what to expect when the inspector arrives
DESCRIPTION
WHAT TO EXPECT WHEN THE INSPECTOR ARRIVES. Edward Horst, NMED-AQB. PROCEDURES. Introductions and presentation of state issued credentials State the purpose of the visit Request permission to conduct an inspection Commence inspection Conduct a closing conference. THE INSPECTION. Procedure: - PowerPoint PPT PresentationTRANSCRIPT
Edward Horst, NMED-AQB
Introductions and presentation of state issued credentials
State the purpose of the visit Request permission to conduct an
inspection Commence inspection Conduct a closing conference
Procedure:◦ Opening Conference◦ Verification of Permit Terms and Conditions◦ Overview of the status of Terms and Conditions◦ Facility Walk Through ◦ Closing Conference
Procedure:◦ Administrative Information◦ Facility Entry◦ Entry Conference◦ Entry conference Participants◦ Statutory authority to enter site and conduct
inspection
The inspector will review:◦ Section II – Registration Process◦ Section III – Facility Operating Requirements◦ Section IV – Monitoring, Recordkeeping and
Notification Requirements◦ Section V – Changes that Prevent Meeting the
General Permit Requirements
The following records will be reviewed:
◦ Actual hours of operations Beginning of daily operation for each applicable day Ending of daily operation for each applicable day
◦ All monitoring requirements set out in Subsection IV. A. of the permit
◦ Weekly total production
◦ Monthly 12 month total production.
• Number of haul truck trips per day • including materials delivery and product
• Fuel delivery manifest• the type of fuel• number of gallons purchased
• The quantity and frequency of water or surfactant application to haul roads
• The frequency of haul road sweeping • (if paved)
• Other haul road control measures • (if used)
• Copies of the manufacturer’s (or applicant’s proposed) maintenance and operating requirements and records demonstrating conformance with said requirements
• Copies of documentation that substantiates compliance with the requirement in subparagraph III.F.2.e.
A walk-though of the facility is conducted so that the inspector becomes familiar with the flow of the operation
Purpose:◦ To verify that the equipment being used matches the
equipment on the facility’s permit◦ To perform opacity reads (if the inspector finds it
necessary)◦ Interview employees (if the inspector finds it necessary)
At the conclusion of the inspection, the inspector will conduct a Closing Conference.
Purpose:◦ Inform the facility personnel any areas that
were found to be inconsistent with any of the Permit Terms or Conditions, or Areas of Concern (AOC)
Cont.:◦ If the inspector has determined that there are
AOCs present a Post Inspection Notification (PIN) will be given to the permitted or their representative
◦ The PIN will list permit terms/conditions and or regulatory citations that appear to be potentiallly non-compliant
◦ Most of the facilities permitted under the GCP Process WILL NOT see an air inspector if those facilities are being “GOOD NEIGHBORS AND STEWARDS OF THE ENVIRONMENT”
◦ Citizen complaints attribute to nearly EVERY INSPECTION that the New Mexico Air Quality Bureau conducts on GCP Permitted
Have respect for your neighbors, their property, quality of life, and health
If there are questions concerning terms and conditions in your permits or if you need
clarification
Please contact us