD
\Vis
ualiz
atio
n\vi
ewpo
ints
_ove
rvie
w_2
0150
610.
mxd
D
ate:
6/1
0/20
15 4
:10:
01 P
M
MINISTRY OF ENERGY AND RESOURCES SASKATCHEWANCANVEC © NATURAL RESOURCES CANADANTS MAPSHEET: 62L/M, 72I/J/O/PNAD83 UTM ZONE 13
REFERENCE
LEGEND
YANCOALSOUTHEY PROJECT
GM 13/04/15
SCALE 1:150,000
Visual AestheticsVP1
Baseline
Stage 1 (20 years)
Stage 2 (40 years)
Stage 3 (100 years)
VP4VP2 VP5VP3
Yancoal Canada Resources Company Limited
Southey Project
Engagement• Engagement and community
involvement is an important part of the Environmental Assessment and permitting process.
• Yancoal will continue to maintain regular communication with the following groups and organizations:• Public (rural municipalities, towns, villages, landowners, and other
interested members of the public);• First Nation and Métis communities; and• Governmental and regulatory agencies.
• The intent of these engagement activities are to:• Provide information on the Project to potentially affected people
and other interested members of the public; and• To actively seek comments from the general public and First
Nation and Métis communities regarding existing environmental and socio-economic conditions in the local area.
Yancoal Canada Resources Company Limited
Southey Project
Contact InformationFor more information about
Yancoal’s Southey Project please contact:
Yancoal Canada Resources Co. Ltd.Unit 300 - 211 4th Avenue South
Saskatoon, SaskatchewanS7K 1N1
Mr. Asad NaqviT: (306) 668-5558, Ext. 6011E-mail: [email protected]
Ms. Leina LiaoT: (306) 668-5558, Ext. 6000
E-mail: [email protected]
www.yancoal.ca