welcome to the illinois route 3 connector … · given that a connection to collinsville road is...

2
The following Alternatives (B, D, F, and H) have been eliminated since the last public meeting because these Conceptual Alternatives include a connection to Collinsville Road near Kenny Bernstein Lane that would not be used on a daily basis. Given that a connection to Collinsville Road is already provided by the existing Exchange Avenue, the cost and impacts to key environmental resources for a new connection to Collinsville Road near Kenny Bernstein Lane were determined not to be prudent.

Upload: hahanh

Post on 02-May-2018

217 views

Category:

Documents


2 download

TRANSCRIPT

The following Alternatives (B, D, F, and H) have been eliminated since the last public meeting because these Conceptual Alternatives include a connection to Collinsville Road near Kenny Bernstein Lane that would not be used on a daily basis. Given that a connection to Collinsville Road is already provided by the existing Exchange Avenue, the cost and impacts to key environmental resources for a new connection to Collinsville Road near Kenny Bernstein Lane were determined not to be prudent.

Illinois Route 3 Connector Project Alternatives Eliminated

Environmental Resources and Alternative Centerline

Preliminary AlignmentsSubject to Modification

Estimated Cost: $59 million

Environmental Resources and Alternative Centerline

Preliminary AlignmentsSubject to Modification

Estimated Cost: $46 million

Environmental Resources and Alternative Centerline

Preliminary AlignmentsSubject to Modification

Estimated Cost: $43 million

Environmental Resources and Alternative Centerline

Preliminary AlignmentsSubject to Modification

Estimated Cost: $36 million

LEGEND LEGEND

LEGEND LEGEND