Page 1: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD

WORKS APPROVAL /

LICENCE APPLICATION

SUPPORTING DOCUMENT –

PARADIGM DEWATERING

CARBINE / PARADIGM PROJECT AREA

Prepared By:

Northern Star Resources Limited

Kalgoorlie Operations - Environment Department

September 2017

Page 2: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page i

TABLE OF CONTENTS

1. INTRODUCTION ....................................................................................................................................... 2

1.1 Company Description................................................................................................................... 2

1.2 Background and Context ............................................................................................................ 2

1.3 Name and Location of Premises ................................................................................................ 2

1.4 Relevant Approvals ....................................................................................................................... 3

2. PROJECT PROPOSAL .............................................................................................................................. 3

2.1 Maps for Proposed Premises ........................................................................................................ 3

2.2 Description of Prescribed Activities ............................................................................................ 6

2.3 Pumping and Pipeline Infrastructure.......................................................................................... 6

2.4 Pipeline Bunding ............................................................................................................................ 7

3. ENVIRONMENTAL RISKS AND MANAGEMENT .................................................................................... 8

3.1 Siting and Location ....................................................................................................................... 8

3.2 Land Clearing ............................................................................................................................... 10

3.3 Groundwater ................................................................................................................................ 10

3.4 Surface Water............................................................................................................................... 10

3.5 Flora ................................................................................................................................................ 10

3.6 Fauna ............................................................................................................................................. 11

3.7 Dust ................................................................................................................................................. 11

3.8 Noise ............................................................................................................................................... 11

3.9 Hazardous Materials .................................................................................................................... 11

3.10 Waste Products ............................................................................................................................ 11

TABLE OF FIGURES

Figure 1. Proposed Premises Boundary Map ............................................................................................. 4

Figure 2. Proposed Premises Activities ........................................................................................................ 5

Figure 3. Pipeline Bunded V-Drain Corridor ............................................................................................... 7

Figure 4. Siting and Location Map .............................................................................................................. 9

ATTACHMENTS

Attachment 1A. Proof of Occupier

Attachment 1B. ASIC Company Extract

Page 3: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 2

1. INTRODUCTION

1.1 Company Description

Northern Star Resources Limited (Northern Star) is an Australian exploration and gold producing

company with major tenement holdings in the Eastern Goldfields of Western Australia. Northern

Star’s ‘Kalgoorlie Operations’ comprises of the operating Kanowna Belle and Kundana Gold

Mines, and the Carbine/Paradigm Project area.

Northern Star currently holds two operating Licences that covers prescribed activities at its

Kalgoorlie Operations. The Kanowna Belle Licence (L5029/1992/11) is held by Northern Star

(Kanowna) Pty Limited, whilst the Kundana Licence (L7323/1998/12) is held by Kundana Gold

Pty Ltd, both wholly owned subsidiaries of Northern Star.

Although historically licenced there is currently no existing operating Licence over the

Carbine/Paradigm Project area.

1.2 Background and Context

Mining operations at Paradigm began in 2002 and ceased in the middle of 2007. The Paradigm

pit and underground operations were dewatered via a bunded pipeline to a nearby pit

(Carbine) approximately 2km to the west of Paradigm pit.

Northern Star have undertaken numerous exploration drilling programmes in and around the

Carbine/Paradigm Project area over the last few years. In order to allow exploration activities

in the surrounding area to advance, dewatering of the Paradigm pit (via bunded pipeline) to

Carbine pit commenced in April 2017.

As a result of early successful drilling campaigns, Northern Star plans to carry out further

investigations and exploration programmes. To ensure Paradigm pit remains dry and to enable

detailed exploration, hydrogeological and geotechnical investigations to commence, the

installed pipeline and pumping system is expected to become permanent infrastructure and

used to allow the mining of ore.

This document has been prepared to support the Works Approval / Licence application for

the proposed activities, as required by Part V of the Environmental Protection Act 1986.

1.3 Name and Location of Premises

Premises Name: Paradigm Dewatering – Carbine/Paradigm Project Area

Tenement Number: M16/548

Tenement Holder: Kundana Gold Pty Ltd

Location: The premises for dewatering discharge is between Paradigm pit and Carbine pit

located within 2km distance of each other. The Project area is located within the Shire of

Coolgardie and is approximately 60km north-west of the City of Kalgoorlie-Boulder.

A copy of the mining tenement summary has been provided as Attachment 1A for proof of

occupier status. A current copy of the ASIC company information extract has been provided

as Attachment 1B.

Page 4: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 3

1.4 Relevant Approvals

The Project area is covered by an existing Groundwater Well Licence GWL 104053(6) issued by

the Department of Water (DoW), now the Department of Water and Environmental Regulation

(DWER). GWL 104053(6) allows the abstraction of up to 1,000,000kL of groundwater for

“dewatering for mining purposes” and “dust suppression” from the Paradigm pit – covered by

tenement M16/548. An application to amend the GWL and increase the abstraction

allocation to 1,500,000kL per annum has been submitted and is currently being assessed.

A Mining Proposal (formerly Notice of Intent) for the Paradigm open pit, underground

operations and associated infrastructure was approved in 2001 and 2003 by the Department

of Mines and Petroleum (DMP), now Department of Mines, Industry Regulation and Safety

(DMIRS). The existing approvals are in line with the proposed activities.

2. PROJECT PROPOSAL

The objectives of this Project are to gain approval to continue dewatering Paradigm pit into

the nearby Carbine pit to allow detailed investigations to progress and allow the mining of ore.

The pumping strategy for ongoing exploration purposes is to keep the pit dewatered and, as

far as practicable, the underground workings dry. It is proposed that the existing pumping and

pipeline infrastructure will become permanent and utilised for the duration of the Project.

2.1 Maps for Proposed Premises

An aerial map of the proposed premises boundary for the Carbine/Paradigm Project area has

been provided in Figure 1.

An aerial map showing the general layout of the proposed prescribed activities associated

with this Project is provided in Figure 2.

Page 5: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 4

Figure 1. Proposed Premises Boundary Map

Page 6: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 5

Figure 2. Proposed Premises Activities

Page 7: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 6

2.2 Description of Prescribed Activities

Historical pump testing and current estimates of groundwater inflows indicate the pumping

rate to be around 20-50L/second. As such, the pumping and pipeline infrastructure will have

a design capacity of up to 1,500,000kL per annum (Table 1). The estimated throughput is based

on the higher water yield of around 45-50L/second, as a contingency, and is also aligned with

the GWL abstraction allocation.

Table 1. Prescribed Premises Category Details

New /

Existing

Activity Category

Number

Category

Production or

Design Capacity

Approved Premises

Production or

Design Capacity

New Mine Dewatering: premises

on which water is

extracted and discharged

into the environment to

allow mining of ore.

6 More than

500,000 tonnes

per year

1,500,000 kL per

annual period

Actual inflows will be tested again once all the surplus water in Paradigm pit is pumped out

and surveyed water levels are measured over time. A detailed exploration drilling programme

including pumping tests and hydrogeological studies will enable the assessment of ongoing

dewatering requirements and flow rates.

The current water level measured in Carbine is at 398m RL to the crest of the pit. Carbine pit

currently has a total remaining capacity of approximately 3,340,000kL allowing for a nominal

6m freeboard (at 424m RL). There is adequate storage capacity in Carbine pit for current

predicted dewatering volumes from Paradigm pit for the Project to progress with its

investigations. To ensure the water holding capacity in Carbine pit is not exceeded,

dewatering volumes will continue to be monitored on a weekly basis and surveyors will

measure the water levels (RL) at least monthly.

2.3 Pumping and Pipeline Infrastructure

The existing pipeline infrastructure for this Project was installed by National Pump & Energy

(NPE), and includes a single diesel pump unit mounted on a pontoon arrangement, and

approximately 2.4km of HDPE pipeline laid within a bunded corridor.

The pump set is a high flow / high head combination and has been mounted to a steel

pontoon. The pontoon is fully hand railed and placed onto a skid frame allowing it to be

pushed down the ramp and into the water.

The pontoon has a 1kL day fuel tank and is supplied by a 26kL primary tank on the surface.

Both units are double skinned, with the fuel line from the primary tank to the day tank bunded

in poly pipe for leakage containment. The pontoon system also has a fuel leak detection box

incorporated and will shut down in the event of any leakage.

Approximately 260m of HDPE DN225 PN25/16 pipe has been installed from the discharge of

the pump and up the Paradigm pit wall. This ties in on the surface to connect to the DN250

Page 8: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 7

PN6.3 main discharge pipeline. The main discharge line runs for approximately 2.1km along an

existing access track from Paradigm pit to the southern end of Carbine pit (Figure 2). Suitably

designed bunding, culverts and scour pits are in place where necessary (detailed in section

2.3 below).

A solar telemetry and trickle charger unit powers the EM digital flow meter installed on the

discharge point to allow constant monitoring of the system performance. The pipeline is also

equipped with leak detection between two flow meters located at each end of the pipeline

from Paradigm to Carbine pit. On detection of a leak the system will automatically shut down

the pump. The pumping system is remotely monitored by NPE from their Kalgoorlie and Perth

branches.

2.4 Pipeline Bunding

The pipeline follows an existing access track/road between the two pits and runs along the

toe of the Paradigm waste rock dump. The pipeline has been laid within a bunded v-drain

corridor to ensure any leaks or spills are contained and to minimise any potential impact to the

surrounding environment (Figure 3).

To ensure safe vehicle access the pipeline has also been buried under the road in four places

and culverts installed where necessary. Three scour pits are also located at low points along

the pipeline corridor to capture water received from the scour valve and to act as a collection

sump for any spills or leaks.

Appropriate visual inspection regimes will be carried out on the pipeline and pumping

infrastructure to further mitigate environmental risks associated with the Project activities.

Figure 3. Pipeline Bunded V-Drain Corridor

Page 9: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 8

3. ENVIRONMENTAL RISKS AND MANAGEMENT

Northern Star believes that the activities described in this proposal represent low impacts to

the surrounding environment, given these are infrastructure types and activities that have

historically been undertaken within the Project area (i.e. pit dewatering) and have previously

been well managed. Furthermore, an assessment of the existing environment and potential

risks and mitigation measures have been identified and discussed in the sections below.

3.1 Siting and Location

The nearest sensitive receptor is Rowles Lagoon located approximately 8km north-west of the

Carbine/Paradigm Project area (Figure 4).

The historical townsite of Ora Band is located approximately 17km north-east, and the nearest

residential premises is the Kurrawang Community approximately 55km south-east from the

Project area.

The proposed activities are not expected to have an effect or impact on the identified

receptors, due to the separation distances and risk management measures in place.

Page 10: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 9

Figure 4. Siting and Location Map

Page 11: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 10

3.2 Land Clearing

It is not anticipated that additional disturbance will be required as part of the proposed

activities, however should any new clearing be necessary it will be undertaken utilising the

10ha exemption covered under Schedule 1, Item 2, Subclause 2 of the Environmental

Protection (Clearing of Native Vegetation) Regulations 2004.

Any required vegetation clearing or land disturbance will be managed to minimise soil erosion,

salinity and impacts to local and regional groundwater and surface water systems.

3.3 Groundwater

The local groundwater in the area is naturally saline to hypersaline with high TDS concentrations

(up to 90,000 mg/L). Based on drilling assessments and previous studies, groundwater levels are

at a depth of approximately 40m.

Due to the depth of the water table and groundwater quality there are no known

groundwater dependent ecosystems in the area, and no expected impacts to the surrounding

vegetation. As discussed in section 2, the presumed 6m rooting depth limit of vegetation has

been considered and therefore Carbine pit water levels will be kept at a minimum of 6m below

ground level.

Additionally, there are no beneficial users or uses of the groundwater in the area, except for

dust suppression purposes.

3.4 Surface Water

The Project area consists of a gently undulating plain shedding through low velocity sheet wash

to the south east. There is no significant drainage system within or near the Project area.

Safety/abandonment bunds have been constructed around the Carbine and Paradigm pits

to divert surface run off around the pits.

The proposed activities are not anticipated to have an impact on existing drainage or surface

water flows in the local and regional area.

3.5 Flora

The Carbine/Paradigm Project area lies within the South–West interzone or the Coolgardie

Botanical District. The most recent flora and vegetation surveys of the Carbine/Paradigm

Project area was conducted in 2015. The vegetation unit is broadly described as Goldfields

Eucalypt woodland with chenopod and acacia understorey.

No Declared Rare Flora or Priority Flora species have been recorded within the Project area.

None of the vegetation communities within the survey area were found to have National

Environmental Significance. The survey area is not located within any Conservation

Reserves/DBCA (formerly DPaW) managed lands.

Page 12: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 11

As discussed in section 2.2 and 2.3, the following measures have been implemented to ensure

any potential risks to the surrounding vegetation from hypersaline spills or leaks are mitigated:

• The pipeline is equipped with automatic cut-outs (leak detection) in the event of a

pipe failure;

• Secondary containment (bunding) has been provided; and

• Routine visual inspections will be carried out.

3.6 Fauna

The most recent fauna survey and assessment of the Carbine/Paradigm Project area was

conducted in 2015. It was concluded to be unlikely that any threatened (vulnerable,

endangered, rare or likely to become extinct) vertebrate species frequent the Project area

except possibly as transients/vagrants, on very rare occasions.

No species of conservation significance has the potential to be affected to any significant

degree by the proposed activities.

3.7 Dust

There will be minimal atmospheric pollution during the operation of the water transfer pipelines

and pumps, as any dust emissions will be restricted to vehicular movement. Water carts will be

used (as required) to apply water in areas that have potential to be a source of dust within the

Project area, particularly along unsealed roads. The use of saline water for dust suppression will

be controlled to avoid overspray which may affect vegetation.

3.8 Noise

As noted in section 3.1, the nearest residential premises is the Kurrawang Community located

approximately 55km south-east from the Carbine/Paradigm Project area. Minimal noise is

expected to be generated from the proposed activities. The impact of noise emissions during

the operation of this Project is predicted to be negligible.

Northern Star will adhere to the Environmental Protection (Noise) Regulations 1997.

3.9 Hazardous Materials

Any diesel fuel, oils, hydraulic fluids and other hazardous materials associated with this Project

will be managed and stored in accordance with relevant Acts and Regulations.

3.10 Waste Products

Any waste products generated during the Project will be taken off-site and disposed of to the

nearest approved landfill site. Any hydrocarbon-contaminated materials will be collected and

removed off site by a licenced controlled waste carrier.

All paper, cardboard, plastics and scrap metal produced on site will be recycled where

possible.

Page 13: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 12

ATTACHMENT 1A: Proof of Occupier

Page 14: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

Created 31/08/2017 08:57:29 Requested By: Yvonne Hynes/Page 1 of 2

MINING TENEMENT SUMMARY REPORT

MINING LEASE 16/548 Status: Live

TENEMENT SUMMARY

Area: 1,904.00000 HA Death Reason :

Mark Out : 19/09/2016 14:30:00 Death Date :

Received : 21/09/2016 11:30:00 Commence : 01/08/2017

Term Granted : 21 Years Expiry : 31/07/2038

CURRENT HOLDER DETAILS

Name and AddressKUNDANA GOLD PTY LTDKUNDANA GOLD PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, [email protected],xxxxx610

DESCRIPTION

Locality: CarbineDatum: Datum is situated GDA Zone 51 301579.646 metres East

6628947.452 metres NorthBoundary: Thence to 303138.968 metres East 6627691.345 metres

North Thence to 304771.521 metres East 6626602.543metres North Thence to 304090.017 metres East6625722.648 metres North Thence to 303358.074metres East 6624785.134 metres North Thence to302395.700 metres East 6625555.556 metres NorthThence to 301897.062 metres East 6625029.824 metresNorth Thence to 302984.976 metres East 6623997.459metres North Thence to 302433.396 metres East6623417.475 metres North Thence to 301441.050metres East 6624359.973 metres North Thence to301202.529 metres East 6624097.400 metres NorthThence to 300125.866 metres East 6624774.449 metresNorth Thence to 300035.591 metres East 6624594.384metres North Thence to 299367.846 metres East6624933.072 metres North Thence to 299496.542metres East 6625237.265 metres North Thence to298795.144 metres East 6625790.053 metres NorthThence to 299119.966 metres East 6626278.152 metresNorth Thence to 298088.708 metres East 6627110.509metres North Thence to 297563.683 metres East6627534.274 metres North Thence to 296909.618metres East 6627942.256 metres North Thence to297410.539 metres East 6628594.221 metres NorthThence to 298539.634 metres East 6627699.908 metresNorth Thence to 299031.682 metres East 6628295.663metres North Thence to 300350.323 metres East6627239.073 metres North Thence to 300948.690metres East 6628119.476 metres North Thence to

Page 15: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

Mining Tenement Summary Report MINING LEASE 16/548 - Live

Created 31/08/2017 08:57:29 Requested By: Yvonne Hynes/Page 2 of 2

301579.646 metres East 6628947.452 thence back todatum

Area : Type Dealing No Start Date AreaGranted 01/08/2017 1,904.00000 HAApplied For 19/09/2016 1,904.00000 HA

SHIRE DETAILS

Shire Shire No Start End AreaCOOLGARDIE SHIRE 1960 21/09/2016 1,904.00000 HA

RENT STATUS

Due For Year End 31/07/2018: PAID IN FULLDue For Year End 31/07/2019: $33,510.40

EXPENDITURE STATUS

Expended Year End : N/ACurrent Year Commitment : $190,400.00

Page 16: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document

Paradigm Dewatering – Carbine / Paradigm Project Area

September 2017 Page 13

ATTACHMENT 1B: ASIC Company Extract

Page 17: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

Current Company Extract for KUNDANA GOLD PTY LIMITEDExtracted from ASIC database on 31/08/2017 at 12:20 AEST

This extract contains information derived from the Australian Securities and Investment Commission's (ASIC) database under section 1274A of the CorporationsAct 2001. Please advise ASIC of any error or omission which you may identify.

Corporation Details Document Number

Name: KUNDANA GOLD PTY LIMITED 011368483A.C.N.: 009643252A.B.N.: 13009643252Registered In: NTRegistration Date: 18/05/1988Previous State number: 09581Organisation Number Type: A.C.N. (Australian Company Number)Review Date: 18/05/2018Ultimate Holding Company: NORTHERN STAR RESOURCES LTDDetails Start Date: 07/06/1996Status: RegisteredName Start Date: 07/06/1996Type: Australian Proprietary CompanyClass: Limited by SharesSubclass: Proprietary CompanyDisclosing Entity: NoRegistered Charity: No

Company Addresses Document Number

Address Type: Registered Office 7E6485261

Address:LEVEL 1 388 HAY STREET SUBIACO , WA 6008

Start Date: 06/11/2014

Address Type: Principal Place of Business 7E6485261

Address:LEVEL 1 388 HAY STREET SUBIACO , WA 6008

Start Date: 20/10/2014

Company Officers Document Number

Role: Director 7E5910504Name: ROWE, CHRISTOPHER KENNETH GEORGE

Address: 10 AIRLIE STREET CLAREMONT , WA 6010

Birth Details: 23/06/1944 ADLINGTON UNITED KINGDOMAppointment Date: 01/03/2014

Role: Director 7E5910504Name: O'CONNOR, PETER EDMUND

Address:2 LYLE PARK 57 PUTNEY HILL LONDON SW15 6RT UNITED KINGDOM

Birth Details: 03/12/1940 QUETTA PAKISTANAppointment Date: 01/03/2014

Role: Director 7E5910504Name: FITZGERALD, JOHN DANIEL

Address: 38 UNION STREET SUBIACO , WA 6008

Birth Details: 01/08/1962 PERTH WAAppointment Date: 01/03/2014

Page 1 of 8

Page 18: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

Role: Director 7E8713147Name: BEAMENT, WILLIAM JAMES

Address: 40 CHALLENGER PARADE CITY BEACH , WA 6015

Birth Details: 28/11/1974 ESPERANCE WAAppointment Date: 01/03/2014

Role: Secretary 7E5892841Name: CARPENE, LIZA

Address: 7A VALE STREET MOUNT LAWLEY , WA 6050

Birth Details: 06/01/1964 PERTH WAAppointment Date: 28/02/2014

Role: Ultimate Holding Company 7E5910504Org Name: NORTHERN STAR RESOURCES LTDA.C.N.: 092832892A.B.N.: 43092832892Address:

Share Structure Document Number

Share Class: ORD (ORDINARY SHARES) 0964325A (AR 1990)Number of Shares Issued: 2Amount Paid: $ 2.00Total Unpaid: $ 0.00

Note: For each class of shares issued by a proprietary company, ASIC records the details of the twenty members of the class (based on shareholdings).The details of any other members holding the same number of shares as the twentieth ranked member will also be recorded by ASIC on the database.Where available, historical records show that a member has ceased to be ranked amongst the twenty members. This may, but does not necessarily mean,that they have ceased to be a member of the company.

Shareholder Document Number

Class: ORD 7E6803662Number Held: 2Beneficially Held: YesFully Paid: YesA.C.N.: 010511789Org Name: NORTHERN STAR (KANOWNA) PTY LIMITED

Address:LEVEL 1 388 HAY STREET SUBIACO , WA 6008

Joint Holding Indicator: NoShare Issuer Org Number Type: A.C.N. (Australian Company Number)

ASIC Satisfied Charges and Related Documents

There are no satisfied charges recorded for this organisation (No charges records are displayed where the extract type is current).

Note: This extract may not contain all charges for organisations registered prior to 1991 and it may be advisable to also search the state or territory recordsheld by A.S.I.C.

Note: On January 30, 2012 the Personal Property Securities Register (PPS Register) commenced. The details of current charges will only be available fromthe PPS Register and the details of satisfied charges (as at 30th January 2012) can be obtained from ASIC. Further information can be obtained fromwww.ppsr.gov.au

Financial Reports Document Number

Balance Date Report Due Date AGM Due Date Extended Due Date Date Held Outstanding30/06/1998 31/10/1998 Unknown Unknown 26/11/1998 N 01470274430/06/1999 31/10/1999 Unknown Unknown Unknown N 01816484030/06/2000 31/10/2000 Unknown Unknown 25/10/2000 N 016767052

Page 2 of 8

Page 19: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

30/06/2001 31/10/2001 Unknown Unknown Unknown N 01749123030/06/2002 31/10/2002 Unknown Unknown 25/10/2002 N 01861206831/12/2006 30/04/2007 Unknown Unknown Unknown N 7E581529131/12/2007 30/04/2008 Unknown Unknown Unknown N 7E581530131/12/2008 30/04/2009 Unknown Unknown Unknown N 7E581531431/12/2009 30/04/2010 Unknown Unknown Unknown N 7E581534331/12/2010 30/04/2011 Unknown Unknown Unknown N 7E581534931/12/2011 30/04/2012 Unknown Unknown Unknown N 7E581535931/12/2012 30/04/2013 Unknown Unknown Unknown N 7E5815365

ASIC Document List

Form Type Pages Received Processed Effective Document Number

484 2 25/01/2017 25/01/2017 25/01/2017 7E8713147

484A1 Change to Company Details Change Officeholder Name Or Address

484 2 17/03/2015 17/03/2015 17/03/2015 7E6803662

484A2 Change to Company Details Change Member Name or Address

484 2 30/10/2014 30/10/2014 30/10/2014 7E6485261

484 Change to Company Details

484B Change of Registered Address

484C Change of Principal Place of Business (Address)

315 1 03/07/2014 21/07/2014 20/06/2014 028899493

315A Notice of Resignation or Removal of Auditor Resignation Of Auditor

351 26 19/05/2014 13/06/2014 19/05/2014 029022101

351 Deed Relating to Class Order

484 5 14/03/2014 14/03/2014 14/03/2014 7E5910504

484 Change to Company Details

484B Change of Registered Address

484C Change of Principal Place of Business (Address)

484D Change to Ultimate Holding Company

484E Appointment or Cessation of a Company Officeholder

484A2 Change Member Name or Address

484 2 07/03/2014 07/03/2014 07/03/2014 7E5892841

484E Change to Company Details Appointment or Cessation of A Company Officeholder

484 2 12/02/2014 12/02/2014 12/02/2014 7E5832069

484E Change to Company Details Appointment or Cessation of A Company Officeholder

388 24 05/02/2014 05/02/2014 31/12/2012 7E5815365

388I Financial Report Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company

388 23 05/02/2014 05/02/2014 31/12/2011 7E5815359

388I Financial Report Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company

388 25 05/02/2014 05/02/2014 31/12/2010 7E5815349

388H Financial Report Financial Report - Large Proprietary Company That Is Not a Disclosing Entity

388 26 05/02/2014 05/02/2014 31/12/2009 7E5815343

388H Financial Report Financial Report - Large Proprietary Company That Is Not a Disclosing Entity

388 24 05/02/2014 05/02/2014 31/12/2008 7E5815314

388I Financial Report Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company

388 26 05/02/2014 05/02/2014 31/12/2007 7E5815301

388H Financial Report Financial Report - Large Proprietary Company That Is Not a Disclosing Entity

388 23 05/02/2014 05/02/2014 31/12/2006 7E5815291

Page 3 of 8

Page 20: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

388 Financial Report

388I Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company

388E Company - Appoint Change Name/address of Auditor

484 2 10/12/2013 10/12/2013 10/12/2013 7E5707790

484E Change to Company Details Appointment or Cessation of A Company Officeholder

492 2 26/11/2013 27/11/2013 26/11/2013 7E5675264

492 Request For Correction Alters 7E5 467 923

484 2 27/08/2013 27/08/2013 27/08/2013 7E5467923

484N Change to Company Details Changes to (Members) Share Holdings Altered by 7E5 675 264

484 2 08/08/2013 08/08/2013 08/08/2013 7E5427556

484A1 Change to Company Details Change Officeholder Name Or Address

484 2 17/07/2013 17/07/2013 17/07/2013 7E5377056

484E Change to Company Details Appointment or Cessation of A Company Officeholder

355 15 06/02/2013 18/02/2013 06/02/2013 028343433

355 Revocation Deed Relating to Class Order

484 2 13/06/2012 13/06/2012 13/06/2012 7E4513526

484A2 Change to Company Details Change Member Name or Address

484 2 12/06/2012 12/06/2012 12/06/2012 7E4511991

484 Change to Company Details

484B Change of Registered Address

484C Change of Principal Place of Business (Address)

484 2 10/04/2012 10/04/2012 10/04/2012 7E4384978

484A1 Change to Company Details Change Officeholder Name Or Address

484 2 19/01/2012 19/01/2012 19/01/2012 7E4225856

484E Change to Company Details Appointment or Cessation of A Company Officeholder

484 2 01/12/2010 01/12/2010 01/12/2010 7E3333478

484E Change to Company Details Appointment or Cessation of A Company Officeholder

484 2 25/11/2010 25/11/2010 25/11/2010 7E3320407

484E Change to Company Details Appointment or Cessation of A Company Officeholder

484 2 23/08/2010 23/08/2010 23/08/2010 7E3124279

484A1 Change to Company Details Change Officeholder Name Or Address

484 2 29/03/2010 29/03/2010 29/03/2010 7E2795548

484E Change to Company Details Appointment or Cessation of A Company Officeholder

484 2 22/01/2009 22/01/2009 22/01/2009 7E2000772

484E Change to Company Details Appointment or Cessation of A Company Officeholder

315 2 01/09/2008 10/09/2008 07/07/2008 024976197

315B Notice of Resignation or Removal of Auditor Removal Of Auditor

484 2 05/08/2008 05/08/2008 05/08/2008 7E1744834

484E Change to Company Details Appointment or Cessation of A Company Officeholder

343 1 21/05/2008 06/06/2008 21/05/2008 024700238

343 Notice Under Subsection 329(1a) to Remove Auditor

351 30 02/01/2007 03/01/2007 02/01/2007 023377450

351 Deed Relating to Class Order

355 15 02/01/2007 03/01/2007 02/01/2007 023377451

355 Revocation Deed Relating to Class Order

484 3 30/10/2006 30/10/2006 30/10/2006 7E0894866

484 Change to Company Details

Page 4 of 8

Page 21: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

484C Change of Principal Place of Business (Address)

484D Change to Ultimate Holding Company

484A1 Change Officeholder Name or Address

484 6 25/09/2006 25/09/2006 25/09/2006 1F0118853

484 Change to Company Details

484B CHANGE OF REGISTERED ADDRESS

484A1 CHANGE OFFICEHOLDER NAME OR ADDRESS

484E APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER

484 4 14/06/2006 14/06/2006 14/06/2006 022860842

484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER

484 3 20/04/2006 01/05/2006 20/04/2006 022752542

484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER

389 2 19/04/2006 24/05/2006 31/12/2005 022940277

389B ANNUAL NOTICE BY WHOLLY-OWNED ENTITY ANNUAL NOTICE BY WHOLLY-OWNED ENTITY - COMPANIES

9201 74 03/02/2006 03/02/2006 03/02/2006 021517012

9201 PRE 1991 COMPANY DOCUMENTS

389 2 28/04/2005 17/05/2005 31/12/2004 016937363

389B ANNUAL NOTICE BY WHOLLY-OWNED ENTITY ANNUAL NOTICE BY WHOLLY-OWNED ENTITY - COMPANIES

484 3 08/03/2005 10/03/2005 10/03/2005 020937854

484A1 CHANGE TO COMPANY DETAILS CHANGE OFFICEHOLDER NAME OR ADDRESS

484 4 14/01/2005 17/01/2005 17/01/2005 020694821

484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER

484 4 27/09/2004 01/10/2004 01/10/2004 020686630

484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER

389 3 02/07/2004 08/07/2004 31/12/2003 020516140

389B ANNUAL NOTICE BY WHOLLY-OWNED ENTITY ANNUAL NOTICE BY WHOLLY-OWNED ENTITY - COMPANIES

484 3 25/05/2004 26/05/2004 26/05/2004 020332010

484A2 CHANGE TO COMPANY DETAILS CHANGE MEMBER NAME OR ADDRESS

304 2 04/03/2003 12/03/2003 28/02/2003 019050795

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

203 2 04/03/2003 12/03/2003 01/03/2003 019050755

203 NOTIFICATION OF

203A CHANGE OF ADDRESS

203G CHANGE OF ADDRESS - PRINCIPAL PLACE OF BUSINESS

351 25 11/02/2003 10/03/2003 11/02/2003 018700182

351 DEED RELATING TO CLASS ORDER

304 2 22/01/2003 28/01/2003 17/01/2003 018843788

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

316 4 10/01/2003 23/01/2003 30/12/2002 00964325M

316L ANNUAL RETURN - PROPRIETARY COMPANY

315 1 19/11/2002 04/12/2002 08/11/2002 018742385

315A NOTICE OF RESIGNATION OR REMOVAL OF AUDITOR RESIGNATION OF AUDITOR

304 2 11/11/2002 18/11/2002 08/11/2002 018007196

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

388 26 29/10/2002 27/11/2002 30/06/2002 018612068

388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY

388 21 27/06/2002 28/06/2002 30/06/1999 018164840

Page 5 of 8

Page 22: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY

304 2 11/04/2002 17/04/2002 29/03/2002 018016439

304C NOTIFICATION OF CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER

304 2 08/02/2002 15/02/2002 30/01/2002 017998190

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

316 3 31/01/2002 08/04/2002 29/01/2002 00964325L

316L ANNUAL RETURN - PROPRIETARY COMPANY

304 2 07/01/2002 15/01/2002 31/12/2001 017754054

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

203 2 07/01/2002 15/01/2002 02/01/2002 017754097

203 NOTIFICATION OF

203A CHANGE OF ADDRESS

203G CHANGE OF ADDRESS - PRINCIPAL PLACE OF BUSINESS

388 26 26/10/2001 27/11/2001 30/06/2001 017491230

388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY

388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY

203 1 28/06/2001 03/07/2001 18/06/2001 017119780

203 NOTIFICATION OF

203A CHANGE OF ADDRESS

203G CHANGE OF ADDRESS - PRINCIPAL PLACE OF BUSINESS

304 2 08/06/2001 15/06/2001 21/05/2001 017261308

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

316 3 20/11/2000 24/11/2000 14/11/2000 00964325K

316L ANNUAL RETURN - PROPRIETARY COMPANY

388 21 31/10/2000 16/11/2000 30/06/2000 016767052

388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY

304 2 13/01/2000 13/01/2000 10/01/2000 015398588

304C NOTIFICATION OF CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER

316 3 06/12/1999 20/12/1999 01/12/1999 00964325J

316 ANNUAL RETURN

316T CHANGE TO PRINCIPAL PLACE OF BUSINESS

316P CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER

316L ANNUAL RETURN - PROPRIETARY COMPANY

304 2 06/01/1999 13/01/1999 18/12/1998 014993690

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

203 2 22/12/1998 06/01/1999 21/12/1998 014701905

203A NOTIFICATION OF CHANGE OF ADDRESS

304 3 22/12/1998 06/01/1999 14/12/1998 014701866

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

388 20 07/12/1998 10/12/1998 30/06/1998 014702744

388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY

316 3 07/12/1998 09/12/1998 26/11/1998 00964325I

316L ANNUAL RETURN - PROPRIETARY COMPANY

304 2 19/03/1998 26/03/1998 13/03/1998 013394454

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

304 2 16/01/1998 28/01/1998 06/01/1998 013409265

304 NOTIFICATION OF

Page 6 of 8

Page 23: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

304A CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

304C CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER

316 21 12/12/1997 13/01/1998 12/12/1997 00964325H

316L ANNUAL RETURN - PROPRIETARY COMPANY

304 2 19/11/1997 03/12/1997 27/10/1997 013189560

304C NOTIFICATION OF CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER

304 2 14/07/1997 18/07/1997 07/07/1997 012208157

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

316 4 18/12/1996 19/12/1996 06/12/1996 00964325G

316L ANNUAL RETURN - PROPRIETARY COMPANY

245 1 07/06/1996 07/06/1996 07/06/1996 011368496

245 CERTIFICATE OF REGISTRATION ON CHANGE OF NAME

205 2 07/06/1996 07/06/1996 06/06/1996 011368483

205A NOTIFICATION OF RESOLUTION CHANGING COMPANY NAME

308 1 07/06/1996 07/06/1996 06/06/1996 011368480

308A NOTIFICATION OF MINUTE RELATING TO THE PROCEEDINGS OF A SUBSIDIARY COMPANY CHANGING THE COMPANY NAME

316 24 22/12/1995 10/01/1996 08/12/1995 00964325F

316 ANNUAL RETURN

316C CHANGE TO OFFICEHOLDERS

316L ANNUAL RETURN - PROPRIETARY COMPANY

203 2 30/11/1995 04/12/1995 29/11/1995 009423336

203A NOTIFICATION OF CHANGE OF ADDRESS

304 4 05/07/1995 21/07/1995 21/06/1995 010062277

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

316 21 05/12/1994 16/12/1994 17/10/1994 008981900

316K ANNUAL RETURN

316 23 02/12/1993 15/12/1993 18/10/1993 00964325D

316K ANNUAL RETURN

316 23 27/11/1992 07/12/1992 28/10/1992 00964325C

316 ANNUAL RETURN

316E CORRECTIONS

316K ANNUAL RETURN

309 53 16/01/1992 20/01/1992 24/12/1991 002065049

309A NOTIFICATION OF DETAILS OF A CHARGE

309 44 24/12/1991 24/12/1991 24/12/1991 002360027

309A NOTIFICATION OF DETAILS OF A CHARGE

309 40 24/12/1991 24/12/1991 24/12/1991 002360016

309A NOTIFICATION OF DETAILS OF A CHARGE

309 44 24/12/1991 24/12/1991 24/12/1991 002360013

309A NOTIFICATION OF DETAILS OF A CHARGE

316 18 21/11/1991 31/01/1992 21/11/1991 00964325B

316 ANNUAL RETURN

316E CORRECTIONS

316K ANNUAL RETURN

304 2 21/11/1991 09/12/1991 25/10/1991 001963870

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

304 2 26/06/1991 01/07/1991 07/06/1991 001254065

Page 7 of 8

Page 24: WORKS APPROVAL / LICENCE APPLICATION ......This document has been prepared to support the Works Approval / Licence application for the proposed activities, as required by Part V of

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

203 1 20/06/1991 25/06/1991 13/06/1991 001444298

203A NOTIFICATION OF CHANGE OF ADDRESS

203 1 02/04/1991 15/04/1991 26/03/1991 001180161

203A NOTIFICATION OF CHANGE OF ADDRESS

304 2 02/04/1991 17/04/1991 26/03/1991 001180179

304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY

316 14 20/11/1990 11/02/1991 20/11/1990 0964325A

316 ANNUAL RETURN

316A CHANGE OF ADDRESS

316B CHANGES FORM NOTIFYING CHANGE OF OFFICE HOURS

316C CHANGE TO OFFICE HOLDERS

316E CORRECTIONS

* * * * End of Report * * * *

Disclaimer: GlobalX Information Pty Ltd reserves the right to manually or electronically charge any fees, which are due and payable by the customer at any stage. The materialspresented on this site are distributed as an information source only. The information recorded in this document is provided on the basis that readers will be responsible formaking their own assessment of the information and are advised to verify all relevant representations, statements and information. No liability (in contract, tort or otherwise)will be accepted for any loss or damage incurred as a result of reliance upon any material contained in this publication, or for any information or advice provided in thispublication or incorporated into it.

By using services the user accepts all terms and conditions of use as published under Legal and Privacy under Client Admin which may change from time to time includingany Deeds by specific suppliers and privacy laws. GlobalX reserves the right to store and reuse data provided by users at data input screens.