Yasmine Amhis EPFL- 23-11 - 09. Status of the LHC and LHCb. Yasmine Amhis EPFL 22-11-09. Adrenaline. Most (all …) of the content of this status report is heavily stolen from various sources (Tuesday meeting, Run minutes, Evian conference….). LHC. The LHC accelerating chain . - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/1.jpg)
Yasmine Amhis EPFL- 23-11-09
Yasmine AmhisEPFL
22-11-09
Status of the LHC and LHCb Adrenaline
![Page 2: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/2.jpg)
Most (all …) of the content of this status report is heavily stolen from various sources (Tuesday meeting, Run minutes, Evian conference….)
![Page 3: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/3.jpg)
The LHC accelerating chain
LHC Linac: 50 MeV Booster:1 GeV PS: 26 GeV SPS: 450 GeV LHC something?
To follow up : http://op-webtools.web.cern.ch/op-webtools/Vistar/vistars.php?usr=LHC1
![Page 4: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/4.jpg)
The LHC cryptic monitoring
![Page 5: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/5.jpg)
SPS injects beam in the LHC
LHC
![Page 6: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/6.jpg)
LHC
![Page 7: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/7.jpg)
LHC
![Page 8: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/8.jpg)
Repairs (status on the 16.11.09 at 10:00 AM)
1. 14 quadrupole magnets replaced.2. 39 dipole magnet replaced.3. 54 electrical interconnections fully repaired. 4. Over 4 km of vacuum beam tube cleaned5. Nearly 900 new helium pressure release ports are being installed around the machine. 6. 6500 new detectors are being added to the magnet protection system.LHC
![Page 9: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/9.jpg)
Month
OP scenario Max number bunch
Protons per bunch
Min beta*
Peak Lumi Integrated % nominal
1 Beam commissioning
2 Pilot physics combined with commissioning 43 3 x 1010 4 8.6 x 1029 ~200 nb-1
3 43 5 x 1010 4 2.4 x 1030 ~1 pb-1
4 156 5 x 1010 2 1.7 x 1031 ~9 pb-1 2.55a No crossing angle 156 7 x 1010 2 3.4 x 1031 ~18 pb-1 3.4
5b No crossing angle – pushing bunch intensity 156 1 x 1011 2 6.9 x 1031 ~36 pb-1 4.8
6 Shift to higher energy: approx 4 weeks
Would aim for physics without crossing angle in the first instance with a gentle ramp back up in intensity
74 – 5 TeV (5 TeV luminosity numbers quoted) 156 7 x 1010 2 4.9 x 1031 ~26 pb-1 3.4
8 50 ns – nominal Xing angle 144 7 x 1010 2 4.4 x 1031 ~23 pb-1 3.1
9 50 ns 288 7 x 1010 2 8.8 x 1031 ~46 pb-1 6.210 50 ns 432 7 x 1010 2 1.3 x 1032 ~69 pb-1 9.4
1150 ns
432 9 x 1010 2 2.1 x 1032 ~110 pb-1 12
LHC
Plans
![Page 10: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/10.jpg)
Utility of beam events
• Coarse Timing.
• Finding z-location of interaction point in all experiments.– Beam stability and background.– First “Switch on” with beam.– Rates from beam halo.– Beam Gas Global and local fine timing and space
alignment.
LHCb
![Page 11: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/11.jpg)
Collisions at 450 GeV• Hope to start with 5 ×1010 per bunch.• If rates and life time allows, try van der Meer scan as soon as possible.• First fill(s) without LHCb magnet and then, as soon as useful, with field
• Aim to finish year with (parts of) VELO (out but on) and field !
• Trigger strategy• No bias/minimum bias interaction trigger with anti-cosmic.• Start out in TAE if still needed after Single Beam run with RICH in spying
mode.• Calibration triggers at 50 Hz.• Luminosity triggers for test purposes at 50 Hz total. • HLT in pass all mode.• VELO alley and triggers needed to test closing procedure and measuring
luminous region.
• Seems a very slim hope to get collisions above 450 GeV before Christmas• Hope (minimum ambition) is high to achieve ramp of single and perhaps
two beams.• Collisions at 1.1 TeV.
LHCb
![Page 12: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/12.jpg)
Run news: 22.11.09. 9:00 AMminutes from Rolf Linder.
LHC&
LHCb
o From 20h30 to 21h00, the LHC delivered quite beam 1 (QB1) with: Up and running: Calorimeters, OT, Muons, VELO (one module each side) .
o From 23h00 to 23h30, QB1 : Joined : IT (1 box), TT (one layer C side), VELO (5 modules per side).
o About a 100 beam gas events were recorded.
![Page 13: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/13.jpg)
LHCb
Offline reconstructed beam gas events22.11.09 at 08:31 PM the date were distributed To tier-1 sites.
![Page 14: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/14.jpg)
Splashes at LHCb
LHCb
![Page 15: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/15.jpg)
Le reste
du monde
LHC
Splashes at ATLAS & CMS
![Page 16: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/16.jpg)
Conclusion, 23.11.09 at 8:08 PM
The possibility to have collision in the coming 24 hours is becoming serious. The management of LHCb is in contact with the LHC coordination, and we should get more news around 9 PM. A meeting is then organised in the control room at 9:30 with all SDs to agree on the strategy. Velo (Stefano+Karol), ST(Abraham), OT(Antonio), RICH(Greig), Calo (Marie-Noelle), Muon (Sandro) and L0 (Patrick) have been contacted.
![Page 17: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/17.jpg)
• After discussion with all SD and the management, the following strategy has been agreed: - LHC will inject only ONE bunch per beam. Colisions are then either ATLAS+CMS or LHCb or Alice. - We are interested to look at these possib le collisions, and all 'big' detectors are ready to go to nominal voltage, with some care. This means RICH, OT, Calo and Muon. - We wont turn ON the silicon detectors (Velo, ST) - If/when LHC will announce that they will proviode collisions for us, the shift crew should call ,the Run Chief, the Commissioning Coordinator, and all the SD coordinators excluding
Conclusion, 23.11.09 at 10:10 PM
![Page 18: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/18.jpg)
BACKUP SLIDES
![Page 19: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/19.jpg)
LHC cooling
![Page 20: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/20.jpg)
![Page 21: Yasmine Amhis EPFL- 23-11 - 09](https://reader035.vdocuments.net/reader035/viewer/2022062301/568161e7550346895dd21016/html5/thumbnails/21.jpg)
Beam dump