welcome presentation on identification of potential waterways in north east india
DESCRIPTION
WELCOME PRESENTATION ON IDENTIFICATION OF POTENTIAL WATERWAYS IN NORTH EAST INDIA Made by RITES India Ltd in IWT meeting at Guwahati in November, 2011. SEQUENCE OF PRESENTATION. MAP OF POTENTIAL WATERWAYS IN THE NORTH EAST STATES MAP OF RIVER BARAK GRID SYSTEM - PowerPoint PPT PresentationTRANSCRIPT
WELCOMEPRESENTATION
ON
IDENTIFICATION
OF
POTENTIAL WATERWAYS IN NORTH EAST INDIA
Made by RITES India Ltd in IWT meeting at Guwahati in November, 2011
SEQUENCE OF PRESENTATION
• MAP OF POTENTIAL WATERWAYS IN THE NORTH EAST STATES • MAP OF RIVER BARAK GRID SYSTEM• POTENTIAL WATERWAYS IN TRIPURA • POTENTIAL WATERWAYS IN MEGHALAYA• POTENTIAL WATERWAYS IN MIZORAM • POTENTIAL WATERWAYS IN MANIPUR• MAP OF RIVER BRAHMAPUTRA GRID SYSTEM • POTENTIAL WATERWAYS IN ARUNACHAL PRADESH• POTENTIAL WATERWAYS IN NAGALAND • POTENTIAL WATERWAYS IN ASSAM
Brahmaputra RBrahmaputra
ASSAM
INDIA
MEGHALAYA
ARUNACHAL PRADESH
MIZORAM
TRIPURA
MANIPUR
MYANMAR
BANGLADESH
SIKKIMNEPAL
WEST BENGAL
BHUTAN
CHINA (TIBET)
KOLKATA
Protocol RouteP
roto
col R
oute
DHAKA
KyanshiSim
sang
Jing
iram
Dib
ang
Lohit
Bara
k R
iver
Extn
Sian
g
Kha
wth
lang
tuip
ui
Tui
chaw
ng
Tut
Gumti
Haora
NAGALAND
Tizu
Dha
nsir
i Dik
how
Loktak Lake
Dha
lesw
ari
Jia BharaliBuri Dihing
Kopili
DisangSuba
nsir
i
Barak
Potential Waterways in North East States
• Barak River Grid System• Brahmaputra River Grid System
Ashuganj
SADIYA
DHUBRI
LAKHIPUR
KARIMGANJ
MEGHALAYA
MIZORAM
TRIPURA
BANGLADESH
KOLKATA
Protocol Route
Protocol Route
DHAKA
Kyanshi
Sim
sang
Bara
k R
iver
Ext
n
Kha
wth
lang
tuip
ui
Tui
chaw
ng
Tut
Gumti
Haora
Loktak Lake
Dha
lesw
ari
Barak
Barak River Grid System
MANIPUR
Tla
wng
Rajiv Nagar
Tlabung
180
Tuichawng
Kawrpuichhuah
Tlangkhang
135
Dapchhuah
55
Udaipur
Sonamura54 km
28Zirania
Joynagar
Ashuganj
Meghna
Chittagong
Lower
Meghna
Nungba
Tipaimukh
60
Delta AreaKarnaphuli
Karimganj
Zakiganj
Kushiyara
Rangamat
i
Dam
Mawet
Ranikor
35
Sizu Mines
Baghmara LCS
35
Someswari
Bau
lai
Lakhipur
125 Silchar
GasuaparaLCS
DEMAGIRI LCS
POTENTIAL WATERWAYS IN TRIPURA
River Start End Length (km)
Gumti Maharani Barrage
Sonamura 54
Hoara Zirania Joynagar 28
Gumti
Haora
28 km
54 km
Salient Features of Rivers of Tripura
River Start End Length (km)
Capacity (tons)
Draft (m)
Navigability Period
Commodity
Gumti Maharani Barrage
Sonamura 54 2-5 0.6 6 months (monsoon
period)
Border trade and local
cargo
Hoara Zirania Joynagar 28 2-5 0.6 6 months (monsoon
period)
Border trade and local
cargo
A View of River Gumti at Udaipur
A View of River Haora at Agartala
Ashuganj Port in Bangladesh on the Banks of Meghana River
Unloading of Heavy Equipment of ONGC Power Plant
MOVEMENT OF OVER DIMENSIONED CARGO BY ROAD FROM ASHUGANJ PORT IN BANGLADESH TO PALTANA (TRIPURA) - ONGC POWER PLANT
POTENTIAL WATERWAYS IN MEGHALAYA
KynshiSimsang
River Start End Length (km)
Kynshi / Jadukota
Borsora / Ranikor
Mawet 35
Simsang Baghmara Siju 35
Jingiram Phulbari Dhubri 20
Salient Features of Rivers of Meghalaya
River Start End Length (km)
Capacity (tons)
Draft (m)
Navigability Period
Commodity
Kynshi / Jadukota
Borsora / Ranikor
Mawet 35 50 (lean)
100 (flood)
2 -10(lean)
5 -15 (flood)
Lean
Flood
coal / limestone /
boulders
Simsang Baghmara Siju 35 10 - 15 (lean)
50 – 100 (flood)
0.3-0.6 (lean)
3 – 4 (flood)
Lean
Flood
coal / limestone /
boulders
Jingiram Phulbari Dhubri 20 10 (lean)100 -200 (flood)
0.5
10
Lean
Flood
Ferry service and local
cargo
View of River Simsang towards Siju mines
Simsang/Someshwari River in Netrakona
district of Bangladesh
View of the River Kynshi / Jadukota at Ranikor Ghat
View of River Kynshi upstream of Road Bridge at
Ranikor
Barges at Phulbari Terminal in River Jingiram
POTENTIAL WATERWAYS IN MIZORAM
Tut
Khawthlangtuipui
Tuichwang
River Start End Length (km)
Karnafuli / Khawthlan
gtuipui
Tlabung Rajiv Nagar 180
Tuichawng Kawrpuichhuah
Tuichawng 135
Tut (Tlawng /
Dhaleswari)
Dapchhhuah
Tlangkhang 55
Tlabung
Rajiv Nagar
Kawrpuichhuah
Tuichawng
Tlangkhang
Dapchhhuah
Karnafuli river
AIZAWL
Dhal
esw
ari
Bairabi
Salient Features of Rivers of Mizoram
River Start End Length (km)
Capacity (tons)
Draft (m)
Navigability Period
Commodity
Karnafuli / Khawthlan
gtuipui
Tlabung Rajiv Nagar 180 2-5 0.6 6 months (monsoon
period)
Border trade and local
cargo
Tuichawng Kawrpuichhuah
Tuichawng 135 2-5 0.6 6 months (monsoon
period)
Ferry service and local
cargo
Tut (Tlawng /
Dhaleswari)
Dapchhhuah
Tlangkhang 55 2-5 0.6 6 months (monsoon
period)
Ferry service and local
cargo
Ferry Ghat on River Karnafuli at Demagiri in India
IWT Vessels on Karnafuli River at Chittagong
POTENTIAL WATERWAYS IN MANIPUR
Nungba
Tipaimukh
Salient Features of Rivers of Manipur
River Start End Length (km)
Capacity (tons)
Draft (m)
Navigability Period
Commodity
Barak Extension
Nungba Tipaimukh 60 10 – 15 0.8 6 months (monsoon
period)
Local cargo
Loktak lake Ferry services 110 2-5 0.8 Round the year Passengers and local
cargo
Ferry Point at Loktak Lake – Karang Island
A view of River Barak near Nungba town
Brahmaputra
ASSAM
MEGHALAYA
Gerukamukh
MYANMAR
BANGLADESH
CHINA (TIBET)
Jin
gira
m
Dib
ang
Lohit
Sian
g
Dh
ansi
ri
Dik
howJia Bharali
Buri Dihing
Kopili
Disang
Suba
nsir
i
Brahmaputra River Grid System
SADIYA
Jagibhaktagaon 50
Bhalukpung
60
Numaligarh
Samjuran
110
25
111
Pasighat 50
90
Parasuramkund
100
Joyapur 80
25
Yangnyu
Naginimara 92
HEP
Anupam
DHUBRI NW1
ARUNACHAL
PRADESH
NAGALAND
Waterways in Arunachal Pradesh
Suba
nsir
i
111
HEPGerukamukh
Sian
g
Pasighat
50
Dib
ang
50
Anupam Lohit
Parasuramkund 100LHEP
HEP
HEP
Dibang Anupam Brahmaputra confluence
90
Lohit Parasuramkund Brahmaputra confluence
100
Siang Pasighat Brahmaputra confluence
50
Subansiri Gerukamukh Brahmaputra confluence
111
Ferry services on River Dibang• Anupam to Anupam circuitus route (80 km)• Malek to Bomjur (10 km)•Bizari to Jial (10km)
Ferry services on River Siang• Sika bamin to Namsing• At Komilaghat
Ferry services on River Lohit• Saikhowa Ghat to Parasuramkund (75 km)• Tezu to Medo • Digaru to Alubari • Shivaji Nagar to Tezugham
Sadiya
BizariJial
Bomjur Malek
Sika Bamin Namsing
KomilaghatTezu
Medo
Digaru
AlubariSaikhowa
Ghat
Shivaji
Nagar
Tezugham
40
FERRY SERVICE IN SIANG RIVER
• SUBANSIRI
Pasighat
Parasuramkund Anupam
Salient Features of Rivers of Arunachal PradeshRiver Start End Length
(km)Capacity
(tons)Draft (m)
Navigability Period
Commodity
Dibang 40 km upstream of proposed
Dibang Power project
50 km downstream of the dam
90 300 1.2 Round the year Construction material for
proposed power projects and local cargo
Lohit Parasuramkund Brahmaputra confluence
100 300 1.2 Round the year Construction material for
proposed power projects and local
cargo
Siang Pasighat Brahmaputra confluence
50 200 1.2 Round the year Ferry services for local cargo / passengers
Subansiri Gerukamukh Brahmaputra confluence
111 200 1.0 6 to 8 months Ferry services for local cargo /
passengers and Construction
material
POTENTIAL WATERWAYS IN NAGALAND
River Start End Length (km)
Dhansiri Samjuran Numaligarh 110
Dikhu / Dikhow
Yangnyu Naginimara 52
Yangnyu
Samjuran
Numaligarh
Naginimara
Salient Features of Rivers of Nagaland
River Start End Length (km)
Capacity (tons)
Draft (m)
Navigability Period
Commodity
Dhansiri Samjuran Numaligarh 110 10-15 0.8 6 months (monsoon
period)
Minerals, cement, local
cargo
Dikhu / Dikhow
Yangnyu Naginimara 52 10-15 0.8 6 months (monsoon
period)
Minerals, cement, local
cargo
POTENTIAL WATERWAYS IN ASSAM
NAGALAND
Kopili
Jagibhaktagaon 50
Jia Bharali
Bhalukpung
60
Dha
nsir
i
Numaligarh
Samjuran
110
25
5240
DisangSib
saga
r
PROTOCOL ROUTENW1
PROTOCOL ROUTE
Dikhow
25
Buri DihingJoyapur 80
Dha
lesw
ari
125
Bairabi
• Dhaleswari / Katakhal• Jia Bharali• Buri Dihing• Disang • Dikhow • Dhansiri• Kopili
NH 37 crossing
Yangnyu
BARAK
Salient Features of Rivers of AssamRiver Start End Length
(km)capacity
(tons)Draft (m)
Navigability Period
Cargo Potential
Dhaleswari / Katakhal
Bairabi Barak confluence (Katakhal)
125 10 (Katakhal)
0.6 6 months (Flood
season)
Food grain, fertilizer,
iron, steel, cement
Jia Bharali Bhalukpung
Brahmaputra confluence
60 200 1.0 6 to 8 months
Local cargo / passengers
and Construction
materials
Buri Dihing Joyapur Brahmaputra confluence
80 200 1.2 8 to 10 months
Industrial cargo, ferry
services
Salient Features of Rivers of Assam
River Start End Length (km)
capacity (tons)
Draft (m)
Navigability Period
Cargo Potential
Kopili Jagibhaktagaon
Brahmaputra confluence
50 100 0.8 6 to 8 months (Flood
season)
Industrial cargo, ferry
services
Disang NH 37 crossing
Brahmaputra confluence
25 100 0.8 6 to 8 months (Flood
season)
Industrial cargo, ferry
services
Dikhow Sibsagar Brahmaputra confluence
40 100 0.8 6 to 8 months (Flood
season)
Industrial cargo, ferry
services
Dhansiri Numaligarh
Brahmaputra confluence
25 100 1.0 6 to 8 months (Flood
season)
Industrial cargo, ferry
services
River Dikhow near Sibsagar
River Dhaleswari / Tlawng at Sairang