western regional coordinator, apwu

84
MANAGER, LABOR RELATIONS Pacific Area January 8, 2015 Omar Gonzalez Western Regional Coordinator, APWU 1350 Old Bayshore HWY. Suite 360 Burlingame, CA 94010 This is to advise you of the intent of the Santa Ana District to utilize the provisions of Article 12.5.C.5 of the National Agreement to involuntarily reassign fourteen (14) full-time motor vehicle employees (11 motor vehicle operators and 3 tractor-trailer operators) from the craft and/or installation at the Alhambra/Industry bid installation (Event 49207). This impact is based on an approved AMP. The impacted employees will be notified of their involuntary reassignments by separate letter. By copy of this notice, we will withhold fourteen (14) full-time assignments in the clerk, carrier, mail handler, motor vehicle and/or custodial crafts in sites within a 50 mile radius of the impacted bid cluster. Attached you will find copies of the automated impact statement, the operational data that supports the excessing, the list of sites at which withholding has been authorized and the names of the junior impacted employees. Please include this impact on the agenda for our next meeting. If you have any questions you may contact me at (858) 674-3193 or Linda Shumate, Area Complement Coordinator at (858) 674-31 Attachments cc: Area Manager Operations Support Area Manager, Human Resources Area Controller Area Manager, In-Plant Support District Manager, Santa Anal District Area Complement Coordinator with attachments Manager, Human Resources - Santa Ana with attachments District Complement Coordinator, Santa Ana District with attachments Chris Jackson, NALC with attachments David Ross, NPMHU with attachments 11255 RANCHO CARMEL DR. RM. 227 SAN DIEGO, CA 92197-4400 PHONE: 858-674-3180 FAX: 858-674-3131

Upload: others

Post on 19-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Western Regional Coordinator, APWU

MANAGER, LABOR RELATIONS

Pacific Area

January 8, 2015

Omar Gonzalez Western Regional Coordinator, APWU 1350 Old Bayshore HWY. Suite 360 Burlingame, CA 94010

This is to advise you of the intent of the Santa Ana District to utilize the provisions of Article 12.5.C.5 of the National Agreement to involuntarily reassign fourteen (14) full-time motor vehicle employees (11 motor vehicle operators and 3 tractor-trailer operators) from the craft and/or installation at the Alhambra/Industry bid installation (Event 49207). This impact is based on an approved AMP.

The impacted employees will be notified of their involuntary reassignments by separate letter.

By copy of this notice, we will withhold fourteen (14) full-time assignments in the clerk, carrier, mail handler, motor vehicle and/or custodial crafts in sites within a 50 mile radius of the impacted bid cluster.

Attached you will find copies of the automated impact statement, the operational data that supports the excessing, the list of sites at which withholding has been authorized and the names of the junior impacted employees.

Please include this impact on the agenda for our next meeting. If you have any questions you may contact me at (858) 674-3193 or Linda Shumate, Area Complement Coordinator at (858) 674-31

Attachments

cc: Area Manager Operations Support Area Manager, Human Resources Area Controller Area Manager, In-Plant Support District Manager, Santa Anal District Area Complement Coordinator with attachments Manager, Human Resources - Santa Ana with attachments District Complement Coordinator, Santa Ana District with attachments Chris Jackson, NALC with attachments David Ross, NPMHU with attachments

11255 RANCHO CARMEL DR. RM. 227

SAN DIEGO, CA 92197-4400

PHONE: 858-674-3180

FAX: 858-674-3131

Page 2: Western Regional Coordinator, APWU

- 2 -

TC's (2) with attachments

Page 3: Western Regional Coordinator, APWU

WorkHour Impact Report

Impacted Bid Cluster

Installation Address

Area Name

Impact Type

Date of Impact

Period (Dates) of Review Performed

Report Prepared By

Report Prepared Date

Reviewed By

Phone

ALHAMBRA POST OFFICE

Event 49207

PACIFIC

Reduction Other Than by Attrition

07/11/2015

01/04/2014thru 01/16/2015

Joseph Badalewski

01/09/2015

Abelardo Munoz

(714) 662-6300

Page 4: Western Regional Coordinator, APWU

WorkHour Impact Report Craft = MOTOR VEHICLE

A B C D E F G Current Planned Weekly Monthly Annual Annual Current Average Weekly Hrs Savings Work FTE FTE Weekly Hrs Savings Hours Savings Yearly Hr

Hrs Savings Rate

Total 726 19 -707 -2828 -36764 -20 1872

OverTime Impact

Current Current Planned Additional Percent Planned Planned OT OT Rate OT per Planned OT Planned OT Hours OT Rate

Average Week per Week OT per per Weekly from Week Week

Hrs changes

Total 60 8.3% -60 0 0 0%

Page 5: Western Regional Coordinator, APWU

WorkHour Impact Report Casuals

a. Current Number of MOTOR VEHICLE Casuals on Rolls

b. Current Total Non-OverTime MOTOR VEHICLE Casuals Hours per Month

c. Planned Reduction in Total Non-OverTime MOTOR VEHICLE Casuals Hours per Month

d. Number of MOTOR VEHICLE Casuals that will have Reduced Hours

e. Number of MOTOR VEHICLE Casuals that will be Terminated

f. Number of MOTOR VEHICLE Casuals Remaining After Impact

g. Provide Narrative Justifying need for Remaining MOTOR VEHICLE Casuals

There are no casuals in the motor vehicle craft.

Mail Handler (MHAs)

a. Current Number of MOTOR VEHICLE MHAs on Rolls

b. Current Total Non-OverTime MOTOR VEHICLE MHA Hours per Month

c. Planned Reduction in Total Non-OverTime MOTOR VEHICLE MHA Hours per Month

d. Number of MOTOR VEHICLE MHAs that will have Reduced Hours

e. Number of MOTOR VEHICLE MHAs that will be Terminated

f. Number of MOTOR VEHICLE MHAs Remaining After Impact

g. Provide Narrative Justifying need for Remaining MOTOR VEHICLE MHAs

There are no MHAs in the motor vehicle craft.

Part Time Flexible (PTFs)

a. Current Number of MOTOR VEHICLE PTFs on Rolls

b. Current Total Non-OverTime MOTOR VEHICLE PTFs Hours per Month

c. Planned Reduction in Total Non-OverTime MOTOR VEHICLE PTFs Hours per Month

d. Number of MOTOR VEHICLE PTFs that will have Reduced Hours

e. Will there be any MOTOR VEHICLE PTFs Excessed from Craft or Installation

If Yes how Many MOTOR VEHICLE PTFs

f. Provide Narrative Explaining need for Excessing

There are no PTFs in the motor vehicle craft.

City Carrier Assistant (CCAs)

o o

o

o o o

o o

o

o o o

o o

o

o

NO

o

a. Current Number of MOTOR VEHICLE CCAs on Rolls 0

b. Current Total Non-OverTime MOTOR VEHICLE CCA Hours per Month 0

c. Planned Reduction in Total Non-OverTime MOTOR VEHICLE CCA Hours 0

Page 6: Western Regional Coordinator, APWU

per Month

d. Number of MOTOR VEHICLE CCAs that will have Reduced Hours

e. Number of MOTOR VEHICLE CCAs that will be Terminated

f. Number of MOTOR VEHICLE CCAs Remaining After Impact

g. Provide Narrative Justifying need for Remaining MOTOR VEHICLE CCAs

There are no CCAs in the motor vehicle craft.

Postal Support Employees (PSE)

o o o

a. Current Number of MOTOR VEHICLE PSE on Rolls 6

b. Current Total Non-OverTime MOTOR VEHICLE PSE Hours per Month 888

c. Planned Reduction in Total Non-OverTime MOTOR VEHICLE PSE Hours per Month 888

d. Number of MOTOR VEHICLE PSE that will have Reduced Hours 0

e. Number of MOTOR VEHICLE PSE that will be Terminated -6

f. Number of MOTOR VEHICLE PSE Remaining After Impact 0

g. Provide Narrative Justifying need for Remaining MOTOR VEHICLE PSE

All PSEs will be separated.

Page 7: Western Regional Coordinator, APWU

WorkHour Impact Report

Part Time Regular (PTRs)

a. Current Number of MOTOR VEHICLE PTRs on Rolls

b. Planned Number of MOTOR VEHICLE PTR Positions after Impact

c. Estimated Number of MOTOR VEHICLE PTR Attrition

d. Will there be any MOTOR VEHICLE PTRs Excessed from Craft or Installation

MOTOR VEHICLE PTRs

e. Provide Narrative Explaining need for Excessing

There are no PTRs in the motor vehicle craft.

Full Time Regular (FTRs)

a. Current Number of MOTOR VEHICLE FTRs on Rolls

b. Planned Number of MOTOR VEHICLE FTR Positions After Impact

c. Estimated Number of MOTOR VEHICLE FTR Attrition

d. Will there be any MOTOR VEHICLE FTRs Excessed from Craft or Installation

If Yes how Many MOTOR VEHICLE FTRs

e. Provide Narrative Explaining need for Excessing

The AMP event will result in the reduction of all MVS drivers.

o o o

NO

o

14

o o

YES

14

Page 8: Western Regional Coordinator, APWU

WorkHour Impact Report-MOTOR VEHICLE

Preliminary Summary

a. Total Planned Non-OT Reduction per Month for Regulars and PTRs

b. Planned Reduction in Total OT Hours per Month

c. Planned Reduction in Casual Non-OT Hours per Month

d. Planned Reduction in MHA Non-OT Hours per Month

e. Planned Reduction in PTF Non-OT Hours per Month

f. Planned Reduction in CCA Non-OT Hours per Month

g. Planned Reduction in PSE Non-OT Hours per Month

h. Total Planned Non-OT Hours per Month

i. Total FTE Savings

-2004

-240

o o o o

-824

76

-20

Page 9: Western Regional Coordinator, APWU

1""'~ •••••• ~."':,,>, ''* ,./ ~-~"!'" •• ... i·~""~ '-'~ ", •• ' \'_'1 ··t,~, ., "" . , .

C ~ .. :. i - - ~ -' ~ AMP Data :EntlfY ~t(lge - - ~ - - ;

Type of Distribution to Consolidate:. Facility Name & Type:'

Street Address: City:

State: 50 Facility ZIP Code:

District: Area:.

Finance Number: Current 3D ZIP Code(s):

Miles to Gaining Facility: EXFC office:

Plant Manager:' Senior Plant Manager: :

District Manager:. Facility Type after AMP:

Destinating Industry P&DC 15421 E Gale Ave Industry CA 91715 Santa Ana Pacific 050109 917,918 24.9 Yes Steve Worley James Clausen Gerald K Ahem Post Office

Facility Name & Type:' Anaheim P&DF Street Address~0a

~~

(/Ci : Anaheim State: CA

50 Facility ZIP Code:. 92899 District: Santa Ana

Area: Pacific Finance Number:· 050224

Current 3D ZIP Code(s): 928 EXFC office: Yes

Plant Manager: Senior Plant Manager:

District Manager:

Dennis Moulds James Clausen Gerald K Ahern

MODS/BPI Office

Start of Study:: 09/15/11 Date Range of Data: Jul-01-2010 : Jun-30-2011

Processing Days per Year: 310 Bargaining Unit Hours per Year: 1,745

EAS Hours per Year: 1,822 Date of HQ memo, DAR Factors/Cost of Borrowing/ New

Facility Start-up Costs Update

Date & Time this workbook was last saved:

Area Vice President:' Drew Aliperto Vice President, Network Operations:' David E. Williams

Area AMP Coordinator:: Steve Mummy HQ AMP Coordinator: I Lane Stalsberg

Package Page 1 AMP Data Entry Page

Page 10: Western Regional Coordinator, APWU

Executive Summary

Losing Facility Name and Type: Industry CA P&DC

Street Address: 15421 E Gale Ave

City, State: Industry, CA

Current 3D ZIP Coders}: 917, 918

Type of Distribution to Consolidate: Destinating Miles to Gaining Facility: 249 tc Anaheim CA 37 to Sama ;>,na CA

Gaining Facility Name and Type: Anaheim CA P&DF and Santa Ana CA P&DC

Current 3D ZIP Coders}: Anaheim CA P&DF 928; Santa Ana CA P&DC 926,927

Savings/Costs Mail Processing Craft Workhour Savings = $7 ":48 from Workhour Costs - Proposeo

----------~~~ Non-MP CraftiEAS + Shared LDCs VVorkhour Savings (less MainVTrans) ==

----------------PCES/Ef\S Supervisory Workhour Savings ==

---~:..:.=.~:.-

Transportation Savings = ------~~~~~

Maintenance Savings = ------~~~~~

Space Savings = -----......::.::.-

Total Annual Savings == Si3,198,555

from Other CUrT' vs Prop

from Other Curr vs Pr'Jp

from Transportation (HeR and PVS)

from Maintenance

from Space Evaluation end Other Cosrs

Total One-Time Costs =: $325,4510 from Space EvaluatIOn and Diller Costs ---~.;..;;;.;..;.;..;..;,..

Total First Year Savings = ==~;;;;;,;,,~~

Staffing Positions

Craft Position Loss = ___ ..:3..:.7 .:..7 __ _

PCES/EAS Position Loss == ___ :::.:... __ _

Volume

Total FHP to be Transferred (Average Daily Volume) :=

Current FHP at Gaining Facility (Average Daily Volume) :=

.--------~~~~

1,949,136 at Anaheim at Santa Ana

,_05",g FaCility Cancellation Volume (Average Daily Volume) = _____ ........:::.:::...:.:..:...:..::....

Service

Service Standard Impacts by ADV

First-Class Mail®

Priority Mail®

Package Services

Periodicals

Standard Mail ::',:00(;/ to iJe:$UnatIDl\ :){!lgJ~ ZIP Code volume IS not

aV2l1l~lblf;

from Staffing, Craft

from Stafffng ,PCES/EAS

from Workhour Costs - Current

from Workhour COSIS - Current

(:;; Total TPH / Operating Days)

Page 11: Western Regional Coordinator, APWU

AMP Savings/Costs

Mall Processing Craft Workhour Savings Non·MP CrattJEAS + Shared lDCs Workhour Savings

(less MaiCltfTrans) PCESfEilS Supervisory WorKhour Savings

Tra:1sportation Savings Maintenance Savings

Space Savings Total Annual Savings

Staffing Positions

Craft Staffing Changes Industry

·646

Management Staffing Changes Industry

·43

~ $3,009,002

SO $38,978

$4,826 96,048,541

$0 S9,101,447

~ 51

Santa Ana $4,028,146

so SO

92,063,109 SO

94,097,108

Santa Ana 218

Santa Ana 15

Total 97,037,148

SO $38,978

'Tota! ~377

Page 12: Western Regional Coordinator, APWU

Approval Signatures t as\ Savco' Octo'tx:i' ~·1. 20"1 '\

city: S~~:~~~---------------------------------------------------------

Fm:llity ZIP Code: ~=~ __ _ Fina'ftc~ Nutnl:>&r: -'E=-'=c:::---

Currcnl30 ZIP Code(s); .;:..;..:..o..;::..:..::...-~ ________________________________ _

Type oj Distribution to Consolidate: -'O;;..;TI.;.<·9z...&.:::...;D;..:est=. _________ _

Gaining Facility Name and

StroetAo'cre$S; .. ~~~~~~::..:..:~~---------------------------------­city: -;; su~:~~~~---------------------------------------------------

faciJity ZIP Code: ~-=-=-::-,.. __ _ Ffmmce Number: -:-::.,:.;:~ __ _

Current 3D ZlP Code(s): ..::.;:-"-__________ . __________________________ _

-I \ha1 1 am a=untable !or and reponmg systems. Including fmanoa! repOrts and those re1a1,ng 'to comuhance '>'lith ~tr<3:cting, complemen't or slmi~r efforts ir.VO}V1ng the ~nv{:-stment ana ex.;Ja:JdTt:.J:~ 01 hJ~s as \'~.?11 "a"s 'all systems 10"Sef'"\nOC to 'Oor customers.

_LQ$JN§ FACILITY,

Postmaster or Plant Manager:

Pr-nledNamil

Senior Plant Manager:

Distri<:t Manager:

GAINI~fI:t,

Plant Manager:

[).;ole

Senior Plant Manager:

District Manager:

Area Vice President:

F~lnted Name

lmpl(!men~tion Date:

Approved: [D' -' Dis .. pproved:

Vice President. Network Operations:

Comments: _________________________ _

rev 1213il2038

Package Page 2 AMP Approval Signatures

Page 13: Western Regional Coordinator, APWU

Summary Narrative Last Saved February 16, 2012

Losing Facility Name and Type: Industry P&DC Current 3D ZIP Code(s): 917, 918

Type of Distribution to Consolidate: Destinating

Gaining Facility Name and Type: Anaheim P&DF Current 3D ZIP Code(s): 928

AREA MAIL PROCESSING (AMP) PROPOSAL Executive Summary

Industry P&DC Consolidated Facility

Back round

Anaheim P&DF Gaining Facility

The Santa Ana Performance Cluster with assistance from the Pacific Area office has completed an Acea Mail I Processing (AMP) study to determine the feasibility of relocating all Industry P&DC destinatlng flat and originating/destinating packages operations for processing at the Anahelnl, CA P&DF The prcposal encompasses mail processing for ZIP code ranges 917 and 918.

Cu the Industry, CA P&DC is an owned facility that processes all outgoing package and ietter, flat and package mail In the 917 and 918 ZIP ranges. Outgoing letter mail, currently processed through Friday at the Industry P&DC, is being moved to the Santa Ana, CA P&DC under an approved AMP vhich is scheduled for implementation by April 1, 2012. Saturday collection mail is processed at Santa Ana,

CA P&DC on Saturday. With the approval of this AMP study, Industry's destinating flat operations and originating/destinating packages processing operations will transfer to the Anaheim, CA P&DF. with processing operations, the Industry facility houses administrative offices, and a Business Marl Entry Unit (BMEU) and a retail unit. The Industry facility is approximately 24.9 miles from the Anaheim, CA P&DF

concurrent AMP feasibility study was conducted which proposes to move the Industry, C/-\ P&DC destinating letter mail proceSSing to the Santa Ana, CA P&DC.

Financial Summa nnual baseline data came from July 1, 2010 - June 30, 2011

consolidation of originating operations are

Total First Year Savings Total Annual Savings Total One-Time Costs

$ 8,308,992 $ 9,101,448 $ (792,456)

FinanCial

The total FHP (average daily volume) to be transferred to Santa Ana is 286,339 pieces.

Customer Service Considerations:

II feasibility analyses are based on the proposed service standard changes to be filed

proposed for thiS

PRC in November of 2011. Due to the size and complexity of any potential retention ·of ht service for inter-plant Priority mail, further modifications to the current stUdy will need to be considered There are no impacts to the BMEU or Retail units as a result of this AMP. They will continue to be available In the current location within the current operating hours. There will be no changes to the collectioll box times.

rev 06/10/2009

Package Page 4 AMP Narrative

Page 14: Western Regional Coordinator, APWU

Summary Narrative (continued)

Sumrnary Narrat:ve Page 2

service standard changes associated with this Area Mail Processing consolidation are u resolution of both (a) the rulemaking in which current market dominant product service standa:ds in 39

121 are being evaluated, and (b) all remaining AMP consolidation proposals that are part of the same rationalization initiative. A complete file reflecting any new service standards will be published at

If!.'-"-'-'-'-'-":'=~.="'-' once all of the related AMP decisions that provide the foundation for new service standards are and Express Mail service standards will be based upon the capability of the network

ns ortation Chan es: Logistics and RAU changes will be required as necessary during the HQ/Area construction of the Changes tab. Highlights of some of the proposed changes include:

he transportation SChedules were established with no OND requirements for First Class and the premise of finalizing DPS at 0400.

for the proposed AMP increases the HCR cost by $344,471 With

transportation schedules were established with no OND requirements for First Class and

R 92810 Added four (4) round trips servicing Anaheim P&DF, Ontario UPS and Ontario THS

mail and

mail.

Added four (4) round trips servicing Anaheim P&DF to Los Angeles ISC Two add ractorrTrailers will be needed at a cost of $16,000.00 annually.

urrent projections from the AMP study indicate a net reduction of 595 craft employees with Industry P& 646 and Anaheim P&DF adding 51 pOSitions. There will be a net reduction of 35 EAS pOSllions,

ndustry P&DC losing 43 EAS positions and Anaheim P&DF adding 8 EAS a matter of POliCY, the Postal Service follows the Worker Adjustment and Retraining Notification Act's

notification requirements when the number of employees experiencing an meaning of WARN would trigger WARN's requirements. Some or all of the impacted described

may not experience an employment loss within the meaning of WARN due to transfers or reassignments

5 AM?

Page 15: Western Regional Coordinator, APWU

Summary Narrative (continued) Summary Narrat!ve Page 3

Ana!leirn

1 Craft = FTR+PTR+PTF+Casuals

2 Craft '" F1 + F4 at Losing; F1 only at Gaining

Equipment Relocation and Maintenance Impacts:

Anaheim P&DF will be adding 2 AFSM's and 3 SPBS/APBS machines.

Space Impacts: The total interior footage of the Industry P&DC is 459,542 sq ft. With the approved AMP, the expected of 303.361 sq ft will be designated as an inactive storage area pending further evaluation of loca! requirements. Infrastructure construction & soft costs for the Anaheim P&DF Include

Other Concurrent Initiatives: Industry is not impacted by any other significant cost savings program occurring during the fl.MP process. Since the commencement of the AMP study, Santa Ana has consolidated craft pOSitions and is scheduled for AFCS 200 deployment in mid 2011. Santa Ana will absorb mail volumes from the AMP consolidation minimal increases in craft complement.

Package Page 6 PJV1P Narrative

Page 16: Western Regional Coordinator, APWU

24 Hour Clock Last Saved February 16, 2012

Losing Facility Name and Type: Industry P&DC Current3DZIPCode(s): 917,918

Type of Distribution to Consolidate: Destinating

Gaining Facility Name and Type: Anaheim P&DF : 928

~ ~ it ~ ~ II . ~

§ ~

fJackage Page 7

~ i ~ ~ r " ~ 3' OJ ~ tl , i II o ,;" 'I

o ~ ~ ~ ~

~ g &' J: ~ ~ 0

~ c

AMP 24 Hour Clock

Page 17: Western Regional Coordinator, APWU

Losing Facility Name and Type: Industry P&DC Current 3D ZIP Code(s): 917, 918

Miles to Gaining FaciHty: 24 9

Gaining Facility Name and Type: Anaheim P&DF Current 3D ZIP Code(s): 928

Package Page 8

MAP

AJ/IP MAP

Page 18: Western Regional Coordinator, APWU

(WorkBook Tab Notification - 1)

Losing Facility: Industry P&DC

f~21okage Page 10

Stakeholders Notification Last Saved February 16.2012 Stakeholder Notlncatlon Page 1

AMP Event: Stan of

rev 07/16/2008

AMP Stakeholders Notification

Page 19: Western Regional Coordinator, APWU

Function 1

P<;lckage Page 11

Function 4

"'.00 "'.00 "'.00 "'.00

.'I----:-::-::=-::l "'.00 "'.00

Workhour Costs· Current Last Saved: February 16. 2012

Page 20: Western Regional Coordinator, APWU

Packoge Page 12

Page 21: Western Regional Coordinator, APWU

i cw(r'r~nl I Opcr'ltlon

NumtxH$

(21

~/_ Movud to

G::linlng

PI Current

Annu;!l FKP Volume

(4)

Curren! Annu;)! TPH Of NATPH Volume

151 Currenl Annu;:)!

Workhours

1'1 Curren!

ProductMty (TPH or NATPH

i1l CUrrent Annu;!!

WorKhour Cosh

~~-:--'-----+---------+-~---'-I----'---+----~= ~~---'------r-' -- ------.,-- .-----

--._---_. +-------_.------ --_._--_._.. . __ ._-----_. ----

----------'---' -_ .. -

i' --r-------I- ---------------+_ f--------1------

1- -- 1----·- "-'--1--'---.-----i--

. -_. . ---+---,

__ 4_ .. ________ ..... • .. ·-·c----- ------- 1-

-.------.;--i----·--------------+-·------~ --~-------~------.-.---

----_+_-----t------+---~·-~t_-.. ---_+------I--------i -----.--I--------~---------i--------~------

---+-------t----.- ------1--- . --.- ···-f------+------- .... -·+-----·-------+-------+-------·---------1 ._ .. _--- ".-

- .. - -_. . '---,---

---'---

-- .. -

'---'--" ._------.- .. -

-------------_.

.. -----_._--r---+- )_._-

.-- ... ------ ---

--+_. - ... _--+---_. ,--.. -.. -- --- i--

----._--_ .. _ .. _ ... _. __________ .1 ______ .. __

Package P;il::tC' 13

-----­.--

I'i \ 191 ,I Current _I. Moved 10

Operation 11.0:;ln" 1 Numbt'lrs , .,

(10) CUffenl

Annu;::i FHP Volume

C~;fi~rlt ! Annu;,1 [Pi". or I NAT?K VOjume

(i2)

Current Annual

WorKhours

--....... - .--+------1-----------+-------.+- -------.. ----+------- ------

I .. -.--.----+----.--

-j~~-I

.----. f-.-.. _-1------1-----------+ --------

---_ . ..,,------ .. + .------~-+---.--

----~----t---------+------_+_----------t----

.. _---

._--+----_.­.. -.

----::1

-----

------_ .

._---------_1 ---

r---·--I---------j--------I-------------i-----.. --+--------- i ._---

+ .. ---+----------+----- ------------------..,--------+---------+------------+---. __ ._-. ------

-------

~:=t .- -_._------.... . - ,-------_. ,----

. -- ,----- ---.- '--' .. ...

J --------1 -+- ... --

, _______ ._ . .1.. --_._-AMP WorKhouf

Page 22: Western Regional Coordinator, APWU

I

f- ._ .... . - -..

Pi Cwrrun;

Ann ... ;)1 r'IP Vv,om,

-... .. _.- - -.-

(7( Cvrf1;n\ Ann\..l;J1

WOrlHlOUi COHS

f·-- -'. -'- .-. - ... --f-.- .. --

f-- --_-'-_~: f----- ,_.,._ ..... _-+-__ ._. __ ._. __ ,------_... ._._._---_ .. ,. ._---.-+---_ ... - -,----

.--.----f--------.-.

--!---_._--j... .._-------

:-- . ··_-_·_·_··---1---· ' ... - .. - .. ----,--+---- -.. . .. _ .... -.- '---

--+---.-~--. -+--·----~-------1 .. _-- t .--

1------,_. .. -'-1-.... - --- ! ....

_ ..

"-'-, .. - -.-

....

' .. _.-----.+-.-----1

I----i--- -------~

--+-

. ..

. _. ._---

1-----. __ ' __ .. ' __ ' '-

.. -­_ .. -----j----- -. ~

---+-----l- -.. ------." ------ --_.

(. I---------I-------·---~------·-···-+ .. ,-· -4--------·~--· .--.--~

-_ .. __ .. 1--··------+_·_·· .. .--1---.-- --.-----------1'--. 1-'---"- . .. --

._-

, .... ,_. -

., - ._.

I .. · .

Pocr.age Page 14

c~~f~lnt j c~~:~n: II ~ i 2 )

Current • PO; I ii" 1 CWffe-1l1

i (rPM 01- ;'JATPHl \ Wor\(flO,,( Co:.,:,

Annw~l fHP , AtH1\,1::li TPi, or

Volume Nr~ TPH VOlvm\, :

1-· ..

( ....

--+-----------r-----------+-----· .. -.... - .. -l-----.- . --

.. --- .. -1-··---····_··· .--------

t-·· .. ---._+._--. ... , .. --- --- ---- i-

J I··· -

.--

'''- . --,_ .. ---

·---1-·

.- -' .

-t---... ----·I ..

---

._ ..•

_ .. ' .. _.-­...

----4--- .. - ..... --; ... ------ .... ---._ .. _-

f-----+----+-----.-

_ .. !---_.... . ...

>_. _____ ._~---... -.... I_-.-----.~~.--------------+---------_4 _____ +i --- .. ----

:~::------ .. ~:- ----- -.. -~-~-~:-=~~j--,-.----1----.. --

Page 23: Western Regional Coordinator, APWU

:"osing Facility:

Puckuge Page 17

WorKhour Costs· proposed Last Saved: February 16, 2012

Gaining Facility:

AMP Workhour Costs + PWp()S8C

Page 24: Western Regional Coordinator, APWU

lPfO~(K1 p<~ Pn>~ (4) I J 1"1

P<opo.oo Proposed Ptof'='d 1 OP'l't~tioo Annual FHP AnnunlTPH 01' Annual Ptoductlvily AAnuru

Number.l Volume NA1?H Voiomo W~ i (TPHorNA1?Hl Work-hour C()$.t$ 7S0 SGO,GS::!

I 0 No (;ale 0 No calc 0 No calc 0, No calc

° No calc

C-'--"-- I f-------1--' 0 No Calc , 0 No calc 0 No calc 0 No calc 0 No calc --"._-, ... -, 0 No Calc 0 No calc 0 No Calc 0 NoCak --_ ... _-

~.-"~---- --- --0 No calC

0 No~\c

0 No calc

0 No Calc --0 No "calc 0 No Calc 0 NoGal 0 No Calc ---------- 0 No calc ------~-0 No Calc 0 No Galc

0 No Calc ,------ --a No calc 0 No Gale a No calc a No calC

0 No Galc ---- 0 No calc 0 No Calc 0 No Galc

0 No Calc 0 No Gale a No calc a No calc 0 No calc 0 No calc

° No Calc 0 No calc 0 No calc --- 0 No Calc 0 No calc 0, No calc a NoCa\.c -- 0 -~---.-- -- I ----, .. _ .. _- '---- a No Galc 0 No calc 0 No CalC --1----"- ----- No Galc ---- -------- 0 No Calc --0 No Calc

Peekage Page 18 AMP Wori<hour Costs· Proposuc

Page 25: Western Regional Coordinator, APWU

'71 I 181 I 191 I (10) ! (1'\) I 112)

Proposco ! Proposoc Ploposod Propo:'>N! OpO[Oltlon i Annu;)j FH? I 0' I Annl..::JJ

IIT?H 0' NATPH] I Annu:J1 Numbers I Volume NATPH Volume! Wor\<hour:; Wo(\cl1our Co:::t.:;

0 No Cole ~-.-.--- ----_.

0 No COle --j ---.. -_. 0 No Calc

--_._-- ----.- --t----- C No Calc

I I 0 No CalC

~--0 No Calc

No Calc 1

r--,- Ne CalC .. .. 0 No Calc ---

No Ca,c ._.-0 No Ca'c

--- '._-1--- No Calc _. 0 ·Z;~ ------ --- ----

.. P-i--

--'-------_.- i--.. ----- -{ [,0 cale --No CalC

-~--. --------_._--.. ~~ _._. -_.-_._-- ._--- ---1-'-- ------ ·------Z

_.-,-- -"- --NDCaIC ,-_._-

+ --:~~ ---""

1---'-- _._._---- ~.-~---.- --.----.. -.-- -~-T

-- ----{- NccaiC No Calc

---- ._.L ___ --{- _.___ No Calc

1-·------ -----_. N£f~c: 0 No ;8iO

~-~F-- 0 No Colc G No Calc

No c:",e 0 No Calc --------.-

-H- No Cole No Cole --No Cole

-.'~'."

--.- ---~ No COlO

No Calc ----._------ _. --{ i----- ,"0 Cn"

.. --'-No CalC

---- ,--'--- Ne 'a-", ____

No I,,'e

--------_.- "--,---. ------. -i ,---- No lole No 'ale ,---- --- -.~-.. r-- No 'ale ----

r- -- --- ---'--'-' ----_. .. -% ,---~;~ -- --.. -----r-- -----_ . -% -- :~~~ I .. -_.------ '---!-_ .. -------

-:i .~--f~ ,-_ .. --_._--'--0- --- Ne ColC

Ne Co'e ------ -------~ .. -.... -~-~ ._-- ._----- _0 No Col -f- _Nc~c:

c---- ------- .~;--~~g~ ----- _2.1. ___ N~~ij ---- --.-~---

r ..... MP Wor!<',rlour

Page 26: Western Regional Coordinator, APWU

1'1 lSi 161 ('0) ("1; ~ ~ 2)

Proposod Proposed Proposod Proposed Propos-uc Annu"l PrOductivity Annu~!

Worl<houfs TPK or NATPH) Workhouf Cost!;

f:l ackage Page 20 AMP 'v'Vor)t,;fOur Costs Pro;:;058d

Page 27: Western Regional Coordinator, APWU

{7l (8) Proposoo i PfOpO~CO

OP(l13tlon i Anr1w::.f FHP Volume

P uckogc Page:? 1 AMP Wo(khOu~ Cost::,

Page 28: Western Regional Coordinator, APWU
Page 29: Western Regional Coordinator, APWU

ProPQ$i:d A nn'.!.:) I WQrkhour Co~t ~_~.-::.=="'--'~ __ _

MlrwnUrn Function 1 Workhour Suvlngs n,lflllwi ;,~Pll~'~Ull\h PfOPor;I'ct w(;rktlOlIi

P aCkiJg8 P 3ge 23

,)pp!ietj It) Upt:l(lllOn~, ;11 ttlC 8;)lf1l1\9 f;l\:IIHy)

VVorknou r Costs

Page 30: Western Regional Coordinator, APWU

Other Workhour Move Analysis

Losmg F:lolity. lndustrv P&OC G;>","9 Focility. Anohoim P&!)F

Page 31: Western Regional Coordinator, APWU

~~:~~ -T--T -·_·--1 -.~

-"-

t-==:-j _._--c--.

---::..-::-.:.:- .--.-.

--------

f·-----' -_. f- ---~ .. -c-----. _., 1--- --

- .-.. _-

I

-1-' -----i 1---

c-

. - 1-: --_ . -.-

.. -.. - ~-. .-._.

'-_ ... -.~-

==_.- _ ... .- --+ . -t-.-. --- r-- i-- - -

--r'---' f----;..-

_ .. . _-r--·····- -.. '- -_._-----

'-'--.~ ..

-.. - -.-.--.- t-·· f---- ------

---I-'-~ '-- [ ---.--. --

._.- _.- _ ... -. _.-._-f--· -- __ J .• _____

f':~ --- '-- .-.. _-.--, ~- .-------

f-

i

~

--- :=::~ -_ .... _-

I j

'-, _J,

--f----

c---'-

i--- -f---- -~::=1

--- ---I - -~

.- ... -._ .. -,--'-' ,-- -_ ... ' !- .• - 1-· ---

-_. _:.==-- I --_.

i--- 1---------

F -1 _.--- .- -I

:=:1 AMP O\:lur Curt Prop

Page 32: Western Regional Coordinator, APWU

I i

--- ---f--~--- -------1 f---- -- 1---- I ----"j

I

oR n Totu!s ~

0 '" 0 SO _0

~ "'''' J 88: 11>'

",£20;

Page 33: Western Regional Coordinator, APWU

,-'--- :------'

r==:r-=- '-

'-- ------

---i---+ ----i----/---i-- '- r-- --i--- --,---f----,------'-t--" f---.---,-r- -- ---

---F=--=:: 1----1---

---- ---j

i--- ------1

:-:::~ "----j

------- -- ,-

r-- -------- --"--J

-----, ,-- --- ,----- ----i--- ---- f- -"" ---- i::= I"'" -----" c, __

1---: -, ---- i--- c. __ ,----, ---- ----- ------ -----" ,-,-~ r- '----1 ---

1----- '--- -- ! ------------- '---'

- - i --- ,-

, "-1 -,---- ----:

"==:::~ r .--;

--S~

\------

,--r--- ----

---

,----

=tj ==~ -- ---

---~:::-~~=::J

r-- '--- i-- , ___ " __ J

L-"':=~t L-

A/v',P OthC"1 CUrT

Page 34: Western Regional Coordinator, APWU

Totals

1i38Q

o

S75S.e! I $1S5.t! I

AMP OtJl<,."f CUff V"'; PrOQ

Page 35: Western Regional Coordinator, APWU

Staffing - Management Last Saved: February 16,2012

Data Extraction Date: 09/19/11 Finance Number: 050-;09

Management Positio (1) (2) (3) (4) (5 (6)

Position Title Level Current jth

On-Kol's Staffing Line Staffing

1 PL_i\NT MANAGER (3) P:':;ES-Ol 1 1 0 -1

2 MGR MAINTENANCE EAS-24 1 1 0 -1

3 MGR IN-PLANT SUPPORT EAS-23 1 1 0 -1

4 MGR DISTRIBUTION OPERATIONS EAS-22 2 _,~;,,',',,;i1,{'" 0 -1

5 MGR MAINTENANCE OPERATIONS EAS-21 2 I;{i'~i)~>:'"~,' 0 I -1

6 OPERATIONS INDUSTRIAL ENGINEER (Fi EAS-21 2 2 0 -2

7 MGR DISIRIB,UILmLOPERATLONS .. " ... - ,', ,EASc20 2 I--·,.·j·',~ -,', 0 I -1

8 OPERATIONS SUPPORT SPECIALIST EAS-20 1 1 0 1 -1

9 MGR MAINTENANCE OPERA,TIONS SUPPT EAS-19 1 1 0 -', 10 I MGR TRANSPORTAT1ON/NETVVORKS EAS-1S 1 1 0 I -1

--11 OPERATiONS SUPPORT SPECIALIST cAS-18 1 1 0 ·1

12 EMPLOYEE IN MODIFIED ASSIGNT (ES) EAS-17 1 1 0 ·1

13 OPER/,TIONS SUPPORT SPECIALIST E,AS-1? 1 1 0 ;

14 SUPV DISTRIBUTION OPERATIONS EAS-17 23 .:1,9 0 -19

15 SUPV M/,INTENANCE OPERATIONS EAS-1? 8 ,',',]; 0 -7

16 NETWORKS SPECIALIST E/,S-16 2 2 0 -2

17 SECRETARY (FLD) EAS-12 1 1 Q _1

18 19 20 21 I 22 1 23 , J 24 i

25 i 26 I i 27 I

28 29 30 I 31 32 33 34 I ,

I

35 I 36 !

37 i I

38 I

39 40 41 42 ,

I 43 I

Package Page 30 f'Jv1 P PCESfEAS

Page 36: Western Regional Coordinator, APWU

I Ii II

'I Ii I I

I II

I ,I ,

I 44 I 45 ,

46 47 48 49 50 51 52 5.3 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73

74 75 76 77 78 79

Retirement Eligibles:

Package Page 31

, i I

I I

I ,

I

I i ,

I T I

I

I I

I I

I I

I

I

I I

I Totals 51 43 oT (43)i

14 Position LOSS 43 I

AMP Staffing - PCES/EAS

Page 37: Western Regional Coordinator, APWU

I

II I' ,I Ii II

II

II II

II II II Ii Ii II Ii

Ii

II

I

Gaining Facility: Anaheim P&DF -----------------------------------------------Data Extraction Date: 09/19111 Finance Number: 050224

Management Positions (12) (13) (14) (15) \ ( I n,(17)

Position Title Level Current A,uth Current , Proposed

Line Staffing On-Rolls I Staffng ,-,merence

1 MGR PROCESSING/DISTRIBUTION FCL TY EAS-24 1 1 1 C

2 MGR MAINTENANCE EAS-21 1 I 1 1 0

3 MGR DiSTRIBUTION OPERATIONS EAS-20 1 0 ~ i 'i

4 MGR DISTRIBUTIO['-i OPERATIONS EAS-19 1 1 ~, i 0

5 MGR MAINTENANCE OPERATIONS EAS-1S 1 1 1 , 0

6 MGR TRANSPORTATiON/NETWORKS EAS-1S 1 1 1 0

7 OPERATIONS SUPPORT SPECIALIST EAS·1S 1 ,() i l 1

8 OPERATIONS SUPPORT SPECIALIST EAS·17 1 1 1 I 0

9 SUPV DISTRIBUTION OPERAT!ONS EAS-17 I 14 14 19 I 5

10 SUPV MAINTENANCi:: OPERATIONS EAS-17 5 4 5 I 1

11 SUPV TRANSPORTAiION-OPERAT1ONS EAS-17 1 1 1 0

12 SECRETA,RY (FLO) EAS-12 1 I 1 i 0

13 I 14 i 15

, I

16 I 17 I 18 I 19 20 21 22 I

23 ! i I

24 I 25 I

26 I 27 28 29 30 i

31 32 I

33 I

34 I

35 I

36 I I

37 i 38 39 !

I 40 I

41 I

42 43 44 45 I 46 I

Package Page 32 AMP Staffing· PCES/EAS

Page 38: Western Regional Coordinator, APWU

47 48 1 49 I I

50 I I

51 52 53 54 I 55 56 I

57 58

1 59 I 60 1

1

61 ! 62 i 63

I I

64 i 1 I

65 i I 66 67 68 I I 69 70 I 71 I 72 73 i 74 I I 75 76 I 77 I

78 I

79 I I

Total 29 26 34 I 8 I Retirement Eligibles: 8 Position Loss (8)

Total PCESfEAS Position Loss: ===3::::;5=== (This number carried forward to the Executive Summery)

33 AMP Staffing - PCES/Ef\S

II ,I I, II II

Page 39: Western Regional Coordinator, APWU

Transportation - PVS Last Saved: February 16, 2012

Losing Facility: __ =~==-____ .....:... _________ _ Finance Number: _=:::~~= __ -:-__

Date Range of Data: __ -'--'--'-__ --' __ -'-__ -'-__

"" (1) """{2)" """" "" (3) Current Proposed Difference

PVS Owned Equipment Seven Ton Trucks 7 0 7 Eleven Ton TrucKs 3 0 3

Single Axle T metors 1 0 j

Taf)oern Axle Tractors 3 0 3

Spotters 0 0 0 ""

PVS Transportation T ot31 Number of Schedules '1"1 0 11

T olal Annual Mileage 328,025 D 328,025

Total Mileage Costs $370,672 SO $370,672

PVS Leases Total Vehicles Leased 0

TotaJ Lease Costs $0

PVS Workhour Costs LOC 31 (617, 679,764) $0 SO SO

LDC 34 (765, 766) $755,646 $755,646 $0

~:d> i!~"·ti,",";"T'L 1?;"';~:~~:~ifj'0;i; SO 'i'~C;: :'''1'' ",iL

Total Workhour Costs $755,646 S755,646 $0

PVS Transportation Savings (Losing Facility): 1--____ -'

Total PVS Transportation Savings:

Gaining Facility: _=~;-;-......:'---------_--Finance Number: _==:::..:.. _____ _

(4) (5) (6) ! Current Proposed Difference PVS Owned E_quipment

Seven Ton Trueks 0 0 G Eleven Ton Trucks 6 6 ~

Single Axle Tmctors 2 " ""Cl Tandem AxIB Tractors 0 0 .11

Spotters 0 0 0 -, - ~~ .-

PVS Transportation Total NumDer of Schooules 16 16 0]

Total Annual Mileage 208,190 208,190 0

Total Mileage Costs $235,255 $235,255 $C

, PVS Leases I

Total Vehicles Leasoo 0 0 0

Total Lease Costs $0 SO SO

PVS Workhour Costs LDC 31 (617, 679,764) $0 $0 SO

LDC 34 (765, 766)

~ $352,60~ ~'

SO ~ Total Workhour Costs $852,004 $352,50" W

PVS Transportation Savings (Gaining Facility): '-____ '---'

$370,672 «0= (This number is summed With Total from 'Trans"HCR' and camed le:ward 10 ,~e ExeCUlJve Summary as TrDnspornltlon Savings)

(7) Nores: ______________________________________________________________________________________________________ __

rev 04/1312009

Package Page 36 AMP Transportation - PVS

Page 40: Western Regional Coordinator, APWU

Transportation - HCR Last Saved February 16, 2012

Losing Facility: -"-'-.:..:c::.:.J-'-::.c::.:.c::.. ________________ _ Gaining Facility: _________________ , ________ _

Type of Distribution to Consolidate: _____ -"-_______ _ CET for cancellations: 0:00 CET lor OGP:

Data Extraction Date: 01101112 C7 tor ()L.;:oound 030 -1 2 3 4 5 I 6 7 8 9 1--- 10", 11 12 I 13 14

Current Current Current Proposed Proposed Proposed Route Annual Annual Cost per Annual Annual Cost per

Current Curren! Currem Proposl:d i Proposed Propos80 Route Annual Annual Cost per Aniwa! Annual Cost

Numbers Mileage Cost Mile Mil~~ Cost Mile Numbers Mileage Cost r~3 928L2 _'~ ~1,Q.~ il,:!Il,10 ,16~ ~9..I.lQ.

I I ; ,

; i

I

[ , , j

-------~: J,

J

i i

I

L i I

, ,

,

I ,

i

Package Page 37 Ai/,P Iransportatlon - HCR

Page 41: Western Regional Coordinator, APWU

i 1 2 cur~nt I 4 I 5 prop60SE"d I 7 I 8 9 1 0 11 12 13 1-" -

I Current Current Proposed Proposed Current Proposed I ?roposed Proposec

Rouw Annual Annual I Cost per I Annual Annual I Cost per Cost per Annua! Annual i Cost Numbers Mileaoe Cost Mile Mileaqe Cost Mile Numbers Miieaqe Cost Mile Mlteaqe Cost I Mile ,

I , I I ;

I I , I

! , I

I I , I I

i . .......- .. ' ... ...... T , I

I

I I i

J. -i I

-I

I 1 -

I

I I

! I I

, i I I

I

I i

I I

I i

I

i ~ I

I i I I

I I

i I i ! I I , i I i i

i-~ I I I I I I \ I

i

I ~ I i

[ ~ i

Package Page 38 AMP Transportatlol~ I-iCR

Page 42: Western Regional Coordinator, APWU

I 1

Route Numbers

f

2 3 4 5 6 7 Current Proposed Proposed Proposed Annual Cost per Annual Annual Cost per Mileaqe Cost Mile Mileaqe Cost Mile

I ~ ~ ~~ .. ~ ... .. ~

proposed Result

167,581

HCR Annual Savings (Losing Facility): ___ ---'-S.o.0_ HCR Annual Savings (Gaining Facility): ($365,8<;'6;

Total HCR Transportation Savings: ==h::;;;;~~~= number ~s sUMmed will, Tew: irorr Svmm<:t{ya$ Tri,j{);;;J)OfT{Jflon Saving:; ) Ie the

rev 11/0512008

Page 43: Western Regional Coordinator, APWU

(1)

Distribution Changes Las! Saved February 16, 2812

Losmg Facility. ~==L:.":::::"=~ ______________________ .. ~ ____ _ Type of DistributIon to Consolidate ..:::.==== __________ _

!ndlcate each DMM labeling list affected by placing an "X" to the left of the list.

DMM L.OO1 DMM La',

X OMM 1.002 X OMM L201

OMM L003 DMM L601

X DMM l.00<1 OMM LG02

X DMM LOO!) DMM LoO:;'

OMM lOOti DMtv', L604

DMM U){;7 DMM L600

X OMM LOOS OMM L606

Dt/.M LOOS

OMM l.010 X DMM LBO,

If revisions to DMM L005 or DMM L201 are needed, indicate proposed DMM label change below.

(2) DMM Labeling List L005 . 3·Digit ZIP Code Prefix Groups. SCF Sortation

From:

Action Code* Column A . 3-Digit ZIP Code Prefix Group Columr: B . Lat}(~i to

(4) Drop Shipments for Destination Entry Discounts· FAST Appointment Summary Rep;::o:::rt'.;... __ ._~--~-,....,_:~....,..-_,_--=.,..._--.,._-~==--r7,~,,=,c_I

Month Losing/G;)inlng ~~~: F~cjjjty Nilmc sc~~O:~Pts f-...=..!.:C'':;;'~7,--+-;;-::'°''C''T=7:---+-='':C:=:'::'''7.;---+-=='T=or·-l No-Show L.1te Arriv;)i , Opon >cd u;:~;a Counl % ,

Count % , Coun! % Cocnl %

Auq-11 Losino Facility 917 Industry 680 93 14%) 245 36% 0 i C"/u I 587 86% 39

Seo-11 Losino Facility 917 In<JustlY 677 115 17% 273 40% 0 i 0% I 562 83% 45

Auq-11 Gainino Facility 928 Anaheim 611 22 4'Yu 152 25% 0 I QUk I 589 96% 66

Sep-11 Gaining Facility 928 i Anaheim i 610 34 61,1/" I 143 23% I 0 I Oll/O I 576 94°/" I 79

is) Notes

--~----

rev 5/14/2009

Package Page 40 AMP Distr bJtlon Changes

Page 44: Western Regional Coordinator, APWU

Space Evaluation and Other Costs

LaSI Savea February 16, 2012

Losing Facility: ___ -"-___________________ _

1 ,"Irrected Facility

Lease information (If not leased skip to 3 below) Enter annual lease cos'

Enter lease expiration date --------------------Enter lease options/termsi __________________ _

:) Current Square Footage

4

Enter the total interior square footage of the Enter gained square footage expected with the

5 Facility Costs

Erner any projected one-time facility

6 Savings Information

sectIOn

Space Savings ($): _-=-,--_,--_..,--___________ _

Employee Relocation Costs

Mail Processing EqUipment Relocation Costs, (from MPE Inventory)

Facility Costs (from above)

Total One-Time Costs: $792,456 (This number carried forward to Executive Summary')

Losmg Fac llily: ~1:.::nd:::u:.::s::.:I~.!..y.:..P:::.&:;::D:::.C:...._ __________ _ Gaining Faci!ity .:.A.::..Ii:;::a:.::li::::e,.:..rr:.;.' P.:..&:::D::.'\'F.:..' __________ _

Product

Package Page 43

YTD Range of Report: ___ 0::;7::.:/0::.1::.:1.:..',0'-'..:..:.06::::1..::3::::01::.:1::.:1 ____ _

(2)

Associated REC

(3)

Current Cost per 1,000 Images

(5)

Associated REC

reV 9124/2006

(5)

Curren: Cost per 1,000 images

AMP Space EvaiuaIlo', ara OCher Costs

Page 45: Western Regional Coordinator, APWU

Type of Distribution to Consolidate: Destinating Facility Name & Type: Industry P&DC

Street Address: 15421 E Gale St City: City of Industry

State:' CA 5D Facility ZIP Code: 91715

District: Santa Ana Area: Pacific

Finance Number: 05-0109 Current 3D ZIP Code(s): 917,918

Miles to Gaining Facility: 37 EXFC office: Yes

. Plant Manager: Steve Worley SeniorpjanfManager: ··JamesClauseh

District Manager: Gerald K. Ahem Facility Type after AMP: Post Office

Facility Name & Type Street Address:

City: State:

5D Facility ZIP Code:

Santa Ana CA 92799

District: Santa Ana Area:. Pacific

Finance Number: 05-6937 Current 3D ZIP Code(s):' 926,927

EXFC office: ~ Yes Plant Manager:

Senior Plant Manager: District Manager:

James Clausen James Clausen Gerald K. Ahem

MODS/BPI Office

Start of Study: 09/15/11

Date Range of Data: Jul-01-2010 :Jun-30-2011 Processing Days per Year: 310

Bargaining Unit Hours per Year: 1,745 EAS Hours per Year: 1,822

Date of HQ memo, DAR Factors/Cost of Borrowing/ New Facmty Start-up Costs Update

Date & Time this workbook was last saved:

Area Vice President: Drew Aliperto Vice President, Network Operations:: David E. Williams

Area AMP Coordinator: Steve Mummy HQ AMP Coordinator: Lane Stalsberg

Page 1 ji,MP Data Ent:-y Page

Page 46: Western Regional Coordinator, APWU

Approval Signatures L;:r.;t Saved: Qdober 21 . 2011

losing Facility Name and Type:~~~:;;::.:~::;::;-_________________________ _ Street Address:..;,:,:::::.~~::::..::::'-:.. _________________________ _

C~:~~~~ ______________________________________ ___

Facility ZlP Code: 7:':",=~,---­Finance Number: ~e:;..~;;---

Current 3D ZIP Code{s): ..::.;..:...:.:::..:.:::...-. ____________________________ _

Type of Distribution to CDnsolidate:..:O::.;I19:.:;"z..:::&:.:D::;.e;::;s:;;I __________ _

Gaining Facility Name and Type: V~~~~~~~======================== Street Address:..;

respe<:tt!1f,' i)Ostal reportlng SYSlerr::;: Indudingfinanoal repons and th~ relating to compliance with contracting. complement. or similar efforts involving :he inves:mer..: and expe-ndHure 01 1unds~,~ :;is -"";;-e:! -~fs--all systems lO-~cerio-01..Jf -customers.

kOSIN!? fA9UTY;

Postmaster or Plant Manager:

Senior Plant Manager:

District Manager:

Pnntcd Name

$AfN1NG fAC/!,ITY;

Plant Manager:

,Signature

Senior Plant Manager:

Printed Nam.:

District Manager:

Printi!d Name

Area Vice President:

FTllltcd Name

lmplementation Date:

Disapproved:

Vice President, Network Operations:

Printed Name

Comments: _____________________________________ _

rev 12J3i12008

Package Page 2 AMP ;\pprovaJ Signatures

Page 47: Western Regional Coordinator, APWU

i

Surnmary Narrative Last Saved February 16, 2012

Losing Facility Name and Type: Industry P&DC Current 3D ZIP Code(s): 917,918

Type of Distribution to Consolidate: Destinating

Gaining Facility Name and Type: Santa Ana P&DC Current 3D ZIP . 926 927

AREA MAIL PROCESSING (AMP) PROPOSAL Executive Summary

!Industry P&DC IlconsOlldated Facility

I!Background

Santa Ana P&OC Gaining Facility

II~he Santa Ana Performance Cluster with assistance from the Pacific Area office has compieted an Area Mail IProcessing (AMP) study to determine the feasibility of relocating all Industry P&DC ietter volumes [for processing at the Santa Ana, CA P&DC. The proposal encompasses mail processing for ZIP code ranges 917 and 918.

Currently, the Industry, CA P&DC is an owned facility that processes all outgoing package and letter, Ilflat and package mail in the 917 and 918 ZIP ranges. Outgoing letter mail, currently processed Monday :hrough Friday at the Industry P&DC, is being moved to the Santa Ana, CA P&DC under an AMP \which is scheduled for implementation by April 1,2012. Saturday collection mail is processed at the Santa Ana,

IICA P&DC on Saturday. With the approval of this AMP study, Industry's destinating letter mail will transfer to the Santa Ana, CA P&DG. Along with processing operations, the Industry faclilty houses administrative offices, and a Business Mail Entry Unit (BMEU) and a retail unit. The Industry facility is lapproXimately 37 miles from the Santa Ana, CA P&OC.

I lA concurrent AMP feasibility study was conducted which proposes to move the Industry, CA P&DC destinating Iflat operations and originating/destinating packages operations to the Anaheim, CA P&DF.

!Financial Summa nnual baseline data came from July 'I, 2010 - June 30, 2011. Financial savings proposed for this

Iconsolidation of originating operations are:

Total First Year Savings $ (2,103,574)

I

T Total Annual Savings $ 4,097,108 I Total One-Time Costs $ (6,200,682)

" he total FHP (averaae dally volume) to be transferred to Santa Ana IS 2,920,425 pieces I Icustomer Service Considerations: I iAll feasibility analyses are based on the proposed service sta~dard changes t~ be fiied '. . 'IPRC in November of 2011 Due to the size and complexity or any potential relentlon of overnight service for inter-plant Priority mail, further modifications to the current study will need to be considered There are no Ilmpacts to the BMEU or Retail units as a result of thiS AMP They will continue to be avai,able in the current location Within the current operating hours There are no changes to the collection box times

iSPWflC ,ecvlce ,tacd"d change' a,soclated WIth thIS Acea Mall Pcoce'Stcg consolIdatIon ace Ithe lesclutton of both (a) the colemaktCg tC whIch

upon

rev 06/1 0/2009

Package Page 4 AMP Summary Narrative

Page 48: Western Regional Coordinator, APWU

Summary Narrative (continued)

~a:["c:Hive Page

market dominant product service standards in 39 CFR Part 121 are being evaluated, and (b) ali AMP consolidation proposals that are part of the same network rationalization initiative. A

reflecting any new service standards will be published at WNW usps com once all of the related AMP that provide the foundation for new service standards are made. and Express Ma'l service

s will be based upon the capability of the network.

Logistics and RAU changes will be required as necessary during the HOiArea construction of the IChanges tab. Highlights of some of the proposed changes include

I~he transportation impact for the proposed AMP increases the HCR cost by $2,750,S90 and decreases PVS by $66S,939.

IOriginating Express for the Night Turn (NT) and West Coast Overlay (WCO) is proposed to move from the iramp to SNA (for NT) and LAX (WCO) I

!Destinating is proposed to continue to arriVB-Btthe ONT ramp to maintain Ontario Main Office would separate volume to the 5-dlgit arriving on the NTNVCO

!prior to implementation, RDC codes and NDLL must be changed i IIINDUSTRY P&DC CHANGES

HCR 90016, Industry P&DC will be removed from the contract; there is enough transportatlol' to handle mail volume to go to Santa Ana on current trips.

HCR 90091 will be terminated; trips will be added to HCR 90190 no incumbency issues allowed for this move

HCR 901 LO, Industry P&DC will be removed from the contract; there is enough transporta~lon to handle

I'mail volume to go to Santa Ana for additional trips.

,H C R 91317, delete trips 1 through 6, there is enough transportation to Pasadena on other

\'HCR 913L3, Industry P&DC will be removed from the contract; there is enough transportation to hand:e ,mail volume to go to Santa A.na on current trips.

/HCR 91712, will be terminated; trips will be added to HCR 926LS no incumbency issues allowed for thiS move

HCR 91313, will be terminated; trips will be added to HCR 926L5 no incumbency issues allowed for this move

HCR 91714, Industry P&DC will be removed from the contract; there is enough transportation to handle mail volume to go to Santa Ana on current trips.

Page 5 AMP '..iarrative

Page 49: Western Regional Coordinator, APWU

Summary Narrative (continued)

HCR 91716, will be terminated; trips will be added to HCR 92616 & 92617 ::0

this move.

HCR 91730, AO trips will be moved from Industry P&DC to Santa Ana P&DC.

HCR 91732, AO trips will be moved from Industry P&DC to Santa Ana P&DC

Staffing Impacts:

issues allowed for

Current projections from the AMP study indicate a net reduction of 427 craft employees with I P&DC losing 695 and Santa Ana P&DC adding 268 positions. There will be a net reduction of 28 EAS positions. with Industry P&DC losing 43 EAS positions and Santa Ana P&DC adding 15 EAS positions

As a matter of policy, the Postal Service follows the Worker Adjustment and Retraining Notification Act's N'·) notification requirements when the number of employees experiencing an employment loss within

the meaning of WARN would trigger WARN's requirements. Some or all of the impacted described above may not experience al}el1l!?loyment loss within the meaning of WARN due to trarlSIe,S or reassignments

Cr

Ma ment

Total Proposed

Oi

Craft '" FTR+PTR+PTF+Casuals

Name -Gaining Site

1 Craft = FTR+PTR+PTF+Casuals

Total Current

II

2 Craft '" F: + F4 at Losing; F1 only at Gaining

Package Page 6

Total Proposed

15

AMP Summary Narrative

Page 50: Western Regional Coordinator, APWU

Summary Narrative (continued) Summary Narrative Page 4

and Maintenance 1m acts:

Page 51: Western Regional Coordinator, APWU

24 Hour Clock

Losing Facility Name and Type: Industry P&OC Current 3D ZIP Code(s}: 917,918

Type of Distribution to Consolidate: Oestinating

Gaining Facility Name and Type: Santa Ana P&OC 926 927

;;; i5 8 § § g g W

~~ ~ ~ ~~ £ ~ w iS w

a -g " 1il " 1il " '" ill ~ ~ ~ "- ~ ~

~~ o -

~ ~ 7? $l 8 !!l " ~ ~ ~

'f)

~ ~ 8 @ ~ § 1'j <; £,@ 5@ 5@

~ ~ " ~ " 4l " lJ.

5 a o a o §

§ ~ ~ 8 ~

Package Page 8

~ 2 ~~ w -g II

Sl ~ ~~ 2 !!l

/3

8 @ ~~ I" o §

~ ~

~ V) :; ~ N C!:

ro ~ p E

] ~ ~ (0 ~ B " :.8 t3 -;: w ,3 ~ c; g

o " 0 " ~ 0 ~ * ~ 2! § '~ "8 ~ g ~ 0. ~

:> '" 0: "- ~ !!l ~ ~ ~ ~ ([)/3

<' 2;

I'

8 'Ii

; ~ R " ~ V)

'" 5 ~8 ,~ 1t '" L, <; Ii >-

~ ~ 'S <; 8 '2: " N hi ~ @ ~ 0 CIJ (5 8

o " is " o " !JJ 11

2 ~ ~ ~ " ~ S ~ ~ ~ Ii ~ E s ~ S ~ c:. , o a Q. ~ ~ ~ ~ ~ ~ g ! ~

AMP 24 Hour Clock

Page 52: Western Regional Coordinator, APWU

Losing Facility Name and Type: Industry P&DC Current 3D ZIP Code(s): 917,918

Miles to Gaining Facility: 37

Gaining Facility Name and Type: Santa Ana P&DC Current 3D ZIP Code(s): 926,927

Package Page 9

MAP Last S;)vr..·o Ft~bfui.lry 16. 201.2

,'\MP MAP

Page 53: Western Regional Coordinator, APWU

Service Standard Impacts Last Saved: February 16, 2012

Losing Facility: ":';":-=~L..:..-=':':'=-= _________________________ _

Losing Facility 3D ZIP Code(s): Gaining Facility 3D ZIP Code(s):~';::-'::=:-------------------------------

Based on report prepared by Network Integration Support dated- mm/dd/yyyy

-------_._-----------

Package Page 10 AMP Service Standard !mpacts

Page 54: Western Regional Coordinator, APWU

(WorkBook Tab Notification 1)

Losing Facility: Industry P8:DC

Package FJage 11

Stakeholders Notification Last Saved: February 16, 2012 Stakeholder NotiiicatlOIl Page 1

AMP Event: Sta:i of

rev 07/16/2008

Ap,;IP Stakeholders Notificat,cr:

Page 55: Western Regional Coordinator, APWU

Function 1

Package Page 1 2

Function 4

"'.00 "'.00 "'.00

Workhour Costs· Current Las1 Saved: February 16. 2012

Page 56: Western Regional Coordinator, APWU
Page 57: Western Regional Coordinator, APWU

P) I' (2) I)

14) I I') I I') C~;!mt _ Cutre:OI ~ MOVe<j to ClTfen! CUtTl.m( ClJTlffit Cum>nt Opof:auon wininG AnO!J.<ll FHP Annual TPH or Anmwl PrOOOCtMty Annul:Il

N-IftNX.'fS 1 VOl"",, NATPH Voklme I 1'10<'<"0"" I (TPH 0( NATPHl Wor1<hoor Cost$:

I

I

I

---r---- -r~- --

I

I

~--

I I

i

, I

I

Pock<>ge Poge 14 AMP WO/thou:f Costs - CurTt..'"fl\

Page 58: Western Regional Coordinator, APWU

(J) Curron(

Annual FHP Volume

('I Cumml

Annu~j TPH Of NATPh Volume

(5) Curron! AnnU;;ll

Wo(Khours

<'I Curren!

[TPH O( NATPHl

(7)

Curron! AnnUal

Workhour Costs

,---+----+---- ---------+---+-------­+------+---------,---- ------- ------

1-------+------ ------ c----------'- ------------1--------1

I-------~_+----+---,-----f___----+-- --- ---- ----~-­---~-----t----------'---I----------r- ----t-------1----,--

--1----

____ 1-- - ---,--------1- - --

f------- ------- 1-------------- 1-

--------- e---- f------

i---I ,-

1-------

f

----- 1-----------

~-. --~- 1---

i--- I--

c-,

I

------i--1--------1

------------- --------,-----­

I --- ---------­------------------,

1--- t--- +------- i------, -/-

---l----- ----+- -------+------ ---------

1------------ -

1------- ----- -+--,-----,----+-------i--------------+-------t-

1- --1-- ------+,-------,------1--- -- --,- ----b -- ------­c------------ ----+----1-- ----

I

l

---------- -

- ------1--- -- --- i----- ----

4------t---------____ l---~==i=====±======~i f-----------r- ---- -r--- f--- --

____ -'--____ 1_ ---

--------,----------1------------- ---- --- -------------+---+-------- -,------------

---------------------

----+------,-11-

----------!-------j "'­

----f-----------I--- ---

---------

--1-------------

-----------

P~lCk<..l9C Pag~ 15

-----

(10)

Currant AnnUl'll FHP

Volume

(12) Currenl

AnnU<li

WOfKhovn

-----------

--+-------------.. -

--- i -------- ------i-------I---~--------!-------------+-------~----------+------- ----------

-- --i-- ----- -- - --- -f-------+-----+-------~------------t---------------~------~j--------­

---+--------------------

t---+----------- -----+----+-------j--------+------'---- ---------

--- ------------1-------

I--+---r----~-------~----~---

i------i------i~-------- -- - -----

T-- -1 ----__ J _____

- -----,--'-- I-------~-----------j

---1--------.J-

------- -----1----

----- i-

--- -------- !--- --

f- ---i-

- -------- --

1 ---

] \- ------ "

--- -----------'-----------~-

AMP Workhour COS~5 .

Page 59: Western Regional Coordinator, APWU

Tot;:)ls

Combined Current WorKhour Annual Workhol,1r Costs; (Th,t; l\<JmtH!! 1:< cnrnuu h,lfW:JrJ to [he bonom ~Mirw;;;;;;;;;;;;~;;;;;;;;;;f;';;;:P:-;;;;X;;-;dj

Page 60: Western Regional Coordinator, APWU

losing Facility:

Poci<age Page 18

WorKhour Costs - Proposed last Saved: February 16, 2012

Gaining Facility:

AMP Wori<ho<Jr Costs . Proposed

Page 61: Western Regional Coordinator, APWU

('I Pc.!.w Pi I') 15) PcO;':;"d , , Anoun! FHP NA TPH' Volume [TPH~ or NATPH)

Annual

W",""""" Workhou: Cost> 0 0 No Calc SC 0 Nc CalC >C 0 0 0 No CalC SC

0 NoCale No CalC

f~--~ Nc :aic

0 No Calc 0 Nc :aic 0 No Calc

~_~_~~o ~o o· 0 ·-~No{)aic ·0 ~ • ~~

0 No Calc No Calc NcCak

0 No Cal< 0

0 0 0 0

f_~~~o~o I 0 No Calc No calC

0 NoCa" 0 No Calc

No Calc No Calc No Calc Nc ::alc

I No Calc 0 No Calc 0 No Calc 0 No Cal, 0 No Cal,

0 No Cal, 0 No Cal, 0 No Cal,

No Cal, No Cal, No Calc

0 No Calc 0 No Calc

No Calc No No No

I--~-.~.-

Package Page 19 AMP WO<l&lour Costs ~ Proposc'd

Page 62: Western Regional Coordinator, APWU

(1) Il) Pro~ 14) I;» PrO;;:;"d Pro~d Propo<od Proposed Propo$Od

Opo-rOltion AnnU<Jl FHP Annual TPH or Annual ProductM<y Anouul Num-bor.s Velum<> NATPH Volul'T)Q Wonchoucs (!PH or tlATPH) Woc1c:hour CO$1$

0 No calc 0 No calc 0, No calc 01 No calc 0 No catc 0 NoGal 0 NO calc 0

~ .- r··-- 0' 1

0 No calc 0, NO calc 0 NO Calc

---~.--- ----~~-.. ----~----, NO calc 0 NO Galc 0, No Galc

~--.-No calc ---r·------.... - I) No Galc -

0 No Calc 0 No calc 0 No Gale 0 No calc 0 NO calc 0, No calc 0 No catc 0 No Calc 0, No calc 0 No calc 0 No Calc 0 No Calc 0 No calc 0 No calc 0 No Galc

0 1 No calc 0, No Calc 0 No calc 0 No Galc

1------f-- 0 No calc 0, No calc 0 No calc 0 No Calc 0 No Calc 0 No Calc 0 No calc 0 No Galc

° No calc 0 No calc 0 No calc 0 No Calc 0 No Calc 0 No Calc _. 0, No calc 01 No calc 0 No Calc

----'------ O.L .. No Cole ---

Package I.)age 20 AMP Workhou~ Cos'S - Propos.&<:J

Page 63: Western Regional Coordinator, APWU

16) Prop05cd Annu~1

Cost!>

No Calc

Package Page 21

(7) I (8) Propo:ooc

Ann,.;::>: FHP VolumlJ

19) ! (10\ I '.11\ I'", -,

Proposed Opcrol.Jon I N"rnbcrs I I Annunl Ol!

NATPrl Voluml;' .

Pfopo:;od I PrOj)ol'{!(l i AnnU;.li i Ir~~O~:~~';ZHII Alln!'):!!

WorkholJf~ Worknoui Costs

---1-- .. - .. _+_...---.-.2.j .... _~NoC"'a"'c'i···_·_·_ __ .. +-..... ____ . 01 NoCale .....

"- -- "-1'-'"

....... --... ---_.

No Calc

NO.

" __ '__ Nc ;alc

....... --+ ... -----i . _____ ... + _____ ... ......;0'-'_...... Nc Ca" 1 _____ . . __ ~NoC~alCr·__······ . __ .. -!----... -+------.. +--.. --.--7'1-.- No Calc

N~

... ...

" .

1···--·---!-·------+-····----+-----· .. ··-7+----= ~~-=;"""I::-.... ----.----..

.......

.. _ .. -

... -

----t .... ···-....

o No Calc

AMP Wori<.nour Costs· r..lroposed

I

Page 64: Western Regional Coordinator, APWU

PIOp05(.'d Propoliod

OPCrOt/Ofl Annu.:ll FrlP Numbt.'r:; VOlume

(3) Propo&od

Annu;)j [PH or NATPH Volvmc

(4)

Propo!>od Anntl;,j!

WorKhours

(5) (6) ProPO'se-d Propo!>-c-d

Productivity Annuul (TPH O'r NATPH WOrl<hOUI Costs

No Calc

AMP Workr)0Ur COSh ProposOd

Page 65: Western Regional Coordinator, APWU

------

Proposed PfO~2~r.Od I Pi I AnnwWi FriP AnnU;l1 0'

VOlume I NATPH volurno i

IS) 16) Prcpo:>od

Anm':;ll AnnU;l1

Wo.khowrs ITP~ or NATPHl Won,hour Costs

!---

Q No Calc . -~~ ___ No Calc ,--------

o No Calc

... + ..

1--"-j-._._-""-No ",Cae-""e, __ •.• ___ ._ ...

No Calc

.-__ -l,_--_--:-.... --.:..-~_+ _____ ._ .. __ .':Oi-------..:;·~'-"-~_"'~'"::~,+t--_ ...... ---.- ,-- No Calc .- ...• ---

___ +_ .. _ .... ___ ~ _____ ~No_"'C~al~e ____ ---__ NoC.le

1,,·--,·, ·-·[------1 .. ----.---+ ---.. -- . -+----_.

No Calc

_~r_--~No~CaieT_ .. -_.----­No CalC

13.375.604 66.234 1.7121 S2,841,4.30

P 8ck<::lge Page 23

prO~~'Cd I ie: 19: :10) I }"i , 1")

Proposod Pf()~t;.>:.cd

~~:~~~; , AnnU;')l FHP 01

W0rk0ou", i n~~~~~~(Z~PHi I V;Ofk~~~~~O:;t~ Volume NATPH Volumo

1----·· _._- .. i-··- ;+ NQ ~"'c ;';0 ~31c 1--.-- j----- i·· No ~a,(

---_ ... __ .

No c;ale No Cole

[---- No ~al(

··-t-- ----~ .". .. -.----..... i- ~~!S --_ ... _----1-- j------ .. _- .... - _.--- ..No ~

~~ ~~ak

... - ..

)_ .. _,:!2.~

,-- No No

No

.. _-- 1---·-'_·- ol·--J~ t-O No-

._ ..

0 NO CalC ._._-,-'- 0 No Caic -~~--~-.

0 No ~alC

1---

-=i ---6 No ~'IC . __ .-_'",,-~aic -._.-

i-- ---+- % l-- .. -l~;-~ .... _ ..

. -% t .~; ~:~ 1- .. -- - ... -"- i--'''- -i--- __ CJ.

;-----~:~~( ~;~'--1---'--· .-.. -. i-' _.'::":' ;ole

r-- No ;01C No ;ole .. _-_. No ;010 . --.-No ;010 :---No ;aic

._----1--- NQ :01,

No laic

No ;0101_ .... . -----.... 1<0 ;oic

. '~.7-" _"-0 ~ ---No ;010

No :010 -_.

s (424Jl~ ,8: ,805,0' 751,00 5<

S. No :ole ,5' 54 '.424.73:

. 562n5~ii% -',52-6,031,00 d;f~1~·· No :"0

\304"ii:%2 7. 35,S· 05 , 394 $63837'69"

AMP .'\IofKnour Costs - ;~rQPOS(;:C

Page 66: Western Regional Coordinator, APWU

Cornblned Cvm;.-nt Annu;)j Workhour Cost ",,====::=c:-';;=::-;==

Proposed Annual Workhour Cost :'."..==+=..;,;.-=~--:: __

Mi~~~!~~U:l~~I~~;r~l;::OD:~:S~~ ::~~~;u~ ;' .. =::::-:===~=:-'::::=== appllC"d 10 operatIon" 01 the gammg lilCl!lly)

AM P WorknotJ~

Page 67: Western Regional Coordinator, APWU

Other Workhour Move Analysis

07101f!E.. to C61))'11

Page 68: Western Regional Coordinator, APWU

,----,- -- -- -; --- r--- ---r-j~~=:::=::j

I

I

1

I I -~

~ 1---

j

,-, 1

r-- 1----

:---- ,-- __ 1 ,--

i ___ --+----

---1---

~ -- ._---

j--- -- -----------

I:=-~~ ---r- t------ ------ ---- -----

r---- --------T- -----

----

f=~ --i---::"--

1- --~i=: -!---- -- - -,

~~ f-- f-- ---f-- ---i---

i ----- +-- ._-----

---r----

---,---- ---- ------- ~~ t------------ ,--i---

- ~~-1

---!-1

1----I __ ,

-~

I 1 , - -------I -------

f- ~ --- I ,---- r----- - -----j

!------

----

--------r---- - -- ------

----1 !

----- 1 ------j

1 1

~

-- j---1 I

1 -- ---1 r-- I I

1-.--- I 1 ---1

; --t -

Page 69: Western Regional Coordinator, APWU

I

... _-- ---- ----- _.---til I

0 $D 0 $D

Q -IC>;»-St<y 365.""· AiiO;ii

Pottage page 27

Page 70: Western Regional Coordinator, APWU

i~---" i"~-- "-- ""

"-- ""~----

l----i-~ --:=

--

r==>- .-~

~ ---

,--... _- ,- ~~.~

--]

1--.-:==:~

-""--"~" " """" -- -

"c-"~~---"--

'·_··-1" ~""- -~-""-

~-I~~·----~ "- I"··· .. _---

r-

1-==~::~ I--I---

" ..1 ._"-r-~---"- ". __ .-r "-" ~ .... _--

""-

~--+-~"-""--"- "--r---r-" -+- " 1-·-" " """"-- r----- .. ~-- ,._". "-+~---"

---- , , , , ,

- , , -,

"-' ~,

-j

-- r-:---,-'-""

.---,- !---- 1- ~=--""".-

"""-"-t~:-·· t·-~-=

~==

1----~

f-- !-~

._."- l--f-

".-

~ ".-~

.~~~ i--- i--

-~

~-l

--1 "-- ~---~

r------ -~

~--- ---~-.-.---j,

'-" \ , , L __ L ~:~1

Page 71: Western Regional Coordinator, APWU

.. - f--._-I I ,

, I

f--~ 0 $I)

I TOlals ""-""""""'" 0 '" .. ~ 0 $I)

0 $D

TOlals -- 0 $D 111 ,""

Ai""""",," 1"11288 ,",044 sao

Currenl Workhours lor lDCs Common to & Shared between Supv & Crafl

NJP Other Ct;ff vs Prop

Page 72: Western Regional Coordinator, APWU

Staffing - Management Last Saved: February 16,2012

Losing Facility: ----~------------------------------------------

Data Extraction Date: 09/19/11 Finance Number: 05-O~09 -----------------

Management Positions I (1) (2) ,,,, .1 14' ! (5)

i (6) ! \~i ,i I

Differelce I ILine Position Title level Current Auth Currer:t I Proposed

Staffing IOn-Roils I Staffing I 1 PLANT MANAGER (3) peES-a1 1 1 C I -1 i 2 MGR MAINTENANCE EAS-24 1 1 a -1 I

3 MGR IN-PLANT SUPPORT EAS-23 1 1 a -1

4 MGR DISTRIBUTION OPERATIONS EAS-22 2 I···· { 0 -1

5 MGR M.AJNTENANCE OPERATIONS EAS-21 2 .1t 0 -1

6 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-21 2 2 a i -2 I 7 MGR DISTRIBUTION OPERATIONS EAS-20 2 1 a -1

8 OPERATIONS SUPPORT SPECIALIST EAS-26 1 f 0 I

1 I

9 MGR MAINTENANCE OPERATIONS SUPPT EAS-19 1 1 a i ·1

10 MGR TRD,NSPORTATION/NETWORKS EAS-18 1 1 a 11 OPERATIONS SUPPORT SPECIALIST EAS-18 1 1 a , -,

12 EMPLOYEE IN MODIFIED ASSIGNT (ES) EAS-l? 1 1 0 -,

13 OPERATIONS SUPPORT SPECIALIST EAS-l? 1 1 a -1

14 SUPV DISTRIBUTION OPERATIONS EAS-l? 23 1,/fJ.';11~,·I·· 0 -19

15 SUPV MAINTENANCE OPERATIONS EAS-l? 8 ··".~:.i;;t;;··.; a -7

16 NETWORKS SPECIALIST EAS-16 2 , 2 0 -2 i 17 SECRETARY (FLO) EAS-12 1 1 , 0 I 1

18 i i I

19 I I

20 I

21 I

22 23 I 24 25

i

I

26 !

27 !

28 i 29 I 30 ,

31 i I I I I

32 I 33 34 ! 35

, I

36 37 I

38 I ,

39 j I

40 41 I

42 l " -, ..,~ I I

Package Page 31 AMP Staffirg PCES/EAS

Page 73: Western Regional Coordinator, APWU

44

45 I J i

46

4f I

48 49 ,

50 I 51 52 I 1 53 ,

I

54 I 55

I I I

56 I

57 I

::>8

59 I

60

61 I 1 62 i

I

63 I i I

64 l I I

65 I I

66 I 67

68 I

69 I

70 I 71 I

I

72 I

73

74

75 76 77 I

78 i i

79 i I i

Totals 51 43 1 01 (43)1

Retirement Eligibles 14 Position Loss 43

Package Page 32 AMP Staffing - PCES/EAS

Page 74: Western Regional Coordinator, APWU

.j

II II

II II I I, II

II Ii .1

II )1

1/

II )1 II

I

Gaining Facility: Santa Ana P&DC Data Extraction Date: 09/19/11 Finance Number: 05-6937

-----------------

Management Positions I

I (12) (13) (14) (15) (16)

I (17) I

Position Title Level Current Auth Current Proposed

8itference I Line Staffing On-Rolls Sta'fing I 1 SR PLANT MANAGER (1) PCES-01 1 1 1 I 0

2 MGR IN-PLANT SUPPORT EAS-25 1 1 1 I 0

3 SR MGR DISTRIBUTION OPERATIONS EAS-25 1 1 1 i 0 I 4 MGR DISTRIBUTION OPERATIONS EAS-24 3 ·······;~r!. 3 1

5 MGR MAINTENANCE (LEAD) EAS-24 1 1 1 0

6 MGR DISTRIBUTION OPERATIONS EAS-22 2 2 1 -,

7 OPERATIONS INDUSTRIAL ENGINEER (FI EAS-22 3 ~ 3 ! 2

8 MGR MAINTENANCE OPERATIONS EAS-21 2 1 2 I 1 I

9 MGR DISTRIBUTION OPERATIONS EAS-20 1 1 1 0

10 MGR MAINT ENGINEERING SUPPORT EAS-20 1 1 1 0

11 MGRTRANSPORTATION/NETWORKS . . 'EAS-20 1 1 1 0

12 OPERATIONS SUPPORT SPECIALIST EAS-20 1 O. 1 1

13 MAINTENANCE ENGINEERING SPECIALIST EAS-19 2 1. 2 1

14 MGR FIELD MAINT OPRNS (LEAD) EAS-19 1 1 1 I (' v i 15 MGR MAINTENANCE OPERATIONS SUPPT EAS-19 1 ; .. Q. •. : 1 i "I I 16 OPERATIONS SUPPORT SPECIALIST EAS-18 1 1 1 I 0

17 OPERATIONS SUPPORT SPECIALIST EAS-l? 6 ~ .§ .i·C : 6 1

18 SUPV DISTRIBUTION OPERATIONS EAS-I? 31 .····,'2>9; ••. 36 6

19 SUPV MAINTENANCE OPERATIONS EAS-I? 10 "7.' ',0 i 3

20 SUPV TRANSPORTATION OPERATIONS EAS-I? 3 3 2 ·1

21 NETWORKS SPECIALIST EAS·16 2 2 2 I 0

22 SECRETARY (FLO) EAS-12 1 1 1 i 0

23 24 I

I

25 I 1---1-. 26 I

27 1 28 I

29 30 1 31 32 I I

33 ,

34 i---

1 I 35 !

36 I

37 38 1 39 i 40 41 i 42 43 I

I

44 I 45 I

L26 I

Package Page 33 AMP - PCES/EAS

II II ii II ,I

" II Ii II II

Page 75: Western Regional Coordinator, APWU

47 48 49 50 51 I

52 53 54 55 I

56 57 I i 58 I 59 60 I 61 62 63 I

64 i 65 66 67 i 68 I ! 69 I 70 i I I

71 i 72 i I

l3 I 74 75 i 76 I 77 I I ,

78 I 79

Total 76 64 79 I '15

Retirement Eligibles: 26 Position Loss jiS)

Total PCES/EAS Position Loss: 28 (This number carried forward to the Executive Summary) ======

Package Page 34 AMP - PCES/F::,,,,S

Page 76: Western Regional Coordinator, APWU

Staffing - Craft Last Saved Febccary 16, 20~2

Industry P&DC 05-0109

09/19/11

I (1) (2) I (3) (4) I (5) i (0) I Cra:'1. P8sitlons Casuals/PSEs Part Time Fuii Time Total

I ;otal

I 0!fference On-Roils On-Rolls I On-Rolls On-Rolis Proposed

IFuC\ct,un 1 . Clerk 21 01 330 351 0 (3S1)

IFu.nctlon1_, C.!"rk 0 0 0 -"33 3i 'unction 1 Mall Handler 0 22 165 Ie? 0 11S7) 'unction 4 - Mail Handler 0 0 0 5 5

Function 1 & 4 Sub-Total 21 22 495 538 38 (500) Function 3A - Vehicle Service 5 0 11 16 0, (16)

Function 3B Maintenance 1 0 122 123 ' 11 I (112)

Functions 67-69 Lmtd/RehabNVC 0 13 13T C I (13)

Other Functions I 0 0 5 5 I 0) 15)

I I I I Total 27 I 22 646 695 I 49 (646)

Retirement Eligibles 272

..• l:~"~:::-'.{ ,_,'::;:.!:::""-" ,:,:""",,,'.' •· .. '''···11·:''.", Gaining Facility: Santa Ana P&DC Finance Number: 05-69:;'!

Data Extraction Date: 09/19/11

(7) 18) (9} , (10)

I (11)

I (12i II

Craft POSitions Casuals/PSEs Pan Time Full Time Total Total On-RoilS On-Rolls On-Rolls On-Roils Proposed

Difference I !

! Function 1 Clerk 10 0 399 409 , 487 7S :

IFunction_ 1 - Mail Handler 0 37 230 267 356 891 Function 1 Sub-Total 10 37 629 676 843 ~ 67 I

I Function 3A - Vehicle Service 2 0 31 33 33 cl IFunction 3B - Maintenance 0 0 153 153 204 51 I I Functions 67-69 - Lmtd/Renab/VVC 0 18 18 18 o I

IOther Functions 0 0 6 5 6 I o . I ,

ITotal 12 37 837 886 1.104 2'\ 3 I Retirement Eligibles 295

Total Craft Position Loss: 428 number earned forward te the Executive Summary)

Package Page 35 Staffing - C rah

Page 77: Western Regional Coordinator, APWU

,

Transportation - PVS Last Saved: February 16, 2012

Losing Faci Iity: .:;In"",,d"",u;:sitTY-fi-.P~&::;D=-C-=--________ _ Finance Number: _°'-5-'='=°7::1,;.,09",..,..,:--___ _

Date Range of Data: 07/01/10 - to - 06/30111

(1 ) (2) (3) .". "" ". Current· Proposed· Difference

PVS Owned Equipment Seven Ton T nJcks 7 0 7

Eleven Ion Trucks 3 0 3

Single Axle Tractors 1 0 1

fandem Axle Tractors 3 0 3

Spot1ers 0 0 0 ' .. '" ,," - . ,-~,.~"

PVS Transportation Total Number of Schedules 1'1 0 11

,olal Annual Mileage 328,025 0 328.025

Total Mileage Costs $370,672 SO $370,672

PVS Leases T atal vehicles Leased 0 0 0

Total Lease Costs SO $0 $0

PVS Workhour Costs LDC 31 (6'l1, 679, 7(4) SO SO $0

LDC 34 (765 766) SO SO

~ '-:(, ·~~'~Jf;~i:,';;.J;: $0

Total Workhour Costs SO $0

PVS Transportation Savings (Losing Facility): 1...1 __ S,-3_7....;0,_07_2-,1

Total PVS Transportation Savings:

Gaining Facility: ...::..:;;.;;.~~.:;.:;:::.::....:-_______ _ Finance Number: __ ---' ______ _

(6) . Gifference

PVS Transportation Savings (Gaining Facility): '-_-"'-_-'--'.J

(S72,403} «= (Thrs number IS summed wrth Totai from 'Trans-HeR' and camoo forward to trIG

Executrve Summary as TransportatIon Savmgs)

~)Notes: ________________________________________________________________________________________________________ _

. rev 04/1312009

Package Page 37 AMP Transportation - PVS

Page 78: Western Regional Coordinator, APWU

Transportation - HeR Last Saved: February 16, 2012

Losing Facility: -'.:..:.::..::.::.::.2..:....=~ _______________ _ Gaining Facility: ..::..:=.::..:..::.:::~=-=-_, _________ ,_, _____ ~ __ __ CET for cancellations: 0:00 eET for OGP:

Data Extraction Date: 01/01/12 CT for Outbound Jock: 0:10

I-S

Cu~ent 10 11 ! 12 " 13, ,14

Current Proposed p;-OPOS(;C

Route Annual Cost per Annual Annual Cost i Numbers Mileaoe lost Mil i

90190 3Os,ill $, ,58 I 92611 5'32:881 $ , )5: ,06 I

, 926['-2 33~,98: $li74,48 I 91318 '113:):15 S4sW ,

! , i

I I

I 'i

i "

, , i ,

: I

" : !

I I I

I I , I ! I , I !

: I

I i, I,

i !

I I

Package Page: 38 AfJ1P Transpo:tatlon HC

Page 79: Western Regional Coordinator, APWU

i 1 2 3 4

propSosed I 6 7 8 9

I 10 11 12 13 14

I

Current Current Current Proposed Proposed Proposed PrOPOS0C

Cost per Annual Annual Cost per Annual \ Annua! Cost : i Numbers MileagC' _Cost Mile Mileaqe I Cost Mile Numbers Mileaoe Cost Mile MileaQe Cost Mde

I I

I I

I I ! J ! I

I I I I

I i I I

i J I 1 I

~ I I

i I j i

1-- .. --~.- I !

I I I I- I

I

I I I

i !

L \

i I

I I !

I I

! J

!

I

:

Package Page 39 AMP Transportation HeR

Page 80: Western Regional Coordinator, APWU

Distribution Changes Las! Saved February 2012

Losing Facility .::.:.:::.::.::.::L:....::::..:::.~ ________ o ______ " __________ "O ___________ _

Type of DIstributIon to Consoltdate ===== __________ _

lndrcate each DMM labeling list affected by placing an "X" to the left of the lise

If revisions to DMM LOOS or OMM L201 are needed, indicate proposed DMM label change below,

(1) (2) DMM Labenng List LOOS - 3-Dig-,t ZIP Code Prefix Groups - SCF Sortation

OMM LOO' DMM LO~ 1 From:

X DMM LOQ2 DMM l201 Action Code* Column A· 3~Dlgi! ZIP Code Prefix Group Column B . !,..abello

X DMM LOO3 DMM L601

X DMtvl. LOO4 DMM L602

X DMM LOO~ DMtJ, L503

OMM L.DOS DMM :_60<:

DMM LOO? DMI\!. UJOb

X OMM I UOB OMW. LoOS

(4 ) Drop Shipments fc:..r Destination Entry Discounts - FAST Appointment SummarY Report

Month I Losing/Gaining I NASS Focility Name ! Total No-Show LJte Arrival Open I Closed u;:~;,"d Code Schd AODts Count % Count % Counl % :oun' -;;.;

Jul'11 Losing Facility I 917 Jndustrv i 626 85 14% I 216 i 35% 0 0% T 541 86% 36

Aug'11 Losing Facility I 917 Industry I 680 93 14% T 245 II 36% G 0%1 587 86% 39

Jul", Gaining Facjllty I 926 i Santa Ana I 753 1 77 24% I 242 1 32%) 0 0% 1 576 75% 20_ -Aug11 Gainmg Facility I 926 Santa Ana I 876 181 2PA) ! 292 I 33 11/tl I 0 0% I 695 I 79(10 26

(S) Notes

rev 5/i 4/2008

Package Page 41 AMP Distr butio~ CCl8coges

Page 81: Western Regional Coordinator, APWU

I ,

I I !

MPE Inventory Last Saved February 16, 2012

Losing Facility: .;;In.:.;o:.:'u:.;:s,,,trvL.' -'-P..:;&:.:D:..;C=-___________ _ Gaining Facility: Santa Ana P&DC

Data Extraction Date: ____ -'-0-'-9/..;;:2.;;.0_/1_1 ____ _

I (1)

I (2) (3)

Current Proposed Difference Equipment

Number I Number .Iype ""."., I· .. _= .

(4)

Equipment Current

Number -....Jype . _. .-

ArcS I 5 I '" ("' ~I AFCS 11

AFSM ALL ; 3 I " (3) I AFSM 100 4

r,prS 0 APPS I ClOSS 4 (/ (4) ClOSS C

CSHeS , 0 CSSCS

D6CS 37 'J (37) DBeS 42

GBeS·OSS " I' 0 DBeS·OSS

DIOSS :; 0 (5) DIOSS 8

FS5 , ~ 0 FSS

SPBS 3 J (3) SPBS 0 UFSM 0 (I 0 UFSM

FC / MICRO MARK 2 0 (2) FC I MICRO MARK 3

ROBOT GANTRY C' U 0 ROBOT GANTRY 3

HSTS / HSLJS 0 U 0 HSTSIHSUS

LeTS I LCUS 2 I ,J I (2) LeTS I LCUS " LIPS '0 ,J 0 LIPS

MLOCR-iSS 0 0 MlOCR·!SS

MPBCS·OSS '; ;') 0 ,,,,pp,'~,n~s

fABBER " 0 TABBER 1

POWERE8

I INDUSTRIAL 0 EQUIPME,NT -

POWERED

EQUIPMENT

-"C_REM I 1 (1) LCREM 2

(5) (6) (7)

Proposed Difference

Excess

Number .- . -"-:CC":'-

14 3 (2)

3 (1) (4)

I I 4 4 0

50 8 (29)

;0 2 (3)

[) I 0 (3)

I 0 1 (3) (5)

0 (3) (3)

2 2 D

t, (1, (',)

I 3 I 1 0

Mail Processing Equipment Relocation Costs from Losing to Gaining Facility: ___ -'$"'3.;:O.;:.S"', 1-=8-=2 ____ (TO'$ nurnDel'$ earned IO<Ward 10 Space

Other CostS) (9) Notes' ___________________________________________________________________________ __

(8)

Reiocation

Cos:s .....

910977')

~27 JOC ,

i $-,3/36 !

!

!

i i I

S1SC.OOC:

! !

i

! S: 317

and

Package Page 42 ;:.rv1P Iv1PE. l~ver,lor\

Page 82: Western Regional Coordinator, APWU

Space Evaluation and Other Costs

Las! Saved Febru()ry 16,2012

Affected Facility

2 Lease Information (If not leased skip to 3 below.) Enter annual lease cost

Enter lease expiration ------------------------Enter lease options/terms ___________________ _

3 Current Square Footage Enter the total interior square footage of the lacilit'

Enter gained square footage expected with the ---:~-=:--:::-=----------------------

4

5 Facility Costs

Enter any projected one-time facility

6 Savings Information

Space Savings ($):--=-------:----:---:-;------,--------;------:c----~,---

7

Employee Relocation Costs

Mail Processing Equipment Relocation Costs (from MPE Inventory )

Facility Costs (from above)

Total One-Time Costs

Losing Facility: .::.In.:::d::::u:::st~ryL:.-P::::&.:::D.:::C:.._ _________ _

$6,200,682 (ThiS number carried fONJard to Executive Summary)

Gaining Facility: Santa Ana P&DC

YTD Range of Report: __ -----'==-'-"---'-==-'-_____ _

(11

Product

Letters

Flats

RS Redirects

APPS

Package Page 44

(2)

Associated REC

(3)

Current Cost

per 1,000 Images

$2895

$30,30

ray 9124/2008

AMP Space Evaluation and Other Costs

Page 83: Western Regional Coordinator, APWU

PAY FINANCE OFFICE LAST FIRST MI EMPID JOBID JOB TITLE LEVEL D/A FUNC LDC SEN DATE SEN#

MOTOR INDUSTRY VEHICLE

50109 CA P&DC HILDRETH RAYMOND D 2941407 70951590 OPERATOR 7 135 3A 34 5/16/1992 2 MOTOR

INDUSTRY VEHICLE 50109 CA P&DC GREINER JOSEPH W 3305926 70951591 OPERATOR 7 135 3A 34 5/30/1992 1

MOTOR INDUSTRY VEHICLE

50109 CA P&DC MORALES EDWARD A 3092826 70951592 OPERATOR 7 135 3A 34 8/21/1993 1 MOTOR

INDUSTRY VEHICLE 50109 CA P&DC HARRIS KECIA L 3350744 70004368 OPERATOR 7 135 67 67 11/7/1998 2

MOTOR INDUSTRY VEHICLE

50109 CA P&DC ARREDONDO PEDRO 3308665 70951593 OPERATOR 7 135 67 67 8/12/2000 1 MOTOR

INDUSTRY VEHICLE 50109 CA P&DC STATEN DANNY R 3114730 70951596 OPERATOR 7 135 3A 34 12/2/2002 1

MOTOR INDUSTRY VEHICLE

50109 CA P&DC JUANG STEPHEN Y 3070656 70951594 OPERATOR 7 135 3A 34 4/19/2003 1 MOTOR

INDUSTRY VEHICLE 50109 CA P&DC VALLIN HECTOR 3069577 71150736 OPERATOR 7 135 3A 34 10/2/2004 1

MOTOR INDUSTRY VEHICLE

50109 CA P&DC GRAHAM WILLIAM S 3182543 70951595 OPERATOR 7 135 3A 34 2/28/2005 1 MOTOR

INDUSTRY VEHICLE 50109 CA P&DC CERVANTES CHRISTOPHER A 3049416 70951597 OPERATOR 7 135 3A 34 4/30/2005 1

MOTOR INDUSTRY VEHICLE

50109 CA P&DC LUU ERIC T 3103915 71150733 OPERATOR 7 135 3A 34 7/23/2005 1

Page 84: Western Regional Coordinator, APWU

, PAY

FINANCE OFFICE LAST FIRST MI EMP 10 JOB 10 JOB TITLE LEVEL D/A FUNC LDC SEN DATE SEN# TRACTOR

INDUSTRY CA TRAILER 50109 P&DC DIAZ FRANCISCO J 3423641 70951589 OPERATOR 8 135 3A 34 5/26/1987 11"',

IRACTOR INDUSTRY CA TRAILER

50109 P&DC JOHNSON WILLIAM A 3651594 70951586 OPERATOR 8 135 3A 34 3/20/2006 1 TRACTOR I

INDUSTRY CA TRAILER 21~11 50109 P&DC RANGEL ADOLFO 4013118 71150737 OPERATOR 8 135 3A 34 9/10/2007