work - actlab · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s...

21
2000-2012 Professional Portfolio AYA MACEDA, architect work

Upload: others

Post on 21-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

2000-2012 Professional Portfolio AYA MACEDA, architectwork

Page 2: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

With the role of Senior Associate and project architect at Australian studio, Popov Bass Architects (PBA), Aya Maceda was responsible for the re-alization of RESIDENTIAL projects, ranging from single dwellings to me-dium density apartments. She lead the INTERIOR ARCHITECTURE department at PBA, ensuring that the concept and high level of detail-ing of PBA’s architecture is carried through to the interiors, joinery and Ä[V\[�HJYVZZ�HSS�WYVQLJ[Z���

single dwelling

apartments

interiors

pba australia2005-2013

the work represented are those where aya maceda has been the lead architect architect from coneptualization - realization

Page 3: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

BALMORAL HOUSESYDNEY, AUSTRALIA 2006-2010ROLE: Project Architect, Interior Designer

SCOPE:concept to constructionfull architectural scopesketch design, design development,detailing, documentation, material ZLSLJ[PVU��PU[LYPVY�Ä[V\[� �contract administration

1 2 3 4

1 Entry through courtyard with concrete canopy2 Courtyard patio3 Living Room4 Balcony

Page 4: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

5 6

7

5 Balcony facing Balmoral Beach -- an extension of the living space6 Continuous living space from the courtyard patio to the open plan living room to the balcony and the beyond7 Open plan living room, kitchen and balcony

Page 5: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

8 9

10

8 Entry door with reflecting pond9 Stairs in American Oak timber10 Rear exterior view

Page 6: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

MOSMAN HOUSE 2SYDNEY, AUSTRALIA 2006-2010ROLE: Project Architect

SCOPE:concept to constructionfull architectural scopesketch design, design development,detailing, docu-mentation, material selection, PU[LYPVY�Ä[V\[� �JVU[YHJ[�HKTPU

An assembly of 4 off-form concrete walls, a vaulted metal roof and a terracotta clad volume rising above this vault to best command views of the harbour. The walls give a grounding to the building, protecting the interior from the elements and giving privacy.

5

AN EXPRESSION OF MATERIALS THROUGH CLARITY OF ASSEMBLY

6

1

1 Axonometric2 Lower Ground Floor Plan3 Ground Floor Plan4 First Floor Plan5 Entry Gate - framing a view6 Rear View

The plan shows a clear linear division between served and servant spaces. The living spaces and bedrooms open to the North and service areas and amenities are to the South.

1 Exploded Axonometric2 Lower Ground Floor Plan3 Ground Floor Plan4 First Floor Plan5 Section

32 4

Page 7: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

1

2

3 4

There is a reliance on showcasing the richness of materials through clarity of assembly from exterior to interior.

1 Kitchen - custom precast concrete bench 2 View upon entry3 Living Room4 Dining and Living Room5 Section

5

Page 8: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

The project is an extension to an existing house. The new pavilion is a contrasting timber box (containing private areas) resting on a black steel pavilion (containing public spaces). A glass portal connects the NEW to the OLD.

ROLE: Project Architect

SCOPE:concept to constructionfull architectural scope design, design dev’t, KVJ\TLU[H[PVU� �contract administration

1 2

3

6

BRIGHTON HOUSE MELBOURNE, AUS 2005-2008

DEFINING NEW AND OLD

1 Construction photo 2 Model3 Concept render4 Detail shot5 Concept sketch6 Completed project

4

5

Page 9: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

3

54

7

6

21

1 Ground Floor Plan2 First Floor Plan3 Sketch 4 Perspective5 New Pavilion Photographs6 Longtitudinal Section7 Northern Elevation

The NEW is tucked in the rear of the property forprivacy.

The NEW is not visible from the street.

Page 10: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

PEARL BEACH HOUSESYDNEY, AUS 2011 (ONGOING)

The site is set in an Australian bush reserve facing the ocean. The proposal is a copper pavilion sitting on a glass base. Copper was the material ZLSLJ[LK�MVY�P[Z�ÄYL�YLZPZ[HU[�qualities and its colouring that mimics the hues of the bushland, especially as it ages and slowly patinas. A wedge is carved out of the side of the plan to announce entry to and to bring northern light into the spaces. A pop-out element is introduced between two of the site’s ZPNUPÄJHU[�[YLLZ�[V�HSSV^�MVY�H�space to experience the for-est from within the dwelling.

THE TREE PAVILION

ROLE: Project Architect

SCOPE: concept design

2

4 5

1

3

Issue AmendmentDate Drwn ChckScale

This drawing is copyright of Popov Bass Architects. It may not be used without written consent. Donot scale off this drawing. Use figured dimensions only. Verify all dimensions on site. Alex PopovArchitects Pty Ltd ABN: 91 002 866 364. Alex Popov NSW ARB 4494 Brian Bass NSW ARB 6470.

t 02 9955 5604 f 02 9955 9258 e [email protected] Glen Street / Milsons Point / NSW 2061 / Australiaarchitecture/urban planning/interiors

PERSPECTIVE12 Green Point Rd

SANNA Ms Jenelle Sanna

team

wor

k://P

BSER

VER

/039

2_A

02_S

K A

ctiv

e

N/A AMMGFOR INFORMATION22.07.11B

7

6

1 Ground Floor Plan2 First Floor Plan3 Site Plan4 Section5 Concept Sketch6 Study Models7 Perspective from driveway

Page 11: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

SYDNEY HOUSEAUSTRALIA2009-2012ROLE: Interior Architect

SCOPE: Interior ArchitectureMaterial SelectionJoinery Design-P_[\YLZ� �-P[[PUNZ-\YUP[\YL�:LSLJ[PVU� �-P[V\[

RESTRAINING OPULENCE

Page 12: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

Issu

eD

ate

Drw

nC

hck

Scal

e

This

dra

win

g is

cop

yrig

ht o

f Pop

ov B

ass

Arc

hite

cts.

It m

ay n

ot b

e us

ed w

ithou

t writ

ten

cons

ent.

Do

not s

cale

off

this

dra

win

g. U

se fi

gure

d di

men

sion

s on

ly.

Verif

y al

l dim

ensi

ons

on s

ite. A

lex

Pop

ovA

rchi

tect

s P

ty L

td A

BN

: 91

002

866

364.

Ale

x P

opov

NS

W A

RB

4494

Bria

n B

ass

NS

W A

RB

647

0.t 0

2 99

55 5

604

f 02

995

5 92

58 e

info

@po

povb

ass.

com

.au

2 G

len

Stre

et /

Mils

ons

Poi

nt /

NS

W 2

061

/ A

ustra

liaar

chite

ctur

e/ur

ban

plan

ning

/inte

riors

No.

1 T

he G

rant

ham

A24

.02.

2012

1:20

0C

LA

M

Ent

ry L

evel

Pla

n

ROLE: Project Architect

PROJECT INVOLVEMENT: facade detailing, planning, design and contract administration for Level 1 and 4 apartments.

THE GRANTHAMSYDNEY, AUS2007 - 2010

CREATING A SENSE OF PLACE IN DENSE LIVING

Issue Date Drwn ChckScale

This drawing is copyright of Popov Bass Architects. It may not be used without written consent. Donot scale off this drawing. Use figured dimensions only. Verify all dimensions on site. Alex PopovArchitects Pty Ltd ABN: 91 002 866 364. Alex Popov NSW ARB 4494 Brian Bass NSW ARB 6470.

t 02 9955 5604 f 02 9955 9258 e [email protected] Glen Street / Milsons Point / NSW 2061 / Australiaarchitecture/urban planning/interiors

No. 1 The GranthamA 24.02.2012 1:200 CL AM

Grantham Street Elevation

Page 13: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

This drawing is copyright of Alex Popov Architects Pty. Ltd.ABN: 91 002 866 364 and may not be used without written consent.Do not scale off this drawing. Use figured dimensions only. Verify all dimensions on site.

t f02 9955 5604 /2 glen street / milsons point / nsw 2061 / australia

06.11.09alex popov & associates

abn02 9955 9258

architects / planners

Title PageHO CHI MINH CITY, VIETNAMCLIENT ISSUE

SGCC CONDOMINIUMSCALE

THE LEIGHTONPERTH, AUSTRALIA 2007-2011

The main goal for the project was to bring the qualities of a home into each apartment within this 60-unit develop-ment through the internal WSHUUPUN��ÄUPZOLZ�HUK�Ä[V\[���3 complimentary material schemes were selected for each unit type to allow varation for the users.

CREATING A SENSE OF PLACE IN DENSE LIVING

ROLE: Interior Architect

SCOPE: interior spatial planning, joinery designÄUPZOLZ�ZLSLJ[PVU��PU[LYPVY�Ä[V\[

1 Interior view2 Material palette3 Western view4 Typical plan5 Northwest view

1

2

3

Issue Date Drwn ChckScale

This drawing is copyright of Popov Bass Architects. It may not be used without written consent. Donot scale off this drawing. Use figured dimensions only. Verify all dimensions on site. Alex PopovArchitects Pty Ltd ABN: 91 002 866 364. Alex Popov NSW ARB 4494 Brian Bass NSW ARB 6470.

t 02 9955 5604 f 02 9955 9258 e [email protected] Glen Street / Milsons Point / NSW 2061 / Australiaarchitecture/urban planning/interiors

The LeightonA 24.02.2012 1:200 CL AM

Typical Floor Plan

4 5

Page 14: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

WOOLSTORES 7 APARTMENTSPERTH, AUS 2009

MATERIALITY AND FORM AS DICTATED BY THE SITE

ROLE: Project Architect

SCOPE: concept design development application

Form and Materiality reacts to extreme site conditions and prime views.

The site is situated on a NW corner with dominant ocean views to the west. The front VM�LHJO�\UP[�PZ�ZWLJPÄJHSS`�oriented to views and the rear opens to a communal garden. The orth facing units in terracotta are “organic” in form and materiality while the west-facing units in zinc respond to the harsh western elements of sun and wind. All units are cross ventilated. The GF is open plan living while bedrooms are on the First -SVVY��*PYJ\SH[PVU� �ZLY]PJLZ�run along one side to TH_PTPZL�LMÄJPLUJ �̀

4

3

2Project

Title

Scale

Date

Drawn By

Drawing No.

Issue AmendmentDate

Client

Checked

[email protected] f02 9955 5604 /

This drawing is copyright of Alex Popov Architects Pty. Ltd.ABN: 91 002 866 364 and may not be used without written consent. Do notscale off this drawing. Use figured dimensions only. Verify all dimensionson site.

2 glen street / milsons point / nsw 2061 / australia

abn: 91 002 866 36402 9955 9258

alex popov & associatesarchitects / planners

S:\P

roje

cts\

2008

\200

8033

1 W

OO

LSTO

RES

PTY

LTD

\033

1 D

OC

UM

ENTA

TIO

N\0

331

DA\

DA

ACTI

VE\0

331

DA

Activ

e.pl

p

Woolstores Pty. Ltd

AM

38 Marine Parade, Cottesloe WA 60117 LUXURY APARTMENTS

Unit 30, 589 Stirling Highway Cottesloe WA 6011

BB

July 2008

c/o Ariane Prevost

TITLE PAGE

A 27/11/08 ISSUE FOR COUNCIL PRESENTATION - DRAFTB 09/04/09 ISSUE FOR COUNCIL PRESENTATION

0331 PP-000

OC

EAN

BEA

CH

MAR

INE

PDE

CU

RTI

N A

VE

0331 PP-000

DRAWING SCHEDULE

0331 PP-001

0331 PP-002

0331 PP-003

0331 PP-004

0331 PP-005

0331 PP-006

0331 PP-007

0331 PP-008

0331 PP-009

0331 PP-010

0331 PP-011

0331 PP-012

0331 PP-013

0331 PP-014

0331 PP-015

0331 PP-016

TITLE PAGE

CONTEXT & SITE ANALYSIS

PROPOSED DEVELOPEMENT SITE PLAN

BASEMENT PLAN

GROUND FLOOR PLAN

FIRST FLOOR PLAN

ROOF PLAN

ELEVATIONS

ELEVATIONS

COMPOSITE STREET ELEVATION

SECTIONS

OVERSHADOWING DIAGRAMS

OPEN SPACE/ AREAS CALCULATION

PHOTOMONTAGE

CONE OF VISION DIAGRAM

LEGEND

RENDERED WITH PAINT FINISH

SITE

DEVELOPMENT INFORMATION

EXTERNAL RENDERER

ES

G

H

LV1

LV2

RPF

Sky.

T

TB

TC

Z

EXTERNAL SUNSHADE

ALUMINIUM FRAMED GLAZING

PAINTED STEEL HANDRAIL WITH GLASS BALUSTRADE

EXTERNAL ALUMINIUM BLINDS

EXTERNAL FIXED ALUMINIUM LOUVRES

SKYLIGHT

TIMBER

TERRACOTTA BATTENS

TERRACOTTA CLADDING

ZINC CLADDING

PHOTOMONTAGE

MATERIALS, FINISHES & PERSPECTIVES

BASEMENT CARPARK 1577.23 m² OPEN SPACE 1321.2 m² PLOT RATIO AREA 2135.66 m² SITE AREA 2,136.96 m² PLOT RATIO 1:1

PROJECT: PROPOSED 7 UNIT, 2 STOREY MULTIPLE DWELLING WITH BASEMENT CARPARK

SITE: 38 MARINE PARADE, COTTESLOE ǿ���LOT #50 (LOTS 1-6), CNR. MARINE PARADE AND WARTON STREET, COTTESLOE

VOL 468 FOL 182A

AREAS SUMMARY

LOT AREA 2137m²

RES CODE ZONED R30

CONTEXT AERIAL PHOTOGRAPH

CONCEPT PLAN CONCEPT SKETCH

PHOTOMONTAGE FROM MARINE PARADENTS

0331 PP-017

0331 PP-018

DIAGRAMS: HEIGHT & AREAS

DIAGRAMS: VISUAL IMPACT OF STAIR PROTRUSIONS

Project

Title

Scale

Date

Drawn By

Drawing No.

Issue AmendmentDate

Client

Checked

[email protected] f02 9955 5604 /

This drawing is copyright of Alex Popov Architects Pty. Ltd.ABN: 91 002 866 364 and may not be used without written consent. Do notscale off this drawing. Use figured dimensions only. Verify all dimensionson site.

2 glen street / milsons point / nsw 2061 / australia

abn: 91 002 866 36402 9955 9258

alex popov & associatesarchitects / planners

S:\P

roje

cts\

2008

\200

8033

1 W

OO

LSTO

RES

PTY

LTD

\033

1 D

OC

UM

ENTA

TIO

N\0

331

DA\

DA

ACTI

VE\0

331

DA

Activ

e.pl

p

Woolstores Pty. Ltd

AM

38 Marine Parade, Cottesloe WA 60117 LUXURY APARTMENTS

Unit 30, 589 Stirling Highway Cottesloe WA 6011

BB

July 2008

c/o Ariane Prevost

TITLE PAGE

A 27/11/08 ISSUE FOR COUNCIL PRESENTATION - DRAFTB 09/04/09 ISSUE FOR COUNCIL PRESENTATION

0331 PP-000

OC

EAN

BEA

CH

MAR

INE

PDE

CU

RTI

N A

VE

0331 PP-000

DRAWING SCHEDULE

0331 PP-001

0331 PP-002

0331 PP-003

0331 PP-004

0331 PP-005

0331 PP-006

0331 PP-007

0331 PP-008

0331 PP-009

0331 PP-010

0331 PP-011

0331 PP-012

0331 PP-013

0331 PP-014

0331 PP-015

0331 PP-016

TITLE PAGE

CONTEXT & SITE ANALYSIS

PROPOSED DEVELOPEMENT SITE PLAN

BASEMENT PLAN

GROUND FLOOR PLAN

FIRST FLOOR PLAN

ROOF PLAN

ELEVATIONS

ELEVATIONS

COMPOSITE STREET ELEVATION

SECTIONS

OVERSHADOWING DIAGRAMS

OPEN SPACE/ AREAS CALCULATION

PHOTOMONTAGE

CONE OF VISION DIAGRAM

LEGEND

RENDERED WITH PAINT FINISH

SITE

DEVELOPMENT INFORMATION

EXTERNAL RENDERER

ES

G

H

LV1

LV2

RPF

Sky.

T

TB

TC

Z

EXTERNAL SUNSHADE

ALUMINIUM FRAMED GLAZING

PAINTED STEEL HANDRAIL WITH GLASS BALUSTRADE

EXTERNAL ALUMINIUM BLINDS

EXTERNAL FIXED ALUMINIUM LOUVRES

SKYLIGHT

TIMBER

TERRACOTTA BATTENS

TERRACOTTA CLADDING

ZINC CLADDING

PHOTOMONTAGE

MATERIALS, FINISHES & PERSPECTIVES

BASEMENT CARPARK 1577.23 m² OPEN SPACE 1321.2 m² PLOT RATIO AREA 2135.66 m² SITE AREA 2,136.96 m² PLOT RATIO 1:1

PROJECT: PROPOSED 7 UNIT, 2 STOREY MULTIPLE DWELLING WITH BASEMENT CARPARK

SITE: 38 MARINE PARADE, COTTESLOE ǿ���LOT #50 (LOTS 1-6), CNR. MARINE PARADE AND WARTON STREET, COTTESLOE

VOL 468 FOL 182A

AREAS SUMMARY

LOT AREA 2137m²

RES CODE ZONED R30

CONTEXT AERIAL PHOTOGRAPH

CONCEPT PLAN CONCEPT SKETCH

PHOTOMONTAGE FROM MARINE PARADENTS

0331 PP-017

0331 PP-018

DIAGRAMS: HEIGHT & AREAS

DIAGRAMS: VISUAL IMPACT OF STAIR PROTRUSIONS

1 Site Sketch2 North Facing Apartments3 West Facing Apartments4. Section5 Perspective

1

Page 15: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

INTERIORS & DETAILS2005-2012

DETAILING

Page 16: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

This body of work represents three years of experience in design dev’t, documentation, detailing & contract administration with Sydney practice, FJMT Architects. The following body of work are Public & Institutional buildings, where Aya Maceda was key team member from concept design to construction. At FJMT, she gained the skill of realizing the ‘big picture’ ideas from large scale to the minutest details of the project.

public institutional

fjmt architectsaustralia

2002-2005

the work represented are those where aya maceda has been key team member involved in the documentation of the projects.

Page 17: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

ARCHITECTURE REVITALIZING COMMUNITY

MAX WEBER LIBRARYSYDNEY, AUSTRALIA2002-2005ROLE: Key Team Member PROJECT INVOLVEMENT: Design Development, Documentation, JoineryDesign, Interiors, Design Support at construction

Awards: RAIA Commendation for Public Buildings 2006, RAIA PREMIER’S PRIZE NSW 2007

The building is a simple assembly of two forms, a transparent glass and louver box and a solid terracotta clad box sitting in front of a public plaza.

Key team member from initial design, documentation, project coordination, contract administration and post oc-cupancy.

Involved in user consultations with the library staff, council VMÄJLYZ�HUK�\ZLYZ�PU�VYKLY�[V�custom design the spaces and extensive joinery for the library.

Grasping the full process of realising a design concept from planning, to façade design, incorporating various environmental technologies HUK�YLÄULK�KL[HPSPUN�[OH[�[OL�building required.

Page 18: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

The subsequent images show [OL�ZJOLTH[PJ�� �[LJOUPJHS�drawings produced to realise the interior spaces of the building.

1

2 3

5

4

6

1 Exploded Axonometric2 Exploded Axonometric of plan3 Main Stairs4 North-South Section 5 Detail section of skylight6 Wall elevations and section

Page 19: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

UNIVERSITY OF SYDNEY, SCHOOL OF ITSYDNEY, AUS2004-2005 ROLE: Team Architect

PROJECT INVOLVEMENT: -HJHKL�+LZPNU� �+L[HPSPUNSpatial Planning

Awards: Master Builders Association Excellence in Construction Award

The North-facing facade oriented to the street was the design focus. The facade is a dominant linear glass screen for a winter garden and serves as an acoustic buffer for the main building.

1 2

1 Winter Garden2 North-South Facade junction3 Level 1 Floor Plan4 Level 2 Floor Plan5 Facade Study Perspectives

3

4

5

Page 20: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²
Page 21: work - actLAB · 2017. 1. 15. · m framed glazing d s e ernal m s ernal fixed m vres t r aerial s g c g age, floor & ives basement carpark 1577.23 m² plot open space 1321.2 m²

www.ayamaceda.com