MMA Div Hd Meeting, Tuesday 13 Oct (note change in day due to NRAOholiday on Monday), 1300 EDT, ph 804 296 7082.Agenda:(1) Is 100m baseline OK for Phase 1 test interferometer?(2) Visit to Gemini system engineering office.(3) Other topics(4) Action items
Action Items At 28Sep98:
Date Due Responsible Deg
980930 Simon981006 Napier/Emerson981010 All981015 Brown981030 Emerson981030 Glendenning9811?? Sramek981102 Webber981115 Webber981130 Napier981130 Emerson981201 Webber981231 Simon981231 Napier981231 Webber981231 Webber
scription
Finish D&D WBSDrawing Number Policy MemoUpdate Project Book ChaptersDraft Agenda for MAC MeetingDraft Interface StandardsDraft Monitor & Control SpecificationsSignal Transmission System PDRComplete Vacuum Window DevelopmentMultiplier Chain LO PDRAntenna RFP CDRFormal release of updated Project BookComplete Cryogenic IF PlatesFinish Project WBSBid Prototype Antenna (#1+#2 option)230 GHz LO Doubler DemoDecision: FIR Filter or Analog BBC
Outstanding Positions At 21Sep98 (no change):
Description Status
SIS Int Amp EngLO Mul. Eng.SIS Mix. Tech.Sr. Sci Prog.Correl Eng 2SIS Rcvr EngProg Sys DesEE LO/IF 1EE F/OCAD/DrafterProgrammerRcvr EngTech (Cryo)Tech (PhLO)Mon/Cont. Eng.
Open (candidate)Open(open, but needs to be posted)Open (possible candidate)PostedOpen (candidate)Open (interviewing)Open (ready to make offer)Open (ready to make offer)Not yet releasedOpen (good candidate; interviewing)Open (a verbal acceptance)Open (possible candidate)OpenPosted
Req. #
CVCVCVCVCVCVSOSOSOSOSOTUTUTUTU
205220532054206720942098215021982199220022022017202220242034
l MMA Task Scheduling iew: Clean Gantt View
LO System 5 selected
WBS Task Start Finish Duratior Wc
5 LO System 6/1/98 1/31/01 139.6w Ow
5.1 Specifications and Conceptual Design 6/1/98 7/24/98 8w Ow
5.2 LO Reference 6/1/98 1/31/01 139.6w 0W
5 3 Multiplier Chain LO 6/1/98 1/31/01 139.6w ow
1999 12000J FMAM J JASONDJ FMAIM J JASOIND
i
5.3.1 Specifications 6/1/98 7/24/98 8w Ow
5.3.2 Tunable phase-locked source R&D 6/1/98 9/3/99 66w ow
5.3.2.1 Phase Noise Measurement System 6/1/98 10/9/98 19w Qw
5.3.2.1.1 Conceptual design 6/1/98 6/19/98 3w Ow
5.3.2.1.2 Circuit design 6/22/98 7/10/98 3w Ow
5.3.2.1.3 Mechanical design 7/13/98 7/31/98 3w Ow
5.3.2.1.4 Order parts 8/3/98 8/21/98 3w Ow
5.3.2.1.5 Assemble 8/24/98 9/11/98 3w Ow
5.3.2.1.6 Test 9/14/98 10/9/98 4w Ow
5.3.2.2 Amplitude Noise Measurement System 10/12/98 2/19/99 19w ow
5.3.2.2.1 Conceptual design 10/12/98 10/30/98 3w Ow
5.3.2.2.2 Circuit design 11/2/98 11/20/98 3w Ow
5.3.2.2.3 Mechanical design 11/23/98 12/11/98 3w Ow
5.3.2.2.4 Order parts 12/14/98 1/1/99 3w Ow
5.3.2.2.5 Assemble 1/4/99 1/22/99 3w Ow
5.3.2.2.6 Test 1/25/99 2/19/99 4w Ow
5.3.2.3 60-120 GHz Phase Lock Loop Sources 2/22/99 7/2/99 19w ow
5.3.2.3.1 Conceptual design 2/22/99 3/12/99 3w Ow
5.3.2.3.2 Circuit design 3/15/99 4/2/99 3w Ow
5.3.2.3.3 Mechanical design 4/5/99 4/23/99 3w Ow
5.3.2.3.4 Order parts 4/26/99 5/14/99 3w Ow
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 .
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 1 of 4 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:32 AM 10/13/98
MMA Task Scheduling View: Clean Gantt View
LO System 5 selected
I 1999 2000 2WBS Task Start Finish Duratior Work JI J ASONDJ IFMIAIM J J IAISIOINID J IFMAIMIJ J IAISIOINID J
5.3.2.3.5 Assemble 5/17/99 6/4/99 3w Ow
5.3.2.3.6 Test 6/7/99 7/2/99 4w Ow
5.3.2.4 LO evaluation 7/5/99 9/3/99 9w w
5.3.2.4.1 Determine Gunn characteristics 7/5/99 7/23/99 3w Ow
5.3.2.4.2 Determine multiplier chain characteristics 7/26/99 8/13/99 3w Ow
5.3.2.4.3 Determine photonic characteristics 8/16/99 9/3/99 3w Ow
5.3.3 Multiplier R&D 6/1/98 3/31/00 96w OW
5.3.3.1 Prototype multiplier development 6/1/98 12/1/98 26.4w OW
5.3.3.1.1 Evaluate 40->80 GHz doubler 6/1/98 7/24/98 8w Ow
5.3.3.1.2 Evaluate 80->160 GHz doubler 10/7/98 12/1/98 8w Ow
5..3.2 55->110 GHz Doubler 6/1/98 12/31/98 30.8w w
5.3.3.2.1 Design 6/1/98 7/24/98 8w g.
5.3.3.2.1.1 Circuit design 6/1/98 6/12/98 2w Ow
5.3.3.2.1.2 Diode design 6/15/98 6/26/98 2w Ow
5.3.3.2.1.3 Block design 6/29/98 7/10/98 2w Ow
5.3.3.2.1.4 Computer simulation 7/13/98 7/24/98 2w Ow
5.3.3.2.2 Diode fabrication 7/27/98 8/21/98 4w Ow
5.3.3.2.3 Block fabrication 8/24/98 9/4/98 2w Ow
5.3.3.2.4 Assemble 9/7/98 10/2/98 4w Ow
5.3.3.2.5 Test 10/5/98 10/30/98 4w Ow
5.3.3.2.6 Design revisions 11/2/98 11/27/98 4w Ow
5.3.3.2.7 Fabricate, assemble, & test revised design 12/4/98 12/31/98 4w Ow
5.3.3.3 1 10->220 GHz Doubler 1/1/99 5/20/99 20w =
5.3.3.3.1 Design 1/1/99 2/25/99 8w Ow
5.3.3.3.1.1 Circuit design 1/1/99 1/14/99 2w Ow
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 . Rollup Moj Summary
Progress Rolled Up Task J Rolled Up Progress
Selected tasks in current WBS Page 2 of 4 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:32 AM 10/13/98
MMA Task SchedulingLO System 5 selected
ew: Clean Gantt View
I 1999 2000 2WBS Task Start Finish Duratior Work J J A S O N D J F M AIMIJIJIAISIOINID JIFMIAIMIJIJIAISIONID J5.3.3.3.1.2 Diode design 1/15/99 1/28/99 2w Ow
5.3.3.3.1.3 Block design 1/29/99 2/11/99 2w Ow
5.3.3.3.1.4 Computer simulation 2/12/99 2/25/99 2w Ow
5.3.3.3.2 Diode fabrication 2/26/99 3/11/99 2w Ow
5.3.3.3.3 Block fabrication 3/12/99 3/25/99 2w Ow
5.3.3.3.4 Assemble 3/26/99 4/8/99 2w Ow
5.3.3.3.5 Test 4/9/99 4/22/99 2w Ow
5.3.3.3.6 Deliver 230 GHz Doubler Demo 4/22/99 4/22/99 Od Ow
5.3.3.3.7 Design revisions 4/23/99 5/6/99 2w Ow
5.3.3.3.8 Fabricate, assemble, & test revised design 5/7/99 5/20/99 2w Ow
5.3.3.4 200->400 GHz Doubler 5/21/99 9/2/99 15w g
5.3.3.4.1 Design 5/21/99 6/24/99 5w Q
5.3.3.4.1.1 Circuit design 5/21/99 6/3/99 2w Ow
5.3.3.4.1.2 MMIC chip design 6/4/99 6/10/99 1w Ow .
5.3.3.4.1.3 Block design 6/11/99 6/17/99 1w Ow
5.3.3.4.1.4 Computer simulation 6/18/99 6/24/99 1w Ow
5.3.3.4.2 MMIC chip fabrication 6/25/99 7/8/99 2w Ow
5.3.3.4.3 Block fabrication 7/9/99 7/15/99 1w Ow
5.3.3.4.4 Assemble 7/16/99 7/22/99 1w Ow
5.3.3.4.5 Test 7/23/99 8/5/99 2w Ow
5.3.3.4.6 Design revisions 8/6/99 8/19/99 2w Ow
5.3.3.4.7 Fabricate, assemble, & test revised design 8/20/99 9/2/99 2w Ow
5.3.3.5 220->660 GHz Tripler 5/21/99 9/30/99 19w Qw
5.3.3.5.1 Design 5/21/99 7/15/99 8w Ow
5.3.3.5.1.1 Circuit design 5/21/99 6/3/99 2w Ow
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone 0 Project SummaryDate: 10/13/98 ... ...... R ole
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 3 of 4 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:32 AM 10/13/98
Y
RpMMA Task Scheduling
LO System 5 selected
ew: Clean Gantt View
1999 2000 12WBS Task Start Finish Duratior Work J J A SO ND J FM AM J J AS O N D J F MA M J J|A S O|NjD J5.3.3.5.1.2
5.3.3.5.1.3
5.3.3.5.1.4
5.3.3.5.2
5.3.3.5.3
5.3.3.5.4
5.3.3.5.5
5.3.3.5.6
5.3.3.5.7
5.3.3.5.8
5.3.3.6
5.3.3.6.1
5.3.3.6.2
5.3.3.6.3
5.3.4
5.3.5
5.3.5.1 ;
5.3.5.2
5.3.5.3
5.3.5.4
5.4
MMIC chip design
Block design
Computer simulation
MMIC chip fabrication
Block fabrication
Assemble
Test
Design revisions
Fabricate, assemble, & test revised design
Deliver 660 GHz LO Tripler demo
Evaluate Performance
Compare diode/MMIC approaches
Project bandwidth/power available
CDR: Multiplier Chain LO
SPDR: Multiplier Chain LO
SProduction for Prototype Receiver
Determine configuration for 170-245 GHz band
Design, assemble, and test source chain
Design, assemble, and test final doubler stage
Deliver Prototype 230 GHz LO for Prototype ReceiN
Photonic LO
6/4/99
6/18/99
7/2/99
7/16/99
7/16/99
7/30/99
8/13/99
8/27/99
9/10/99
9/30/99
10/1/99
10/1/99
11/26/99
3/31/00
10/30/98
8/17/00
8/17/00
10/12/00
12/7/00
1/31/01
6/1/98
6/17/99
7/1/99
7/15/99
7/29/99
7/29/99
8/12/99
8/26/99
9/9/99
9/23/99
9/30/99
3/31/00
11/25/99
1/20/00
3/31/00
10/30/98
1/31/01
10/11/00
12/6/00
1/31/01
1/31/01
1/22/01
D
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone ( Project SummaryDate: 10/13/98
Progress Rolled Up Task I Rolled Up Progress
Selected tasks in current WBS Page 4 of 4 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:32 AM 10/13/98
2w
2w
2w
2w
2w
2w
2w
2w
2w
Od
26.2w
8w
8w
Od
Od
24w
8w
8w
8w
Od
138.2w
_ pipw
MMA Task SchedulingCDL SIS, HFET Tasks selected
Cw: lean Gantt View
I 999 2000 2WBS Task Start Finish Duratior Work JIJ A SO NID J F|M AM J J ASOND JIFIM AM J J AS OIN DJ44.1
4.1.1
4.1.1.1
4.1.1.2
4.1.1.3
4.1.1.4
4.1.1.5
4.1.2
4.1.2.1
4.1.2.2
4.1.2.3
4.1.2.4
4.1.2.5
4.1.2.6
4.1.3
4.1.3.1
4.1.3.2
4.1.3.3
4.1.3.4
4.1.3.5
4.1.3.6
4.1.4
4.1.4.1
4.1.4.2
6/1/98 12/28/01 187w OwReceiversSIS Mixers
Specifications
Write target specifications
PDR: SIS Mixer
Evaluate 170-245 and 602-720 performance
Make final design on operating bands
CDR: SIS Mixer
Sideband Source Plates
Specifications
Circuit design
Mechanical design
Order parts
Assemble
Test
Room Temperature IF Plates
Specifications
Circuit design
Mechanical design
Order parts
Assemble
Test
Cryogenic IF Plates
Specifications
Circuit design
6/1/98
6/1/98
6/1/98
1/29/99
2/1/99
4/26/99
9/30/99
6/1/98
6/1/98
8/24/98
11/16/98
2/8/99
5/3/99
9/9/99
6/1/98
6/1/98
8/31/98
11/30/98
3/1/99
5/31/99
8/30/99
6/1/98
6/1/98
7/27/98
8/31/01
9/30/99
8/21/98
1/29/99
4/23/99
7/16/99
9/30/99
12/1/99
8/21/98
11/13/98
2/5/99
4/30/99
7/23/99
12/1/99
12/1/99
8/28/98
11/27/98
2/26/99
5/28/99
8/27/99
12/1/99
6/1/99
7/24/98
9/18/98
p.-i -
170w
69.8w
12w
Od
12w
12w
Od
78.6w
12w
12w
12w
12w
12w
12w
78.6w
13w
13w
13w
13w
13w
13.6w
52.4w
8w
8w
Task Milestone _ Rolled Up Split External TasksProject: MMAvit ProectSumarProject: MMA Project Split Summary Rolled Up Milestone Project Summary .Date: 10/13/98 . . . . . . . . r
Progress Rolled Up Task i l Rolled Up Progress
Selected tasks in current WBS Page 1 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
-]
V
]
IL
I
MMA Task SchedulingCDL SIS, HFET Tasks selected
I 1999WBS Task Start Finish Duratior Work J J AS O N D J F M A M J4.1.4.3 Mechanical design 9/21/98 11/13/98 8w Ow
4.1.4.4 Order parts 11/16/98 1/8/99 8w Ow
4.1.4.5 Assemble 1/11/99 3/5/99 8w Ow
4.1.4.6 Test 3/8/99 4/30/99 8w Ow
4.1.4.7 Complete Cryogenic IF plates for mixer testing 6/1/99 6/1/99 Od Ow
4.1.5 Dewar Instrumentation 6/1/98 9/1/99 65.6w Qw
4.1.5.1 Specifications 6/1/98 8/14/98 11w Ow
4.1.5.2 Circuit design 8/17/98 10/30/98 11w Ow
4.1.5.3 Mechanical design 11/2/98 1/15/99 11w Ow
4.1.5.4 Order parts 1/18/99 4/2/99 11w Ow
4.1.5.5 Assemble 4/5/99 6/18/99 11w Ow
4.1.5.6 Test 6/21/99 9/1/99 10.6w Ow
4.1.6 LO Plates 6/1/98 3/1/00 91.6w gw
4.1.6.1 Specifications 6/1/98 9/11/98 15w Ow
4.1.6.2 Circuit design 9/14/98 12/25/98 15w Ow
4.1.6.3 Mechanical design 12/28/98 4/9/99 15w Ow
4.1.6.4 Order parts 4/12/99 7/23/99 15w Ow
4.1.6.5 Assemble 7/26/99 11/5/99 15w Ow
4.1.6.6 Test 11/8/99 2/18/00 15w Ow
4.1.6.10 Complete 170-245 LO Plate, sideband source plate: 3/1/00 3/1/00 Od Ow
4.1.7 Equipment Rack 6/1/98 12/1/99 78.6w 0w
4.1.7.1 Specifications 6/1/98 8/28/98 13w Ow
4.1.7.2 Circuit design 8/31/98 11/27/98 13w Ow
4.1.7.3 Mechanical design 11/30/98 2/26/99 13w Ow
4.1.7.4 Order parts 3/1/99 5/28/99 13w Ow
Task Milestone Rolled Up Split
Project: MMA Project Split Summary Rolled Up MilestoneDate: 10/13/98 Rolled.up.Milestone
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 2 of 11
Tew: Clean Gantt ViewMMA Task SchedulingCDL SIS, HFET Tasks selected
1999 2000 2WBS Task Start Finish Duratior Work J J A S ONDJ FMAMJ J ASOND J F MAMJ JJ AS O|N DJ
Assemble
Test
4.1.7.5
4.1.7.6
4.1.8
4.1.8.1
4.1.8.1.1
4.1.8.1.2
4.1.8.1.10
4.1.8.2
4.1.8.2.1
4.1.8.2.1.1
4.1.8.2.1.2
4.1.8.2.1.3
4.1.8.2.1.4
4.1.8.2.1.5
4.1.8.2.1.6
4.1.8.2.1.7
4.1.8.2.1.8
4.1.8.2.1.9
4.1.8.2.1.10
4.1.8.2.1.11
4.1.8.2.2
4.1.8.2.2.1
4.1.8.2.2.2
4.1.8.2.2.3
4.1.8.2.2.4
Mixers
200-300 GHz
Evaluate sideband separating prototypes
Evaluate balanced prototypes
Complete Eval. 200-300 GHz bal. & sideband-sep. mixers
170-245 GHz
Elemental mixer
Circuit design
Computer simulation
Chip layout
Block design
Mask fabrication
Chip fabrication
Block fabrication
Assemble
Test
Design revisions
Fab., assemble, & test revised design
Sideband separating mixer
Circuit design
Computer simulation
Chip layout
Block design
5/31/99
8/30/99
6/1/98
6/1/98
6/1/98
9/14/98
1/4/99
1/5/99
1/5/99
1/5/99
1/19/99
2/2/99
2/16/99
3/2/99
3/16/99
3/30/99
4/13/99
4/20/99
5/4/99
5/18/99
6/2/99
6/2/99
6/14/99
6/24/99
7/6/99
8/27/99
12/1/99
8/31/01
1/4/99
9/11/98
1/1/99
1/4/99
6/1/00
6/1/99
1/18/99
2/1/99
2/15/99
3/1/99
3/15/99
3/29/99
4/12/99
4/19/99
5/3/99
5/17/99
6/1/99
10/1/99
6/11/99
6/23/99
7/5/99
7/15/99
p.
13w
13.6w
170w
31.2w
15w
16w
Od
73.6w
21.2w
2w
2w
2w
2w
2w
2w
2w
1w
2w
2w
2.2w
17.6w
1.6w
1.6w
1.6w
1.6w
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 . .
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 3 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
EJ~
G
I I 1. )
I I
I ~rrJ
"Tew: Clean Gantt ViewMMA uas SchedulingCDL SIS, HFET Tasks selected
1999 12000 2
WBS Task Start Finish Duratior Work JJA SOND J FMAM J ASOND JF MAMJ J ASO ND J
4.1.8.2.2.5 Mask fabrication 7/16/99 7/27/99 1.6w Ow
4.1.8.2.2.6 Chip fabrication 7/28/99 8/6/99 1.6w Ow
4.1.8.2.2.7 Block fabrication 8/9/99 8/18/99 1.6w Ow
4.1.8.2.2.8 Assemble 8/19/99 8/30/99 1.6w Ow
4.1.8.2.2.9 Test 8/31/99 9/9/99 1.6w Ow
4.1.8.2.2.10 Design revisions 9/10/99 9/21/99 1.6w Ow
4.1.8.2.2.11 Fab., assemble, & test revised design 9/22/99 10/1/99 1.6w Ow
4.1.8.2.3 Balanced mixer 10/4/99 2/1/00 17.4w Q
4.1.8.2.3.1 Circuit design 10/4/99 10/13/99 1.6w Ow
4.1.8.2.3.2 Computer simulation 10/14/99 10/25/99 1.6w Ow
4.1.8.2.3.3 Chip layout 10/26/99 11/4/99 1.6w Ow
4.1.8.2.3.4 Block design 11/5/99 11/16/99 1.6w Ow
4.1.8.2.3.5 Mask fabrication 11/17/99 11/26/99 1.6w Ow
4.1.8.2.3.6 Chip fabrication 11/29/99 12/8/99 1.6w Ow
4.1.8.2.3.7 Block fabrication 12/9/99 12/20/99 1.6w Ow
4.1.8.2.3.8 Assemble 12/21/99 12/30/99 1.6w Ow
4.1.8.2.3.9 170-245 balanced mixer tests 12/30/99 12/30/99 Ow Ow
4.1.8.2.3.10 Design revisions 12/31/99 1/13/00 2w Ow
4.1.8.2.3.11 Fab., assemble, & test revised design 1/14/00 2/1/00 2.6w Ow
4.1.8.2.4 Sideband separating, balanced mixer 2/2/00 6/1/00 17.4w QyW
4.1.8.2.4.1 Circuit design 2/2/00 2/8/00 1w Ow
4.1.8.2.4.2 Computer simulation 2/9/00 2/15/00 1w Ow
4.1.8.2.4.3 Chip layout 2/16/00 2/22/00 1w Ow
4.1.8.2.4.4 Block design 2/23/00 2/29/00 1w Ow
4.1.8.2.4.5 Mask fabrication 3/1/00 3/7/00 1w Ow
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 " o ie
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 4 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
d C
w
MMA Task SchedulingCDL SIS, HFET Tasks selected
'w: Clean Gantt View
1 | 1 999 2000 2WBS Task Start Finish Duratior Work JIJIAISOINID J F MIAIMIJI J A SlOIND J FMAM J J A SOND J4.1.8.2.4.6
4.1.8.2.4.7
4.1.8.2.4.8
4.1.8.2.4.9
4.1.8.2.4.10
4.1.8.2.4.11
4.1.8.2.10
4.1.8.3
4.1.8.3.1
4.1.8.3.1.1
4.1.8.3.1.2
4.1.8.3.1.3
4.1.8.3.1.4
4.1.8.3.1.5
4.1.8.3.1.6
4.1.8.3.1.7
4.1.8.3.1.8
4.1.8.3.1.9
4.1.8.3.1.10
4.1.8.3.1.11
4.1.8.3.2
4.1.8.3.2.1
4.1.8.3.2.2
4.1.8.3.2.3
4.1.8.3.2.4
Chip fabrication
Block fabrication
Assemble
170-245 bal., sideband-sep. mixer tests
Design revisions
Fab., assemble, & test revised design
Deliver prototype 170-245 GHz
602-720 GHz
Elemental mixer
Circuit design
Computer simulation
Chip layout
Block design
Mask fabrication
Chip fabrication
Block fabrication
Assemble
Start 602-720 building block mixer tests
Design revisions
Fab., assemble, & test revised design
Sideband separating mixer
Circuit design
Computer simulation
Chip layout
Block design
3/8/00
3/15/00
3/22/00
5/1/00
5/2/00
5/19/00
6/1/00
6/2/00
6/2/00
6/2/00
6/8/00
6/14/00
6/20/00
6/26/00
6/30/00
7/6/00
7/12/00
7/18/00
7/19/00
7/26/00
8/2/00
8/2/00
8/9/00
8/15/oo00
8/21/00
3/14/00
3/21/00
3/28/00
5/1/00
5/18/00
6/1/00
6/1/00
8/31/01
8/1/00
6/7/00
6/13/00
6/19/00
6/23/00
6/29/00
7/5/00
7/11/00
7/18/00
7/18/00
7/25/00
8/1/00
9/29/00
8/8/00
8/14/00
8/18/00
8/24/00
1w
1w
1w
Od
2.6w
2w
Od
65.2w
8.6w
0.8w
0.8w
0.8w
0.8w
0.8w
0.8w
0.8w
1w
Od
1w
1w
8.6w
1w
0.8w
0.8w
0.8w
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98.. . . . . . ..
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 5 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
---- , ------ . . . . . . . . . . . . . . . . . . . . . . .
Z
0*
8
MEN"
d
ew: Clean Gantt ViewMMA Task SchedulingCDL SIS, HFET Tasks selected
II I 1999 2000 2WBS Task Start Finish Duratior Work J J ASONDJ FMAM J J A S O N D J FMAMJ J ASONDJ4.1.8.3.2.5 Mask fabrication 8/25/00 8/30/00 0.8w Ow
4.1.8.3.2.6 Chip fabrication 8/31/00 9/5/00 0.8w Ow
4.1.8.3.2.7 Block fabrication 9/6/00 9/11/00 0.8w Ow
4.1.8.3.2.8 Assemble 9/12/00 9/15/00 0.8w Ow
4.1.8.3.2.9 Start 602-720 Balanced Mixer tests 9/15/00 9/15/00 Od Ow
4.1.8.3.2.10 Design revisions 9/18/00 9/22/00 1w Ow
4.1.8.3.2.11 Fab., assemble, & test revised design 9/25/00 9/29/00 1w Ow
4.1.8.3.3 Balanced mixer 10/2/00 12/1/00 9w Qw
4.1.8.3.3.1 Circuit design 10/2/00 10/5/00 0.8w Ow
4.1.8.3.3.2 Computer simulation 10/6/00 10/11/00 0.8w Ow
4.1.8.3.3.3 Chip layout 10/12/00 10/17/00 0.8w Ow
4.1.8.3.3.4 Block design 10/18/00 10/23/00 0.8w Ow
4.1.8.3.3.5 Mask fabrication 10/24/00 10/27/00 0.8w Ow
4.1.8.3.3.6 Chip fabrication 10/30/00 11/2/00 0.8w Ow
4.1.8.3.3.7 Block fabrication 11/3/00 11/8/00 0.8w Ow
4.1.8.3.3.8 Assemble 11/9/00 11/14/00 0.8w Ow
4.1.8.3.3.9 Test 11/15/00 11/20/00O 0.8w Ow
4.1.8.3.3.10 Design revisions 11/21/00 11/24/00 0.8w Ow
4.1.8.3.3.11 Fab., assemble, & test revised design 11/27/00 12/1/00 1w Ow
4.1.8.3.4 Sideband separating, balanced mixer 12/4/00 4/26/01 20.8w QW
4.1.8.3.4.1 Circuit design 12/4/00 12/8/00 1w Ow
4.1.8.3.4.2 Computer simulation 12/11/00 12/15/00 1w Ow
4.1.8.3.4.3 Chip layout 12/18/00 12/22/00 1w Ow
4.1.8.3.4.4 Block design 12/25/00 12/29/00 1w Ow
4.1.8.3.4.5 Mask fabrication 1/1/01 1/5/01 1w Ow
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 Rolled
Progress Rolled Up Task I Rolled Up Progress
Selected tasks in current WBS Page 6 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
MMA Task Scheduling ew: Clean Gantt View
CDL SIS, HFET Tasks selected
1 1999 2000 2WBS Task Start Finish Duratior Work J J A SONDJ FMAM J J ASOND J FMAM J J ASONDJ4.1.8.3.4.6
4.1.8.3.4.7
4.1.8.3.4.8
4.1.8.3.4.9
4.1.8.3.4.10
4.1.8.3.4.11
4.1.8.3.5
4.1.9
4.1.9.1
4.1.9.2
4.1.9.3
4.1.9.4
4.1.9.5
4.1.9.6
4.1.9.7
4.1.9.8
4.1.9.10
4.1.10
4.1.10.1
4.1.10.2
4.1.10.3
4.1.10.4
4.1.10.5
4.1.10.6
4.1.10.7
Chip fabrication
Block fabrication
Assemble
Start 602-720 Bal., sideband sep. mixer tes
Design revisions
Fab., assemble, & test revised design
Deliver prototype 602-720 GHz
Automated Mixer Testing
Specifications
Conceptual design
Circuit design
Mechanical design
Order parts
Assemble
Write software
Test
Complete automated mixer testing, 2nd SIS test set
Wafer Evaluation
Specifications
Conceptual design
Circuit design
Mechanical design
Dewar layout
Order parts
Assemble
1/8/01 1/12/01
1/15/01 1/19/01
1/22/01 2/1/01
2/1/01 2/1/01
2/2/01 3/15/01
3/16/01 4/26/01
8/31/01 8/31/01
6/1/98 12/1/99
6/1/98 7/31/98
8/3/98 10/2/98
10/5/98 12/11/98
12/14/98 2/19/99
2/22/99 4/30/99
5/3/99 7/9/99
7/12/99 9/17/99
9/20/99 11/26/99
12/1/99 12/1/99
6/1/98 7/1/99
6/1/98 6/19/98
6/22/98 7/10/98
7/13/98 8/7/98
8/10/98 9/4/98
9/7/98 10/2/98
10/5/98 10/16/98
10/19/98 1/8/99
Task Milestone Rolled Up Split .External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 7 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
1w
1w
1.8w
Od
6w
6w
Od
78.6w
9w
9w
10w
10w
10w
10w
10w
10w
Od
56.8w
3w
3w
4w
4w
4w
2w
12w
w
I I
lt
WBS T,
MMA Task Scheduling w: Clean Gantt View
CDL SIS, HFET Tasks selected
ask Start Finish Duratior Work J J ASOND J F M A M J J ASONDJ F|M AM J J AS OjN DJ4.1.10.7.1 Dewar assembly 10/19/98 11/13/98 4w Ow
4.1.10.7.2 Circuit fabrication 11/16/98 12/11/98 4w Ow
4.1.10.7.3 Hardware fabrication 12/14/98 1/8/99 4w Ow
4.1.10.8 Write software 10/19/98 11/13/98 4w Ow
4.1.10.9 Test 11/16/98 1/8/99 8w Ow
4.1.10.10 Complete Wafer Evaluation circuits 7/1/99 7/1/99 Od Ow
4.1.11 Integrated IF 6/1/98 3/1/00 91.6w Ow
4.1.11.1 Specifications 6/1/98 6/1/98 ld Ow
4.1.11.2 MMIC implementation 6/2/98 5/3/99 48w Ow
4.1.11.2.1 Circuit design 6/2/98 6/29/98 4w Ow
4.1.11.2.2 Mechanical design 6/30/98 7/27/98 4w Ow
4.1.11.2.3 Chip design 7/28/98 8/24/98 4w Ow
4.1.11.2.4 Chip fabrication 8/25/98 10/5/98 6w Ow
4.1.11.2.5 Test block fabrication 10/6/98 11/16/98 6w Ow [
4.1.11.2.6 Assemble 11/17/98 12/14/98 4w Ow
4.1.11.2.10 First MMIC IF Amplifier Tests 2/1/99 2/1/99 Od Ow
4.1.11.2.11 Test 2/2/99 2/22/99 3w Ow
4.1.11.2.12 Revise design 2/23/99 3/22/99 4w Ow
4.1.11.2.13 Fab., assemble, & test revised design 3/23/99 5/3/99 6w Ow
4.1.11.2.11 Complete integrated MMIC IF development 5/3/99 5/3/99 Od Ow
4.1.11.3 Discrete device implementation 5/4/99 9/1/99 17.4w Ow
4.1.11.3.1 Circuit design 5/4/99 5/24/99 3w Ow
4.1.11.3.2 Mechanical design 5/25/99 6/7/99 2w Ow
4.1.11.3.3 Assemble 6/8/99 6/28/99 3w Ow
4.1.11.3.4 Test 6/29/99 7/19/99 3w Ow
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98.. . . . . . .. "rProgress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 8 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
_ p pMMA Task Scheduling
CDL SIS, HFET Tasks selected
ew: Clean Gantt View
1999 2000 2WBS Task Start Finish Duratior Work J J AS ON DJ FMAMJ J ASOND J FM A M J J AS O N D J4.1.11.3.5
4.1.11.3.6
4.1.11.4
4.1.11.4.1
4.1.11.4.2
4.1.11.4.3
4.1.11.4.4
4.1.12
4.1.12.1
4.1.12.2
4.1.12.3
4.1.12.4
4.1.12.5
4.1.12.6
4.1.12.7
4.1.12.10
4.1.13
4.1.13.1
4.1.13.2
4.1.13.3
4.1.13.4
4.1.13.5
4.1.13.6
4.1.13.7
4.1.13.8
Revise design
Fab., assemble, & test revised design
Select MMIC/discrete device for production
Evaluate performance and cost
Make selection
Document features for system design
Complete MMIC Development
Vacuum Windows
Specifications
Microwave design
Mechanical design
Order parts
Assemble
Test
Document features for Dewar design
Complete Vacuum Window Development
Fourier Transform Spectrometer
Specifications
Conceptual design
Circuit design
Mechanical design
Order parts
Assemble
Write software
Test
7/20/99
8/10/99
9/2/99
9/2/99
9/30/99
10/7/99
3/1/00
6/1/98
6/1/98
7/6/98
8/10/98
9/14/98
10/19/98
11/23/98
12/28/98
2/1/99
6/1/98
6/1/98
8/3/98
10/5/98
12/14/98
2/22/99
5/3/99
7/12/99
9/20/99
8/9/99
9/1/99
3/1/00
9/29/99
10/6/99
11/3/99
3/1/00
2/1/99
7/3/98
8/7/98
9/11/98
10/16/98
11/20/98
12/25/98
1/29/99
2/1/99
12/1/99
7/31/98
10/2/98
12/11/98
2/19/99
4/30/99
7/9/99
9/17/99
11/26/99
3w
3.4w
26w
4w
1w
4w
Ow
35.2w
5w
5w
5w
5w
5w
5w
5w
Od
78.6w
9w
9w
10w
10w
10w
10w
10w
10w
Task Milestone Rolled Up Split External Tasks
Project:0MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 . . . . . . . . "
Progress Rolled Up Task 1 Rolled Up Progress
Selected tasks in current WBS Page 9 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
S3/1
f I
wMMA Task Scheduling
CDL SIS, HFET Tasks selected
WBS Task4.1.13.10
4.1.14
4.1.14.1
4.1.14.2
4.1.14.3
4.1.14.4
4.1.14.5
4.1.14.6
4.1.15
4.1.16
4.1.17
4.1.18
4.1.18.1
4.1.18.2
4.1.18.3
4.1.18.4
4.1.18.5
4.1.19
4.1.19.1
4.1.19.2
4.1.19.3
4.1.20
4.2
4.2.1
4.2.2
Complete Fourier Transform Spectrometer
Noise Test Plate
Specifications
Circuit design
Mechanical design
Order parts
Assemble
Test
Lab Equipment
Lab Supplies
Lab Software
Production for Antenna Test Receiver
Decide configuration for antenna test receiver
Fab, assemble, test Test Ant mixer: 230GHz ban,
Deliver Test Ant mixer: 230 GHz band
Fab, assemble, test Test Ant mixer: 86GHz band
Deliver Test Ant mixer: 86 GHz band
Production for Test Interferometer
Decide configuration for prototype receiver
Fab., assemble, & test 170-245 GHz mixers
Fab., assemble, & test 86-115 GHz mixers
Continued Support
HFET Amplifiers
Specifications
Circuit design
Task Milestone Rolled Up Split External Tasks
Project: MMA Project Split Summary Rolled Up Milestone Project SummaryDate: 10/13/98 Rolled.....Progress Rolled Up Task I Rolled Up Progress
Selected tasks in current WBS Page 10 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98
TCvw: Clean Gantt View
12/1/99
6/1/98
6/1/98
8/3/98
10/5/98
12/7/98
2/8/99
4/7/99
6/1/98
6/1/98
6/1/98
2/9/99
2/9/99
3/2/99
6/30/99
3/2/99
6/30/99
2/2/99
2/2/99
3/2/99
3/2/99
6/1/98
1/4/99
1/4/99
2/1/99
12/1/99
6/1/99
7/31/98
10/2/98
12/4/98
2/5/99
4/2/99
6/1/99
12/31/99
1/1/01
1/1/01
6/30/99
3/1/99
6/21/99
6/30/99
6/21/99
6/30/99
6/21/99
3/1/99
6/21/99
6/21/99
1/1/01
1/31/00
2/1/99
3/1/99
Od
52.4w
9w
9w
9w
9w
8w
8w
83w
135.2w
135.2w
20.4w
3w
16w
Od
16w
Od
20w
4w
16w
16w
135.2w
56.06w
4w
4w
_ pw
MMA Task SchedulingCDL SIS, HFET Tasks selected
w: Clean Gantt View
1999 2000 2WBS Task Start Finish Duratior Work J J A SjO NDJ FMAM J J |ASONDJ FMA MIJ J AS O|N|D J4.2.3 Mechanical design 3/1/99 4/1/99 4.66w Ow
4.2.4 Order parts 4/2/99 5/3/99 4.4w Ow
4.2.5 Assemble 5/4/99 6/1/99 4.2w Ow
4.2.6 Test 6/2/99 6/30/99 4.2w Ow
4.2.7 Deliver Test Ant Amplifier: 30 GHz Band 6/30/99 6/30/99 Od Ow
4.2.8 Deliver Prototype Amplifier: 30 GHz Band 1/31/00 1/31/00 Od Ow
Task Milestone Rolled Up Split External Tasks
Project:0MMA Project Split Summary Rolled Up Milestone O Project SummaryDate: 10/13/98 Rolled..... V"
Progress Rolled Up Task Rolled Up Progress
Selected tasks in current WBS Page 11 of 11 File: ProjPlan981005.mppMilestones in bold, Summary tasks in underline type Printed: 11:17 AM 10/13/98