CUT TO LENGTH LINE Reported ByATKIN
MACHINE NUMBER 9C00PURPOSE CORE CUTTING MACHINE
2007 Agung T.NDate :
No DATA Nilai / Value SATUAN / UNIT No Maintenance Performance Indicator Formula 2007 UnitBreakdown Frequency kali Machine Availability Rate ( TK ) OT- DT - UT MoreFrekuensi Breakdown ( BF ) Times Tingkat Ketersedian Mesin OT ThanPreventive Maintenance Execution kali Maintenace Cost Rate Per Hour ( MC ) ( BC + PMC ) lastEksekusi Perawatan Pencegahan ( PME ) Times Biaya Perawatan darurat/ jam ( BT + PMT ) YearBreakdown Cost breakdown time percentage BT LessBiaya untuk Breakdown Maintenance ( BC ) Tingkat Waktu Mati Mesin Akibat Breakdown DWT ThanPreventive Maintenance Cost Material cost Rate per Work Order ( BC + PC ) lastBiaya Preventive Maintenance ( PMC ) Rata - rata biaya material per WO ( Work Order ) ( BF + PME ) YearBreakdown Time Jam/ Tahun Production Direct Cost Losses cause Breakdown BT x ( MR + MC ) LessWaktu total Breakdown ( BT ) Hour/ year Total Biaya Produksi yang Hilang akibat Breakdown CM ThanPreventive Time Jam/ Tahun Production Direct Cost Losses cause Breakdown ( IDR ) 113,977,575 IDRWaktu Preventive Maintenance ( PMT ) Hour/Year Mean Time To Repair BT Jam LessUseless Time Rate Jam/ Tahun Waktu rata-rata dalam memperbaiki mesin BF Hour ThanWaktu yang tidak digunakan ( UT ) Hour/Year Maintenance Time To Failure OT-UT-BT Jam MoreTotal Operating Time 2007 Jam/ Tahun Tingkat Resiko Kegagalan Fungsi Mesin (MTTF) BF Hour ThanTotal Waktu Operasi mesin yang tersedia ( OT ) Hour/ yearDowntime Jam/ TahunTotal waktu mesin mati ( DWT ) Hour/YearProduction Rate / Hour Lembar/ JamRata - rata produksi / jam ( PR ) Sheet/ HourMachine Rate/ HourTarif mesin/ jam ( MR )Production Material CostTotal biaya langsung material yang digunakan ( CM )
3
300
MACHINE NAMEBRAND
15.5
53.17
2 3
YEAR
1
PT. PAUWELS TRAFO ASIA Dominikus MRDate :
YEARLY MAINTENANCE PERFORMANCE INDICATOR
Comparation/goal
0.15%
34
58,420,942.40
Acknowladge By
-
84.21% 87.50%%
335,140.65 IDR
4.721
%
IDR
%
198.422
10%
-
15.34%
1,677,874.71
0.27%
1046.00
160
375,000
IDR
( IDR )563,812.82
160.50
( IDR )
42,500,050,626
6960
IDR
1
6
3
4
5
6
5
4
3
2
9
10
11
12
77
8
84.21%
87.50%
82.00%
83.00%
84.00%
85.00%
86.00%
87.00%
88.00%
Perc
enta
ge
Machine Availability
2007
Comparation/goal
15.34%
10%
0.00%
2.00%
4.00%
6.00%
8.00%
10.00%
12.00%
14.00%
16.00%
18.00%
Perc
enta
ge
Breakdown Percentage
breakdown timepercentageComparation/goal
198.422
300
0.000
50.000
100.000
150.000
200.000
250.000
300.000
350.000
Hou
r
Maintenance Time To Failure
Maintenance Time ToFailure
Comparation/goal
335,140.65
--
50,000.00
100,000.00
150,000.00
200,000.00
250,000.00
300,000.00
350,000.00
400,000.00
IDR
Maintenance Cost per Hour
Maintenace Cost Rate PerHour ( MC )Comparation/goal
92%
8%
Maintenance Job Distribution
Breakdown Frequency
Preventive MaintenanceExecution
99%
1%
Maintenance Cost Distribution
Breakdown Cost
PreventiveMaintenance Cost
6960
1046.00
0
1000
2000
3000
4000
5000
6000
7000
8000
Hou
r
Operation Time Comparation
Total Operating Time2007
Downtime
4.721
3
0.000
0.500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
4.500
5.000
Hou
r
Mean Time To Repair
Mean Time To Repair
Comparation/goal