Closed and Zero Flares:“Environmental Protection & Gas Back to Value Chain”
&
City
Flaring
Flaring seen from satellite
Why Closed & Zero Flare Systems?
• Political Goals in many areas of the world • Reduced Emissions (smoke, SOx, NOx & CO2)• Environmental Friendly• Less Noise & Light Disturbances• Gas Returned to the Value Chain• Reduced CO2-Taxes (in some areas, North Sea)• Reduced Maintenance (on PSV’s & Tip)• Reduced Purging Requirements (less fuel gas)
First Zero Flare Plant in Middle East
Client: ADCO. BAB Field, United Arabic Emirates. Delivered in 2003 Design Capacity (recovered gas): 2.2 MMSCFD
Reduction in H2S emissions: ~50 tonnes per annum
Safety Integrity Level 3 required. Actual level (SIL4): 10- 4 to 10- 5
Comprising the following deliveries (EPC): Gas Recovery Compressor Inert Gas Package Valve Skid (Quick opening Valves, QOV) Auto Ignition System Control & Monitoring
LOGIC
PT
K.O. DRUMN
2 INERT
GAS FOR
PURGING
DCS
LOGIC
PTPTGAS RECOVERY
K.O. DRUM
INTEGRATED FLARE CONTROLPACKAGE
(IEC 61508/61511 SAFETY STANDARD)
STATOIL PATENTED
UK,Norway, USA
MARKETED BY ABB
Zero Flare System at BAB, UAE
TANK FARM
Continuous
Ignition
System
N2 Purge
Process Control & QOV Ignition System
May 2003
Zero Flare Project References:
First zero flare pilot plant for the Middle East. Client: ADCO. BAB Field, United Arabic Emirates (2003)
Kristin Platform. Client: Statoil (2005) Snorre B Platform. Client: Norsk Hydro (2001) Oseberg South Platform. Client: Norsk Hydro (2000) Åsgard B Platform. Client: Statoil (2000) Pierce FPSO. Client: Enterprice Oil (1999) Oseberg Gas Platform. Client: Norsk Hydro (1999) Åsgard A Platform. Client: Statoil (1999) Siri Platform. Client: Statoil (1998) Njord Platform. Client: Norsk Hydro (1997) Heidrun Platform. Client: Statoil (1995)
Aker Kvaerner Technology
Gas Technology
• AK Main Contractor
• CO2 Capture from gas
• Reinjection in aquifer
CO2 Capture&
Green Power
• Fuel Cell
• Multi- MW Demo Plant
• Developments, IPR
• CO2 Membrane
• Compact Design
• Pilot @ Kårstø
• HiOx Development
• Zero Emission Power
• Demo Plant 45 MWe
• Closed Flare
• Pilot Plant in UAE
• Optimum Flare Design
• Hydrate Production
• Gas Transport
• Own Technology, IPR
• LNG Facilities
• Onshore & Offshore
• Production & Terminals
• GTL / Methanol / CNG
• Offshore Application
• Stranded Gas
Gas Production
Contact: Oscar Fr. Graff, Tel. +47 91 37 58 [email protected]
HIPPS system;last barrier to protect the Top side on this unmanned platform in offshore Borneo waters. Reducing CAPEX by spec-break. Offshore commissionig due in October.Shell Sarawak`s first HIPPS in accordance with IEC 61508 Safety Standard.
SAAS System is a specialist integrator of Environmental and Safety applications to the Petroleum Industry. Have since 1998 worked closely with Aker Kvaerner Technology to promote environmental friendly technologies in selected export markets.
SAAS` latest delivery to Malaysia
SAAS System