WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE

Doc. No.: Birsta 3PH4b - Rev. 0

Page 2: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Working Description

Birstaverken AB - Birstavägen 10 - S-863 22 Sundsbruk - Tel: +46 (0)60 52 72 00 - Fax: +46 (0)60 52 72 16

Prepared by : Fredrik Sangö

Doc. no.: Birsta 3PH4b

Introduction/data:

Birsta 3PH4b has been full-scale tested according to EN 1317-2 (TB11 and TB61) and CE marked in accordance with EN 1317-5:2007 + a2:2012 for containment level H4b (No. 0402 - CPR - SC0892-12)

The results from the test were working width W3 (1.0 m) and vehicle intrusion VI4 (1.3 m). The tested length was 90 meters plus end anchors. The installation work can be broken down into the following 10 steps, which will be processed individually in the work description in the order shown below. 1) Planning 2) Unloading of material 3) Proprietary inspection 4) Safety 5) Establishment 6) Installation 7) Repairs to zinc damage 8) Demobilisation 9) Repairs 10) Maintenance Chap. 11 includes additional information (drawings, CE certificates and DoP). Rev. no. Date Signature Reason for revision

0 2015-03-23 Fredrik Sangö Approved by Birstaverken

Page 3: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Birsta 3PH4b Page 3 Birsta 3PH4b - Rev. 0INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

Contents

1 PLANNING ........................................................................................................... 4

2 UNLOADING OF MATERIAL ............................................................................... 4

3 PROPRIETARY INSPECTION ............................................................................. 4

4 SAFETY ............................................................................................................... 5

5 ESTABLISHMENT ............................................................................................... 5

6 INSTALLATION .................................................................................................... 5

7 REPAIRS TO ZINC DAMAGE .............................................................................. 6

8 DEMOBILISATION ............................................................................................... 6

9 REPAIRS ............................................................................................................. 7

10 MAINTENANCE ................................................................................................... 7

11 OTHER INFORMATION ....................................................................................... 8

Page 4: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

1 PLANNING

It is at this point that the quality and flexibility of the project is determined. Well planned installation routines are a good basis when you are looking to achieve high quality, good logistics, work that is conducted safely and satisfied employees.

All the parties involved should have discussed the preconditions for the installation in good time and agreed on how it should be done.

It is important that both the client and the contractor are aware of the undertakings that each other have agreed to. These are best coordinated through good contacts.

Plan deliveries and installation in a timely manner. All the parties involved must keep each other notified as to any changed circumstances.

2 UNLOADING OF MATERIAL

The material is unloaded and suitably placed where the installation is to be carried out. This is to ensure that any unnecessary handling in the workplace can be avoided. Handle the material carefully, use wood pieces as support for material that is not placed on pallets.

When unloading, check that the unloaded goods match the delivery note. The goods must be checked to ensure that no damage is present. Non-conformance regarding package quantities or damages must be indicated on the delivery note and the sender must be contacted immediately.

3 PROPRIETARY INSPECTION

Assembly personnel are to perform and report, in the appropriate documents, proprietary inspections which must include the minimum of the following points: Inspection points for installation in settings with traffic:

• The material is checked for damage and quantity following delivery to the worksite

• The curvature is checked

• The height is checked

• All bolt joints are fitted and tightened

• The opening in the joints is according to the drawings

• If dilation joints should be installed, this should be checked according to the drawing of the dilation joint.

• If infill should be installed, this should be checked according to the drawing of the infill.

• Any minor damage to the galvanizing or painting is treated

Page 5: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Birsta 3PH4b Page 5 Birsta 3PH4b - Rev. 0INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

4 SAFETY

As installation is often performed in a busy setting, the safety aspect is crucial. Temporary barriers (if needed) must be adapted to ensure that installation can be performed without them being removed.

5 ESTABLISHMENT

Assembly personnel must be notified or be privy to the conditions prevailing in the workplace by the time of establishment at the latest.

6 INSTALLATION

The installation description assumes that the company responsible for the installation has ensured that the assembly personnel have the necessary expertise with regard to the safety barrier components, terms and bolt dimensions, etc., see drawings in Chap . 11.1. This information is available in the drawings. These are attached at the end of this description. Each bolt must be tightened with a normal torque.

Setting out: Before installation can commence, the location for the posts must be set out. This requires great accuracy. Setting out is done according to the drawing. NOTE: The cc-dimension runs parallel with the rloadway (inclined dimensions).

Installation of posts:

1- Start the installation with the post support:

Bolt group:

For installation with bolt groups remove concrete from the bolts (if needed). Inspect the bolts for visible damage. Add installation lubricate or wax to the bolts before assembling the nuts. Start with the nuts to be installed below the base plate (check location and heights). Note add washer before the posts are located at the bolt groups.

2- The installation continues with the top rail. A crane may be need for lift assist.

The installation of the top rail starts at one end of the bridge (or road). The top rails should be located according to the specification for the project. All joints (bolts) are first assembled by hands (without tools). The joint pipe is mounted in the first top rail. Put the next top rail at the joint pipe and continue until all the top rails are mounted. 3- Install the deformation element for the rails and if required the brackets for the infill.

Page 6: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Birsta 3PH4b Page 6 Birsta 3PH4b - Rev. 0INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

4- Install the rails (use the procedure for the top rail). 5- Final, inspect the installation and tightening each bolt with a normal torque.

6- If needed, Grouting:

Perform under grouting of base plate.

7- If needed, install the infill.

7 REPAIRS TO ZINC DAMAGE

Repairs to any zinc damage in the delivered materials are carried out according to SS/EN-1461 and “Industry Standard - finishing and repairs”.

Zinc damage must be treated as follows:

• Scratches and elongated spots narrower than 2 mm and less than 10 cm2. No action required.

• Damage wider than 2 mm and less than 3.16x3.16 cm (or less than 10 cm2)must be rectified by painting with zinc-rich paint. It is also possible to use a suitable zinc paste, zinc flakes or alloyed “sticks”. Before any repairs are made, clean with a stainless steel brush.

• Damages larger than 10 cm2 must be re-galvanized.

8 DEMOBILISATION

Inspection regarding heights and general visual impression.

A proprietary inspection in accordance with point 3 must be conducted and completed, and copies forwarded to the client (customer).

Following the proprietary inspection the safety barrier is marked with a CE Mark (on the first and last post in the CE-marked safety barrier. Where necessary, an additional CE Mark can be set up between the first and last posts).

Page 7: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Birsta 3PH4b Page 7 Birsta 3PH4b - Rev. 0INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

9 REPAIRS

All damaged material must be replaced immediately. Damage means that the steel is weakened such as deep scratches, rips, creases and suchlike. Damaged material must be replaced with genuine parts.

Replacing damaged components following a collision is no different from a normal installation besides the disassembly operation. Bear in mind that there may be a lot of tension in the safety barrier that has been hit.

10 MAINTENANCE

A minimum of maintenance includes rinsing with clean water where necessary followed by a visual inspection for damage.

Page 8: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Birsta 3PH4b Page 8 Birsta 3PH4b - Rev. 0INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION

11 OTHER INFORMATION

11.1 Drawings: Page 9 11.2 CE Certificate: Page 10 -11 11.3 Declaration of Performance (DoP): Page 12

Page 9: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Page 9

Page 10: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Page 10

Page 11: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Page 11

Page 12: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

0402

DECLARATION of PERFORMANCE (DoP)

No. Birsta 3PH4b

Manufacturer Birstaverken AB

Box 30, SE 863 32 Sundsbruk, Sweden

Telephone: +46 60 527200 Web: www.birsta.eu

Product identification code Birsta 3PH4b – Single sided safety barrier c/c 2.0

Height 1.5 m. Base plate.

Product type Birsta 3PH4b

Intended use In vehicle circulation areas

Harmonised standard EN 1317-5:2007 / A2:2012

System of assessment and verification System 1 (CPR no. 305/2011)

Name of notified body SP Technical Research Institute of Sweden

Identification number of the notified body No. 0402

Certificate of constancy of performance No. 0402-CPR-SC0892-12

Declared performances

Essential characteristics Performance Harmonised standard

Performance under impact:

- containment level H4b EN 1317-5:2007 / A2:2012 - impact severity B EN 1317-5:2007 / A2:2012 - normalized working width W3 (1.0 m) EN 1317-5:2007 / A2:2012 - normalized vehicle intrusion VI4 (1.3 m) EN 1317-5:2007 / A2:2012 - normalized dynamic deflection 0.8 m EN 1317-5:2007 / A2:2012

Resistance to snow removal: Class 4 EN 1317-5:2007 / A2:2012

Durability:

- of performance under impact Hot dip galvanized coatings

according to EN ISO 1461

EN 1317-5:2007 / A2:2012

- of resistance to snow removal Hot dip galvanized coatings

according to EN ISO 1461

EN 1317-5:2007 / A2:2012

The performance of the product is in conformity with the declared performance. This declaration of

performance is issued under the sole responsibility of the manufacturer.

Signed for and on behalf of the manufacturer by: Fredrik Sangö, Senior Technical Adviser

Sundsvall 2015-02-11

Page 12

Page 13: Working Instruction - Birsta 3PH4b · Birsta 3PH4b Page 4 Birsta 3PH4b - Rev. 0 INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 1 PLANNING It is at this point that the quality

Main Office

Birstaverken AB Birstavägen 10

Box 30 863 22 Sundsbruk

Sweden Tel: +46 60 52 72 00 Fax: +46 60 52 72 16

www.birsta.eu

Arboga Office

Kapellgatan 29 Box 216

732 24 Arboga Sweden

Borås Office

Viaredsvägen 35 504 94 Borås

Sweden