05 cdm specialist training rev01
DESCRIPTION
CDM Training MaterialTRANSCRIPT
-
Martin Schmidt
Slide 1
07/04/2010
CDM Specialist TrainingPart 05 - Summary
-
CDM Specialist Training
Martin Schmidt
Slide 2
07/04/2010
Similar Requirements Well Known in Endress+Hauser
Module Integration Test :
(Software Integration Test) :
(Software Modulation Test) :
Project :Acceptance :
Form :
SAT :
OQ Documents for Memo-Graph S :
IQ Test plan :
Signature List :
: Software Architecture
: Software Module Specification
: User Manual
: Hardware & System : Software Specification
PQPerformance
Qualification
OQOperational
Qualification
DQ ModuleIntegration
Test
IQInstallation
Qualification
Implementation
DSSW Design
Specification
FSFunctional
Specification
DSSystem
Specification
URSUser Requirement
Specification
Documents for Memo-Graph S :
AdditionalDocumentation
Module Integration Test :
(Software Integration Test) :
(Software Modulation Test) :
Project :Acceptance :
Form :
SAT :
OQ Documents for Memo-Graph S :
IQ Test plan :
Signature List :
: Software Architecture
: Software Module Specification
: User Manual
: Hardware & System : Software Specification
PQPerformance
Qualification
OQOperational
Qualification
DQ ModuleIntegration
Test
IQInstallation
Qualification
Implementation
DSSW Design
Specification
FSFunctional
Specification
DSSystem
Specification
URSUser Requirement
Specification
Documents for Memo-Graph S :
AdditionalDocumentation
-
CDM Specialist Training
Martin Schmidt
Slide 3
07/04/2010
Position of Endress+Hauser: Fulfiller
Owner / Investor / OperatorOwner / Investor / Operator
CDM ConsultantCDM Consultant Biogas EPCBiogas EPC
AuthoritiesAuthorities
AutomationAutomation
Ensure CDM compliant automation solutions and calculate CERs.
Process Design and Performance with PI&D according CDM rules.
PI and PDDPI and PDDCDMCDMTeamTeamWorkWork
-
CDM Specialist Training
Martin Schmidt
Slide 4
07/04/2010
Biogas Composition
500 mg/m10 .. 30.000 mg/mHydrogen sulfide
0,7 mg/m0,01 .. 2,5 mg/mAmmonia
-
CDM Specialist Training
Martin Schmidt
Slide 5
07/04/2010
Tele Alarm Functionality
Acknowledgment of alarms
Alarms
4 20 mA Relays 1-12
Set relays
MemographMemograph M : Tele Alarm provides fast M : Tele Alarm provides fast information to plant operator and service information to plant operator and service for fastest possible reaction.for fastest possible reaction.
CDM requires reliability, sustainability and CDM requires reliability, sustainability and availability. Malfunction need to be availability. Malfunction need to be informed and optimized as fast as possible.informed and optimized as fast as possible.
-
CDM Specialist Training
Martin Schmidt
Slide 6
07/04/2010
Memograph M Mathematic Module simplified
Mathematic & Mathematic & Integration Integration FunctionFunction
DIN
/ISO 5167
RMC621 calculation of compensated dp FlowAccording Standard DIN/ISO 5167 !
MemographMemograph M calculate and M calculate and documented the Methane documented the Methane Flow in kg/h and integrate the Flow in kg/h and integrate the flow over time for the total flow over time for the total amount in kg or t.amount in kg or t.
In addition (customization),In addition (customization),MemographMemograph M can deliver M can deliver signals to control the gas signals to control the gas engine, to calculate for other engine, to calculate for other biogas measuring points (e.g. biogas measuring points (e.g. flare gas flow) or the control flare gas flow) or the control system at all.system at all.
Norm Volume Flow
> Norm Volume/Mass> Norm Volume/Mass> Humidity> Humidity> Gas Composition> Gas Composition
> > dpdp> p> p> T> T
-
CDM Specialist Training
Martin Schmidt
Slide 7
07/04/2010
Gas Flow Comparison
Vortex: Prowirl 72F dp: Deltatop Series
15D5D (b 0.1) . . 22D (b 0.75)
15DStraight Length
Bad (Good for Dry Gas)
GoodGoodWet Gas accuracy
LowLowHigh (Need Min Flow)
Flowrate
2% (Mass)1% (Volume)1% (Volume)Accuracy
Thermal MassFlow
99 DIN/ISO !DIN/ISO !99 recalibrationrecalibration99 T, p compensationT, p compensation
99 application engineeringapplication engineering99 Service 2Service 2ndnd devicedevice99 NO compensationNO compensation
99 Service 2Service 2ndnd devicedevice99 complex traceabilitycomplex traceability99 T, p compensationT, p compensation
-
CDM Specialist Training
Martin Schmidt
Slide 8
07/04/2010
Tips & Traps
-
CDM Specialist Training
Martin Schmidt
Slide 9
07/04/2010
Tips & Traps
-
CDM Specialist Training
Martin Schmidt
Slide 10
07/04/2010
Tips & Traps Low Flow/Max Flow
-
CDM Specialist Training
Martin Schmidt
Slide 11
07/04/2010
Benefits and Added Value Examples
SAFETY
QUALITY
PROFIT
Competence in Validation, Qualification, Traceable (Re-)Calibration and complete automated solutions will benefit in suitable documentation as well as fast and professional customization of the CDM Solutions.
-
CDM Specialist Training
Martin Schmidt
Slide 12
07/04/2010
Benefits and Added Value Examples
SAFETY
QUALITY
PROFIT
CDM Rules and Conservative Way ofCertified Emission Reduction !
The balance of the calculated and measured emission reduction takes any probable loss and error into account.
In a conservative way, all possible errors are deducted from the measured and calculated value of Methane and CO2e .
Therefore, accuracy of instrumentation, equipment and error calculation plays a major role for the profit !
+x
-x
+y
-y
Delta CO2e !
The selection of the Design, the Equipment and the Procedures according Good Practices and described in
the PDD, will have a Major Impact on the CDM Result !
-
CDM Specialist Training
Martin Schmidt
Slide 13
07/04/2010
Benefits and Added Value Examples
CDM Rules and Conservative Way ofCertified Emission Reduction !
+x
-x
+y
-y
Delta CO2e !
Customer Project Description:
% each error counts
-
Martin Schmidt
Slide 14
07/04/2010
CDM Automation the Key to Success
-
CDM Specialist Training
Martin Schmidt
Slide 15
07/04/2010
What are the drivers for CDM investors?
On the example of a PDD:
Fossil fuel replacement with Methane capture from anaerobic digestion of bio waste.
The solution has to be:
As efficient as possible
Easy and fast to implement
Lowest risk in CDM validation process
Fastest return of investment
Traceability
Durable to ensure the Verification after years of operation
-
CDM Specialist Training
Martin Schmidt
Slide 16
07/04/2010
The proven way
Of course, there are many other ways between how to build a Biogas plant, but there are not much flexibility in the way of engineer a CDM projects.
Our competence and our solutions will help to implement the CDM Biogas projects much faster and doubtless proven.
How a system integrationshould not look like!
-
CDM Specialist Training
Martin Schmidt
Slide 17
07/04/2010
There are different ways to build a Biogas plant
The simple way without any technology
-
CDM Specialist Training
Martin Schmidt
Slide 18
07/04/2010Patent pending
Fast ROI
Easy
Safety
Services
Thank You
Any Question ?
CDM AutomationCDM AutomationSpecialist SeminarSpecialist Seminar
Martin Schmidt,Martin Schmidt,Diploma Physicist (Master)Diploma Physicist (Master)Industry Manager Renewable EnergyIndustry Manager Renewable EnergyEE--Mail: Mail: [email protected]@my.endress.comPhone: +60 17 200 7184Phone: +60 17 200 7184