    BP.080 - Purchasing Process

    Document Control

    Change Record

    4

    Date Author Version Change Reference

    12-Jan-2013 Ajay Singh 0.1 Base Document

    22-Mar-2013 Ajay Singh 1.0 Final Version

    Reviewers

    Name Position

    Prithwish Chatterjee Wipro Project Manager

    Swarup Ghosal Chaudhary Wipro Program Manager

    Approver

    Name Position Signature

    Sh. Kamal Kant Kaushaik Manager - Projects

    Sh. Kumar Bachchan Sr. Manager - DNM

    Sh. A K Sablania GGM DNM

    Sh. Ashutosh Vasant GM - Projects

    Sh. Puran Singh GGM - Infrastructure

    Sh. Suresh Kumar GGM NTP

    Distribution

    Copy No. Name Location

    1 RailTel Project Parivartan Steering Committee Gurgaon2 RailTel Project Parivartan Core Working Group Gurgaon3 RailTel Project Parivartan Regional CWG New Delhi/Mumbai/Secunderabad/Kolkata4 Wipro Onsite Team Gurgaon5 Wipro Technical Team Gurgaon

    Note to Holders:

    If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover

    page, for document control purposes.

    If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    3/125

    BP.080 - Purchasing Process

    Contents

    Document Control ..................................................................................................................... ii

    Introduction ...................................................................................................................... ......... 1

    About this Document.......................................................................................................... 1How this document is organized ............................................. ........................................... 2Generic Assumptions .......................................................................................................... 3

    Overall Project & Procurement Flow ......................................................... ................................ 4

    PO 01 - On Line Purchase Indent Process .................................................................................. 6PO 02 - Purchase Indent Process ............................................................................................... 9

    PO 03 - Indent Preparation & Approval ................................................................................... 11

    PO 04 - Overall Procurement Tender Process (Supply Item) ................................................... 13

    PO 05 - Overall Project Tender Process (Works/Service/Item) ............................................... 17

    PO 06 - Open/Global Tender Process Single Packet ............................... .............................. 21

    PO 07 - Open/Global Tender Process Two Packet ......................................................... ....... 24

    PO 08 - Limited Tender Process ............................................................................................... 27

    PO 09 - Single Tender Process ................................................................................................. 30

    PO 10 - Dispensation of Tender Process for Material .............................................................. 33

    PO 11 - Dispensation of Tender Process for Works Contract & Execution .............................. 35

    PO 12 - Procurement Process for Material (Supply Item) ....................................................... 38

    PO 13 - Procurement Process for Works Contract (Supply, Installation & Commissioning) ... 41

    PO 14 - Procurement Process for Execution .......................................................... .................. 44

    PO 15 - Procurement Process for AMC (Equipments, Sections, Miscellaneous) ..................... 47

    PO 16 - Procurement Process for Inspection (Material, Works Contract & Execution) .......... 49

    PO 17 - Imprest/Advance Procurement Process .............................................................. ....... 52

    PO 18 - Bank Guarantee Process ............................................................................................. 54

    PO 19 - Site Readiness Process-For Material and Service ........................................................ 56

    PO 20 - Inspection Process....................................................................................................... 59

    PO 21 - Standard Purchase Order Process ............................................................. .................. 62

    PO 22- Rate Contract for Material (Supply Item) .............................................................. ....... 65

    PO 23 - Rate Contract Releases of Material (Sub PO) .............................................................. 68

    PO 24 - Rate Contract for Service & Works Contract ........................................................ ....... 71

    PO 25 - Rate Contract Releases of Service & Works Contract (Sub PO) ................ .................. 75

    PO 26 - Advance Purchase Order ............................................................... .............................. 78

    PO 27 - Advance Purchase Order Release (Sub PO) ................................................................ 80

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    4/125

    BP.080 - Purchasing Process

    PO 28 - Global Purchase Agreement........................................................................................ 83

    PO 29 - Maintain Purchase Order Process (Variation/Enhancement in Quantities) ............... 86

    PO 30 - RFI- Request for Information (Tender Process) ........................................................... 89

    PO 31 - Request for Quotation and Quotations (Tender Process)........................................... 92

    PO 32 - Supplier Registration (iSupplier Module) .................................................................... 96

    PO 33 PO/LOA Acknowledgement (iSupplier Module) ......................................................... 98

    PO 34 - ASN Creation and Online Submission (iSupplier Module) ......................................... 101

    PO 35 - Contracting Process (Procurement Contract) ........................................... ................ 104

    PO 36 - Contracting Amendment Process (Procurement Contract) ...................................... 107

    PO 37 - Approved Supplier List (ASL) ..................................................................................... 110

    PO 38 Spot Purchase Process .................................................................. ............................ 113

    PO 39 Inspection Waiver Process ........................... ............................................................ 116

    PO 40 Delivery Period/Date of Completion - Extension ................................................ ..... 119

    Open and Closed Issues for this Deliverable .......................................................... ................ 121

    Open Issues..................................................................................................................... 121Closed Issues ................................................................................................................... 121

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    5/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Introduction

    About this Document

    RAILTEL has appointed Wipro Limited to implement Oracle E-Business Suite. The implementation spans

    Financials and Supply Chain Management processes. This document describes the ProcurementProcess for RAILTEL.

    The project is divided into Five Stages viz. Plan, Analyse, Design, Develop and Go-Live. The Analyse

    Stage covers identifying the gaps in the As-Is processes and re-designing them in order to adopt

    leading processes as also to harness the capability of the chosen technology.

    This document contains the RAILTEL Procurement process flow that would be configured onto

    the Oracle E-Business Suite.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    6/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    How this document is organized

    This document forms deliverable of the operation analysis phase of the ERP

    implementation project for RailTel. The purpose of this document is to compile a

    comprehensive list of requirements against which to map Application features. The

    scenarios listed in the subsequent sections are reusable templates and are created once

    for each business process.

    Each of the following sections consists of the following sub sections:

    Assumptions

    Any assumptions that are specific to the process being detailed are recorded in this

    sub section.

    Process Scenario

    The Event initiates the corresponding process.

    Process Solution:

    1. Complete process flow2. Process Id #: Unique number for the sub-processes within the main

    process.

    Description

    1. Process Title & Description: The bold letters gives the process titlefollowed by the detailed description of the process in normal font.

    2. Key Requirements from the above process

    Requirement Fulfillment using ERP Approach

    1. Solution Type & Description: Used to designate type of solution. Thetypes mentioned here are Screen, Manual and System. The Screen refers

    to the type where the data is to be entered in the screen or can be viewed

    in the screen. Manual type is the manual way of doing the process whetherthe user would be performing the process in the system or otherwise. The

    System type of solution is referred to when the system performs the step

    through automation or sub-automation. The following keys can be used for

    the process in the system.

    i.S Standardii.W - Workaroundiii.C Extension/Customization

    2. Navigation Path: The path to navigate to the relevant functionality inApplications. The following acronyms have been used for navigation type:

    i.(T) Tabii.(B) Buttoniii.(CB) Check Boxiv.(F) Field

    3. Impact analysisProcess Improvements

    Quality & Customer Service

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    7/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Leading Practices

    Note: The texts in grey shade are optional activities.

    Generic Assumptions

    Any additional information captured in ERP through external systems will be highly dependent

    on the external systems. Wipro will not be responsible for the functioning or the

    implementation of the external systems.

    Customizations identified in the requirement definition document will be developed subject

    to the scope defined in the approved project charter.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    8/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Overall Project & Procurement Flow

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    9/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Railtel End to End Project Flow and Integration with other Modules

    General Ledger Payables Fixed Assets Receivables

    Finance

    Projects

    Procurement

    Marketing&

    Sales

    Business

    Business Plan

    General Ledger

    Budget Definition as per theBusiness Plan

    Transaction posted form other

    Modules

    Sources of the Projects

    Railways Pink Book

    Railtel Law BookOthers Marketing

    START

    ProjectCreation &

    Approval

    Project Budget

    Creation,Revision &

    Approval

    Workplan Creation,

    Versioning andProgress

    Management

    Project StatusInquiry

    Project AssetCreation &

    Transfer to FA

    Transfer toInventory/

    ProjectVice Versa

    Inspection &Recieving

    PurchaseOrders/APO/Rate Contracts

    Commercial &TechnicalAnalysis

    TenderCreation &

    Floating

    PurchaseIndent/

    Creation &Approval

    Invoicing relatedto Project in

    Payables

    Asset Posting inFixed Assets

    Invoice to theCustomer inRecievables

    Note:The Business plan is conceptualized by the RailtelDirectorsBusiness Plan prepared by Railtel Team / ConsultantsProjects are created as per the Business plan decided.

    Project Closure

    END

    Demand NoteCreation & Customer

    Acceptance

    Sales OrderBooking

    Contract Creation Billing

    Note :The Approval related to the projects is further elaborated in the next flow.The Project Planning team will do the estimation and enter the budget in thesystem.The details estimate will be done and Indent / Requisitions will be raised withreference to the project.Detail processes related to the project are further elaborated in the document.

    ManualERP

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    10/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 01 - On Line Purchase Indent Process

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    11/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    On Line Purchase Indent Process

    AllDepartments

    Log in to I ProcurementEnter indent online usingweb forms and catalogs

    Find Items Add Items & Quantity

    Edit Shopping Cart

    Add Items , Quantityand delivery location

    detail

    Review/ModifyIndent

    Submit Indent

    Proceed to Check Out

    Proceed to Check Out

    Check OutWorkflow basedpurchase indent

    approval

    ProcurementProcessPO12

    Suppliernotified anddeliver the

    goods

    Record receiptin to the web

    End

    ERP Manual Email

    Start

    No

    Yes

    Finance

    FinanceVetting

    O & Mactivities

    Projects(Railway/

    RailTel/LMCetc)

    Others(General

    Admin etc.)

    RAILTEL Process: On Line Purchase Indent Process Business Function: RAILTEL Project Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    12/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Control Number: PO 01 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 01 Description: This step explains the On Line Purchase Indent Process.

    Event Description: This process is triggered to raise the online purchase indent.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # DescriptionMode

    RequirementFulfillment using ERP

    Approach (Y/N)

    Procurement POM_PO_PI_1 PO 01.01 On line Indent will be created using web forms and catalogs. System Y

    Procurement POM_PO_PI_1 PO 01.02 Find Items online and add quantity and delivery details. System Y

    Procurement POM_PO_PI_1 PO 01.03 Edit, modify and review indent online. System Y

    Procurement POM_PO_PI_1 PO 01.04 Online Indent will be submitted. System Y

    Procurement POM_PO_PI_1 PO 01.05 Purchase Indent will be approved as per defined approval hierarchy. System Y

    Procurement POM_PO_PI_1 PO 01.06 After approval of Online Indent, Procurement process is initiated. System Y

    Procurement POM_PO_PI_1 PO 01.07 Supplier notified and delivers the goods as required. Receipt detail will be recorded. System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    13/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 02 - Purchase Indent Process

    Purchase Indent Process

    AllDepartments

    ERP Manual Email

    Start

    User to enter the

    IndentHeader details

    Enter the Linedetails Item code,

    Qty, Need by date,Etc

    Select theOrganization,

    Location andSupplier(Optional)

    Save the

    Document andsubmit for

    Approval

    Purchase

    IndentApproved

    Automaticnotification to

    Requestor

    Yes

    Approved Purchase

    Indent becomes theinput for Purchase

    Order to be created bythe Purchasing

    department

    ProcurementProcess

    PO12

    End

    Capture the ChargeAccount, If any

    consumablesitems(without Item Code)

    No

    Finance

    Finance

    Vetting

    O & M

    activities

    Projects(Railway/RailTel/LMC

    etc)

    Others

    (GeneralAdmin etc.)

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    14/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Purchase Indent Process Business Function: RAILTEL Project Date: 12-01-2013

    Control Number: PO 02 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 02 Description: This step explains the Purchase Indent Process.

    Event Description: This process is triggered to raise the purchase indent.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Procurement POM_PO_PI_1 PO 02.01 User will create the Indent by mentioning the PR headers details like the PR type ,

    Description

    System Y

    Procurement POM_PO_PI_1 PO 02.02 Create Purchase Indent with information like item or description, quantity and

    (Approx) purchase price. When item not available the user should choose

    purchasing category and write a description.

    System Y

    Procurement POM_PO_PI_1 PO 02.03 Indent preparers should select the inventory organization name, location and

    Supplier details (options).

    System Y

    Procurement POM_PO_PI_1 PO 02.04 Select the Charge Account Number in case of Expense or Consumables items. System Y

    Procurement POM_PO_PI_1 PO 02.05 Generate a Purchase Indent with automatic document number. System Y

    Procurement POM_PO_PI_1 PO 02.06 Submit the purchase Indent for approval through the delegation of authority. System Y

    Procurement POM_PO_PI_1 PO 02.07 Requester will not be able to approve Indent. Indent approval will be a workflow

    based process based on approval limits. Approved Purchase Indent is the input for

    Purchase Order Creation.

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    15/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 03 - Indent Preparation & Approval

    Indent Preparation & Approval

    Project&Proc

    urement

    ERP Manual

    Start

    Indent/

    Estimates

    raised at

    territory level

    Submit for

    approval &

    Finance

    Concurrence

    Finance

    Approval as

    per SOP

    Approval from

    TM as per

    SOP

    Yes

    More Info

    MoreInfo

    No

    RO collates all Indent/

    Estimates of territory level

    and prepares consolidated

    proposal

    Or Indent/Estimate raised

    at regional level

    Yes

    Finance

    concurrence

    as per SOP

    Submit for

    approval &

    Finance

    Concurrence

    Approval from

    RGM as per

    SOP

    Yes

    More Info

    No

    More Info

    CO collates all Indent/

    Estimates of regional level

    and prepares consolidated

    proposal

    Or Indent/Estimate raised

    at corporate level

    Yes

    Submit for

    approval &

    Finance

    Concurrence

    Corporate

    finance

    concurrence

    as per SOP

    Approval from

    MD/Director as

    per SOP

    End

    Yes

    More Info

    oN

    More Info

    Tender

    Process at

    Territory Level

    If applicable

    PO04-PO05

    Tender

    Process at

    Regional Level

    PO04-PO05

    Territory Level Regional Level Corporate Level

    Tender Process

    at Corporate

    Level

    PO04-PO05

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    16/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Indent Preparation & Approval Business Function: RAILTEL Project Date: 12-01-2013

    Control Number: PO 03 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 03 Description: This step explains the Indent preparation and approval.

    Event Description: This process is triggered whenever an Indent is prepared and approved.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Procurement POM_RP_EP_2 PO 03.01 Indent/Estimates are raised at territory level System Y

    Procurement POM_RP_EP_2 PO 03.02 Indent is submitted for approval System Y

    Procurement POM_RP_EP_2 PO 03.03 Approval is done as per SOP System Y

    Procurement POM_RP_EP_2 PO 03.04 Final approval is done from TM as per SOP System Y

    Procurement POM_RP_EP_2 PO 03.05 RO collates all indent/estimates of territory level and prepares consolidated

    proposal then it is put up for approval

    System Y

    Procurement POM_RP_EP_2 PO 03.06 Approval from finance for concurrence is done as per SOP System Y

    Procurement POM_RP_EP_2 PO 03.07 Final approval is done from RGM as per SOP System Y

    Procurement POM_RP_EP_2 PO 03.08 CO collates all indent/estimates of regional level and prepares consolidated proposal

    then it is put up for approval

    System Y

    Procurement POM_RP_EP_2 PO 03.09 Approval from finance for concurrence is done as per SOP System Y

    Procurement POM_RP_EP_2 PO 03.10 Final approval is done from CMD/Director as per SOP System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    17/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 04 - Overall Procurement Tender Process (Supply Item)

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    18/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Start

    Procurement

    Finance

    Business Plan

    Railways OFCSection Works

    Other Railways

    Project

    Other CustomerProject

    O&M Activities

    Govt. Projects

    Global Tender

    Open Tender

    Limited Tender

    Special LimitedTender

    Single Tender

    Quotation

    Tender DocumentFloated

    Receive

    response frombidder

    Tender document

    is opened bynominated TOC

    Comparative sheet

    and Briefing noteare prepared by

    executive

    B

    C

    Vetted

    comparative sheetand Briefing note

    put up to TC

    TC prepares final

    observation

    Comparative sheet & final

    minutes sent to TAA forapproval

    Successful bidderdeposit various

    documents like PBG,Security Deposit

    EMD handed over

    to finance

    Comparative sheet &

    Briefing note vettedby financeB C

    Purchase Indent/Estimates raised at

    Territory Level.(Project

    budget will be revised if

    indent estimate increases

    more than project budget)

    Purchase Indent/Estimates raised

    at regional Level

    RO collates all

    requisitions fromterritories & Prepares

    consolidatedproposal

    CO collates allrequisitions from

    regions & Preparesconsolidated

    proposal

    EMD Return tounsuccessful

    bidder & EMD

    returns tosuccessful bidder

    or adjusted withInvoice

    Purchase Order

    Issued tosuccessful bidder.

    Tender estimate

    will be revised ifPO estimate

    increases morethan tender

    estimate.

    Tender processing

    officer isnominated

    ProjectBudgeting

    ProcessPRJ05

    Tender cost Estimationprepared and Put up to

    Finance for FinanceVetting & approval as per

    SOP along with PACissued by Region/

    Corporate and approvedby Director

    A

    Tender cost Estimationprepared and Put up to

    Finance for FinanceVetting

    A

    Prebid meeting and

    change/modificationTender document

    accordingly

    Acceptance from

    Supplier

    Supplier

    RegistrationProcess

    PO32

    TC nomination asper SOP

    Purchase Indent

    raised at corporatelevel

    Overall Procurement Tender Process ERP Manual Email

    Discharge

    Counter offer/LOI

    Acceptance

    NIT Published in

    News Paper(Online)

    Negotiation maydone with

    supplier

    Approved Supplier

    List or Freshapproved supplier

    list via approvalPO37

    End

    Non-Acceptance

    NIT and Tender

    Document

    uploaded on

    website

    PR Process

    RAILTEL Process: Overall Procurement Tender Process Business Function: RAILTEL Tender Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    19/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Control Number: PO 04 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 04 Description: This step explains the Overall Procurement Tender process for material.

    Event Description: This process is triggered Whenever a Tender is created for material.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERPApproach (Y/N)

    Requirement

    Generation

    POM_TP_

    RG_1

    PO 04.1 Requirement for floating the tender is triggered from the various sources.

    Business Plan (Long Term & Short Term)

    Railway Project OFC section works

    Other Railway Projects

    Other Customer projects

    O&M activities

    Customer Lead

    Government Project

    Manual Y

    Indent/Estimates POM_RP_

    EP_2

    PO 04.2 Purchase Indent/Estimates raised at territory and regional level

    RO & CO collates all the indent and prepares consolidated proposal

    Estimates and Tender document prepared and put up to finance for finance

    vetting.

    System Y

    Tender Document POM_TP_

    TD_2

    PO 04.3 Tender Processing officer is nominated.

    Tender are of various types, open tender, limited tender, special limited tender,

    Global tender, single tender and quotation. Respective tender document is created.

    System Y

    Tender Document

    Execution

    POM_TP_

    TE_3

    PO 04.4 As per SOP and schedule of work, Tender process is followed and floated;

    Simultaneously It is published in news paper and on RailTel website also.

    As required tender is floated to selected supplier from approved supplier

    list.

    Prebid meeting is done and tender document is changed accordingly

    Response is received from various vendors.

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    20/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Tender document is opened by nominated TOC

    Comparative sheet and Briefing note are prepared by executive

    EMD is hand over to finance and Comparative sheet and briefing note are

    vetted by finance.

    TC nomination is done.

    Vetted comparative sheet put up to TC and TC prepares the final

    observation.

    Comparative sheet and final minutes sent to competent authority approval.

    Negotiation is done if required and Discharge can also be happen

    Counter offer process is done for final price.

    Purchase Order is issued to successful bidder and acknowledgment is

    received.

    Successful bidder deposit various document like PBG, Security deposit.

    Simultaneously EMD is returned to unsuccessful bidder.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    21/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 05 - Overall Project Tender Process (Works/Service/Item)

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    22/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Start

    Project

    Finance

    Business Plan

    Railways OFC

    Section Works

    Other Railways

    Project

    Other CustomerProject

    O&M Activities

    Govt. Projects

    Global Tender

    Open Tender

    Limited Tender

    Special LimitedTender

    Single Tender

    Quotation

    Tender DocumentFloated

    Receive

    response frombidder

    Tender document

    is opened bynominated TOC

    Comparative sheet

    and Briefing noteare prepared by

    executive

    B

    C

    Vettedcomparative sheet

    and Briefing note

    put up to TC

    TC prepares finalobservation

    Comparative sheet & final

    minutes sent to TAA for

    approval

    Successful bidder

    deposit variousdocuments like PBG,

    Security Deposit

    EMD handed over

    to finance

    Comparative sheet &Briefing note vetted

    by financeB C

    Purchase Indent/Estimates raised at

    Territory Level.(Project

    budget will be revised ifindent estimate

    increases more thanproject budget)

    Purchase Indent/

    Estimates raised

    at regional Level

    RO collates all

    requisitions from

    territories & Preparesconsolidated

    proposal

    CO collates all

    requisitions fromregions & Prepares

    consolidated

    proposal

    EMD Return to

    unsuccessfulbidder & EMD

    returns to

    successful bidderor adjusted with

    Invoice

    LOA Issued tosuccessful bidder.

    Tender estimate

    will be revised ifLOA estimate

    increases more

    than tenderestimate.

    Tender processing

    officer is

    nominated

    Project

    BudgetingProcess

    PRJ05

    Tender cost Estimation

    prepared and Put up to

    Finance for FinanceVetting & approval as per

    SOP along with PAC

    issued by Region/Corporate and approved

    by Director

    A

    Tender cost Estimation

    prepared and Put up to

    Finance for FinanceVetting

    A

    Prebid meeting andchange/modification

    Tender document

    accordingly

    Acceptance fromSupplier

    Supplier

    RegistrationProcess

    PO32

    TC nomination as

    per SOP

    Purchase Indentraised at corporate

    level

    Overall Project Tender Process ERP Manual Email

    Discharge

    Counter offer/LOI

    Acceptance

    NIT Published in

    News Paper

    (Online)

    Negotiation may

    done with

    supplier

    Approved Supplier

    List or Freshapproved supplier

    list via approval

    PO37

    End

    Non-Acceptance

    NIT and Tender

    Document

    uploaded on

    website

    PR Process

    RAILTEL Process: Overall Project Tender Process Business Function: RAILTEL Tender Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    23/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Control Number: PO 05 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 05 Description: This step explains the Overall Project Tender process for Service and Work Contract.

    Event Description: This process is triggered Whenever a Tender is created for service and works contract.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERPApproach (Y/N)

    Requirement

    Generation

    POM_TP_

    RG_1

    PO 05.1 Requirement for floating the tender is triggered from the various sources.

    Business Plan (Long Term & Short Term)

    Railway Project OFC section works

    Other Railway Projects

    Other Customer projects

    O&M activities

    Customer Lead

    Government Project

    Manual Y

    Indent/Estimates POM_RP_

    EP_2

    PO 05.2 Purchase Indent/Estimates raised at territory and regional level

    RO & CO collates all the indent and prepares consolidated proposal

    Estimates and Tender document prepared and put up to finance for finance

    vetting.

    System Y

    Tender Document POM_TP_

    TD_2

    PO 05.3 Tender Processing officer is nominated.

    Tender are of various types, open tender, limited tender, special limited tender,

    Global tender, single tender and quotation. Respective tender document is created.

    System Y

    Tender Document

    Execution

    POM_TP_

    TE_3

    PO 05.4 As per SOP and schedule of work, Tender process is followed and floated;

    Simultaneously It is published in news paper and on RailTel website also.

    As required tender is floated to selected supplier from approved supplier

    list.

    Prebid meeting is done and tender document is changed accordingly

    Response is received from various vendors.

    Tender document is opened by nominated TOC

    Comparative sheet and Briefing note are prepared by executive

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    24/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    EMD is hand over to finance and Comparative sheet and briefing note are

    vetted by finance.

    TC nomination is done.

    Vetted comparative sheet put up to TC and TC prepares the final

    observation.

    Comparative sheet and final minutes sent to competent authority approval.

    Negotiation is done if required and Discharge can also be happen

    Counter offer process is done for final price.

    LOA is issued to successful bidder and acknowledgment is received.

    Successful bidder deposit various document like PBG, Security deposit.

    Simultaneously EMD is returned to unsuccessful bidder.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    25/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 06 - Open/Global Tender Process Single Packet

    Start

    Project&Procurement

    Finance

    Open/Global

    Tender documentfloated

    Receiveresponse from

    bidder

    Tender document

    is opened bynominated TOC

    Comparative sheetand Briefing note

    are prepared byexecutive

    B

    C

    Vettedcomparative sheetand Briefing note

    put up to TC

    TC prepares finalobservation

    Comparative sheet & final

    minutes sent to TAA forapproval

    Successful bidder

    deposit variousdocuments like PBG,

    Security Deposit

    EMD handed over

    to finance

    Comparative sheet &

    Briefing note vettedby financeB C

    Purchase Indent/Estimates raised at

    Territory Level.(Projectbudget will be revised if

    indent estimate increasesmore than project

    budget)

    Purchase Indent/Estimates raised

    at regional Level

    RO collates allrequisitions from

    territories & Prepares

    consolidated

    proposal

    CO collates allrequisitions from

    regions & Preparesconsolidated

    proposal

    EMD Return tounsuccessfulbidder & EMD

    returns tosuccessful bidder

    or adjusted withInvoice

    Purchase Order/LOAIssued to successful

    bidder.

    Tender estimate will berevised if LOA/PO

    estimate increases morethan tender estimate.

    Tender processingofficer is

    nominated

    ProjectBudgeting

    ProcessPRJ05

    Tender cost Estimationprepared and Put up to

    Finance for FinanceVetting & approval as per

    SOP

    A

    Tender cost Estimationprepared and Put up to

    Finance for Finance

    Vetting

    A

    Acceptance fromSupplier

    SupplierRegistration

    ProcessPO32

    End

    TC nomination asper SOP

    Purchase Indent

    raised at corporatelevel

    Open/Global Tender Process Single Packet ERP Manual Email

    Discharge

    Counter offer/LOI

    NIT Published inNews Paper

    (Online)

    Negotiation maydone withsupplier

    AcceptanceNon-Acceptance

    NIT and Tender

    Document

    uploaded on

    website

    PR Process

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    26/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Open/Global Tender Process

    Single Packet

    Business Function: RAILTEL Tender Date: 12-01-2013

    Control Number: PO 06 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 06 Description: This step explains the Open/Global Tender process for Single Packet.

    Event Description: This process is triggered Whenever an Open Tender is created.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Indent/Estimates POM_RP_

    EP_2

    PO 06.1 Purchase Indent/Estimates raised at territory and regional level

    RO & CO collates all the indent and prepares consolidated proposal

    Estimates and Tender document prepared and put up to finance for finance

    vetting.

    Tender Document POM_TP_

    TD_2

    PO 06.2 Tender Processing officer is nominated for Open/Global Tender Single Packet. System Y

    Tender Document

    Execution

    POM_TP_

    TE_3

    PO 06.3 As per SOP and schedule of work, Tender process is followed and floated;

    Simultaneously It is published in news paper and on RailTel website also.

    Response is received from various vendors.

    Tender document is opened by nominated TOC

    Comparative sheet and Briefing note are prepared by executive

    EMD is hand over to finance and Comparative sheet and briefing note arevetted by finance.

    TC nomination is done.

    Vetted comparative sheet put up to TC and TC prepares the final

    observation.

    Comparative sheet and final minutes sent to competent authority approval.

    Negotiation is done if required and Discharge can also be happen

    Counter offer process is done for final price.

    PO/LOA is issued to successful bidder and acknowledgment is received.

    Successful bidder deposit various document like PBG, Security deposit.

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    27/125

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    28/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 07 - Open/Global Tender Process Two Packet

    Start

    Project&Procurement

    Finance

    Open/Global

    Tender documentfloated

    Receiveresponse from

    bidder

    Tenderdocument(Technical)

    is opened bynominated TOC

    Briefing note are

    prepared byexecutive

    B

    C

    Vetted Briefingnote put up to TC

    TC prepares final

    observation

    Final minutes sent to TAA for

    approval

    EMD handed over

    to finance

    Comparative sheet &

    Briefing note vettedby financeB C

    Purchase Indent/Estimates raised at

    Territory Level.(Projectbudget will be revised if

    indent estimateincreases more than

    project budget)

    Purchase Indent/Estimates raised

    at regional Level

    RO collates allrequisitions from

    territories & Prepares

    consolidated

    proposal

    CO collates allrequisitions from

    regions & Preparesconsolidated

    proposal

    Tender processingofficer is

    nominated

    ProjectBudgeting

    ProcessPRJ05

    Tender cost Estimationprepared and Put up to

    Finance for FinanceVetting and approval as

    per SOP

    A

    Tender cost Estimationprepared and Put up to

    Finance for Finance

    Vetting

    A

    TC nomination asper SOP

    Purchase Indent

    raised at corporatelevel

    Open/Global Tender Process Two Packet ERP Manual Email

    NIT Published inNews Paper

    (Online)

    Prebid Meeting &Change/Modify

    Tender document

    Prebid queriesPublish on

    Website

    Price bid kept in

    seal packet withexecutive along

    with seal of RCIL

    and sign. of TOCand all bidders

    EMD and

    Unopened Pricebid returns to

    unsuccessfulbidders

    Price TC openedby nominated

    TOC

    Notification to allsuccessful bidder

    of Price bid

    Comparative sheet

    are prepared byexecutive

    C

    B

    Vettedcomparative sheet

    put up to TC

    TC prepares finalobservation

    Comparative sheet & final

    minutes sent to TAA forapproval

    Successful bidder

    deposit variousdocuments like PBG,

    Security Deposit

    EMD Return to

    unsuccessfulbidder & EMD

    returns tosuccessful bidder

    or adjusted withInvoice

    Purchase Order/LOA

    Issued to successfulbidder.

    Tender estimate will berevised if LOA/PO

    estimate increases morethan tender estimate.

    Acceptance fromSupplier

    SupplierRegistration

    ProcessPO32

    Discharge

    Counter Offer/LOI

    Negotiation may

    done withsupplier

    End

    AcceptanceNon-Acceptance

    NIT and Tender

    Documentuploaded on

    website

    PR Process

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    29/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Open/Global Tender Process Two

    Packet

    Business Function: RAILTEL Tender Date: 12-01-2013

    Control Number: PO 07 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 07 Description: This step explains the Open/Global Tender process for Two Packet.

    Event Description: This process is triggered Whenever an Open Tender is created.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Indent/Estimates POM_RP_

    EP_2

    PO 07.1 Purchase Indent/Estimates raised at territory and regional level

    RO & CO collates all the indent and prepares consolidated proposal

    Estimates and Tender document prepared and put up to finance for finance

    vetting.

    Manual N

    Tender Document POM_TP_

    TD_2

    PO 07.2 Tender Processing officer is nominated for Open/Global Tender Two Packet. System Y

    Tender Document

    Execution

    POM_TP_

    TE_3

    PO 07.4 As per SOP and schedule of work, Tender process is followed and floated;

    Simultaneously It is published in news paper and on RailTel website also.

    Prebid meeting is done and tender document is changed /modified

    accordingly. Prebid queries are published on website also.

    Response is received from various vendors.

    Tender document (Technical) is opened by nominated TOCPrice bid kept in seal packet with executive along with seal of RCIL and sign.

    of TOC and all bidders

    Briefing note is prepared by executive.

    EMD is hand over to finance and briefing note is vetted by finance.

    TC nomination is done.

    Vetted Briefing note put up to TC and TC prepares the technical

    observation.

    Technical minutes sent to competent authority for approval.

    EMD and unopened price bid returned to unsuccessful bidder

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    30/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Price TC opened by nominated TOC

    Notification is sent to all successful bidders of price bid for opening.

    Comparative sheet and Briefing note are prepared by executive

    Comparative sheet and briefing note are vetted by finance.

    Vetted comparative sheet put up to TC and TC prepares the final

    observation.

    Comparative sheet and final minutes sent to competent authority approval.

    Negotiation is done if required and Discharge can also be happen

    Counter offer process is done for final price.

    PO/LOA is issued to successful bidder and acknowledgment is received.

    Successful bidder deposit various document like PBG, Security deposit.

    Simultaneously EMD is returned to unsuccessful bidders.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    31/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 08 - Limited Tender Process

    Start

    Project&Procurement

    Finance

    Limited Tenderfloated to selected

    vendor

    Receiveresponse from

    bidder

    Tender documentis opened by

    nominated TOC

    Comparative sheetand Briefing noteare prepared by

    executive

    B

    C

    Vetted

    comparative sheetand Briefing note

    put up to TC

    TC prepares finalobservation

    Comparative sheet & finalminutes sent to TAA for

    approval

    Successful bidderdeposit various

    documents like PBG,Security Deposit

    EMD handed over

    to finance

    Comparative sheet &

    Briefing note vettedby financeB C

    Purchase Indent/

    Estimates raised at

    Territory Level.(Projectbudget will be revised if

    indent estimateincreases more than

    project budget)

    Purchase Indent/

    Estimates raisedat regional Level

    RO collates allrequisitions from

    territories & Preparesconsolidated

    proposal

    CO collates all

    requisitions fromregions & Prepares

    consolidated

    proposal

    EMD Return tounsuccessful

    bidder & EMDreturns to

    successful bidder

    or adjusted withInvoice

    Purchase Order/LOA Issued to

    successful bidder.Tender estimate willbe revised if LOA/

    PO estimate

    increases more thantender estimate.

    Tender processingofficer is

    nominated

    ProjectBudgeting

    ProcessPRJ05

    Tender cost Estimation

    prepared and Put up toFinance for Finance

    Vetting & approval as per

    SOP

    A

    Tender cost Estimationprepared and Put up to

    Finance for Finance

    Vetting

    A

    Acceptance fromSupplier

    Supplier

    RegistrationProcessPO32

    End

    TC nomination asper SOP

    Purchase Indentraised at corporate

    level

    Limited Tender ERP Manual Email

    Discharge

    Counter offer/LOI

    Negotiation maydone with

    supplier

    ApprovedSupplier List

    PO37

    Fresh approvedsupplier list via

    approval

    Prebid Meeting &

    Change/Modify

    Tender document

    Non-AcceptanceAcceptance

    NIT and Tender

    Documentuploaded on

    website

    PR Process

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    32/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Limited Tender Process Business Function: RAILTEL Tender Date: 12-01-2013

    Control Number: PO 08 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 08 Description: This step explains the Limited Tender process.

    Event Description: This process is triggered Whenever a Limited Tender is created.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # DescriptionMode

    RequirementFulfillment using ERP

    Approach (Y/N)

    Indent/Estimates POM_RP_

    EP_2

    PO 08.1 Purchase Indent/Estimates raised at territory and regional level

    RO & CO collates all the indent and prepares consolidated proposal

    Estimates and Tender document prepared and put up to finance for finance

    vetting.

    System Y

    Tender Document POM_TP_

    TD_2

    PO 08.2 Tender Processing officer is nominated and Limited tender is floated to selected

    vendors.

    System Y

    Tender Document

    Execution

    POM_TP_

    TE_3

    PO 08.3 As per SOP and schedule of work, Tender process is followed and floated;

    Simultaneously It is published on RailTel website also.

    As required tender is floated to selected supplier from approved supplier

    list or fresh approved supplier list can be created before floating the tender

    document.

    Prebid meeting may be done and tender document is changed accordinglyif required.

    Response is received from various vendors.

    Tender document is opened by nominated TOC

    Comparative sheet and Briefing note are prepared by executive

    EMD is hand over to finance and Comparative sheet and briefing note are

    vetted by finance.

    TC nomination is done.

    Vetted comparative sheet put up to TC and TC prepares the final

    observation.

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    33/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Comparative sheet and final minutes sent to competent authority approval.

    Negotiation is done if required and Discharge can also be happen

    Counter offer process is done for final price.

    LOA is issued to successful bidder and acknowledgment is received.

    Successful bidder deposit various document like PBG, Security deposit.

    Simultaneously EMD is returned to unsuccessful bidder.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    34/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 09 - Single Tender Process

    Start

    Project&Procurement

    Finance

    Single Tenderfloated to single

    vendor

    Receiveresponse from

    bidder

    Tender documentis opened by

    nominated TOC

    Comparative sheetand Briefing noteare prepared by

    executive

    B

    C

    Vetted

    comparative sheetand Briefing note

    put up to TC

    TC prepares finalobservation

    Comparative sheet & finalminutes sent to TAA for

    approval

    Successful bidderdeposit various

    documents like PBG,Security Deposit

    EMD handed overto finance

    Comparative sheet &Briefing note vetted

    by financeB C

    Purchase Indent/Estimates raised at

    Territory Level.(Projectbudget will be revised if

    indent estimate increasesmore than project

    budget)

    Purchase Indent/Estimates raisedat regional Level

    RO collates all

    requisitions fromterritories & Prepares

    consolidated

    proposal

    CO collates allrequisitions from

    regions & Preparesconsolidated

    proposal

    EMD returns oradjusted with

    Invoice

    Purchase Order/LOA Issuedto successful bidder.

    Tender estimate will berevised if LOA/PO estimateincreases more than tender

    estimate.

    Tender processingofficer is

    nominated

    ProjectBudgetingProcessPRJ05

    Tender cost Estimationprepared and Put up to

    Finance for FinanceVetting & approval as per

    SOP. Along with PACissued by region/

    Corporate (with vetting)and approval by director/

    Corporate

    A

    Tender cost Estimationprepared and Put up to

    Finance for FinanceVetting

    A

    Acceptance fromSupplier

    SupplierRegistration

    Process

    PO32

    End

    TC nomination asper SOP

    Purchase Indentraised at corporate

    level

    Single Tender ERP Manual Email

    Discharge

    Counter offer/LOI

    Negotiation maydone with

    supplier

    ApprovedSupplier List

    PO37

    Fresh approvedsupplier list via

    approval

    Non AcceptanceAcceptance

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    35/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Single Tender Process Business Function: RAILTEL Tender Date: 12-01-2013

    Control Number: PO 09 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 09 Description: This step explains the Single Tender process.

    Event Description: This process is triggered Whenever Single Tender is created.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # DescriptionMode

    RequirementFulfillment using ERP

    Approach (Y/N)

    Indent/Estimates POM_RP_

    EP_2

    PO 09.1 Purchase Indent/Estimates raised at territory and regional level

    RO & CO collates all the indent and prepares consolidated proposal

    Estimates and Tender document prepared and put up to finance for finance

    vetting, along and with PAC issued by region (with vetting) and approval by

    director/corporate.

    System Y

    Tender Document POM_TP_

    TD_2

    PO 09.2 Tender Processing officer is nominated and Singe tender is floated to vendor. System Y

    Tender Document

    Execution

    POM_TP_

    TE_3

    PO 09.3 As per SOP and schedule of work, Tender process is followed and floated.

    As required tender is floated to selected supplier from approved supplier

    list or fresh approved supplier list can be created before floating the tender

    document.

    Tender document is opened by nominated TOC

    Comparative sheet and Briefing note are prepared by executiveEMD is hand over to finance and Comparative sheet and briefing note are

    vetted by finance.

    TC nomination is done.

    Vetted comparative sheet put up to TC and TC prepares the final

    observation.

    Comparative sheet and final minutes sent to competent authority approval.

    Negotiation is done if required and Discharge can also be happen

    Counter offer process is done for final price.

    LOA is issued to successful bidder and acknowledgment is received.

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    36/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Successful bidder deposit various document like PBG, Security deposit.

    Simultaneously EMD is returned to unsuccessful bidder.

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    37/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 10 - Dispensation of Tender Process for Material

    Dispensation of Tender for Material

    Territory/Region/

    Corporate

    Finance

    Project&Procurement

    Start

    Executive

    processes thedispensation of

    Tender

    RFQ will becreated for

    quotation

    Quotation are

    called fromvarious vendors

    (Minimum 3)PO31

    Comparative

    statement isprepared by the

    executive andsent to finance

    for vetting

    Comparativesheet sent to

    competentauthority

    approval

    Purchase

    Order is issuedto successful

    bidder

    End

    RFQProcess

    PO31

    Executive sends the

    proposal PurchaseRequisition/Indent to

    Manager (HQ/RO/CO)PO01-PO02

    Purchase

    Indent Process

    PO01-PO02

    ProcurementProcess

    PO12

    Successful bidder

    deposit variousdocuments like PBG,

    Security Deposit(Optional)

    A

    AFinance

    Vetting

    ERP Manual Email

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    38/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Dispensation of Tender Process for

    Material

    Business Function: RAILTEL Tender Date: 12-01-2013

    Control Number: PO 10 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 10 Description: This step explains the Dispensation of Tender process for Material.

    Event Description: This process is triggered Whenever Dispensation of Tender Process is done.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 10.1 Dispensation of tender is requested on urgent basis for extension of maintenance

    activity or last mile. Executive processes the dispensation of tender process.

    System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 10.2 RFQ document is created and sent to approve suppliers or Fresh Suppliers.

    Quotations are called from various suppliers.

    System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 10.3 Comparative statement is prepared and sends to finance for vetting then it is sent to

    competent authority for approval.

    System Y

    Dispensation of

    Tender/QuotationProcess

    POM_TP

    _DT_4

    PO 10.4 Purchase Order is issued to successful bidder System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 10.5 Successful bidder deposits various documents like PBG, Security deposit. System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 10.6 Procurement process is initiated for further activity. System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    39/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 11 - Dispensation of Tender Process for Works Contract & Execution

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    40/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Dispensation of Tender for Works Contract & Execution

    Territory/Region/

    Corporate

    Finance

    Pro

    curement

    Start

    Executive

    processes the

    dispensation ofTender

    RFQ will becreated for

    quotation

    Quotation are

    called fromvarious vendors

    (Minimum 3)

    PO31

    Comparative

    statement is

    prepared by theexecutive and sent to

    finance for vetting

    Comparative

    sheet sent to

    competentauthority

    approval

    LOA is issued

    to successfulbidder

    End

    RFQProcess

    PO31

    Executive sends the

    proposal Purchase

    Requisition/Indent toManager (HQ/RO/CO)

    PO01-PO02

    PurchaseIndent Process

    PO01-PO02

    Procurement

    ProcessPO13

    Successful bidder

    deposit various

    documents like PBG,Security Deposit

    (Optional)

    A

    AFinance

    Vetting

    ERP Manual Email

    RAILTEL Process: Dispensation of Tender Process for Business Function: RAILTEL Tender Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    41/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Service & Works Contract

    Control Number: PO 11 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 11 Description: This step explains the Dispensation of Tender process for Service & Works Contract.

    Event Description: This process is triggered Whenever Dispensation of Tender Process is done.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID # Description

    Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 11.1 Dispensation of tender is requested on urgent basis for extension of maintenance

    activity or last mile. Executive processes the dispensation of tender process.

    System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 11.2 RFQ document is created and sent to approve suppliers or Fresh Suppliers

    Quotations are called from various suppliers.

    System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 11.3 Comparative statement is prepared and sent to finance for vetting then it is sent to

    competent authority for approval.

    System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 11.4 LOA is issued to successful bidder System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 11.5 Successful bidder deposits various documents like PBG, Security deposit. System Y

    Dispensation of

    Tender/Quotation

    Process

    POM_TP

    _DT_4

    PO 11.6 Procurement process is initiated for further activity. System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    42/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 12 - Procurement Process for Material (Supply Item)

    Standard

    PurchaseOrder

    APO/RC/SPO/SubAPO/Sub RC Sent

    for Finance Vetting

    Purchase

    Order Issuedto Successful

    bidder

    Sub PO arereleased

    against RC

    Procurement

    Finance

    Supplier offer

    RailTel forcarrying

    inspection

    Inspection from

    nominated agencyeither from ASL orby RailTel officials

    Confirmation of

    Change ofconsignee if

    any

    Item delivered

    at store

    Warranty asper PO

    conditions

    Invoice Bills &

    PaymentsAP02-AP04

    RailTel Usesthe item to the

    site or RailTeldeliver the item

    to the site

    Start

    End

    PurchaseOrder

    DocumentCreated

    Sub PO are

    releasedagainst APO

    Region wiseDistribution

    Procurement Process for Supply Item

    Standing Bank

    GuaranteeSubmission

    from Supplier

    AdvancePurchase

    Order

    Rate Contract

    PO will be amended

    to change theconsignee detail withexecutive approval

    Nomination ofinspection

    authorizedagency

    ApprovedSupplier List or

    New SupplierPO37

    Payment to

    OutsideInspection

    authority

    ERP Manual Email

    End

    Receiving

    ProcessINV02

    Inspectionreport is

    entered in tothe system

    Acceptance &

    BG submissionfrom Supplier

    PO18

    Inspection Outside

    RailTel

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    43/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Procurement Process for Material Business Function: RAILTEL-Project Date: 12-01-2013

    Control Number: PO 12 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 12 Description: This step explains the procurement process of Material.

    Event Description: This process is triggered Whenever a purchase order is raised for material procurement.

    Source: RAILTEL Project Team/AS-IS Document

    AS ISProcess

    AS IS ID # Process ID #Description Mode

    RequirementFulfillment using ERP

    Approach (Y/N)

    Purchase

    Order

    Creation

    POM_PO_PC_3 PO 12.1 Purchase Order is created as per the requirement in the tender with the

    successful bidder.

    System Y

    Purchase

    Order

    POM_PP_PO_4 PO12.2 Purchase Order can be of multiple types like Standard PO, APO and

    RC.

    Purchase Order is issued to successful bidder after finance vetting.

    Standing BG is submitted from supplier against APO and RC.

    BG is submitted and accepted from supplier against Standard PO and

    Sub-Pos against APO & RC.

    System Y

    Inspection POM_PO_IP_4 PO 12.3 Supplier offer RailTel for carrying Inspection.

    Inspection can be from nominated agency either from ASL or by

    RailTel officials.

    If Inspection is from outside, nomination of inspection authorizedagency is done from ASL and Payment to inspection authority is made.

    Inspection report is entered in to the system.

    System Y

    None None PO 12.4 PO will be amended to change the consignee detail with the executive

    approval.

    System Y

    Receiving/D

    elivery

    POM_PO_RD_5 PO 12.5 Item is delivered at store

    RailTel uses the item to the site or RailTel deliver the item to the site.

    System Y

    Inspection/F POM_RP_TS_4/P PO 12.6 Warranty will be applicable after delivery of Item as per PO condition. System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    44/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS

    Process

    AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    AT OM_PP_FT_5

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    45/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 13 - Procurement Process for Works Contract (Supply, Installation & Commissioning)

    LOA Sent for

    FinanceVetting

    LOA Issued toSuccessful

    bidder

    Project

    Finance

    Contract agreement

    is prepared with

    successful bidder

    Contractoroffer RailTel

    for carrying

    inspection

    Inspection fromnominated agency

    either from ASL or

    by RailTel officials

    Confirmation ofchange in

    consignee if

    any

    Service/Itemdelivered &

    recorded

    Item deliveredat site

    Vendor doesI&C after site

    readiness

    SI Conducts

    AT in co-

    ordination with

    RailTel

    Executive

    PAC released

    after AT

    FAC as per

    LOA T&C EndWarranty as

    per LOA T&C

    Invoice Bills &

    Payments

    AP02-AP04

    Start

    LOADocument

    Created

    Region wise

    Distribution

    Contract

    agreement is

    sent for legal

    vetting

    Procurement Process for Works Contract

    Nomination of

    inspection

    authorized

    agency

    Approved

    Supplier

    List

    PO37

    Payment to

    Inspection

    authority

    End

    LOA will be amendedto change the

    consignee detail with

    executive approval

    Part PAC can

    also be released

    as per LOA T&C

    Acceptance &

    BGSubmission

    from Supplier

    PO18

    ERP Manual Email

    Inspection Outside

    RailTel

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    46/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Procurement Process for Service &

    Works Contract

    Business Function: RAILTEL-Project Date: 12-01-2013

    Control Number: PO 13 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 13 Description: This step explains the procurement process for service & Works Contract.

    Event Description: This process is triggered Whenever a LOA is created for service and Works Contract.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS Process AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    LOA Creation POM_PO_P

    C_3

    PO 13.1 LOA document is created and region wise distribution can also be happen. System Y

    LOA Creation POM_PP_P

    O_4

    PO 13.2 LOA is issued to successful bidder after finance vetting. System Y

    None None PO 13.3 LOA is accepted and Bank Guarantee is submitted from supplier.

    None POM_RP_TP

    _5

    PO 13.4 Contract agreement is prepared with successful bidder and it is sent for legal

    vetting.

    System Y

    Inspection POM_PO_IP

    _4

    PO 13.5 Contractor offer RailTel for carrying Inspection

    Inspection can be from nominated agency either from ASL or RailTel

    officials. Fresh nomination of agency can also be done.

    If inspection is from outside, nomination of inspection authorized agency isdone from ASL and Payment to inspection authority is made.

    System Y

    None None PO 13.6 Consignee detail can be changed by amending the consignee detail in LOA. LOA will

    go for executive approval.

    System Y

    Receiving/Delivery POM_PO_R

    D_5

    PO 13.7 Service/Item is delivered to site/Store.

    Vendor does I&C at site after site readiness.

    System Y

    Inspection/FAT POM_PP_FT PO 13.8 SI conducts AT in coordination with RailTel executive

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    47/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    AS IS Process AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    _5/POM_RP

    _TS_4

    PAC is released after AT, Part PAC can also be released as per LOA terms &

    condition

    FAC will be issued after PAC release as per LOA terms & condition

    Warranty will be applicable after delivery as per LOA terms & condition

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    48/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 14 - Procurement Process for Execution

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    49/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    LOA Sent for

    FinanceVetting

    LOA Issued toSuccessful

    bidder

    Project

    Finance

    Contract agreement

    is prepared withsuccessful bidder

    Work

    Confirmation of

    Service

    delivered

    Invoice Bills &

    PaymentsAP02-AP04

    Start

    LOA

    Document

    Created

    Region wiseDistribution

    Contract agreement issent for legal vetting

    Optional for Execution

    works at RO

    Procurement Process for Execution ERP Manual Email

    PAC released

    after AT

    FAC as per

    LOA condition End

    Part PAC canalso be released

    as per LOAcondition

    Acceptance &

    BG, SDSubmission

    from Supplier

    PO18

    SI Conducts AT

    in co-ordination

    with RailTel

    Executive

    SI Conducts AT

    in co-ordination

    with RailTel

    Executive

    Stock

    Transfer

    from Store toProject Site

    INV04

    On-hand

    quantity will

    get updated

    End

    Indent for

    Material

    requirement atsites

    PO01-PO02

    Materialrequired at site

    for other

    activity

    RAILTEL Process: Procurement Process for Execution Business Function: RAILTEL-Project Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    50/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Control Number: PO 14 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 14 Description: This step explains the procurement process for Execution.

    Event Description: This process is triggered Whenever LOA is raised for execution activity.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS

    Process

    AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERPApproach (Y/N)

    LOA

    Creation

    POM_PO_

    PC_3

    PO 13.1 LOA document is created and region wise distribution can also be happen. System Y

    LOA

    Creation

    POM_PP_

    PO_4

    PO 13.2 LOA is issued to successful bidder after finance vetting. System Y

    None None PO 13.3 LOA is accepted and Bank Guarantee, Security Deposit is submitted from supplier.

    None POM_RP_

    TP_5

    PO 13.4 Contract agreement is prepared with successful bidder and it is sent for legal

    vetting.

    System Y

    Receiving/D

    elivery

    POM_PO_

    RD_5

    PO 13.5 Work Confirmation of Service is entered for service receiving. System Y

    None None PO 13.6 In case of Material requirement like Duct, Cable at site an Indent will be

    raised to issue the material from store to site.

    Stock is transferred from store to site.

    System Y

    Inspection/F

    AT

    POM_PP_

    FT_5/POM_RP_TS

    _4

    PO 13.7 SI conducts AT in coordination with RailTel executive

    PAC is released after AT, Part PAC can also be released as per LOA terms &condition

    FAC will be issued after PAC release as per LOA terms & condition

    System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    51/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 15 - Procurement Process for AMC (Equipments, Sections, Miscellaneous)

    LOA Sent forFinanceVetting

    LOA Issued toSuccessful

    bidder for AMCWork

    Project

    Finance

    Contract agreementis prepared with

    successful bidder

    Servicedelivered &recorded

    Invoice Bills& PaymentsAP02-AP04

    Start

    LOADocumentCreated

    Region wiseDistribution

    Contractagreement issent for legal

    vetting

    Procurement Process for AMC Work (Equipment, Section)

    WorkConfirmation of

    Service

    End

    EmailManualERP

    Acceptance &BG

    Submissionfrom Supplier

    PO18

    WorkOrder

    MNT04

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    52/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Procurement Process for AMC Business Function: RAILTEL-Project Date: 12-01-2013

    Control Number: PO 15 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 15 Description: This step explains the procurement process for AMC work.

    Event Description: This process is triggered Whenever LOA is raised for AMC work against Work Order and Purchase Indent.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS

    Process

    AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    LOA

    Creation

    POM_PO_

    PC_3

    PO 13.1 LOA document is created and region wise distribution can also be happen for AMC

    work.

    System Y

    LOA

    Creation

    POM_PP_

    PO_4

    PO 13.2 LOA is issued to successful bidder after finance vetting. System Y

    None None PO 13.3 LOA is accepted and Bank Guarantee is submitted from supplier.

    None POM_RP_

    TP_5

    PO 13.4 Contract agreement is prepared with successful bidder and it is sent for legal

    vetting.

    System Y

    Receiving/D

    elivery

    POM_PO_

    RD_5

    PO 13.5 Work Confirmation of Service is entered for service receiving. System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    53/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 16 - Procurement Process for Inspection (Material, Works Contract & Execution)

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    54/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Procurement Process for Inspection Charges

    Procurement

    Procurement

    Fin

    ance

    Start

    Service PO is created for

    Inspection Charges with

    Supplier Ship to and Bill to

    details

    Shipment

    detail is

    entered

    Distribution detail is

    entered for service

    delivery/Inspection

    work/Inspection

    charges

    Service details,

    amount, need by

    date and

    promised date is

    entered

    Give Distribution

    detail location wise

    and delivery

    schedule for item

    delivery

    Approve POPO

    approved

    No

    Automaticnotification to

    buyer

    Yes

    PO sent for

    finance vetting

    ServiceDelivered/Inspection

    completed

    Inspection reportis submitted to

    Project Executive

    End

    Invoice Bill &

    Payments to

    supplier for

    Inspection Work

    AP02-AP04

    ERP Manual Email

    WorkConfirmationof Service

    INV03

    RAILTEL Process: Procurement Process for Inspection Business Function: RAILTEL-Project Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    55/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Control Number: PO 16 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 16 Description: This step explains the procurement process for Inspection Charges.

    Event Description: This process is triggered Whenever Payment for Inspection Charges is done.

    Source: RAILTEL Project Team/AS-IS Document

    AS ISProcess

    AS IS ID # Process ID #Description Mode

    RequirementFulfillment using ERP

    Approach (Y/N)

    None None PO 16.1 Service Purchase Order is created for Inspection charges with supplier details. System Y

    None None PO 16.2 Service amount/quantity, service fulfillment date is entered. System Y

    None None PO 16.3 Shipment detail is entered System Y

    None None PO 16.4 Distribution detail location wise is entered for service delivery information System Y

    None None PO 16.5 Service Purchase Order is submitted for approval for finance vetting System Y

    None None PO 16.6 Automatic notification will be sent to buyer for confirmation of LOA approval. System Y

    None None PO 16.7 Inspection report is submitted to project executive. Manual N

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    56/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 17 - Imprest/Advance Procurement Process

    Imprest/Advance Procurement Process

    Procurem

    ent

    Operation&Maintenance

    Finance

    Start

    ServicePurchase

    Order sent forfinance vetting

    Invoice Bill &Payments to

    supplierAP02-AP04

    ERP Manual Email

    Unoreredreceipt of Item/Service detail

    is created

    Receipt of linedetail is

    recorded

    Item/Service,Quantity, UOM andreceiving locationfor receipt line is

    specified

    Generate newreceipt or add

    unordered receiptlines to an

    existing receipt

    Projects&Procurement

    Receipt headerinformation isentered and

    transaction issubmitted

    SearchUnorderedreceipts to

    match

    Select receiptlines to match

    PurchaseOrder is

    created tomatch the

    receipt lines

    Select PurchaseOrder documentnumber & Linedetails to match

    SubmitUnordered

    receipt line formatching

    Receiving ofItem/Service is

    done in thesystem

    Final deliveryof Item/Service

    End

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    57/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    RAILTEL Process: Imprest/Advance Procurement

    Process

    Business Function: RAILTEL-Project Date: 12-01-2013

    Control Number: PO 17 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 17 Description: This step explains the Imprest/Advance Procurement Process.

    Event Description: This process is triggered Whenever unordered receipt is made without valid Purchase Order.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS

    Process

    AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    None None PO 17.1 Unordered receipt of Item/Service detail is created System Y

    None None PO 17.2 Item/Service, Quantity, UOM and receiving location for receipt line is specified System Y

    None None PO 17.3 Generate new receipt or add unordered receipt lines to an existing receipt System Y

    None None PO 17.4 Receipt header information is entered and transaction is submitted System Y

    None None PO 17.5 Purchase Order is created to match the receipt lines System Y

    None None PO 17.6 Unordered receipt and receipt lines is searched to match with PO document number System Y

    None None PO 17.7 Unordered receipt line is submitted for matching System Y

    None None PO 17.8 Receiving of Item/Service is done in the system System Y

    None None PO 17.9 Final delivery is created of Item/Service. System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    58/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 18 - Bank Guarantee Process

    Bank Guarantee Process

    Procurem

    ent

    Project&Procurement

    Legal

    PBG sent forlegal vetting

    ERP Manual Email

    Start

    Purchase

    Order

    Letter of Award

    Sub PO

    against RateContract

    Sub PO

    againstAdvance

    PurchaseOrder

    Performance BankGuarantee will sent

    to bank for

    confirmation

    Afterconfirmation,

    sent for legal

    vetting

    After legalvetting

    submitted to

    finance forsafe custody

    Standing BGwill be sent to

    bank for

    confirmation

    Advance

    PurchaseOrder

    Rate Contract

    Delivery/DOC period

    extends

    Extension of BankGuarantee date &

    Performance BankGuarantee will sent to bank

    for confirmation. System

    alert will go to finance forbank guarantee date

    extension

    Yes

    After Bank

    Confirmation itis submitted to

    finance for

    safe custody

    Supplier Bank Guarantee will

    be released after PO/LOAfulfillment/Encashment in

    case of default/termination

    End

    No

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    59/125

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    60/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 19 - Site Readiness Process-For Material and Service

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    61/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Site Readiness Process

    Procurement

    Project&Procurement

    ERP Manual

    Start

    Notification will

    be sent to

    concern stores

    for Space

    check

    Space

    Available for

    Material

    PO/LOA

    issued for

    Material/Works

    PO12-PO13

    Procurement

    process for

    Material/Works

    Execution

    Executive will

    check & show

    drop down menu

    for readiness of

    activity

    Activities can be like for I&C activity:

    Fiber through & Terminated from BS to

    BS

    Power Supply-AC

    Power Supply-DC, Battery, Chargers

    Rack Installation

    Space

    Earthing etc.

    Concern authority

    will put suitable

    remarks for

    readiness/non

    readiness

    LOA for

    work

    execution

    PO14

    Pre-requisite

    Activity

    defined

    Executive will

    check & show

    drop down

    menu for

    readiness of

    activity

    Activities can be like:

    Proposed route Plan

    Approval from Railways/other

    authority along with offset boundary

    lines

    ROW permission

    Duct Availability

    OFC Availability etc..

    Concern authority

    will put suitable

    remarks for

    readiness/non

    readiness

    Yes

    No (Authority will put suitable remarks)

    Yes

    No (Authority will put suitable

    remarks)

    End

    End

    RAILTEL Process: Installation & Commissioning and Business Function: RAILTEL-Project Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    62/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Site Readiness Process

    Control Number: PO 19 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 19 Description: This step explains the Installation & Commissioning/Site readiness activity.

    Event Description: This process is triggered to fulfill pre-requisite activity before doing the Installation and Commissioning.

    Source: RAILTEL Project Team/AS-IS Document

    AS IS

    Process

    AS IS ID # Process ID #

    Description Mode

    Requirement

    Fulfillment using ERP

    Approach (Y/N)

    None None PO 19.1 PO/LOA is issued for Material/Work/Execution process System Y

    None None PO 19.2 Notification will be sent to concern stores for space check System Y

    None None PO 19.3 Concern store checks the space availability of material System Y

    None None PO 19.4 Executive will check and enter detail for readiness of activity for works System Y

    None None PO 19.5 Various activities are required to check before I&C activities like:

    Fiber through & Terminated from BS to BS

    Power Supply AC

    Power Supply DC, Battery, Chargers

    Rack Installation etc..

    System Y

    None None PO 19.6 Concern authority will put suitable remarks for readiness/non-readiness System Y

    None None PO 19.7 Pre-requisite activity will be defined for execution activity System Y

    None None PO 19.8 Executive will check and enter detail for readiness of activity for execution System Y

    None None PO 19.9 Various activities are required to check before execution:

    Proposed Route Plan

    Approval from railways authority along with offset boundary lines

    Duct availability

    OFC availability etc..boundary lines

    Duct availability

    OFC availability etc..

    System Y

    None None PO 19.10 Concern authority will put suitable remarks for readiness/non-readiness System Y

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    63/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    PO 20 - Inspection Process

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    64/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Inspection Process

    Procurement

    Project&Procurement

    ERP Manual

    Start

    Supplier/Contractor offer

    RailTel for carryingInspection

    Inspection

    Inspection byRailTel official

    Inspection report

    is submitted toProject

    Executives

    Inspection

    report isentered in to

    the system

    End

    RailTel

    Nomination ofInspection

    authorized agencyeither by ASL or by

    RailTel officials

    Outside Agency

    Outside agencysubmits the

    Inspection reportto Project

    Executives

    Inspectionreport is

    entered in tothe system

    End

    In case of FAT/AT outside India agreement in between RailTel and Supplier is mandate, without agreement (Formal) no official of RailTel can go outside of India

    RAILTEL Process: Inspection Process Business Function: RAILTEL-Project Date: 12-01-2013

  • 7/27/2019 Wipro BP080 Purchasing V1 0

    65/125

    BP.080 - Purchasing Process

    CompanyConfidential - For internal use only

    Control Number: PO 20 Mapping Team: Wipro Process Owner: RAILTEL Project Team

    Process Number: PO 20 Description: This step explains the Inspection Process.

    Event Description: This process is triggered whenever Inspection is required.

    Source: RAILTEL Project Team/AS-IS Document

    AS ISProcess

    AS IS ID # Process ID #Description Mode

    RequirementFulfillment using ERP

    Approach (Y/N)

    None None PO 20.1 Supplier/Contractor offer RailTel for carrying Inspection System Y

    None None PO 20.2 Inspection can be done by RailTel team or Outside agency System Y

    None None PO 20.3 In case of RailTel team, Inspection is done by RailTel officials System Y

    None None PO 20.4 Inspection report is submitted to Project executives System Y