Eastside Corridor Tolling Study November 2009 – Eastside Corridor Tolling Study Open House Welcome!

Upload: others

Post on 12-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

Welcome!

Page 2: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

How does WSDOT determine express toll lane performance?

The performance takes into consideration five sections • (screen lines) of the corridorEvaluates the total number of people and vehicles • moving at free flow speedsCompares, for each option, a tolled improvement and • non-tolled improvementThe study results assume a 3+ HOV, car pool definition.• • Study options 2 and 3 will be too congested

at a 2+ HOV, car pool definition.

Sections of the corridor we studied

405

90

5

18

405

5

167

509

169

522

99

161

167

164

5

167

99

512

520

AUBURN

KENT

SEATTLE

FEDERAL WAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

Study Area

Screen Line

Page 3: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

Why an express toll lane system? (Preliminary results)

Because we can move more people and vehicles faster

October 28, 2009

Comparison of Study Options – Year 2020 Traffic Performance (preliminary results)

Vehi

cles

/Peo

ple

120,000

100,000

80,000

60,000

40,000

20,000

0Non-Tolled Improvements Tolled Improvements

Vehicles People

Vehi

cles

/Peo

ple

120,000

100,000

80,000

60,000

40,000

20,000

0Non-Tolled Improvements Tolled Improvements

Vehicles People

Vehi

cles

/Peo

ple

120,000

100,000

80,000

60,000

40,000

20,000

0Non-Tolled Improvements Tolled Improvements

Vehicles People

Vehi

cles

/Peo

ple

120,000

100,000

80,000

60,000

40,000

20,000

0Non-Tolled Improvements Tolled Improvements

Vehicles People

Vehicles and people moving at freeflow speeds

Callout Legend

new with this option part of prior option

Callout Legend

new with this option part of prior option

Callout Legend

new with this option part of prior option

Callout Legend

new with this option part of prior option

Callout Legend

new with this option part of prior option

167

*funding possible from savings within the corridor

Study Option 1*Funded

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

2 expresstoll lanes

Study Option 440 Mile System

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE 1 express tolllane - stage 5

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

167 link

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

167 link

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

2 expresstoll lanes

2 expresstoll lanes

2 expresstoll lanes

1 express toll lane-stages 4 & 5

Study Option 550 Mile System

+1 GP lane

1 express tolllane - stage 6

Study Option 2Separate Systems

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

Study Option 3Connected System

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

1 lane 1 lane

2 expresstoll lanes

167 link

Page 4: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

What is the average toll I might pay in 2020? (Preliminary results)

Toll rates are estimates only as the actual rates would be based on supply and demand

October 28, 2009

Comparison of Study Options – Average Toll Rates (preliminary results)

2020 Weekday Peak Period Toll Rates (2008 Dollars)

Tolle

d Tr

ips

Toll Rate ($)

10,000

8,000

6,000

4,000

2,000

0$0 $5 $10 $15 $20 $25

Study Option 440 Mile System

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE 1 express tolllane - stage 5

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

167 link

Callout Legend

new with this option part of prior option

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

167 link

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

2 expresstoll lanes

2 expresstoll lanes

2 expresstoll lanes

1 express toll lane-stages 4 & 5

Study Option 550 Mile System

+1 GP lane

1 express tolllane - stage 6

Callout Legend

new with this option part of prior option

Study Option 1*Funded

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

Callout Legend

new with this option part of prior option

Study Option 2Separate Systems

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

Callout Legend

new with this option part of prior option

1 lane

Study Option 3Connected System

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

167 link

Callout Legend

new with this option part of prior option

1 lane

Tolle

d Tr

ips

Toll Rate ($)

10,000

8,000

6,000

4,000

2,000

0$0 $5 $10 $15 $20 $25

80% of tolled trips

Average toll:

$4.10

Tolle

d Tr

ips

Toll Rate ($)

10,000

8,000

6,000

4,000

2,000

0$0 $5 $10 $15 $20 $25

80% of tolled trips

Average toll:

$4.80To

lled

Trip

s

Toll Rate ($)

10,000

8,000

6,000

4,000

2,000

0$0 $5 $10 $15 $20 $25

80% of tolled trips

Average toll:

$8.00

80% of tolled trips

Average toll:

$4.10Potential tollcap of $12-15

167

*funding possible from savings within the corridor

Page 5: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

How much would express toll lanes cost? (Preliminary results)

October 28, 2009

Comparison of Study Options – Available & Needed Funding (preliminary results)Study Option 440 Mile System

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE 1 express tolllane - stage 5

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

167 link

Callout Legend

new with this option part of prior option

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

167 link

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

2 expresstoll lanes

2 expresstoll lanes

2 expresstoll lanes

1 express toll lane-stages 4 & 5

Study Option 550 Mile System

+1 GP lane

1 express tolllane - stage 6

Callout Legend

new with this option part of prior option

Study Option 1*Funded

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

Callout Legend

new with this option part of prior option

Study Option 2Separate Systems

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

Callout Legend

new with this option part of prior option

1 lane

Study Option 3Connected System

405

90

5

18

405

5

167

522

167

5

167

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

LYNNWOOD

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

1 expresstoll lane

1 express tolllane - stage 4

2 expresstoll lanes

Legend

Existing

1 ExpressToll Lane

2 ExpressToll Lanes

+2 ExpressToll Lanes +1 GP lane

Interchange

167 Link

167 link

Callout Legend

new with this option part of prior option

1 lane

BondingRange of net bond proceeds

% of funding gap filled

Remaining funding gap

$135-245 M

$0100%+

$160-290 M

$0100%+

$190-345 M

($285-440 M)30-55%

$450-775 M

($770-1,095 M)30-50%

Available in December

Available in December

FundingCapital cost

Available funding

Funds needed

Study Option 1* Study Option 2 Study Option 3 Study Option 4 Study Option 5$470 M

($67 M)*$403 M

$540 M

($140 M)$403 M

$1,030 M

($630 M)

$1,950 M

($1,545 M)

$4,100 M

($3,685 M)$403 M $403 M $403 M

Study Option 1 Study Option 2 Study Option 3 Study Option 4 Study Option 5

167

*funding possible from savings within the corridor

Page 6: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

Public outreachHosted booths at 10 summer festivals• Heard from 1,105 people through comment forms and • email correspondenceMailed 220,000 postcards to households in the I-405 and SR • 167 corridor to advertise the online survey and open housesHeld 5 public meetings, 3 in August and 2 in November• Fielded 2,584 online surveys• Conducted a statistically valid phone survey of 1,000 I-405 • or SR 167 usersFacilitated four corridor focus groups• • 2 with I-405 users and 2 with SR 167 users

(48 total participants)

405

90

5

18

405

5

167

509

169

522

99

161

167

164

5

167

99

512

520

AUBURN

KENT

SEATTLE

FEDERALWAY

BOTHELL

TACOMA

RENTON

TUKWILA

PUYALLUP

BELLEVUE

KIRK LAND

FIFE

99

EDMONDS

SHORELINE

LYNNWOOD

522

527

16

Study Area

Summer FestivalsPublic Meetings

Auburn (Aug. 18)•Bellevue (Aug. 19)•Renton (Aug. 20)•Kent (Nov. 3)•Kirkland (Nov. 5)•

Page 7: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

What have we heard so far?Use = Support Focus groups show that those who have used toll lanes, like the SR 167 HOT lanes and support the idea of express toll lanes on I-405.

Congestion relief = Willingness to PayOur research shows that approximately 52 percent would pay to use express toll lanes if it would give them a faster, more reliable trip. Participants in the focus groups who have used HOT lanes are willing to pay up to $5 asegment on I 405 to travel faster.

Understanding = SupportPeople who understand the benefits of express toll lanes tend to support them. When electronic toll operations were explained to phone survey participants, they found the collection method to be appealing.

Undecided = OpportunityFor people who do not yet know the benefits of express toll lanes, there is an opportunity to alleviate their concerns through further information.

Dislike of tolls = Non supportersPeople who dislike the idea of tolling under most or all circumstances are unlikely to become supporters.

“I use the HOT lanes regularly on SR-167 as I drive N/S to Seattle, Bellevue, and Redmond. Having HOT (express toll lanes on) I-405 will save me hours of commute time every week. Please move forward with I-405. Thanks.”

Alex, Auburn

“I was skeptical about the idea when it first went in on the northern end of 167, but I’ve been pleasantly surprised by the results. I thought it would either clog the carpool lane forever or be incredibly frustrating if I was driving alone. Neither have happened. So put it in - I’m a fan.”

Lindsey, Pierce County

Page 8: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

How do we compare nationally?

Per

cent

of O

vera

ll

70%

60%

50%

40%

30%

20%

10%

0%

Public support for tolled lanes increases after implementation

Pre-Implementation Phone Survey

1995 Survey, Pre-Implementation1997 Survey, Phase 12002 Survey, Phase 2

Eastside Corridor 2009

San Diego I-15

Approved Opposed Undecided

Page 9: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

How do SR 167 HOT lane users feel about paying a toll to use the HOV lane?

Per

cent

of O

vera

ll

70%

60%

50%

40%

30%

20%

10%

0%

Public support for tolled lanes increases after implementation

Pre-Implementation (08/2005)

Post-Implementation (05/2009)

SR 167 HOT Lanes

“Allowing single drivers to use the carpool (HOV) lanes by paying a toll is a good idea.”

Before implementation

Random Sample

After implementation

SR 167 Users

“Allowing single driver to use the carpool (HOV) lanes by paying a toll is a good idea”

Page 10: Welcome! - dot.wa.govdot.wa.gov/sites/default/files/2009/06/10/i405_Tolling_Presentation.p… · November 2009 – Eastside Corridor Tolling Study Open House Why an express toll lane

Eastside Corridor Tolling Study

November 2009 – Eastside Corridor Tolling Study Open House

Peop

le

120,000

100,000

80,000

60,000

40,000

20,000

0

Tolle

d Impro

vemen

ts

Option 1

Non-Tolle

d Optio

n 1

Non-Tolle

d Optio

n 4

Tolle

d Impro

vemen

ts

Option 2

Tolle

d Impro

vemen

ts

Option 3

Tolle

d Impro

vemen

ts

Option 4

Tolle

d Impro

vemen

ts

Option 1

Non-Tolle

d Optio

n 1

Non-Tolle

d Optio

n 4

Tolle

d Impro

vemen

ts

Option 2

Tolle

d Impro

vemen

ts

Option 3

Tolle

d Impro

vemen

ts

Option 4

Vehi

cles

120,000

100,000

80,000

60,000

40,000

20,000

0

Comparison of Study Options - Performance in 2020