wsr 2012_wk30
TRANSCRIPT
-
7/27/2019 WSR 2012_Wk30
1/5
Weekly
Summary Report2012 Trading Week 30: 16-22 July 2012
-
7/27/2019 WSR 2012_Wk30
2/5
MARKET HIGHLIGHTS
SUPPLY AND DEMAND
MIN MAX AVE MIN MAX AVE
Jul-16 7,467 8,881 8,166 5,834 8,785 7,507
Jul-17 7,546 8,805 8,127 6,195 8,810 7,665
Jul-18 7,587 8,800 8,085 6,219 8,810 7,595
Jul-19 7,570 8,680 7,996 6,122 8,559 7,411
Jul-20 7,411 8,485 7,930 6,002 8,293 7,099
Jul-21 7,767 8,775 8,320 5,514 7,299 6,374
Jul-22 7,906 8,531 8,226 4,594 6,982 5,680
7,411 8,881 8,121 4,594 8,810 7,047
FORECASTED VS. ACTUAL DEMAND
DATE
Jul-16
Jul-17
Jul-18
Jul-19
Jul-20
Jul-21
Jul-22
EX-ANTE GENERATION MIX
Jul-16 51.5 14.5 7.6 19.7 6.7 -
Jul-17 52.3 14.3 8.0 17.7 7.7 -
Jul-18 50.2 14.0 8.7 20.1 7.0 -
Jul-19 50.3 14.9 8.2 20.4 6.2 -
Jul-20 50.9 15.4 7.6 21.4 4.7 -
Jul-21 46.9 17.2 7.7 28.0 0.3 -
Jul-22 43.0 17.9 8.6 30.3 0.2 -
49.6 15.3 8.1 22.1 5.0 -
DATE
GENERATION MIX, %
DATE
RTD DEMAND, MWOFFER, MW
WIND AND
BIOCOAL GEO
FORECAST ERRORS, %
MINIMUM MAXIMUM
NAT GASDIESEL /
OIL
0.02
0.00
0.03
0.00
MAPE
HYDRO
0.08
0.13
0.21
0.00
3.05
4.22
3.41
4.22
1.09
1.36
1.31
0.90
2.95 0.82
1.99 0.45
1.65 0.66
2.05 0.66
Ex-ante system demand peaked at a level of 8,810 MW during the week (1400H, 18 July 2012), while the maximum market offer significantly decreased to8,881 MW (1300H, 16 July 2012) in comparison with the previous week.
Tight and insufficient supply conditions were observed through most of the weekdays as a result of the unavailability of Ilijan 1 and 2 (Block A and B) giventhat the Malampaya onshore natural gas plant was still on maintenance during the week. Ilijan 1 only started to become available at 2400H of 20 July2012. With this, under-generation and load shedding conditions were observed in the market results during most of the week. Supply margins started to
widen on 20 July 2012 because of the low demand requirement until the weekend, which may be attributed to the continuous downpour of rain in Luzon. With the Malampaya complex still undergoing maintenance during the week, affected generating units (Sta. Rita and San Lorenzo) operated usingalternate fuel.
Towards the weekend, however, natural gas supply from Malampaya resumed as indicated by the availability of Ilijan 1 at 240 0H of 20 July 2012. On theother hand, the Sta. Rita and San Lorenzo gas plants implemented their fuel change-over from fuel to fuel gas in the morning of 21 July 2012.
With the tight and insufficient supply levels during the weekdays, oil-based plants increased in frequency in setting the price in the market; prices as high asPhP 54,458/MWh (1500H, 16 July 2012) was cleared in the market. During the weekend, however, with system ex-ante demand level going as low as4,594 MW, prices went as low as PhP 0/MWh for trading intervals 0300H, 0500H to 0700H, and 2400H on 22 July 2012. Over-all, the weekly averagenodal price (system-wide) was observed to be lower at PhP 8,246/MWh in comparison with the previous week.
With the tight supply and inadequate reserve levels being experienced in the grid, must-run units (MRUs) in Luzon, particularly Malaya 1 and 2, weredispatched from 16-20 of July 2012. In the Visayas, a few MRUs were still called upon all of which were still from the island of Panay for system voltagerequirement.
The dispatch of oil-based plants increased to 5% (based on ex-ante schedules) in comparison to last week's 3.1% as their capacities were frequentlycleared in the market, coupled with their increased utilization as MRUs.
Price separation was observed in the Luzon grid because of a congestion at the Tayabas 500/230 kV Sub -station from 17-18 July 2012 since one of thethree 600 MVA transformers was on maintenance while the N-1 contingency requirement was imposed on the said sub-station. There were a few tradingintervals affected by the price separation in the Visayas because of congestions at the New Naga-Quiot 138 kV line and at the Negros-Panay submarinecable.
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
MW
OFFEREFFECTIVE SUPPLYSYSTEM RTD
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
MW
SYSTEM RTD
SYSTEM ACTUAL
COAL49.6%
GEO15.3%
HYDRO8.1%
NAT GAS22.1%
DIESEL/OIL5.0%
Weekly Summary Report Week 30: 16-22 July 2012
-
7/27/2019 WSR 2012_Wk30
3/5
Weekly Summary Report Week 30: 16-22 July 2012
CAPACITY (OFFER) MIX
Jul-16 49.8 13.3 8.5 19.1 9.3 -
Jul-17 50.0 13.4 8.6 19.1 8.9 -
Jul-18 50.3 13.5 8.7 19.3 8.2 -
Jul-19 50.4 13.8 8.2 19.5 8.1 -
Jul-20 50.7 13.9 8.1 19.6 7.6 -
Jul-21 48.7 13.3 8.0 23.9 6.2 -
Jul-22 48.6 13.3 8.3 23.7 6.1 -
49.8 13.5 8.3 20.6 7.8 -
HVDC FLOW EX-ANTE HVDC FLOW
NO FLOW VL LV NO FLOW VL LVJul-16 - 100.0 - - 100.0 -
Jul-17 - 100.0 - - 100.0 -
Jul-18 - 100.0 - - 100.0 -
Jul-19 - 100.0 - - 100.0 -
Jul-20 - 100.0 - - 100.0 -
Jul-21 - 91.7 8.3 4.2 95.8 -
Jul-22 - 87.5 12.5 4.2 87.5 8.3
- 97.0 3.0 1.2 97.6 1.2
SYSTEM MARKET PRICES SYSTEM MARKET PRICES (LWAP)
MIN MAX AVE MIN MAX AVE
Jul-16 2,677 54,458 14,523 2,676 54,458 14,395
Jul-17 3,065 51,237 14,706 3,266 39,080 14,304
Jul-18 2,856 23,398 9,886 2,588 23,588 9,415
Jul-19 2,330 14,581 7,541 2,328 14,612 7,781
Jul-20 2,300 9,636 4,377 2,317 9,307 4,350
Jul-21 1,702 2,849 2,324 1,590 2,846 2,321
Jul-22 0 2,601 1,452 0 2,569 1,361
0 54,458 8,246 0 54,458 8,117
EX-ANTE LWAP DISTRIBUTION EX-ANTE MARKET PRICES PER GRID (LWAP )
DATE
WIND AND
BIO
RTD
DATERTD ACTUAL
COAL
HVDC DIRECTION, % OF TIME
DATE
AVERAGE CAPACITY MIX, %
GEO HYDRO NAT GASDIESEL /
OIL
DAILY SUMMARY OF SYSTEM PRICES (LWAP), PhP/MWh
RTX
-100
-50
0
50
100
150
200
250
300
350
400
MW
LUZON-TO-VISAYAS
VISAYAS-TO-LUZON
0
10000
20000
30000
40000
50000
60000
LWAP,PhP/MWh
RTD LWAP
RTX LWAP
0
10
20
30
40
50
60
70
80
90
100
0 and Below 0 - 2000 2000 - 4000 4000 - 6000 6000 - 8000 8000 -10000
Above10000
PERCENTOFTIME
RTD RTX
0
10000
20000
30000
40000
50000
60000
LWAP,PhP/MWh
LUZON
VISAYAS
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
11000
MW
DIESEL/OIL NAT GAS
HYDRO GEO
COAL
-
7/27/2019 WSR 2012_Wk30
4/5
Weekly Summary Report Week 30: 16-22 July 2012
SUMMARY OF PRICES PER GRID, LUZON LUZON MARKET PRICES (LWAP)
MIN MAX AVE MIN MAX AVE
Jul-16 2,684 54,694 14,318 2,687 54,694 14,417
Jul-17 3,075 51,237 14,817 3,282 39,080 14,333
Jul-18 2,860 23,753 10,029 2,602 23,753 9,438
Jul-19 2,333 14,715 7,575 2,335 14,715 7,779
Jul-20 2,311 9,285 4,348 2,330 9,285 4,332
Jul-21 1,703 2,863 2,304 1,592 2,863 2,311
Jul-22 0 2,533 1,435 0 2,495 1,342
0 54,694 8,285 0 54,694 8,159
SUMMARY OF PRICES PER GRID, VISAYAS VISAYAS MARKET PRICES (LWAP)
MIN MAX AVE MIN MAX AVE
Jul-16 2,635 53,166 15,650 2,612 53,166 14,271
Jul-17 3,006 51,237 14,101 3,176 39,080 14,145
Jul-18 1,194 21,435 9,102 2,485 22,679 9,289
Jul-19 2,308 13,839 7,357 2,282 14,047 7,795
Jul-20 2,239 11,504 4,533 2,246 9,421 4,442
Jul-21 1,694 3,390 2,424 1,581 3,079 2,371
Jul-22 0 2,905 1,530 0 2,884 1,446
0 53,166 8,040 0 53,166 7,892
INTERVALS WITH MUST-RUN UNIT (MRU) EVENTS HOURLY MRU EVENTS
MRU EVENTS, LUZON MRU EVENTS, VISAYAS
DATE TOTAL THERMAL RESERVE VOLTAGE COMM/REG OTHERS DATE TOTAL THERMAL RESERVE VOLTAGE COMM/REG OTHERS
Jul-16 18 - 18 - - - Jul-16 - - - - - -
Jul-17 31 - 31 - - - Jul-17 - - - - - -
Jul-18 43 - 43 - - - Jul-18 - - - - - -
Jul-19 42 - 42 - - - Jul-19 - - - - - -
Jul-20 45 - 45 - - - Jul-20 2 - - 2 - -
Jul-21 - - - - - - Jul-21 3 - - 3 - -
Jul-22 - - - - - - Jul-22 - - - - - -
179 - 179 - - - 5 - - 5 - -
Note: MRU events refer to occurrences in which generating uni ts are designated THERMAL - Thermal Limits of Transmission Line and/or Power Equipment
as must-run units for certain trading intervals RESERVE - Inadequate Reserve Level
Source: NGCP Luzon System Operations and Visayas System Operations VOLTAGE - System Voltage Requirement
COMM/REG - Commercia l Operation or Regulatory Requirements
OTHERS - Other Reasons for MRU Dispatch such as System Tests, etc.
DATE
Jul-16
Jul-17
Jul-18
Jul-19
Jul-20
Jul-21
Jul-22 -
111
3
-
5
VISAYAS
DATE
DATE
-
2
RTD, PhP/MWh RTX, PhP/MWh
RTD, PhP/MWh
-
-
LUZON
18
22
24
23
24
RTX, PhP/MWh
-
-
0
10000
20000
30000
40000
50000
60000
LWAP,PhP
/MWh
RTD LWAP
RTX LWAP
0
10000
20000
30000
40000
50000
60000
LWAP,PhP/MWh
RTD LWAP
RTX LWAP
0
1
2
3
HOURLYFREQUE
NCYOFMRU
EVENT
S
LUZON
VISAYAS
-
7/27/2019 WSR 2012_Wk30
5/5
Weekly Summary Report Week 30: 16-22 July 2012
LUZON PRICING CONDITIONS (FREQUENCY) VISAYAS PRICING CONDITIONS (FREQUENCY)
VALID PEN VALID MRR VALID PEN VALID MRR
- 12 12 21 3 - 19 5 21 3
- 12 12 19 5 - 18 6 19 5
- 13 11 23 1 - 23 1 23 1
- 14 10 24 - - 24 - 24 -
- 20 4 24 - - 24 - 24 -
- 24 - 24 - - 24 - 24 -
- 24 - 24 - - 24 - 24 -
- 119 49 159 9 - 156 12 159 9
AP - Trading hours affected by Market Intervention
VALID - Trading hours wit h no is suance of PEN or Market Intervent ion
PEN/MRR - Trading hours issued with pricing errors
REASON FOR PRICING ERRORS, LUZON REASON FOR PRICING ERRORS, VISAYAS
DATE UGEN VOLL CONT BC PSM ERR DATE UGEN VOLL CONT BC PSM ERR
Jul-16 1 5 12 - - - Jul-16 1 4 - - - -
Jul-17 3 4 11 - 2 - Jul-17 3 1 - - 2 -
Jul-18 - 1 11 - 1 - Jul-18 - - 1 - 1 -
Jul-19 - - 10 - - - Jul-19 - - - - - -
Jul-20 - - 4 - - - Jul-20 - - - - - -
Jul-21 - - - - - - Jul-21 - - - - - -
Jul-22 - - - - - - Jul-22 - - - - - -
4 10 48 - 3 - 4 5 1 - 3 -
DATE UGEN VOLL CONT BC PSM ERR DATE UGEN VOLL CONT BC PSM ERR
Jul-16 3 - - - - - Jul-16 3 - - - - -
Jul-17 5 - - - - - Jul-17 5 - - - - -
Jul-18 1 - - - - - Jul-18 1 - - - - -
Jul-19 - - - - - - Jul-19 - - - - - -
Jul-20 - - - - - - Jul-20 - - - - - -
Jul-21 - - - - - - Jul-21 - - - - - -
Jul-22 - - - - - - Jul-22 - - - - - -
9 - - - - - 9 - - - - -
UGEN - Under-generation BC - Base Case CVC
VOLL - Nodal Value of Lost Load PSM - Subject to the Price Substitution Methodology
CONT - Contingency CVC ERR - Erroneous Input or Snapshot Information
RTX
Jul-16
Jul-17
Jul-18
Jul-19
Jul-20
Jul-21
Jul-22
RTX
VISAYAS, EX-ANTE PEN
VISAYAS, EX-POST PEN
Jul-20
Jul-21
Jul-22
APRTD
Jul-17
Jul-16
Jul-19
DATE
Jul-18
LUZON, EX-POST PEN
LUZON, EX-ANTE PEN
DATE APRTD