What We Do. Tom Trayer Regional Manager Trayer Engineering Corporation March 11, 2013

Upload: lybao

Post on 31-Jan-2018

220 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

What We Do.

Tom Trayer Regional Manager Trayer Engineering Corporation March 11, 2013

Page 2: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Distribution class vacuum switchgear and circuit protection. • Padmounted • Vaultmounted • Submersible

What Do We Design and Build?

System Automation

1. 2.

Page 3: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Liquid or SF-6 Insulation

10,000 Operations

Liquid SF-6

3,000 Operations

Page 4: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Load Switching

Load switching through 35kV • At 15kV can be delta or grounded wye • Over 15kV must be grounded wye

Page 5: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Dry Well Fusing

• Dry well fusing through 35kV and up to 50 amps

Page 6: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Wet Well Fusing

• At 15.5kV protection can be delta or grounded wye

• Over 15.5kV must be grounded wye

Page 7: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Vacuum Circuit Protection

Vacuum Fault Interrupter (VFI) through 25kV up to 600 amp • At 15.5kV can be delta or grounded wye • Over 15.5kV must be grounded wye • 12.5kA interrupting capacity • 65 interruptions at fault capacity

Page 8: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Vacuum Circuit Protection

3-phase or single phase available

Page 9: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Vacuum Circuit Protection 3-Phase • 3000 series = heavy duty VFI • 3-phase trip only , onboard PT for 120 VAC

control XXXX (word missing) • SEL Relays – Standard, aux power available

Page 10: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Vacuum Circuit Protection Single Phase • 4000 series = lighter duty VFI • 3-phase or single phase trip only • CT powered T&B Relay, no aux power

available • 3-phase or single phase reset and load

switching

Page 11: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Visible Disconnects Available through 35kV

Closed/Open

2 Position 3 Position

Closed/Open/Grounded

Page 12: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

System Automation

• Automatic transfer – 10 Seconds – 10 Cycle

• SCADA controls – Local – Remote

• Advanced automation

• Stand alone and peer-to-peer

• SmartGrid, MicroGrid, and some Substation

Page 13: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

• Primary Metering Cabinets

• Voltage Regulators • Reclosers • Transformers • Capacitor Banks

What We DON’T Design and Build

• Bar-b-ques • Brewer equipment • Bull milking machines • OTHER MANUFACTURERS

EQUIPMENT!

Page 14: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering
Page 15: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Who Do We Sell To?

• Utilities • Commercial & Industrial • Consultants

Page 16: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Utility Customers

• Distribution Engineering • Standards • Operations • Reliability

• Automation – Smartgrid, Microgrid

• Special projects – Big Stick – Deep pockets – Senior Engineers vs Junior

Engineers

Page 17: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Commercial & Industrial Customers

• Colleges • Universities • Military

• Gas & Oil • Mining • Heavy Manufacturing

Page 18: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Consultant Customers

• Involved with all of the above

Page 19: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

How Can We Sell Trayer?

From a Position of Knowledge

Page 20: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Selling Trayer

From a Position of Knowledge

Page 21: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Selling Trayer

Know the product well enough to see real opportunity.

Page 22: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Selling Trayer

Know the product well enough to have a meaningful discussion.

Page 23: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Selling Trayer

Know the product well enough to know who to talk to.

Page 24: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Selling Trayer

Know your region well enough to know where the opportunities should be.

Page 25: What We Do. - Trayer · PDF fileup to 600 amp • At 15.5kV can be ... some Substation • Primary Metering

Selling Trayer

Be creative. Where’s your next opportunity?