Primary Responsibilities• Road Safety• Road Maintenance• Storm Water Maintenance and Repair• Infrastructure Improvement (Capital Projects)• Infrastructure Inspection• Lending a Helping Hand

Road Safety• Snow Removal

• Brickman• Practical Property Group

• Pothole Repair• FE Harding• 108 tons of Asphalt placed (88 hot/20 cold)

• Federal HSIP Grant• Highway Safety Improvement Program• $1.5 Million awarded for ADA and intersection safety

improvements

Road Maintenance• Pothole repair• Crack sealing

• Spring and Fall Seasons• Night work

• Shoulder repair• Infrared patching• Resurfacing

• Highway Safety Improvement Program• $1.5 Million awarded for intersection safety improvements

Storm Water Maintenance and Repair• Erosion and encroachment inspection• Culvert replacement and repair• Sink hole repair• Ditching and swale repair

Infrastructure Improvement• 2015 Spring Resurfacing• 156th and Springmill Round-a-bout• 191st and Tomlinson Round-a-bout• Grand Park Blvd. Extension• 161st and Oakridge Round-a-bout• Mill Street Extension

Infrastructure Improvement156th and Springmill Round-a-bout

Infrastructure Improvement191st and Tomlinson Round-a-bout

Infrastructure ImprovementGrand Park Blvd. Extension

Infrastructure Improvement161st and Oak Ridge Round-a-bout

Infrastructure ImprovementMill St. Extension

Lending a Helping Hand• Grand Park• Design and construction of the WYSI field additions• Under-brush clearing in the wooded areas• Rock pile removal and placement• Shade sail installation