WellMaster:

Industry Reliability Database for Well Completion Equipment

Objective

”To obtain continuous improvement in the reliability of well completions through collection, analysis and sharing of reliability data for the well completion equipment.”

Page 2: WellMaster_05-10-2011

Value Proposition - WellMaster

Best available decision support data for well reliability and risk problems:

Best available reliability data on well equipment world-wide -accepted as industry norm

Access to most advanced Expert Services

Full insight into reliability of own wells and highly representative industry wide data for benchmarking purposes

Combined use of WellMaster Data and risk assessments are key to informed decisions on well intervention issues, well lifetime extensions following malfunctions and deterioration of well barriers

07/10/2011 2

Page 3: WellMaster_05-10-2011

ExproSoft has created huge savings for clients through use of WellMaster results

• Major cost savings during Heidrun TLP development • WellMaster rated as Conoco Norway’s #1 R&D

project in Norway in 2000 • Return on investment more than 280x

140

Statoil

Conoco

Phillips

350+

Hydro

Oil &Gas 130+

• Savings through 15 studies performed 2001-2008 • Return on investment more than 70x

• Significant savings through 32 ExproSoft studies 2000-2011

• Return on investment more than 330x

Description Savings for clients - examples

USD Million

3

Page 4: WellMaster_05-10-2011

WellMaster Success Stories

Bjørn Skårdal, Well Intervention Supervisor, ConocoPhillips 01.02.2008:

“ConocoPhillips Norway have over the years utilized the analytical services of ExproSoft and the contents of their generic WellMaster database to conduct risk assessments that have enabled us to oppose Norwegian Authorities with confidence, reverse unfortunate legislation and improve our overall understanding of the risk associated with our business. Another attractive side-effect of these studies has also been huge savings (several hundred million USD over the past 15 years)”

07/10/2011 4

Page 5: WellMaster_05-10-2011

07/10/2011 5

Reliability Data – What is It?

Exposure data: Service time

Stressors/environmental data (pressure, temperature, CO2, H2S) etc

Equipment inventory data (item, manufacturer, model designation, size, etc)

Failure Data:.

Failed item/date of failure

Failure Mode

Failure Effect (initial, consequential failure)

Suspected Cause of Failure

Information on Repair/Remedial Action

Root Cause Failure Analysis(RCFA)

Increasing value of data

Page 6: WellMaster_05-10-2011

07/10/2011 6

WellMaster synergies with other applications

Relational (Oracle) Database

Well

Mas

ter

Fie

ldS

im (

OP

EX

)

WIM

S

Page 7: WellMaster_05-10-2011

07/10/2011 7

Members (Phase 6 – completed Dec ‘2009)

BG Group

BHP Billiton Petroleum

BP

Chevron

ConocoPhillips

Eni Group

ExxonMobil

Statoil

Shell

Talisman Energy

Total

Page 8: WellMaster_05-10-2011

07/10/2011 8

WellMaster: Phases V and VI

Phase VI (Oct ’06 – Dec ’09)

Participants: 11 oil companies

Budget: NOK 11.5 million (USD 2.0 million)

Database scope:

4156 wells (platform and subsea)

3 133 equipment failures

28 923 well-years of service

Phase V (Dec ’02 – Mar ’06)

Participants: 10 oil companies

Budget: NOK 5.9 million (USD 0.9 million)

Database scope:

2 971 wells (platform and subsea)

1 944 equipment failures

17 200 well-years of service

”Largest reliability database for Well Completion Equipment World-Wide”

Page 9: WellMaster_05-10-2011

07/10/2011 9

WellMaster Software (I)

Graphical presentation of well with integrated database

Building of failure and operational history

Reliability data processing capability

Can be used to share data with other oil/gas companies to learn from mistakes

Page 10: WellMaster_05-10-2011

07/10/2011

WellMaster Software (II) Powerful Reliability Analysis

Tool:

Mean Time to Failure Analysis

RunTime Distribution

Weibull Analysis

’History book’ for the well (well operations, equipment failures, well interventions, etc)

Output can be used for decision making and high-impact risk assessments

Page 11: WellMaster_05-10-2011

07/10/2011 11

WellMaster JIP Deliverables

Databases with real data (10-13 JIP members)

Data Collection and Analysis Tool (WellMaster)

Report with summary data on reliability of downhole equipment

Web-based tool with downhole failure data (WellWatch)

Reliability Simulation Tool (FieldSim)

Page 12: WellMaster_05-10-2011

07/10/2011 12

WellMaster Output –

Completion Equipment

Failure cause report, installation and in-service failures

Failure rate/MTTF

Failure mode distributions

Failure and survival probability data

Event and event chain reports (failure consequences)

Well Barrier Schematics (ISO/NORSOK compliant)

Page 13: WellMaster_05-10-2011

Well Barrier Schematics as per forthcoming ISO Standard and existing NORSOK D-010 Well Integrity Guideline

13

Page 14: WellMaster_05-10-2011

07/10/2011 14

Well Reliability and Integrity Issues

evaluated with data from WellMaster

What is the risk associated with

gas lift operations?

Horizontal or

Vertical XMT?

Effect of deepset plug on

Integrity of temporary

abandoned wells? Benchmarking of

manufacturers

and operators

Well Intervention Frequency?

Dual SCSSV

configuration?

Can SCSSV

be eliminated?

Tubing & casing integrity?

Blowout risk?

Master valve

configuration?

Production Packer

Reservoir

TR-SCSSV

Annulus Tubing

Sea Bed

To

production

manifold

Isolation

Plug

PMV PWV

XOV

Isolation

Plug

Tree cap

AMV

SPM

Deepset plug

Reservoir

Well risk after barrier failure?

Tubing mounted or wellhead

mounted annulus safety valves?

Page 15: WellMaster_05-10-2011

WellMaster JIP: Way Forward for Phase 7 (currently in initiation)

Focus on continuous data collection (yearly updating of reports)

New participants get access to entire WellMaster database: unique basis for risk assessments and analysis of well integrity issues

New participants need to contribute with operational data from a minimum of 50 wells

07/10/2011 15

Page 16: WellMaster_05-10-2011

WellMaster Options

Build your own Well Completions Reliability Database

Build on synergies w/WIMS package to create tool suite for total reliability and integrity management of your own wells

Become JIP member and share knowledge with other oil & gas companies

07/10/2011 16