www.automain.eu a joint research project funded under the seventh framework programme (fp7) of the...

26
www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on the Contiunous track monitoring and advanced monitoring for switches & crossings Dr. Gunnar Baumann Director Infrastructure System Interfaces – I.NVT 8 [email protected]

Upload: mckayla-bails

Post on 29-Mar-2015

219 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

High Speed - Inspection

Work on the Contiunous track monitoring and advanced

monitoring for switches & crossings

Dr. Gunnar BaumannDirector Infrastructure System Interfaces – I.NVT [email protected]

Page 2: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Aims

Aims

Unplanned and planned non-availability of the track caused by failures or restrictions are cost-drivers in the networks.

A prediction of failures allows an optimisation of the instant of time, where the

work is economical in a larger part of the track. Larger maintenance sections reduce the costs and provide usually a better quality !!!

Switches are most critical devices in the network concerning availability and costs.

A reduction of failures are direct noticeable by the passenger or the logistic company.

Page 3: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Solutions

Solutions

Monitoring of track alignment by regular sheduled trains during operation to get „Online“-Information of the track. On this basis a prognosis of the deterioration of single faults is possible and a maintenance planning for the line is more economical.

Monitoring and inspection of switches will give an individual information about the

„Health“ of a switch. Maintenance intervention before any faults are possible, maintenance staff will be equipped with the spare-parts needed. Traffic interruption caused by switches will be reduced.

Page 4: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

WP 3 Organisation

WP 3 Organisation

WP 3.1 In-Service Measurement (ISM): Measurement of the track alignment by an in-service freight locomotive

in the demonstrator. Line will be Rotterdam (Nl) – Dillingen (D). Data processing for failure prediction and the display to the maintenance staff

(MMI).

WP 3.2 Switch:

Monitoring and inspection of switches by intelligent sensors and failure prediction by modern algorithms and the display to the maintenance staff (MMI). Demonstrators are switches in Eslöv (S).

WP 3 Partners: ProRail, Network Rail, Deutsche Bahn, Trafikverket, Strukton Rail, Damill, Birmingham Univ., Luleå Tekniska Univ., DLR, Mermec,

Vossloh

Page 5: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Workflow

Programming of the MMIVCSA

Development of AlgoritmsUoB

Delivery of switch dataUoB / DAM

Delivering of track recording dataDB / MER

Algorithms for failure predictionDLR / UoB

Prediction of opt. time for Mainten.DLR / UoB

Development of Maintenance Prog.Stru / LTU

Input for WP2, WP4, WP5

Demonstrators

WP 3 Organisation

Page 6: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Advantages of ISM

Advantages Reduction of service breakdown and delays by early detection of defects

Measured data are automatically stored in a maintenance database

Prediction of defect development (more frequently measurements)

Early maintenance planning due to defect/failure prediction (Single defect tamping vs. line tamping)

Verify the quality of repair efforts (close control loop)

Measurement is a “by-product (spin-off) of train operation”

Improvement of maintenance management Reduction of costs (LCC)

From “Find and Fix” to “Predict and Prevent”

High Availability of the Freight-Backbones of the ports (Target of FP 7 !)

Page 7: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Equipment of ISM

Continuous monitoring of track geometry on Freight Loko (BR 189)

Acceleration sensors on axle bearingOnboard-computer module (IPC)

Location with GPS

Data transmission by radio

Freight train

IMU (Gyroscope)

Page 8: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Corridor for demonstrator

Dillingen/ Saar

Quelle:Verkehrsrundschau.de

Foto: A. Seidel

Ore line Rotterdam - Dillingen

Page 9: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Corridor for demonstrator

Foto: bahn007.startbilder.de

Ore-line Rotterdam - Dillingen

Decision was done due to the automatic coupling of the lokomotive

fixed schedule for the ore-line

Page 10: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Processing of the acc.-data

Quelle: DLR

Processing of the acceleration data To gain the vertical alignment from the acceleration data, a double integration has

to be carried out. Algorithms were applied to minimize sensor errors. Still, different measurement runs could not easily be compared, see the Fig. left side.

Fig: Vertical alignment of several measurement runs before (left) and after (right, zoomed in) filtering

Page 11: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Defect/Failure prediction

Defect growth prediction

Jul07 Aug07 Sep07 Oct07 Nov07 Dec076

7

8

9

10

11

12

Datum

3-P

un

kt-

Sig

na

l -

lin

ke

Sc

hie

ne

[m

m]

Strecke 1700-1; km 136,1

Date

Verti

cal D

evia

tion

of tr

ack

alig

nmen

t [m

m]

Limit value (11 mm)Predicted exceeding of the Limit value

Inspection measurement (Railab)Mid-October

Date of the predicted exceeding of the limit value

Jul Aug Sep Oct Nov Dec

In-service measurement (ISM)

Page 12: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Monitoring of defects

Sustainable maintenance:

Track position [km]

Dat

e

Verti

cal D

evia

tion

of tr

ack

alig

nmen

t [m

m]

1

1

1

1

1

1

2

3

33

Längshöhe (3Punkt) in mm, beurteilt nach Ril 821.2001, (vzg=200km/h)

km auf Strecke 1700-2

Da

tum

135.79 135.8 135.81 135.82 135.83 135.84 135.85

01-Mar-2007

01-Apr-2007

01-May-2007

01-Jun-2007

01-Jul-2007

01-Aug-2007

01-Sep-2007

01-Oct-2007

01-Nov-2007

01-Dec-2007

01-Jan-2008

01-Feb-2008 0

1

2

3

4

5

6

7

8

9

10

11

Page 13: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Switches & Crossings

SP 3.2 Monitoring & intelligent self-inspection of switches

Switch inspection with special staff for the signalling and the track part causes a lot of logistic and economical effort

Inspections are carried out in fixed time periods

– The condition of the individual switch is not respected

– Sudden defects will be undetected until the next inspection or produced a failure

Prediction of development of defects is difficult

Monitoring is different than Self-Inspecting

Page 14: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Modular Self-Inspecting Infrastructure – Switches

Condition monitoring Automatic inspection

Focussed on inspecting the asset according to inspection standards and it can: - identify the assets that do not meet the standards - carry out inspections specified in inspection standards - carry out the inspections in a way that satisfies the inspection requirements (e.g. precision of measurement)

Orientated on the fault and it can do: - fault detection: a system is able to detect a fault which is happening - fault diagnosis: a system is able to diagnose the fault - fault prediction: the system is able the predict a fault a certain amount of time before it will happen

Page 15: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Modular Self-Inspecting Infrastructure – Switches

Condition monitoring Automatic inspection

1. Measure parameters specified by inspection standards.

2. Parameters must be measured must be in line with the standards.

3. The drive is to eliminate the need for maintenance personnel to inspect switches in person.

1. Measures parameters that reveal faults in the system.

2. Analyse the data and identify the faults or predict potential faults.

3. Develop a cost effective system. The drive is to use the smallest number of sensors to identify the largest number of faults.

Page 16: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Summary of self inspecting switch: Review of inspection tasks

Visual inspection

Potential solution Video train

Shape, size, gauge and position of rails

Potential solutionLaser measurements

Point machine inspection

Potential solutionImproved CM

Cracks in rails and crossing

Potential solutions???

Switch rail fittings(bolt loosening, cracks)

Potential solution???

Page 17: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Architecture of the MMI

(Man-Machine-Interface)

Page 18: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

MMI data flow Used in WP6 for demonstration

MMIVossloh

Scheduling Tool (WP5)SNCF

Internet

Emails, SMS

Track data (scenario 1)MERMEC/UoB system

Track data (scenario 2)DLR/DB system

Switch data (scenario 3) UoB system

Switch data (scenario 4)Damill system

RailML + HTTPS

RailML + HTTPS

Maintenance workers

RailML + HTTPS

RailML + HTTPS

RailML + HTTPS

Switch data (scenario 5)Struckton system

RailM

L +

HTT

PS

Internet

Import RailML filesInfrastructure

managers

MTN Task

Page 19: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

MMI architectureUsed in WP6 for demonstration

Page 20: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Maintenance task definition

The MMI is a “task management system”. The level of data managed by the MMI is a maintenance task. From ISO13374-1:2003 (Condition monitoring and diagnostics of machines — Data processing, communication and presentation — Part 1: General guidelines) the level of data for a maintenance task is defined as a recommended action.

Page 21: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Maintenance task process

Maintenance task process

Page 22: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

RailML data standard

www.railml.org Since 2001: The railML.org Initiative was founded against the background of the

chronic difficulty of connecting different railway IT applications. Its main objective is to enable heterogeneous railway applications to

communicate with each other. Today, the connection of various railway software packages is beset with

problems. The purpose of the railML.org Initiative has been to find, discuss and present systematic, XML-based solutions for simplified data exchange between railway applications.

First step in european standardisation for maintenance IT-tools MERMEC has already provided lists of standard defects and standard

measurements.

Page 23: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

RailML data standard

State of the art in AUTOMAIN The RailML schema was agreed by all partners The level of data is “the maintenance task”. Every demonstrator has to decide

the way of communication: The monitoring inspection systems must send a maintenance task to the MMI The monitoring inspection systems send a failure to the MMI, and a “translation table”

validated by the maintenance will match the tasks in relation to the failure produced. Every system must send a message to confirm the system is alive

A draft of a XML schema exists to understand The RailML standard will be a data schema file (XSD file). When it is mature

(approved by demonstration), it will be proposed to the official RailML organization.

Page 24: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Map for Tasks

The assets have colours and description for the flag: No flag if no task RED Flag: Needing corrective maintenance. ORANGE Flag: Needing preventative maintenance

For the scheduled maintenance, the asset will be “orange” when it’s time to do it and red when it’s too late. For the conditional maintenance, the asset will be “orange” when it appears (alarm from a system, expert

report...)

Page 25: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

Specifications

MMI main features 1 unique access for all the systems monitoring assets (through Internet) 1 unique level of data : maintenance task Map with the status of the maintenance tasks for several assets Table with the status of the maintenance tasks for several assets Inspection report on site (questionnaire on site to perform the maintenance

task ) MMI administration Import/export infrastructure RailML data RailML “maintenance tasks ” exchange between applications

Send emails, SMS, etc... to the maintenance team when a task needs it Allow confirmation by maintenance to take the work in charge Monitors the availibility of the systems (message to know if each system is still alive)

Page 26: Www.automain.eu A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission High Speed - Inspection Work on

www.automain.eu

A Joint Research Project funded under the Seventh Framework Programme (FP7) of the European Commission

… 18 months left

Thank you for your attention!