works approval / licence application ......this document has been prepared to support the works...
TRANSCRIPT
KUNDANA GOLD PTY LTD
WORKS APPROVAL /
LICENCE APPLICATION
SUPPORTING DOCUMENT –
PARADIGM DEWATERING
CARBINE / PARADIGM PROJECT AREA
Prepared By:
Northern Star Resources Limited
Kalgoorlie Operations - Environment Department
September 2017
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page i
TABLE OF CONTENTS
1. INTRODUCTION ....................................................................................................................................... 2
1.1 Company Description................................................................................................................... 2
1.2 Background and Context ............................................................................................................ 2
1.3 Name and Location of Premises ................................................................................................ 2
1.4 Relevant Approvals ....................................................................................................................... 3
2. PROJECT PROPOSAL .............................................................................................................................. 3
2.1 Maps for Proposed Premises ........................................................................................................ 3
2.2 Description of Prescribed Activities ............................................................................................ 6
2.3 Pumping and Pipeline Infrastructure.......................................................................................... 6
2.4 Pipeline Bunding ............................................................................................................................ 7
3. ENVIRONMENTAL RISKS AND MANAGEMENT .................................................................................... 8
3.1 Siting and Location ....................................................................................................................... 8
3.2 Land Clearing ............................................................................................................................... 10
3.3 Groundwater ................................................................................................................................ 10
3.4 Surface Water............................................................................................................................... 10
3.5 Flora ................................................................................................................................................ 10
3.6 Fauna ............................................................................................................................................. 11
3.7 Dust ................................................................................................................................................. 11
3.8 Noise ............................................................................................................................................... 11
3.9 Hazardous Materials .................................................................................................................... 11
3.10 Waste Products ............................................................................................................................ 11
TABLE OF FIGURES
Figure 1. Proposed Premises Boundary Map ............................................................................................. 4
Figure 2. Proposed Premises Activities ........................................................................................................ 5
Figure 3. Pipeline Bunded V-Drain Corridor ............................................................................................... 7
Figure 4. Siting and Location Map .............................................................................................................. 9
ATTACHMENTS
Attachment 1A. Proof of Occupier
Attachment 1B. ASIC Company Extract
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 2
1. INTRODUCTION
1.1 Company Description
Northern Star Resources Limited (Northern Star) is an Australian exploration and gold producing
company with major tenement holdings in the Eastern Goldfields of Western Australia. Northern
Star’s ‘Kalgoorlie Operations’ comprises of the operating Kanowna Belle and Kundana Gold
Mines, and the Carbine/Paradigm Project area.
Northern Star currently holds two operating Licences that covers prescribed activities at its
Kalgoorlie Operations. The Kanowna Belle Licence (L5029/1992/11) is held by Northern Star
(Kanowna) Pty Limited, whilst the Kundana Licence (L7323/1998/12) is held by Kundana Gold
Pty Ltd, both wholly owned subsidiaries of Northern Star.
Although historically licenced there is currently no existing operating Licence over the
Carbine/Paradigm Project area.
1.2 Background and Context
Mining operations at Paradigm began in 2002 and ceased in the middle of 2007. The Paradigm
pit and underground operations were dewatered via a bunded pipeline to a nearby pit
(Carbine) approximately 2km to the west of Paradigm pit.
Northern Star have undertaken numerous exploration drilling programmes in and around the
Carbine/Paradigm Project area over the last few years. In order to allow exploration activities
in the surrounding area to advance, dewatering of the Paradigm pit (via bunded pipeline) to
Carbine pit commenced in April 2017.
As a result of early successful drilling campaigns, Northern Star plans to carry out further
investigations and exploration programmes. To ensure Paradigm pit remains dry and to enable
detailed exploration, hydrogeological and geotechnical investigations to commence, the
installed pipeline and pumping system is expected to become permanent infrastructure and
used to allow the mining of ore.
This document has been prepared to support the Works Approval / Licence application for
the proposed activities, as required by Part V of the Environmental Protection Act 1986.
1.3 Name and Location of Premises
Premises Name: Paradigm Dewatering – Carbine/Paradigm Project Area
Tenement Number: M16/548
Tenement Holder: Kundana Gold Pty Ltd
Location: The premises for dewatering discharge is between Paradigm pit and Carbine pit
located within 2km distance of each other. The Project area is located within the Shire of
Coolgardie and is approximately 60km north-west of the City of Kalgoorlie-Boulder.
A copy of the mining tenement summary has been provided as Attachment 1A for proof of
occupier status. A current copy of the ASIC company information extract has been provided
as Attachment 1B.
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 3
1.4 Relevant Approvals
The Project area is covered by an existing Groundwater Well Licence GWL 104053(6) issued by
the Department of Water (DoW), now the Department of Water and Environmental Regulation
(DWER). GWL 104053(6) allows the abstraction of up to 1,000,000kL of groundwater for
“dewatering for mining purposes” and “dust suppression” from the Paradigm pit – covered by
tenement M16/548. An application to amend the GWL and increase the abstraction
allocation to 1,500,000kL per annum has been submitted and is currently being assessed.
A Mining Proposal (formerly Notice of Intent) for the Paradigm open pit, underground
operations and associated infrastructure was approved in 2001 and 2003 by the Department
of Mines and Petroleum (DMP), now Department of Mines, Industry Regulation and Safety
(DMIRS). The existing approvals are in line with the proposed activities.
2. PROJECT PROPOSAL
The objectives of this Project are to gain approval to continue dewatering Paradigm pit into
the nearby Carbine pit to allow detailed investigations to progress and allow the mining of ore.
The pumping strategy for ongoing exploration purposes is to keep the pit dewatered and, as
far as practicable, the underground workings dry. It is proposed that the existing pumping and
pipeline infrastructure will become permanent and utilised for the duration of the Project.
2.1 Maps for Proposed Premises
An aerial map of the proposed premises boundary for the Carbine/Paradigm Project area has
been provided in Figure 1.
An aerial map showing the general layout of the proposed prescribed activities associated
with this Project is provided in Figure 2.
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 4
Figure 1. Proposed Premises Boundary Map
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 5
Figure 2. Proposed Premises Activities
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 6
2.2 Description of Prescribed Activities
Historical pump testing and current estimates of groundwater inflows indicate the pumping
rate to be around 20-50L/second. As such, the pumping and pipeline infrastructure will have
a design capacity of up to 1,500,000kL per annum (Table 1). The estimated throughput is based
on the higher water yield of around 45-50L/second, as a contingency, and is also aligned with
the GWL abstraction allocation.
Table 1. Prescribed Premises Category Details
New /
Existing
Activity Category
Number
Category
Production or
Design Capacity
Approved Premises
Production or
Design Capacity
New Mine Dewatering: premises
on which water is
extracted and discharged
into the environment to
allow mining of ore.
6 More than
500,000 tonnes
per year
1,500,000 kL per
annual period
Actual inflows will be tested again once all the surplus water in Paradigm pit is pumped out
and surveyed water levels are measured over time. A detailed exploration drilling programme
including pumping tests and hydrogeological studies will enable the assessment of ongoing
dewatering requirements and flow rates.
The current water level measured in Carbine is at 398m RL to the crest of the pit. Carbine pit
currently has a total remaining capacity of approximately 3,340,000kL allowing for a nominal
6m freeboard (at 424m RL). There is adequate storage capacity in Carbine pit for current
predicted dewatering volumes from Paradigm pit for the Project to progress with its
investigations. To ensure the water holding capacity in Carbine pit is not exceeded,
dewatering volumes will continue to be monitored on a weekly basis and surveyors will
measure the water levels (RL) at least monthly.
2.3 Pumping and Pipeline Infrastructure
The existing pipeline infrastructure for this Project was installed by National Pump & Energy
(NPE), and includes a single diesel pump unit mounted on a pontoon arrangement, and
approximately 2.4km of HDPE pipeline laid within a bunded corridor.
The pump set is a high flow / high head combination and has been mounted to a steel
pontoon. The pontoon is fully hand railed and placed onto a skid frame allowing it to be
pushed down the ramp and into the water.
The pontoon has a 1kL day fuel tank and is supplied by a 26kL primary tank on the surface.
Both units are double skinned, with the fuel line from the primary tank to the day tank bunded
in poly pipe for leakage containment. The pontoon system also has a fuel leak detection box
incorporated and will shut down in the event of any leakage.
Approximately 260m of HDPE DN225 PN25/16 pipe has been installed from the discharge of
the pump and up the Paradigm pit wall. This ties in on the surface to connect to the DN250
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 7
PN6.3 main discharge pipeline. The main discharge line runs for approximately 2.1km along an
existing access track from Paradigm pit to the southern end of Carbine pit (Figure 2). Suitably
designed bunding, culverts and scour pits are in place where necessary (detailed in section
2.3 below).
A solar telemetry and trickle charger unit powers the EM digital flow meter installed on the
discharge point to allow constant monitoring of the system performance. The pipeline is also
equipped with leak detection between two flow meters located at each end of the pipeline
from Paradigm to Carbine pit. On detection of a leak the system will automatically shut down
the pump. The pumping system is remotely monitored by NPE from their Kalgoorlie and Perth
branches.
2.4 Pipeline Bunding
The pipeline follows an existing access track/road between the two pits and runs along the
toe of the Paradigm waste rock dump. The pipeline has been laid within a bunded v-drain
corridor to ensure any leaks or spills are contained and to minimise any potential impact to the
surrounding environment (Figure 3).
To ensure safe vehicle access the pipeline has also been buried under the road in four places
and culverts installed where necessary. Three scour pits are also located at low points along
the pipeline corridor to capture water received from the scour valve and to act as a collection
sump for any spills or leaks.
Appropriate visual inspection regimes will be carried out on the pipeline and pumping
infrastructure to further mitigate environmental risks associated with the Project activities.
Figure 3. Pipeline Bunded V-Drain Corridor
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 8
3. ENVIRONMENTAL RISKS AND MANAGEMENT
Northern Star believes that the activities described in this proposal represent low impacts to
the surrounding environment, given these are infrastructure types and activities that have
historically been undertaken within the Project area (i.e. pit dewatering) and have previously
been well managed. Furthermore, an assessment of the existing environment and potential
risks and mitigation measures have been identified and discussed in the sections below.
3.1 Siting and Location
The nearest sensitive receptor is Rowles Lagoon located approximately 8km north-west of the
Carbine/Paradigm Project area (Figure 4).
The historical townsite of Ora Band is located approximately 17km north-east, and the nearest
residential premises is the Kurrawang Community approximately 55km south-east from the
Project area.
The proposed activities are not expected to have an effect or impact on the identified
receptors, due to the separation distances and risk management measures in place.
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 9
Figure 4. Siting and Location Map
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 10
3.2 Land Clearing
It is not anticipated that additional disturbance will be required as part of the proposed
activities, however should any new clearing be necessary it will be undertaken utilising the
10ha exemption covered under Schedule 1, Item 2, Subclause 2 of the Environmental
Protection (Clearing of Native Vegetation) Regulations 2004.
Any required vegetation clearing or land disturbance will be managed to minimise soil erosion,
salinity and impacts to local and regional groundwater and surface water systems.
3.3 Groundwater
The local groundwater in the area is naturally saline to hypersaline with high TDS concentrations
(up to 90,000 mg/L). Based on drilling assessments and previous studies, groundwater levels are
at a depth of approximately 40m.
Due to the depth of the water table and groundwater quality there are no known
groundwater dependent ecosystems in the area, and no expected impacts to the surrounding
vegetation. As discussed in section 2, the presumed 6m rooting depth limit of vegetation has
been considered and therefore Carbine pit water levels will be kept at a minimum of 6m below
ground level.
Additionally, there are no beneficial users or uses of the groundwater in the area, except for
dust suppression purposes.
3.4 Surface Water
The Project area consists of a gently undulating plain shedding through low velocity sheet wash
to the south east. There is no significant drainage system within or near the Project area.
Safety/abandonment bunds have been constructed around the Carbine and Paradigm pits
to divert surface run off around the pits.
The proposed activities are not anticipated to have an impact on existing drainage or surface
water flows in the local and regional area.
3.5 Flora
The Carbine/Paradigm Project area lies within the South–West interzone or the Coolgardie
Botanical District. The most recent flora and vegetation surveys of the Carbine/Paradigm
Project area was conducted in 2015. The vegetation unit is broadly described as Goldfields
Eucalypt woodland with chenopod and acacia understorey.
No Declared Rare Flora or Priority Flora species have been recorded within the Project area.
None of the vegetation communities within the survey area were found to have National
Environmental Significance. The survey area is not located within any Conservation
Reserves/DBCA (formerly DPaW) managed lands.
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 11
As discussed in section 2.2 and 2.3, the following measures have been implemented to ensure
any potential risks to the surrounding vegetation from hypersaline spills or leaks are mitigated:
• The pipeline is equipped with automatic cut-outs (leak detection) in the event of a
pipe failure;
• Secondary containment (bunding) has been provided; and
• Routine visual inspections will be carried out.
3.6 Fauna
The most recent fauna survey and assessment of the Carbine/Paradigm Project area was
conducted in 2015. It was concluded to be unlikely that any threatened (vulnerable,
endangered, rare or likely to become extinct) vertebrate species frequent the Project area
except possibly as transients/vagrants, on very rare occasions.
No species of conservation significance has the potential to be affected to any significant
degree by the proposed activities.
3.7 Dust
There will be minimal atmospheric pollution during the operation of the water transfer pipelines
and pumps, as any dust emissions will be restricted to vehicular movement. Water carts will be
used (as required) to apply water in areas that have potential to be a source of dust within the
Project area, particularly along unsealed roads. The use of saline water for dust suppression will
be controlled to avoid overspray which may affect vegetation.
3.8 Noise
As noted in section 3.1, the nearest residential premises is the Kurrawang Community located
approximately 55km south-east from the Carbine/Paradigm Project area. Minimal noise is
expected to be generated from the proposed activities. The impact of noise emissions during
the operation of this Project is predicted to be negligible.
Northern Star will adhere to the Environmental Protection (Noise) Regulations 1997.
3.9 Hazardous Materials
Any diesel fuel, oils, hydraulic fluids and other hazardous materials associated with this Project
will be managed and stored in accordance with relevant Acts and Regulations.
3.10 Waste Products
Any waste products generated during the Project will be taken off-site and disposed of to the
nearest approved landfill site. Any hydrocarbon-contaminated materials will be collected and
removed off site by a licenced controlled waste carrier.
All paper, cardboard, plastics and scrap metal produced on site will be recycled where
possible.
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 12
ATTACHMENT 1A: Proof of Occupier
Created 31/08/2017 08:57:29 Requested By: Yvonne Hynes/Page 1 of 2
MINING TENEMENT SUMMARY REPORT
MINING LEASE 16/548 Status: Live
TENEMENT SUMMARY
Area: 1,904.00000 HA Death Reason :
Mark Out : 19/09/2016 14:30:00 Death Date :
Received : 21/09/2016 11:30:00 Commence : 01/08/2017
Term Granted : 21 Years Expiry : 31/07/2038
CURRENT HOLDER DETAILS
Name and AddressKUNDANA GOLD PTY LTDKUNDANA GOLD PTY LTD, C/- LAND DEPARTMENT, PO BOX 2008, SUBIACO, WA, 6904, [email protected],xxxxx610
DESCRIPTION
Locality: CarbineDatum: Datum is situated GDA Zone 51 301579.646 metres East
6628947.452 metres NorthBoundary: Thence to 303138.968 metres East 6627691.345 metres
North Thence to 304771.521 metres East 6626602.543metres North Thence to 304090.017 metres East6625722.648 metres North Thence to 303358.074metres East 6624785.134 metres North Thence to302395.700 metres East 6625555.556 metres NorthThence to 301897.062 metres East 6625029.824 metresNorth Thence to 302984.976 metres East 6623997.459metres North Thence to 302433.396 metres East6623417.475 metres North Thence to 301441.050metres East 6624359.973 metres North Thence to301202.529 metres East 6624097.400 metres NorthThence to 300125.866 metres East 6624774.449 metresNorth Thence to 300035.591 metres East 6624594.384metres North Thence to 299367.846 metres East6624933.072 metres North Thence to 299496.542metres East 6625237.265 metres North Thence to298795.144 metres East 6625790.053 metres NorthThence to 299119.966 metres East 6626278.152 metresNorth Thence to 298088.708 metres East 6627110.509metres North Thence to 297563.683 metres East6627534.274 metres North Thence to 296909.618metres East 6627942.256 metres North Thence to297410.539 metres East 6628594.221 metres NorthThence to 298539.634 metres East 6627699.908 metresNorth Thence to 299031.682 metres East 6628295.663metres North Thence to 300350.323 metres East6627239.073 metres North Thence to 300948.690metres East 6628119.476 metres North Thence to
Mining Tenement Summary Report MINING LEASE 16/548 - Live
Created 31/08/2017 08:57:29 Requested By: Yvonne Hynes/Page 2 of 2
301579.646 metres East 6628947.452 thence back todatum
Area : Type Dealing No Start Date AreaGranted 01/08/2017 1,904.00000 HAApplied For 19/09/2016 1,904.00000 HA
SHIRE DETAILS
Shire Shire No Start End AreaCOOLGARDIE SHIRE 1960 21/09/2016 1,904.00000 HA
RENT STATUS
Due For Year End 31/07/2018: PAID IN FULLDue For Year End 31/07/2019: $33,510.40
EXPENDITURE STATUS
Expended Year End : N/ACurrent Year Commitment : $190,400.00
KUNDANA GOLD PTY LTD Works Approval / Licence Application Supporting Document
Paradigm Dewatering – Carbine / Paradigm Project Area
September 2017 Page 13
ATTACHMENT 1B: ASIC Company Extract
Current Company Extract for KUNDANA GOLD PTY LIMITEDExtracted from ASIC database on 31/08/2017 at 12:20 AEST
This extract contains information derived from the Australian Securities and Investment Commission's (ASIC) database under section 1274A of the CorporationsAct 2001. Please advise ASIC of any error or omission which you may identify.
Corporation Details Document Number
Name: KUNDANA GOLD PTY LIMITED 011368483A.C.N.: 009643252A.B.N.: 13009643252Registered In: NTRegistration Date: 18/05/1988Previous State number: 09581Organisation Number Type: A.C.N. (Australian Company Number)Review Date: 18/05/2018Ultimate Holding Company: NORTHERN STAR RESOURCES LTDDetails Start Date: 07/06/1996Status: RegisteredName Start Date: 07/06/1996Type: Australian Proprietary CompanyClass: Limited by SharesSubclass: Proprietary CompanyDisclosing Entity: NoRegistered Charity: No
Company Addresses Document Number
Address Type: Registered Office 7E6485261
Address:LEVEL 1 388 HAY STREET SUBIACO , WA 6008
Start Date: 06/11/2014
Address Type: Principal Place of Business 7E6485261
Address:LEVEL 1 388 HAY STREET SUBIACO , WA 6008
Start Date: 20/10/2014
Company Officers Document Number
Role: Director 7E5910504Name: ROWE, CHRISTOPHER KENNETH GEORGE
Address: 10 AIRLIE STREET CLAREMONT , WA 6010
Birth Details: 23/06/1944 ADLINGTON UNITED KINGDOMAppointment Date: 01/03/2014
Role: Director 7E5910504Name: O'CONNOR, PETER EDMUND
Address:2 LYLE PARK 57 PUTNEY HILL LONDON SW15 6RT UNITED KINGDOM
Birth Details: 03/12/1940 QUETTA PAKISTANAppointment Date: 01/03/2014
Role: Director 7E5910504Name: FITZGERALD, JOHN DANIEL
Address: 38 UNION STREET SUBIACO , WA 6008
Birth Details: 01/08/1962 PERTH WAAppointment Date: 01/03/2014
Page 1 of 8
Role: Director 7E8713147Name: BEAMENT, WILLIAM JAMES
Address: 40 CHALLENGER PARADE CITY BEACH , WA 6015
Birth Details: 28/11/1974 ESPERANCE WAAppointment Date: 01/03/2014
Role: Secretary 7E5892841Name: CARPENE, LIZA
Address: 7A VALE STREET MOUNT LAWLEY , WA 6050
Birth Details: 06/01/1964 PERTH WAAppointment Date: 28/02/2014
Role: Ultimate Holding Company 7E5910504Org Name: NORTHERN STAR RESOURCES LTDA.C.N.: 092832892A.B.N.: 43092832892Address:
Share Structure Document Number
Share Class: ORD (ORDINARY SHARES) 0964325A (AR 1990)Number of Shares Issued: 2Amount Paid: $ 2.00Total Unpaid: $ 0.00
Note: For each class of shares issued by a proprietary company, ASIC records the details of the twenty members of the class (based on shareholdings).The details of any other members holding the same number of shares as the twentieth ranked member will also be recorded by ASIC on the database.Where available, historical records show that a member has ceased to be ranked amongst the twenty members. This may, but does not necessarily mean,that they have ceased to be a member of the company.
Shareholder Document Number
Class: ORD 7E6803662Number Held: 2Beneficially Held: YesFully Paid: YesA.C.N.: 010511789Org Name: NORTHERN STAR (KANOWNA) PTY LIMITED
Address:LEVEL 1 388 HAY STREET SUBIACO , WA 6008
Joint Holding Indicator: NoShare Issuer Org Number Type: A.C.N. (Australian Company Number)
ASIC Satisfied Charges and Related Documents
There are no satisfied charges recorded for this organisation (No charges records are displayed where the extract type is current).
Note: This extract may not contain all charges for organisations registered prior to 1991 and it may be advisable to also search the state or territory recordsheld by A.S.I.C.
Note: On January 30, 2012 the Personal Property Securities Register (PPS Register) commenced. The details of current charges will only be available fromthe PPS Register and the details of satisfied charges (as at 30th January 2012) can be obtained from ASIC. Further information can be obtained fromwww.ppsr.gov.au
Financial Reports Document Number
Balance Date Report Due Date AGM Due Date Extended Due Date Date Held Outstanding30/06/1998 31/10/1998 Unknown Unknown 26/11/1998 N 01470274430/06/1999 31/10/1999 Unknown Unknown Unknown N 01816484030/06/2000 31/10/2000 Unknown Unknown 25/10/2000 N 016767052
Page 2 of 8
30/06/2001 31/10/2001 Unknown Unknown Unknown N 01749123030/06/2002 31/10/2002 Unknown Unknown 25/10/2002 N 01861206831/12/2006 30/04/2007 Unknown Unknown Unknown N 7E581529131/12/2007 30/04/2008 Unknown Unknown Unknown N 7E581530131/12/2008 30/04/2009 Unknown Unknown Unknown N 7E581531431/12/2009 30/04/2010 Unknown Unknown Unknown N 7E581534331/12/2010 30/04/2011 Unknown Unknown Unknown N 7E581534931/12/2011 30/04/2012 Unknown Unknown Unknown N 7E581535931/12/2012 30/04/2013 Unknown Unknown Unknown N 7E5815365
ASIC Document List
Form Type Pages Received Processed Effective Document Number
484 2 25/01/2017 25/01/2017 25/01/2017 7E8713147
484A1 Change to Company Details Change Officeholder Name Or Address
484 2 17/03/2015 17/03/2015 17/03/2015 7E6803662
484A2 Change to Company Details Change Member Name or Address
484 2 30/10/2014 30/10/2014 30/10/2014 7E6485261
484 Change to Company Details
484B Change of Registered Address
484C Change of Principal Place of Business (Address)
315 1 03/07/2014 21/07/2014 20/06/2014 028899493
315A Notice of Resignation or Removal of Auditor Resignation Of Auditor
351 26 19/05/2014 13/06/2014 19/05/2014 029022101
351 Deed Relating to Class Order
484 5 14/03/2014 14/03/2014 14/03/2014 7E5910504
484 Change to Company Details
484B Change of Registered Address
484C Change of Principal Place of Business (Address)
484D Change to Ultimate Holding Company
484E Appointment or Cessation of a Company Officeholder
484A2 Change Member Name or Address
484 2 07/03/2014 07/03/2014 07/03/2014 7E5892841
484E Change to Company Details Appointment or Cessation of A Company Officeholder
484 2 12/02/2014 12/02/2014 12/02/2014 7E5832069
484E Change to Company Details Appointment or Cessation of A Company Officeholder
388 24 05/02/2014 05/02/2014 31/12/2012 7E5815365
388I Financial Report Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company
388 23 05/02/2014 05/02/2014 31/12/2011 7E5815359
388I Financial Report Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company
388 25 05/02/2014 05/02/2014 31/12/2010 7E5815349
388H Financial Report Financial Report - Large Proprietary Company That Is Not a Disclosing Entity
388 26 05/02/2014 05/02/2014 31/12/2009 7E5815343
388H Financial Report Financial Report - Large Proprietary Company That Is Not a Disclosing Entity
388 24 05/02/2014 05/02/2014 31/12/2008 7E5815314
388I Financial Report Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company
388 26 05/02/2014 05/02/2014 31/12/2007 7E5815301
388H Financial Report Financial Report - Large Proprietary Company That Is Not a Disclosing Entity
388 23 05/02/2014 05/02/2014 31/12/2006 7E5815291
Page 3 of 8
388 Financial Report
388I Financial Report - Small Proprietary Company That Is Controlled By a Foreign Company
388E Company - Appoint Change Name/address of Auditor
484 2 10/12/2013 10/12/2013 10/12/2013 7E5707790
484E Change to Company Details Appointment or Cessation of A Company Officeholder
492 2 26/11/2013 27/11/2013 26/11/2013 7E5675264
492 Request For Correction Alters 7E5 467 923
484 2 27/08/2013 27/08/2013 27/08/2013 7E5467923
484N Change to Company Details Changes to (Members) Share Holdings Altered by 7E5 675 264
484 2 08/08/2013 08/08/2013 08/08/2013 7E5427556
484A1 Change to Company Details Change Officeholder Name Or Address
484 2 17/07/2013 17/07/2013 17/07/2013 7E5377056
484E Change to Company Details Appointment or Cessation of A Company Officeholder
355 15 06/02/2013 18/02/2013 06/02/2013 028343433
355 Revocation Deed Relating to Class Order
484 2 13/06/2012 13/06/2012 13/06/2012 7E4513526
484A2 Change to Company Details Change Member Name or Address
484 2 12/06/2012 12/06/2012 12/06/2012 7E4511991
484 Change to Company Details
484B Change of Registered Address
484C Change of Principal Place of Business (Address)
484 2 10/04/2012 10/04/2012 10/04/2012 7E4384978
484A1 Change to Company Details Change Officeholder Name Or Address
484 2 19/01/2012 19/01/2012 19/01/2012 7E4225856
484E Change to Company Details Appointment or Cessation of A Company Officeholder
484 2 01/12/2010 01/12/2010 01/12/2010 7E3333478
484E Change to Company Details Appointment or Cessation of A Company Officeholder
484 2 25/11/2010 25/11/2010 25/11/2010 7E3320407
484E Change to Company Details Appointment or Cessation of A Company Officeholder
484 2 23/08/2010 23/08/2010 23/08/2010 7E3124279
484A1 Change to Company Details Change Officeholder Name Or Address
484 2 29/03/2010 29/03/2010 29/03/2010 7E2795548
484E Change to Company Details Appointment or Cessation of A Company Officeholder
484 2 22/01/2009 22/01/2009 22/01/2009 7E2000772
484E Change to Company Details Appointment or Cessation of A Company Officeholder
315 2 01/09/2008 10/09/2008 07/07/2008 024976197
315B Notice of Resignation or Removal of Auditor Removal Of Auditor
484 2 05/08/2008 05/08/2008 05/08/2008 7E1744834
484E Change to Company Details Appointment or Cessation of A Company Officeholder
343 1 21/05/2008 06/06/2008 21/05/2008 024700238
343 Notice Under Subsection 329(1a) to Remove Auditor
351 30 02/01/2007 03/01/2007 02/01/2007 023377450
351 Deed Relating to Class Order
355 15 02/01/2007 03/01/2007 02/01/2007 023377451
355 Revocation Deed Relating to Class Order
484 3 30/10/2006 30/10/2006 30/10/2006 7E0894866
484 Change to Company Details
Page 4 of 8
484C Change of Principal Place of Business (Address)
484D Change to Ultimate Holding Company
484A1 Change Officeholder Name or Address
484 6 25/09/2006 25/09/2006 25/09/2006 1F0118853
484 Change to Company Details
484B CHANGE OF REGISTERED ADDRESS
484A1 CHANGE OFFICEHOLDER NAME OR ADDRESS
484E APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER
484 4 14/06/2006 14/06/2006 14/06/2006 022860842
484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER
484 3 20/04/2006 01/05/2006 20/04/2006 022752542
484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER
389 2 19/04/2006 24/05/2006 31/12/2005 022940277
389B ANNUAL NOTICE BY WHOLLY-OWNED ENTITY ANNUAL NOTICE BY WHOLLY-OWNED ENTITY - COMPANIES
9201 74 03/02/2006 03/02/2006 03/02/2006 021517012
9201 PRE 1991 COMPANY DOCUMENTS
389 2 28/04/2005 17/05/2005 31/12/2004 016937363
389B ANNUAL NOTICE BY WHOLLY-OWNED ENTITY ANNUAL NOTICE BY WHOLLY-OWNED ENTITY - COMPANIES
484 3 08/03/2005 10/03/2005 10/03/2005 020937854
484A1 CHANGE TO COMPANY DETAILS CHANGE OFFICEHOLDER NAME OR ADDRESS
484 4 14/01/2005 17/01/2005 17/01/2005 020694821
484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER
484 4 27/09/2004 01/10/2004 01/10/2004 020686630
484E CHANGE TO COMPANY DETAILS APPOINTMENT OR CESSATION OF A COMPANY OFFICEHOLDER
389 3 02/07/2004 08/07/2004 31/12/2003 020516140
389B ANNUAL NOTICE BY WHOLLY-OWNED ENTITY ANNUAL NOTICE BY WHOLLY-OWNED ENTITY - COMPANIES
484 3 25/05/2004 26/05/2004 26/05/2004 020332010
484A2 CHANGE TO COMPANY DETAILS CHANGE MEMBER NAME OR ADDRESS
304 2 04/03/2003 12/03/2003 28/02/2003 019050795
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
203 2 04/03/2003 12/03/2003 01/03/2003 019050755
203 NOTIFICATION OF
203A CHANGE OF ADDRESS
203G CHANGE OF ADDRESS - PRINCIPAL PLACE OF BUSINESS
351 25 11/02/2003 10/03/2003 11/02/2003 018700182
351 DEED RELATING TO CLASS ORDER
304 2 22/01/2003 28/01/2003 17/01/2003 018843788
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
316 4 10/01/2003 23/01/2003 30/12/2002 00964325M
316L ANNUAL RETURN - PROPRIETARY COMPANY
315 1 19/11/2002 04/12/2002 08/11/2002 018742385
315A NOTICE OF RESIGNATION OR REMOVAL OF AUDITOR RESIGNATION OF AUDITOR
304 2 11/11/2002 18/11/2002 08/11/2002 018007196
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
388 26 29/10/2002 27/11/2002 30/06/2002 018612068
388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY
388 21 27/06/2002 28/06/2002 30/06/1999 018164840
Page 5 of 8
388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY
304 2 11/04/2002 17/04/2002 29/03/2002 018016439
304C NOTIFICATION OF CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER
304 2 08/02/2002 15/02/2002 30/01/2002 017998190
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
316 3 31/01/2002 08/04/2002 29/01/2002 00964325L
316L ANNUAL RETURN - PROPRIETARY COMPANY
304 2 07/01/2002 15/01/2002 31/12/2001 017754054
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
203 2 07/01/2002 15/01/2002 02/01/2002 017754097
203 NOTIFICATION OF
203A CHANGE OF ADDRESS
203G CHANGE OF ADDRESS - PRINCIPAL PLACE OF BUSINESS
388 26 26/10/2001 27/11/2001 30/06/2001 017491230
388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY
388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY
203 1 28/06/2001 03/07/2001 18/06/2001 017119780
203 NOTIFICATION OF
203A CHANGE OF ADDRESS
203G CHANGE OF ADDRESS - PRINCIPAL PLACE OF BUSINESS
304 2 08/06/2001 15/06/2001 21/05/2001 017261308
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
316 3 20/11/2000 24/11/2000 14/11/2000 00964325K
316L ANNUAL RETURN - PROPRIETARY COMPANY
388 21 31/10/2000 16/11/2000 30/06/2000 016767052
388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY
304 2 13/01/2000 13/01/2000 10/01/2000 015398588
304C NOTIFICATION OF CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER
316 3 06/12/1999 20/12/1999 01/12/1999 00964325J
316 ANNUAL RETURN
316T CHANGE TO PRINCIPAL PLACE OF BUSINESS
316P CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER
316L ANNUAL RETURN - PROPRIETARY COMPANY
304 2 06/01/1999 13/01/1999 18/12/1998 014993690
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
203 2 22/12/1998 06/01/1999 21/12/1998 014701905
203A NOTIFICATION OF CHANGE OF ADDRESS
304 3 22/12/1998 06/01/1999 14/12/1998 014701866
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
388 20 07/12/1998 10/12/1998 30/06/1998 014702744
388H FINANCIAL REPORT FINANCIAL REPORT - LARGE PROPRIETARY COMPANY THAT IS NOT A DISCLOSING ENTITY
316 3 07/12/1998 09/12/1998 26/11/1998 00964325I
316L ANNUAL RETURN - PROPRIETARY COMPANY
304 2 19/03/1998 26/03/1998 13/03/1998 013394454
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
304 2 16/01/1998 28/01/1998 06/01/1998 013409265
304 NOTIFICATION OF
Page 6 of 8
304A CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
304C CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER
316 21 12/12/1997 13/01/1998 12/12/1997 00964325H
316L ANNUAL RETURN - PROPRIETARY COMPANY
304 2 19/11/1997 03/12/1997 27/10/1997 013189560
304C NOTIFICATION OF CHANGE OF NAME OR ADDRESS OF OFFICEHOLDER
304 2 14/07/1997 18/07/1997 07/07/1997 012208157
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
316 4 18/12/1996 19/12/1996 06/12/1996 00964325G
316L ANNUAL RETURN - PROPRIETARY COMPANY
245 1 07/06/1996 07/06/1996 07/06/1996 011368496
245 CERTIFICATE OF REGISTRATION ON CHANGE OF NAME
205 2 07/06/1996 07/06/1996 06/06/1996 011368483
205A NOTIFICATION OF RESOLUTION CHANGING COMPANY NAME
308 1 07/06/1996 07/06/1996 06/06/1996 011368480
308A NOTIFICATION OF MINUTE RELATING TO THE PROCEEDINGS OF A SUBSIDIARY COMPANY CHANGING THE COMPANY NAME
316 24 22/12/1995 10/01/1996 08/12/1995 00964325F
316 ANNUAL RETURN
316C CHANGE TO OFFICEHOLDERS
316L ANNUAL RETURN - PROPRIETARY COMPANY
203 2 30/11/1995 04/12/1995 29/11/1995 009423336
203A NOTIFICATION OF CHANGE OF ADDRESS
304 4 05/07/1995 21/07/1995 21/06/1995 010062277
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
316 21 05/12/1994 16/12/1994 17/10/1994 008981900
316K ANNUAL RETURN
316 23 02/12/1993 15/12/1993 18/10/1993 00964325D
316K ANNUAL RETURN
316 23 27/11/1992 07/12/1992 28/10/1992 00964325C
316 ANNUAL RETURN
316E CORRECTIONS
316K ANNUAL RETURN
309 53 16/01/1992 20/01/1992 24/12/1991 002065049
309A NOTIFICATION OF DETAILS OF A CHARGE
309 44 24/12/1991 24/12/1991 24/12/1991 002360027
309A NOTIFICATION OF DETAILS OF A CHARGE
309 40 24/12/1991 24/12/1991 24/12/1991 002360016
309A NOTIFICATION OF DETAILS OF A CHARGE
309 44 24/12/1991 24/12/1991 24/12/1991 002360013
309A NOTIFICATION OF DETAILS OF A CHARGE
316 18 21/11/1991 31/01/1992 21/11/1991 00964325B
316 ANNUAL RETURN
316E CORRECTIONS
316K ANNUAL RETURN
304 2 21/11/1991 09/12/1991 25/10/1991 001963870
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
304 2 26/06/1991 01/07/1991 07/06/1991 001254065
Page 7 of 8
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
203 1 20/06/1991 25/06/1991 13/06/1991 001444298
203A NOTIFICATION OF CHANGE OF ADDRESS
203 1 02/04/1991 15/04/1991 26/03/1991 001180161
203A NOTIFICATION OF CHANGE OF ADDRESS
304 2 02/04/1991 17/04/1991 26/03/1991 001180179
304A NOTIFICATION OF CHANGE TO OFFICEHOLDERS OF AUSTRALIAN COMPANY
316 14 20/11/1990 11/02/1991 20/11/1990 0964325A
316 ANNUAL RETURN
316A CHANGE OF ADDRESS
316B CHANGES FORM NOTIFYING CHANGE OF OFFICE HOURS
316C CHANGE TO OFFICE HOLDERS
316E CORRECTIONS
* * * * End of Report * * * *
Disclaimer: GlobalX Information Pty Ltd reserves the right to manually or electronically charge any fees, which are due and payable by the customer at any stage. The materialspresented on this site are distributed as an information source only. The information recorded in this document is provided on the basis that readers will be responsible formaking their own assessment of the information and are advised to verify all relevant representations, statements and information. No liability (in contract, tort or otherwise)will be accepted for any loss or damage incurred as a result of reliance upon any material contained in this publication, or for any information or advice provided in thispublication or incorporated into it.
By using services the user accepts all terms and conditions of use as published under Legal and Privacy under Client Admin which may change from time to time includingany Deeds by specific suppliers and privacy laws. GlobalX reserves the right to store and reuse data provided by users at data input screens.
Page 8 of 8