    Weekly

    Summary Report2012 Trading Week 30: 16-22 July 2012

  • 7/27/2019 WSR 2012_Wk30

    2/5

    MARKET HIGHLIGHTS

    SUPPLY AND DEMAND

    MIN MAX AVE MIN MAX AVE

    Jul-16 7,467 8,881 8,166 5,834 8,785 7,507

    Jul-17 7,546 8,805 8,127 6,195 8,810 7,665

    Jul-18 7,587 8,800 8,085 6,219 8,810 7,595

    Jul-19 7,570 8,680 7,996 6,122 8,559 7,411

    Jul-20 7,411 8,485 7,930 6,002 8,293 7,099

    Jul-21 7,767 8,775 8,320 5,514 7,299 6,374

    Jul-22 7,906 8,531 8,226 4,594 6,982 5,680

    7,411 8,881 8,121 4,594 8,810 7,047

    FORECASTED VS. ACTUAL DEMAND

    DATE

    Jul-16

    Jul-17

    Jul-18

    Jul-19

    Jul-20

    Jul-21

    Jul-22

    EX-ANTE GENERATION MIX

    Jul-16 51.5 14.5 7.6 19.7 6.7 -

    Jul-17 52.3 14.3 8.0 17.7 7.7 -

    Jul-18 50.2 14.0 8.7 20.1 7.0 -

    Jul-19 50.3 14.9 8.2 20.4 6.2 -

    Jul-20 50.9 15.4 7.6 21.4 4.7 -

    Jul-21 46.9 17.2 7.7 28.0 0.3 -

    Jul-22 43.0 17.9 8.6 30.3 0.2 -

    49.6 15.3 8.1 22.1 5.0 -

    DATE

    GENERATION MIX, %

    DATE

    RTD DEMAND, MWOFFER, MW

    WIND AND

    BIOCOAL GEO

    FORECAST ERRORS, %

    MINIMUM MAXIMUM

    NAT GASDIESEL /

    OIL

    0.02

    0.00

    0.03

    0.00

    MAPE

    HYDRO

    0.08

    0.13

    0.21

    0.00

    3.05

    4.22

    3.41

    4.22

    1.09

    1.36

    1.31

    0.90

    2.95 0.82

    1.99 0.45

    1.65 0.66

    2.05 0.66

    Ex-ante system demand peaked at a level of 8,810 MW during the week (1400H, 18 July 2012), while the maximum market offer significantly decreased to8,881 MW (1300H, 16 July 2012) in comparison with the previous week.

    Tight and insufficient supply conditions were observed through most of the weekdays as a result of the unavailability of Ilijan 1 and 2 (Block A and B) giventhat the Malampaya onshore natural gas plant was still on maintenance during the week. Ilijan 1 only started to become available at 2400H of 20 July2012. With this, under-generation and load shedding conditions were observed in the market results during most of the week. Supply margins started to

    widen on 20 July 2012 because of the low demand requirement until the weekend, which may be attributed to the continuous downpour of rain in Luzon. With the Malampaya complex still undergoing maintenance during the week, affected generating units (Sta. Rita and San Lorenzo) operated usingalternate fuel.

    Towards the weekend, however, natural gas supply from Malampaya resumed as indicated by the availability of Ilijan 1 at 240 0H of 20 July 2012. On theother hand, the Sta. Rita and San Lorenzo gas plants implemented their fuel change-over from fuel to fuel gas in the morning of 21 July 2012.

    With the tight and insufficient supply levels during the weekdays, oil-based plants increased in frequency in setting the price in the market; prices as high asPhP 54,458/MWh (1500H, 16 July 2012) was cleared in the market. During the weekend, however, with system ex-ante demand level going as low as4,594 MW, prices went as low as PhP 0/MWh for trading intervals 0300H, 0500H to 0700H, and 2400H on 22 July 2012. Over-all, the weekly averagenodal price (system-wide) was observed to be lower at PhP 8,246/MWh in comparison with the previous week.

    With the tight supply and inadequate reserve levels being experienced in the grid, must-run units (MRUs) in Luzon, particularly Malaya 1 and 2, weredispatched from 16-20 of July 2012. In the Visayas, a few MRUs were still called upon all of which were still from the island of Panay for system voltagerequirement.

    The dispatch of oil-based plants increased to 5% (based on ex-ante schedules) in comparison to last week's 3.1% as their capacities were frequentlycleared in the market, coupled with their increased utilization as MRUs.

    Price separation was observed in the Luzon grid because of a congestion at the Tayabas 500/230 kV Sub -station from 17-18 July 2012 since one of thethree 600 MVA transformers was on maintenance while the N-1 contingency requirement was imposed on the said sub-station. There were a few tradingintervals affected by the price separation in the Visayas because of congestions at the New Naga-Quiot 138 kV line and at the Negros-Panay submarinecable.

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    11000

    MW

    OFFEREFFECTIVE SUPPLYSYSTEM RTD

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    MW

    SYSTEM RTD

    SYSTEM ACTUAL

    COAL49.6%

    GEO15.3%

    HYDRO8.1%

    NAT GAS22.1%

    DIESEL/OIL5.0%

    Weekly Summary Report Week 30: 16-22 July 2012

  • 7/27/2019 WSR 2012_Wk30

    3/5

    Weekly Summary Report Week 30: 16-22 July 2012

    CAPACITY (OFFER) MIX

    Jul-16 49.8 13.3 8.5 19.1 9.3 -

    Jul-17 50.0 13.4 8.6 19.1 8.9 -

    Jul-18 50.3 13.5 8.7 19.3 8.2 -

    Jul-19 50.4 13.8 8.2 19.5 8.1 -

    Jul-20 50.7 13.9 8.1 19.6 7.6 -

    Jul-21 48.7 13.3 8.0 23.9 6.2 -

    Jul-22 48.6 13.3 8.3 23.7 6.1 -

    49.8 13.5 8.3 20.6 7.8 -

    HVDC FLOW EX-ANTE HVDC FLOW

    NO FLOW VL LV NO FLOW VL LVJul-16 - 100.0 - - 100.0 -

    Jul-17 - 100.0 - - 100.0 -

    Jul-18 - 100.0 - - 100.0 -

    Jul-19 - 100.0 - - 100.0 -

    Jul-20 - 100.0 - - 100.0 -

    Jul-21 - 91.7 8.3 4.2 95.8 -

    Jul-22 - 87.5 12.5 4.2 87.5 8.3

    - 97.0 3.0 1.2 97.6 1.2

    SYSTEM MARKET PRICES SYSTEM MARKET PRICES (LWAP)

    MIN MAX AVE MIN MAX AVE

    Jul-16 2,677 54,458 14,523 2,676 54,458 14,395

    Jul-17 3,065 51,237 14,706 3,266 39,080 14,304

    Jul-18 2,856 23,398 9,886 2,588 23,588 9,415

    Jul-19 2,330 14,581 7,541 2,328 14,612 7,781

    Jul-20 2,300 9,636 4,377 2,317 9,307 4,350

    Jul-21 1,702 2,849 2,324 1,590 2,846 2,321

    Jul-22 0 2,601 1,452 0 2,569 1,361

    0 54,458 8,246 0 54,458 8,117

    EX-ANTE LWAP DISTRIBUTION EX-ANTE MARKET PRICES PER GRID (LWAP )

    DATE

    WIND AND

    BIO

    RTD

    DATERTD ACTUAL

    COAL

    HVDC DIRECTION, % OF TIME

    DATE

    AVERAGE CAPACITY MIX, %

    GEO HYDRO NAT GASDIESEL /

    OIL

    DAILY SUMMARY OF SYSTEM PRICES (LWAP), PhP/MWh

    RTX

    -100

    -50

    0

    50

    100

    150

    200

    250

    300

    350

    400

    MW

    LUZON-TO-VISAYAS

    VISAYAS-TO-LUZON

    0

    10000

    20000

    30000

    40000

    50000

    60000

    LWAP,PhP/MWh

    RTD LWAP

    RTX LWAP

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    0 and Below 0 - 2000 2000 - 4000 4000 - 6000 6000 - 8000 8000 -10000

    Above10000

    PERCENTOFTIME

    RTD RTX

    0

    10000

    20000

    30000

    40000

    50000

    60000

    LWAP,PhP/MWh

    LUZON

    VISAYAS

    0

    1000

    2000

    3000

    4000

    5000

    6000

    7000

    8000

    9000

    10000

    11000

    MW

    DIESEL/OIL NAT GAS

    HYDRO GEO

    COAL

  • 7/27/2019 WSR 2012_Wk30

    4/5

    Weekly Summary Report Week 30: 16-22 July 2012

    SUMMARY OF PRICES PER GRID, LUZON LUZON MARKET PRICES (LWAP)

    MIN MAX AVE MIN MAX AVE

    Jul-16 2,684 54,694 14,318 2,687 54,694 14,417

    Jul-17 3,075 51,237 14,817 3,282 39,080 14,333

    Jul-18 2,860 23,753 10,029 2,602 23,753 9,438

    Jul-19 2,333 14,715 7,575 2,335 14,715 7,779

    Jul-20 2,311 9,285 4,348 2,330 9,285 4,332

    Jul-21 1,703 2,863 2,304 1,592 2,863 2,311

    Jul-22 0 2,533 1,435 0 2,495 1,342

    0 54,694 8,285 0 54,694 8,159

    SUMMARY OF PRICES PER GRID, VISAYAS VISAYAS MARKET PRICES (LWAP)

    MIN MAX AVE MIN MAX AVE

    Jul-16 2,635 53,166 15,650 2,612 53,166 14,271

    Jul-17 3,006 51,237 14,101 3,176 39,080 14,145

    Jul-18 1,194 21,435 9,102 2,485 22,679 9,289

    Jul-19 2,308 13,839 7,357 2,282 14,047 7,795

    Jul-20 2,239 11,504 4,533 2,246 9,421 4,442

    Jul-21 1,694 3,390 2,424 1,581 3,079 2,371

    Jul-22 0 2,905 1,530 0 2,884 1,446

    0 53,166 8,040 0 53,166 7,892

    INTERVALS WITH MUST-RUN UNIT (MRU) EVENTS HOURLY MRU EVENTS

    MRU EVENTS, LUZON MRU EVENTS, VISAYAS

    DATE TOTAL THERMAL RESERVE VOLTAGE COMM/REG OTHERS DATE TOTAL THERMAL RESERVE VOLTAGE COMM/REG OTHERS

    Jul-16 18 - 18 - - - Jul-16 - - - - - -

    Jul-17 31 - 31 - - - Jul-17 - - - - - -

    Jul-18 43 - 43 - - - Jul-18 - - - - - -

    Jul-19 42 - 42 - - - Jul-19 - - - - - -

    Jul-20 45 - 45 - - - Jul-20 2 - - 2 - -

    Jul-21 - - - - - - Jul-21 3 - - 3 - -

    Jul-22 - - - - - - Jul-22 - - - - - -

    179 - 179 - - - 5 - - 5 - -

    Note: MRU events refer to occurrences in which generating uni ts are designated THERMAL - Thermal Limits of Transmission Line and/or Power Equipment

    as must-run units for certain trading intervals RESERVE - Inadequate Reserve Level

    Source: NGCP Luzon System Operations and Visayas System Operations VOLTAGE - System Voltage Requirement

    COMM/REG - Commercia l Operation or Regulatory Requirements

    OTHERS - Other Reasons for MRU Dispatch such as System Tests, etc.

    DATE

    Jul-16

    Jul-17

    Jul-18

    Jul-19

    Jul-20

    Jul-21

    Jul-22 -

    111

    3

    -

    5

    VISAYAS

    DATE

    DATE

    -

    2

    RTD, PhP/MWh RTX, PhP/MWh

    RTD, PhP/MWh

    -

    -

    LUZON

    18

    22

    24

    23

    24

    RTX, PhP/MWh

    -

    -

    0

    10000

    20000

    30000

    40000

    50000

    60000

    LWAP,PhP

    /MWh

    RTD LWAP

    RTX LWAP

    0

    10000

    20000

    30000

    40000

    50000

    60000

    LWAP,PhP/MWh

    RTD LWAP

    RTX LWAP

    0

    1

    2

    3

    HOURLYFREQUE

    NCYOFMRU

    EVENT

    S

    LUZON

    VISAYAS

  • 7/27/2019 WSR 2012_Wk30

    5/5

    Weekly Summary Report Week 30: 16-22 July 2012

    LUZON PRICING CONDITIONS (FREQUENCY) VISAYAS PRICING CONDITIONS (FREQUENCY)

    VALID PEN VALID MRR VALID PEN VALID MRR

    - 12 12 21 3 - 19 5 21 3

    - 12 12 19 5 - 18 6 19 5

    - 13 11 23 1 - 23 1 23 1

    - 14 10 24 - - 24 - 24 -

    - 20 4 24 - - 24 - 24 -

    - 24 - 24 - - 24 - 24 -

    - 24 - 24 - - 24 - 24 -

    - 119 49 159 9 - 156 12 159 9

    AP - Trading hours affected by Market Intervention

    VALID - Trading hours wit h no is suance of PEN or Market Intervent ion

    PEN/MRR - Trading hours issued with pricing errors

    REASON FOR PRICING ERRORS, LUZON REASON FOR PRICING ERRORS, VISAYAS

    DATE UGEN VOLL CONT BC PSM ERR DATE UGEN VOLL CONT BC PSM ERR

    Jul-16 1 5 12 - - - Jul-16 1 4 - - - -

    Jul-17 3 4 11 - 2 - Jul-17 3 1 - - 2 -

    Jul-18 - 1 11 - 1 - Jul-18 - - 1 - 1 -

    Jul-19 - - 10 - - - Jul-19 - - - - - -

    Jul-20 - - 4 - - - Jul-20 - - - - - -

    Jul-21 - - - - - - Jul-21 - - - - - -

    Jul-22 - - - - - - Jul-22 - - - - - -

    4 10 48 - 3 - 4 5 1 - 3 -

    DATE UGEN VOLL CONT BC PSM ERR DATE UGEN VOLL CONT BC PSM ERR

    Jul-16 3 - - - - - Jul-16 3 - - - - -

    Jul-17 5 - - - - - Jul-17 5 - - - - -

    Jul-18 1 - - - - - Jul-18 1 - - - - -

    Jul-19 - - - - - - Jul-19 - - - - - -

    Jul-20 - - - - - - Jul-20 - - - - - -

    Jul-21 - - - - - - Jul-21 - - - - - -

    Jul-22 - - - - - - Jul-22 - - - - - -

    9 - - - - - 9 - - - - -

    UGEN - Under-generation BC - Base Case CVC

    VOLL - Nodal Value of Lost Load PSM - Subject to the Price Substitution Methodology

    CONT - Contingency CVC ERR - Erroneous Input or Snapshot Information

    RTX

    Jul-16

    Jul-17

    Jul-18

    Jul-19

    Jul-20

    Jul-21

    Jul-22

    RTX

    VISAYAS, EX-ANTE PEN

    VISAYAS, EX-POST PEN

    Jul-20

    Jul-21

    Jul-22

    APRTD

    Jul-17

    Jul-16

    Jul-19

    DATE

    Jul-18

    LUZON, EX-POST PEN

    LUZON, EX-ANTE PEN

    DATE APRTD